GILA-GILA VALLEY 34.5-KV

TRANSMISSION LINE LATERALS

Spec. No. 904

SECTION C

DESCRIPTION/SPECIFICATIONS

ARIZONA

SECTION C

DESCRIPTION/SPECIFICATIONS

GILA-GILA VALLEY 34.5-KV TRANSMISSION LINE LATERALS

DIVISION 1 – GENERAL REQUIREMENTS

A. CONTRACT REQUIREMENT

B. DESCRIPTION OF WORK

C. DESCRIPTION OF BIDDING SCHEDULE ITEM

1. Bidding Schedule item “Mobilization and preparatory work”

D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

1. Commencement, Prosecution, and Completion of the Work

2. Submittal Approval Time

3. Outage Restrictions

4. Construction Schedule Restrictions

5. Maximum Available Fault Current

E. CONSTRUCTION SCHEDULE

1. Submittal Time

2. Format and Detail

3. Two Week Look-Ahead Schedule

F. MATERIAL

1. Points-of-Delivery

G. RIGHTS-OF-WAY

1. General

2. Access Easements

3. Work on the Right-of-Way

H. GEOLOGIC INVESTIGATIONS

I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES

J. WATER FOR CONSTRUCTION PURPOSES

K. SAFETY PROFESSIONAL

1. Safety Professional

2. Contractor’s Safety and Health Program

L. EXPLOSIVES AND BLASTING

M. SUBMITTALS

1. General

2. Approval Time

3. Transmittal

DIVISION 2 – SITEWORK

A. GENERAL

B. DESCRIPTION OF BIDDING SCHEDULE ITEM

1. Bidding Schedule item “Removing existing 34.5-kV/480-V transmission line”

2. Bidding Schedule item “Fence grounds”

3. Bidding Schedule does not contain separate items

DIVISION 7 – WOOD POLE STRUCTURES

A. DESCRIPTION OF BID ITEMS

1. Bidding Schedule items for wood pole structures

DIVISION 10 – TRANSMISSION LINE ELECTRICAL

A. DESCRIPTION OF BID ITEMS

1. Bidding Schedule items for “Furnish and install 69-kV steel single-string T11-B tension insulator assemblies (20,000 lbs), complete with compression dead end, suitable for 477 kcmil, ACSR, 26/7, “Hawk” conductor,” “Furnish and install 34.5-kV insulator assemblies, complete with compression dead end, suitable for 477 kcmil, ACSR, 26/7, “Hawk” conductor,” “Furnish and install 34.5-kV insulator assemblies, complete with suspension clamp or compression dead end, suitable for 266.8 kcmil, AAC, 7-strand, “Daisy” conductor,” “Furnish and install 34.5-kV insulator assemblies, complete with suspension clamp or compression dead end, suitable for 4/0, ACSR, 6/1, “Penguin” conductor,” “Furnish and install 34.5-kV insulator assemblies, complete with suspension clamp or compression dead end, suitable for 1/0, ACSR, 6/1, “Raven” conductor,” “Furnish and install 34.5-kV insulator assemblies, complete with compression dead end, suitable for #2, ACSR, 6/1, “Sparrow” conductor,” “Furnish and install 34.5-kV insulator assemblies, complete with suspension clamp or compression dead end, suitable for #4, ACSR, 6/1, “Swan” conductor,” and “Furnish and install 34.5-kV insulator assemblies, complete with suspension clamp or compression dead end, suitable for 3-strand #6 alumoweld conductor”

2. Bidding Schedule items for “Furnish and install overhead ground wire assemblies, complete with suspension clamp or compression dead end, suitable for 3/8-inch, high-strength (HS), 7-strand steel overhead ground wire”

3. Bidding Schedule items for “Furnish and install three (3) 477 kcmil, ACSR, 26/7, “Hawk” conductors,” “Furnish and install three (3) 4/0, ACSR, 6/1, “Penguin” conductors,” “Furnish and install three (3) 1/0, ACSR, 6/1, “Raven” conductors,” “Furnish and install three (3) 3-strand #6 alumoweld conductors,” “Reinstall three (3) existing 266.8 kcmil, AAC, 7-strand, “Daisy” conductors,” “Reinstall three (3) existing 4/0, ACSR, 6/1, “Penguin” conductors,” “Reinstall three (3) existing 1/0, ACSR, 6/1, “Raven” conductors,” “Reinstall three (3) existing #2, ACSR, 6/1, “Sparrow” conductors,” “Reinstall three (3) existing #4, ACSR, 6/1, “Swan” conductors,” and “Reinstall three (3) existing 3-strand #6 Alumoweld conductors”

4. Bidding Schedule item for “Furnish and install one (1) 3/8-inch, high-strength (HS), 7-strand steel overhead ground wire”

5. Bidding Schedule items for “Furnish and install Stockbridge-type vibration dampers for 477 kcmil, ACSR, 26/7, “Hawk” conductors,” “Furnish and install Stockbridge-type vibration dampers for 266.8 kcmil, AAC, 7-strand, “Daisy” conductors,” “Furnish and install Stockbridge-type vibration dampers for 4/0, ACSR, 6/1, “Penguin” conductors,” “Furnish and install Stockbridge-type vibration dampers for 1/0, ACSR, 6/1, “Raven” conductors,” Furnish and install Stockbridge-type vibration dampers for #2, ACSR, 6/1, “Sparrow” conductors,” “Furnish and install Stockbridge-type vibration dampers for #4, ACSR, 6/1, “Swan” conductors,” “Furnish and install Stockbridge-type vibration dampers for 3-strand #6 alumoweld conductors,” and “Furnish and install spiral-type vibration dampers for 3/8-inch, high-strength (HS), 7-strand steel overhead ground wire”

6. Bidding Schedule items for “Furnish and install conductor hold-down weights”

7. Bidding Schedule item for “Furnish and install fused cutouts”

8. Bidding Schedule items for “Furnish and install fuses”

9. Bidding Schedule item for “Furnish and install surge arresters”

10. Bidding Schedule items for “Install Government-furnished 75 kVA 34.5/480-V transformers” and “Reinstall existing 34.5-kV/480-V transformers”

11. Bidding Schedule item for “Furnish and install #2 AWG, 7-strand bare copper conductor”

12. Bidding Schedule item for “Furnish and install avian protection devices”

13. Bidding Schedule item for “Transformer Phasing”

DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION

A. CONTRACTOR-FURNISHED DATA

1. Bidding Schedule does not contain separate items

B. SPECIAL CONSIDERATIONS

1. Air Pollution – Dust

2. Biological Resources

3. Cultural Resources

4. Water Pollution – Permits

5. Identification of New Work Areas – Environmental Reviews

APPENDIX A – CM-16 TRANSMITTAL FORM

APPENDIX B – LAYDOWN YARD

DIVISION 1 – GENERAL REQUIREMENTS

A. CONTRACT REQUIREMENT:

Construct and complete the Gila-Gila Valley 34.5 kV Transmission Line Laterals, in accordance with the Construction Contract (Standard Form 1442); the Contract Clauses; Western’s Construction Standards, including Standard 1 – General Requirements (September 2016), Standard 2 – Sitework (September 2016), Standard 7 – Wood Poles (September 2016), Standard 10 – Transmission Line

– Electrical (September 2016), Standard 13 – Environmental Quality Protection (September 2016), Standard 15 – Drawings (September 2016); Standard Drawings; and these Project Specifications and Drawings.

If a conflict occurs between the Project Specifications and the Construction Standards, the Project Specifications shall govern. The Project Specifications and the Drawings are used to take exceptions or provide additions to the Construction Standards. Some paragraphs in the Construction Standards will not apply to this job.

Western’s Construction Standards, Standard Drawings, and Electrical Equipment Standards are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx.

Western Project Specifications and Construction Standards are explained in Standard 1 – General Requirements, Section 1.1.1, “Standards and Project Specifications”.

B. DESCRIPTION OF WORK:

The principal components of work include removing and replacing a total of 3.7 miles of 34.5-kV transmission line on six different alignments including associated electrical equipment.

Paragraphs “Description of Bidding Schedule Items” in Divisions – 1, 2, 7, 10, and 13 describe the work to be performed.

The work is located in Yuma County, Arizona, as shown on Drawing GLA 0015.

C. DESCRIPTION OF BIDDING SCHEDULE ITEM:

1. Bidding Schedule item “Mobilization and preparatory work” includes the following:

a. Performing mobilization and preparatory work in accordance with Section M of the contract clauses.

b. Prepare and submit a Construction Schedule and furnish a Safety and Health Program.

D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:

1. COMMENCEMENT, PROSECUTION, AND COMPLETION OF THE WORK: See FAR 52.211-10 in Section F of the solicitation/contract.

2. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, Western will require 30-calendar days for review of drawings or data submitted for approval.

3. OUTAGE RESTRICTIONS: In addition to the restrictions listed in Construction Standard 1, the following outage restrictions shall apply:

General:

1. Coordination of outages and HLO’s on the APS Lines shall be the responsibility of the Contractor. These outages/HLO’s shall be minimized and correlated with the associated outages on Western’s GLA-GIV 34.5-kV line (Alignment A) described below.

2. All outage requests shall be submitted and work shall be performed in accordance with the requirements of Western’s Construction Standard 1.

Outages for Alignment A Work:

1. An outage on the GLA-GIV 34.5-kV line (Alignment A) will be allowed to perform the required work between structure 3/6 of Western’s Alignment A, and APS’s structure 10/3 as well as the disconnection of Alignment E from the GLA-GIV 34.5-kV line. This outage shall not exceed 2 calendar days and shall be concurrent with the first two days of the outage on Alignment E.

Outages for Alignment E Work:

1. The outage on Alignment E shall not exceed 21 calendar days.

2. An outage on the GLA-GIV 34.5-kV line (Alignment A) will be allowed to reconnect

Alignment E to GLA-GIV 34.5-kV line. This outage shall not exceed 2 calendar days.

Outages for Alignment C Work:

1. The outage on Alignment C shall not exceed 24 calendar days.

2. An outage on the GLA-GIV 34.5-kV line (Alignment A) will be allowed to disconnect Alignment C from the GLA-GIV 34.5-kV line. This outage shall not exceed 2 calendar days. This outage shall be concurrent with item 2, of Alignment E work above.

3. An outage on the GLA-GIV 34.5-kV line (Alignment A) will be allowed to reconnect

Alignment C to the GLA-GIV 34.5-kV line. This outage shall not exceed 2 calendar days.

Outages for Alignment H Work:

1. The outage on Alignment H shall not exceed 24 calendar days.

2. An outage on the GLA-GIV 34.5-kV line (Alignment A) will be allowed to disconnect

Alignment H from the GLA-GIV 34.5-kV line. This outage shall not exceed 2 calendar days. This outage shall be concurrent with item 3, of Alignment C work above.

3. An outage on the GLA-GIV 34.5-kV line (Alignment A) will be allowed to reconnect

Alignment H to the GLA-GIV 34.5-kV line. This outage shall not exceed 2 calendar days.

Outages for Alignment D Work:

1. The outage on Alignment D shall not exceed 21 calendar days.

2. An outage on the GLA-GIV 34.5-kV line (Alignment A) will be allowed to disconnect

Alignment D from the GLA-GIV 34.5-kV line. This outage shall not exceed 2 calendar days. This outage shall be concurrent with item 3, of Alignment H work above.

3. An outage on the GLA-GIV 34.5-kV line (Alignment A) will be allowed to reconnect

Alignment D to the GLA-GIV 34.5-kV line. This outage shall not exceed 2 calendar days.

Outages for Alignment F Work:

1. The outage on Alignment F shall not exceed 21 calendar days.

2. An outage on the GLA-GIV 34.5-kV line (Alignment A) will be allowed to disconnect

Alignment F from the GLA-GIV 34.5-kV line. This outage shall not exceed 2 calendar days. This outage shall be concurrent with item 3, of Alignment D work above.

Alignment F to the GLA-GIV 34.5-kV line. This outage shall not exceed 2 calendar

Outages for Alignment G Work:

1. The outage on Alignment G, shall not exceed 14 calendar days.

2. An outage on the GLA-GIV 34.5-kV line (Alignment A) will be allowed to disconnect

Alignment G from the GLA-GIV 34.5-kV line. This outage shall not exceed 2 calendar day. This outage shall be concurrent with item 3, of Alignment F work above.

Alignment G to the GLA-GIV 34.5-kV line. This outage shall not exceed 2 calendar

4. CONSTRUCTION SCHEDULE RESTRICTIONS: The following Construction Schedule restrictions shall apply:

General:

1. The work under this contract shall be performed in the order the alignments are described below.

2. All work performed under this contract that is in the vicinity of APS or any other utility lines shall be monitored by the contractor’s safety professional.

3. Each alignment identified below has a maximum timeframe that each set of respective pumps can be out of service. If the contractor is unable to complete the work so the pumps are operational in that time, the contractor shall furnish, install, and maintain generators so that the pumps are operational at no cost to the Government.

Alignment A

1. All GLA-GIV 34.5 kV line (Alignment A) work between structure 3/6 of Western’s GLA-

GIV 34.5 kV line, and APS’s structure 10/3 shall be completed within 2- calendar days.

Alignment E:

1. Disconnection of Alignment E from Western’s GLA-GIV 34.5 kV line shall be performed first. This shall be performed concurrently with the Alignment A work above.

2. The first work performed on Alignment E after it is disconnected from Western’s GLA-

GIV 34.5 kV line shall be the installation of structures 3/6E1 and 3/6E9 and all associated equipment (see DWG GLA-GIV 1000, Note 4). The contractor will have 3 calendar days to complete this work.

3. Once Alignment E is de-energized the contractor shall have 21 calendar days to perform all work required for the pumps to be operational. No work shall be performed on the next alignment until the Alignment E pumps are fully functional (energized by Western’s

GLA-GIV 34.5 kV line).

Alignment C:

1. The Contractor shall notify the COR a minimum of two weeks prior to beginning work on

Alignment C to allow coordination with the Bureau regarding canal operations. This will require the contractor to move Western’s generator to the site in accordance with

Division 10 of the construction specifications paragraph A.10.a.(4).

2. Disconnection of Alignment C from Western’s GLA-GIV 34.5 kV line shall be performed first. The contractor shall have 2 calendar day to perform this work.

3. The first work performed on Alignment C after it is disconnected from Western’s GLA-

GIV 34.5 kV line shall be the installation of structures 0/9C2, 0/9C11 and 0/9C14 and all associated equipment (see DWG GLA-GIV 1000, Note 3). The contractor will have

4 calendar days to complete this work.

4. Once Alignment C is de-energized, the contractor shall have 24 calendar days to perform all work required for the pumps to be operational. No work shall be performed on the next alignment until the Alignment C pumps are fully functional (energized by

Western’s GLA-GIV 34.5 kV line).

Alignment H:

1. The disconnection of Alignment H from Western’s GLA-GIV 34.5 kV line shall be performed first. The contractor shall have 2 calendar days to perform this work.

2. The first work performed on Alignment H after it is disconnected from Western’s GLA-

GIV 34.5 kV line shall be the installation of structures 5/5H1, 5/5H9, 5/5H12 and

5/5H16 and all associated equipment (see DWG GLA-GIV 1000, Note 4). The contractor will have 5 calendar days to complete this work.

3. Once Alignment H is de-energized the contractor shall have 24 calendar days to on the next alignment until the Alignment H pumps are fully functional (energized by

Western’s GLA-GIV 34.5 kV line).

Alignment D:

1. The disconnection of Alignment D from Western’s GLA-GIV 34.5 kV line shall be

2. The first work performed on Alignment D after it is disconnected from Western’s GLA-

GIV 34.5 kV line shall be the installation of structures 2/10D1, 2/10D4 and 2/10D9 and all associated equipment (see DWG GLA-GIV 1000, Note 4). The contractor will have

4 calendar days to complete this work.

3. Once Alignment D is de-energized the contractor shall have 21 calendar days to perform all work required for the pumps to be operational. No work shall be performed on the next alignment until the Alignment D pumps are fully functional (energized by

Western’s GLA-GIV 34.5 kV line).

Alignment F:

1. The disconnection of Alignment F from Western’s GLA-GIV 34.5 kV line shall be

2. The first work performed on Alignment F after it is disconnected from Western’s GLA-

GIV 34.5 kV line shall be the installation of structures 4/7F1, 4/7F9 and 4/7F10 and all associated equipment (see DWG GLA-GIV 1000, Note 4). The contractor will have 4

3. Once Alignment F is de-energized the contractor shall have 21 calendar days to on the next alignment until the Alignment F pumps are fully functional (energized by

Western’s GLA-GIV 34.5 kV line).

Alignment G:

1. The Disconnection of Alignment G from Western’s GLA-GIV 34.5 kV line shall be

2. The first work performed on Alignment G after it is disconnected from Western’s GLA-

GIV 34.5 kV line shall be the installation of structures 4/7G1, 3/10T, and 4/3T and all associated equipment (see DWG GLA-GIV 1000, Note 5). The contractor will have 4

3. Once Alignment G is de-energized the contractor shall have 14 calendar days to on the next alignment until the Alignment G pumps are fully functional (energized by Western’s GLA-GIV 34.5 kV line).

5. MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized as defined below and shall meet the requirements of Standard 1 – General Requirements, Section 1.4 “Safety and Health” and the following:

a. The maximum available fault current on the Gila-Gila Valley 34.5-kV transmission line is 6,803 amps and the X/R ratio is 23.4 prior to completing and after completing construction.

b. A minimum of one (1) 1/0 ground shall be used on the Gila-Gila Valley 34.5-kV transmission line.

E. CONSTRUCTION SCHEDULE:

1. SUBMITTAL TIME: Prepare and submit a Construction Schedule to the CO (Contracting Officer) within 15-calendar days after date of Notice to Proceed.

2. FORMAT AND DETAIL: Dates for each item of Government-furnished material shall be provided. Do not program dates earlier than the estimated delivery dates shown in the “Material” table in Division 1 paragraph F.

3. TWO WEEK LOOK-AHEAD SCHEDULE: During construction, the Contractor shall submit to the COR, on a weekly basis, a 2-week look-ahead schedule. The schedule shall indicate the actual work to be performed by the Contractor and any Sub-Contractors during the next 2-weeks.

F. MATERIAL: Furnish all material for completing the work, except material furnished by Western as listed below:

ITEM

ESTIMATED

WEIGHT

(LBS)

ESTIMATED

DELIVERY

DATE

ESTIMATED

COST

1. (3) Class 2, wood poles, 50-foot 1815 ea

NST 11-9-17

NLT 12-9-17

$594 ea

2. (4) Class 2, wood poles, 55-foot 2100 ea

NST 11-9-17

NLT 12-9-17

$664 ea

3. (4) Class 1, wood poles, 55-foot 2260 ea

NST 11-9-17

NLT 12-9-17

$803 ea

4. (6) Class 2, wood poles, 60-foot 2410 ea

NST 11-9-17

NLT 12-9-17

$732 ea

5. (1) Class 1, wood poles, 60-foot 2575 ea

NST 11-9-17

NLT 12-9-17

$1020 ea

6. (13) Class 2, wood poles, 65-foot 2735 ea

NST 11-9-17

NLT 12-9-17

$860 ea

7. (11) Class 1, wood poles, 65-foot 2920 ea

NST 11-9-17

NLT 12-9-17

$1200 ea

8. (7) Class 2, wood poles, 70-foot 3100 ea

NST 11-9-17

NLT 12-9-17

$941 ea

9. (2) Class 1, wood poles, 70-foot 3285 ea

NST 11-9-17

NLT 12-9-17

$1330 ea

10. (1) Class 2, wood poles, 75-foot 3465 ea

NST 11-9-17

NLT 12-9-17

$1112 ea

11. (5) Class 1, wood poles, 75-foot 3675 ea

NST 11-9-17

NLT 12-9-17

$1463 ea

12. (2) Class 1, wood poles, 80-foot 4095 ea

NST 11-9-17

NLT 12-9-17

$1675 ea

13. (2) Class 2, wood poles, 85-foot 4310 ea

NST 11-9-17

NLT 12-9-17

$1906 ea

14. (3) Class 1, wood poles, 85-foot 4560 ea

NST 11-9-17

NLT 12-9-17

$1437 ea

15. (12) 75 kVA 34.5-kV/480-V Transformers

1151 ea At Facility $1800 ea

NST – No sooner than.

NLT – No later than.

1. POINTS-OF-DELIVERY: Material furnished by Western will be delivered to a storage yard located at the southeast corner of 24 th street and Araby Road, Yuma, AZ 85365, as shown in

“Appendix B”. The Contractor shall load, transport, and unload the material to the jobsite. The Contractor shall inspect the equipment and report any damages to the COR.

Transformers furnished by Western are located at Western’s facility at Gila Substation, approximately 0.9-miles east of the jobsite, per Drawing GLA 0015. The Contractor shall load the transformers at Gila Substation, transport the transformers to jobsite, and unload the transformers at the jobsite. The Contractor shall inspect the transformers and report any damages to the COR.

G. RIGHTS-OF-WAY:

1. GENERAL: Transmission line right-of-way varies from 10-feet to 40-feet as noted on the plan and profile drawings, except at locations where guys and anchors require additional right-of-way. Western does not represent that the Contractor can gain access to every structure site or travel continuously along the transmission line.

Orient construction methods and equipment to utilize Government-furnished rights-of-way, or obtain additional temporary access without additional cost to Western. Any additional temporary access acquired by the Contractor shall have prior COR approval, since several areas of the transmission line have travel restricted areas. During the contract period, Western reserves the right to use Contractor-obtained access.

2. ACCESS EASEMENTS: Western has acquired access easements from existing public roads to the transmission line, and some off right-of-way access along the transmission line. This off right-of-way access route is to provide access to the transmission line structure sites not accessible by traveling the transmission line.

3. WORK ON THE RIGHT-OF-WAY:

a. General: Perform work on the rights-of-way necessary for access to or along the transmission line. Only that excavation, dozing, or blading absolutely necessary will be allowed. Excavation, dozing, and blading for ease of travel may only be performed after field review and approval by the COR. Unauthorized excavation, dozing, blading shall immediately be repaired, or Western will have the damage repaired and back charge the Contractor for all costs involved.

b. Ease of Travel and Crane Landings: Excavation, dozing, or blading done for ease of travel on any easement or for crane landings shall be restored to the original contour of the land, and shall be compacted to a dry density not less than the natural in-place dry density of the surrounding earth. The use of water may be required to obtain the required density. Topsoil shall be stockpiled and spread on cuts prior to completion of work.

H. GEOLOGIC INVESTIGATIONS:

Geologic information has not been obtained for this project, and none is known to exist. The Contractor shall determine the nature of the material to be excavated, the difficulties of making and maintaining required excavations, and doing other work affected by geology and ground water elevations at the work site.

I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:

The Contractor may furnish power for his operations by other means at no additional cost to Western. Make arrangements and provide all electric power for construction purposes. Provide necessary transmission lines, distribution circuits, transformers, and other electrical equipment for distributing the power to the places of use. At contract completion, remove temporary electrical equipment and distribution lines.

J. WATER FOR CONSTRUCTION PURPOSES:

Furnish water for construction purposes. Make arrangements for obtaining the water, and provide for conveying the water to the points of use.

K. SAFETY PROFESSIONAL:

1. SAFETY PROFESSIONAL: Prior to the start of construction the Contractor shall employ a competent Safety Professional who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous. The person shall devote their time toward accident prevention, and shall not be used to supervise or perform any other portion of the Contractor’s work under this contract. The Safety Professional shall be directed by the Contractor’s corporate headquarters, and shall not be directed by the onsite Superintendent. The person shall be qualified by possession of a recognized degree, certificate, or professional standing; or one who, by extensive knowledge, training, and experience, has successfully demonstrated the ability to solve or resolve problems relating to the subject matter, the work, or the project, and to the satisfaction to the COR. The effectiveness of the Safety Professional in executing the Contractor’s Safety and Health Program will be subject to continued review and approval by the COR.

At a minimum, the Safety Professional shall perform the following duties:

a. Prepare/review all safety related plans required by these specifications (e.g., removal, structure erection, stringing, and Safety and Health Program).

b. Participate in, and prepare/review Job hazard Analysis (JHA) on unusual or recurring work processes.

c. Visit the jobsite at least once a week (visit to be a minimum of one (1) full working day) to review actual work procedures, and equipment for conformance to the Safety and Health Program. The Safety Professional shall brief Western’s onsite Construction Control Representative prior to leaving the site.

d. Attend Preconstruction/Management Safety Awareness/Joint Policy Safety meetings.

e. At least once each week, the Safety Professional shall prepare and submit, in writing, to the COR, a detailed safety inspection and status report based on site visits, which shall include a list of noted deficiencies, their abatement dates, and follow-up action for all jobsite activities.

2. CONTRACTOR’S SAFETY AND HEALTH PROGRAM: Shall include designation of the Safety

Professional with resume of qualifications, experience, and training as related to this subject.

L. EXPLOSIVES AND BLASTING:

Explosives shall not be used.

M. SUBMITTALS:

1. GENERAL: The Contractor shall furnish submittals via email as specified in the Construction Standards and Project Specifications. The Contractor shall furnish submittals electronically (i.e.

e-mail), unless otherwise specified by the COR. Submittals shall be sent to DSW-G5600-CS@wapa.gov in standard PDF or electronic CAD “*.dwg” (AutoCAD 2010) formats. All submittals shall include WAPA’s Contract No., Project Title, Transmittal/Submittal No., and corresponding Item No. Refer to the Submittal Log for the list of required submittals.

This list may not be all-inclusive, and it remains the Contractor’s responsibility to ensure conformance to the individual Specifications for possible additional submittal requirements. All submittals must be submitted with the attached cover sheet “CM-16 Transmittal Form Appendix A” in Microsoft Excel or PDF. Submittals will be rejected if CM-16 Form is not attached. In addition to the submittals required in the attached Submittal Log, the Contractor shall submit the following to DSM-G5600-CS@wapa.gov:

a. Payrolls

b. Sub-Contractor List/Forms

c. Citizenship Forms

d. Environmental Submittals

e. Request for Information (RFI)

f. Request for Equitable Adjustment (REA)

g. Any question related to the project.

A submittal is required if the item is used in performance of this contract.

2. APPROVAL TIME: Approval time for submittal shall be in accordance with the “Commencement, Prosecution, and Completion of Work” paragraph.

3. TRANSMITTAL: The Contractor shall forward specified non-electronic submittals to the following address:

Western Area Power Administration

ATTN: G5600

P.O. Box 6457

Phoenix, AZ 85005-5313

DIVISION 2 – SITEWORK

A. GENERAL:

Approximately 1.0 miles of the transmission line will be in cultivated fields, requiring disposal of excess excavated material. Three structures on alignment D, 2/10D5, 2/10D6 and 2/10D7, are located in areas with mature landscaping. Landscaping at these locations shall be restored to their original state.

B. DESCRIPTION OF BIDDING SCHEDULE ITEM:

1. Bidding Schedule item “Removing existing 34.5-kV/480-V transmission line” includes the following:

a. Removing electrical items and wood pole structures on the existing Gila-Gila Valley

34.5-kV transmission line alignments C, D, E, F, G, and H. Items removed from the existing line shall become the property of the Contractor, shall be removed promptly from the right-of-way, and may not be reused in constructing the new line, except as described in sub-paragraphs “d,” “f,” and “g” below.

b. Approximate quantities are listed in Tables 2-1 and 2-2. The Contractor shall determine the actual quantities to be removed and, regardless of the quantities removed, payment will only be made for the lump sum price bid in the Bidding Schedule.

c. Remove the conductors, complete with accessories, listed in Table 2-1 located on existing transmission line alignments C, D, E ,F, G, and H as shown on the plan Drawings GLA- GIV t100 to GLA-GIV t107. Contractor shall field verify size, type, and stranding of conductors on each of the transmission line alignments C, D, E, F, G, and H. Contractor shall order necessary die sizes upon verification of size, type, and stranding of conductors.

TABLE 2-1 – ELECTRICAL ITEMS TO BE REMOVED

MATERIAL UNIT QUANTITY

Three (Alignment A) Conductors MI 0.01

Three (Alignment C) Conductors MI 0.86

Three (Alignment D) Conductors MI 0.48

Three (Alignment E Upper) Conductors MI 0.23

Three (Alignment E Lower) Conductors MI 0.46

Three (Alignment F) Conductors MI 0.51

Three (Alignment G) Conductors MI 0.24

Three (Pump 10) Conductors MI 0.04

Three (Pump 13) Conductors MI 0.01

Three (Alignment H) Conductors MI 1.05

Horizontal Post Insulator Assemblies EA 17

Pin-Type and Vertical Post Insulator Assemblies EA 188

Suspension Insulator Assemblies EA 3

Tension Insulator Assemblies EA 102

APS Composite Tension Insulator Assemblies EA 15

MATERIAL UNIT QUANTITY

Surge Arresters EA 30

Fused Cutouts EA 30

Transformers EA 28

d. Remove the wood pole structures; complete with crossarms, guys, and anchors, listed in

Table 2-2 located on existing transmission line alignments C, D, E, F, G, and H as shown on plan Drawings GLA-GIV t100 through GLA-GIV t107. The only exception is that guy anchors shall be left in place and reused at structure 2/10D1.

e. For each of the transmission line alignments C, D, E, F, G, and H, remove the wood pole structure(s) containing transformers prior to performing any other work on the alignments.

TABLE 2-2 – WOOD POLE STRUCTURES TO BE REMOVED

WOOD POLE STRUCTURE TYPE QUANTITY

Single-Pole Single-Circuit Suspension Wood Structures 45

Single-Pole Single-Circuit Tension Wood Structures 9

Single-Pole Single-Circuit Guyed Tension Wood Structures 11

Single-Pole Double-Circuit Suspension Wood Structures 3

Single-Pole Double-Circuit Guyed Tension Wood Structures 2

f. Remove surge arresters, fused cutouts, 34.5-kV/480 V transformers, and hardware from the existing single-pole single-circuit wood pole structures. The existing transformers will be reinstalled on the new 34.5-kV wood pole structures.

g. Remove conductors from the existing single-pole single-circuit and single-pole double-circuit wood pole structures. The existing conductors will be reinstalled on the new 34.5-kV wood pole structures.

h. Prior to removal of electrical items and wood pole structures on Alignment C Contractor shall provide the generator required per Division 10 paragraph A.10.a.(4).

2. Bidding Schedule item “Fence grounds” includes the following:

a. Grounding the following:

(1) Metallic fences that cross under or are parallel to and within 75-feet of transmission line centerline. Grounding is not required at locations already having fence ground.

(2) Metallic gates within the right-of-way.

b. See Western Construction Standards, Standard 1 – General Requirements

Section 1.4.14.

3. Bidding Schedule does not contain separate items for the following. Include these items in applicable Bidding Schedule items.

a. Clearing as directed by the COR.

b. Grading for structure sites and line clearances as directed by the COR.

c. Dewatering excavations if required.

d. Casing excavations if required.

e. Disposing of excavated material.

f. Use of secondary power (generators) as directed by the COR.

g. Traffic control.

DIVISION 7 – WOOD POLE STRUCTURES

A. DESCRIPTION OF BID ITEMS:

1. Bidding Schedule items for wood pole structures includes furnishing and installing the following on Government-furnished Class 1 and Class 2 wood poles in accordance with Western Area Power Administration Construction Standard 7:

a. Fiberglass crossarms equal to PUPI fiberglass manufactured by Geotek and equal to the following and as shown on structure drawings:

(1) Dead-End Assembly Type DA3000144 with extra eye nut, twelve (12) - Foot in length

(2) Tangent Assembly Type TB3000144SPX2, twelve (12) - Foot in length

b. Attachment bolts for fiberglass crossarms.

c. Structure grounding including all grounding hardware. Additional bonding clips, parallel groove clamps, and copper clad wire will be required for guy attachment hardware.

d. Guy wire, dead end tees, swinging angle brackets and all attachment hardware. Guying assemblies shall be furnished and installed with twisted loop grip dead ends made with galvanized steel, equal to those manufactured by Preformed Line Products Company.

Assembly shall develop the full strength of the guy strand. Guying requirements are shown on the plan and profile drawings.

e. Fiberglass guy strain insulators, complete with attachment hardware, ten (10)-foot in length, shall be furnished and installed at the top of every guy assembly. Additional insulators may be required where the phase to guy separation is less than eight (8) feet.

f. Guy wire markers shall be furnished and installed at the bottom of every guy. Markers shall be orange and made of UV-stabilized, high-impact, high density polyethylene. The markers shall be 96-inches long and full-round with a 2 1/2-inch-diameter equal to Chance CT079-0228 or Virginia Plastics TGP 25 BB 80.

g. Guy anchors shall be furnished and installed. Reuse existing anchors on alignment

D structure 2/10D1.

h. Furnish and install a structure number sign in accordance with Drawings 41 9004 and plan and profile drawings. Mount eight (8)-feet above ground line.

Existing wood pole structures with transformers shall be removed and replaced with the following new wood pole structures prior to performing any other work on the alignments:

Structure Location and Alignment

Structure Height and Type

0/9C11 70-DT-4

0/9C14 65-DDE-3

2/10D9 85-DT-4

2/10D10 85-DDE-3

3/6E1 65-DT-5

3/6E9 65-DDE-3

4/7F1 65-DT-5

4/7F9 65-DT-4

4/7F10 65-DDE-3

GLA-YUT 3/10T 50-DDE-3A

Structure Location and Alignment

Structure Height and Type

GLA-YUT 4/3T 50-DDE-3A

5/5H9 70-DB-6

5/5H12 65-DDE-3

5/5H16 65-DDE-3

DIVISION 10 – TRANSMISSION LINE ELECTRICAL

A. DESCRIPTION OF BID ITEMS:

1. Bidding Schedule items for “Furnish and install 69-kV steel single-string T11-B tension insulator assemblies (20,000 lbs), complete with compression dead end, suitable for 477 kcmil, ACSR, 26/7, “Hawk” conductor,” “Furnish and install 34.5-kV insulator assemblies, complete with compression dead end, suitable for 477 kcmil, ACSR, 26/7, “Hawk” conductor,” “Furnish and install 34.5-kV insulator assemblies, complete with suspension clamp or compression dead end, suitable for 266.8 kcmil, AAC, 7-strand, “Daisy” conductor,” “Furnish and install 34.5-kV insulator assemblies, complete with suspension clamp or compression dead end, suitable for 4/0, ACSR, 6/1, “Penguin” conductor,” “Furnish and install 34.5-kV insulator assemblies, complete with suspension clamp or compression dead end, suitable for 1/0, ACSR, 6/1, “Raven” conductor,” “Furnish and install 34.5-kV insulator assemblies, complete with compression dead end, suitable for #2, ACSR, 6/1, “Sparrow” conductor,” “Furnish and install 34.5-kV insulator assemblies, complete with suspension clamp or compression dead end, suitable for #4, ACSR, 6/1, “Swan” conductor,” and “Furnish and install 34.5-kV insulator assemblies, complete with suspension clamp or compression dead end, suitable for 3-strand #6 alumoweld conductor” include furnishing material and performing work and tests to furnish and install insulator assemblies shown on Drawing 41 1020, 41 1022 and 41 1024. An estimate of material quantities for each type of structure is shown on Drawings GLA-GIV 1003-1 and GLA-GIV 1003-2.

a. 69-kV Insulator Assemblies:

(1) Insulators shall be porcelain and brown in color.

(2) Porcelain suspension-type insulators shall comply with the characteristics of Table

10-1.

TABLE 10-1 – 69-kV PORCELAIN INSULATOR CHARACTERISTICS

INSULATOR CHARACTERISTICS

69-KV T11-B

TENSION

INSULATOR

STEEL

ANSI Class 52-3-H

Minimum Combined Mechanical and Electrical Strength Rating (lbs)

20,000

b. 34.5-kV Insulator Assemblies:

(1) Suspension and tension-type insulators are composite and gray in color.

(2) Composite insulators shall comply with the characteristics of Table 10-2.

TABLE 10-2 – 34.5-kV COMPOSITE INSULATOR CHARACTERISTICS

INSULATOR CHARACTERISTICS

34.5-KV T11-B

TENSION

STEEL

34.5-KV SIA11-B

SUSPENSION

WOOD

34.5-KV T11-A

TENSION

WOOD

34.5-KV T11-C

TENSION

WOOD

Specified Mechanical Load Rating (LBS) 15,000 15,000 15,000 15,000

Minimum 60 Hz Wet Flashover (kV) 175 140 160 160

INSULATOR CHARACTERISTICS

34.5-KV T11-B

TENSION

STEEL

34.5-KV SIA11-B

SUSPENSION

WOOD

34.5-KV T11-A

TENSION

WOOD

34.5-KV T11-C

TENSION

WOOD

Minimum Positive Critical Impulse Flashover (kV)

360 320 325 325

Minimum Dry Arc Distance (IN) 19.1 18.0 20.0 20.0

Minimum Leakage Distance (IN) 37.6 39.0 33.0 33.0

Minimum Section Length (IN) 23.0 17.25 25.0 25.0

Cold End Fitting Socket Socket Socket Socket

Hot End Fitting Ball Ball Ball Ball

(3) The base material for the housing (sheath) and weathersheds of composite suspension and tension insulators shall be a silicone or EPDM rubber, or a silicone compound blended with an EP rubber during the batching process such that an alloy of the two (2) is formed during the final vulcanization process.

(4) All Type T11-A tension insulator assemblies shall have a ball Y-clevis on the cold end of the assemblies in place of the oval eye ball.

(5) All Type T11-C tension insulator assemblies suitable for 477 kcmil, ACSR, 26/7, “Hawk” conductor shall include an 18-inch extension link and a Y-clevis clevis on the cold end of the assemblies in place of the two (2) anchor shackles.

(6) Twelve (12) Type T11-C tension insulator assemblies suitable for 266.8 kcmil, AAC, 7-strand, “Daisy” conductor shall include a 12-inch extension link.

(7) Fifteen (15) Type T11-C tension insulator assemblies suitable for 266.8 kcmil, AAC, 7-strand, “Daisy” conductor shall include an 18-inch extension link and a Y-clevis clevis on the cold end side of the assemblies in place of the two (2) anchor shackles.

(8) Six (6) Type T11-C tension insulator assemblies suitable for 4/0, ACSR, 6/1, “Penguin” conductor shall include a 12-inch extension link.

(9) Three (3) Type T11-C tension insulator assemblies suitable for 4/0, ACSR, 6/1, “Penguin” conductor shall include an 18-inch extension link and a Y-clevis clevis on

(10) Eighteen (18) Type T11-C tension insulator assemblies suitable for 1/0, ACSR, 6/1, “Raven” conductor shall include a 12-inch extension link.

(11) Nine (9) Type T11-C tension insulator assemblies suitable for 1/0, ACSR, 6/1, “Raven” conductor shall include an 18-inch extension link and a Y-clevis clevis on

(12) Six (6) Type T11-C tension insulator assemblies suitable for #4, ACSR, 6/1, “Swan” conductor shall include a 12-inch extension link.

(13) Three (3) Type T11-C tension insulator assemblies suitable for #4, ACSR, 6/1, “Swan” conductor shall include an 18-inch extension link and a Y-clevis clevis on

(14) Six (6) Type T11-C tension insulator assemblies suitable for 3-strand #6 alumoweld conductor shall include a 12-inch extension link.

(15) Six (6) Type T11-C tension insulator assemblies suitable for 3-strand #6 alumoweld conductor shall include an 18-inch extension link and a Y-clevis clevis on the cold end of the assemblies in place of the two (2) anchor shackles.

(16) Horizontal post-type insulators are composite and gray in color.

(17) Horizontal post-type insulators shall comply with the characteristics of Table 10-3.

TABLE 10-3 – 34.5-kV HORIZONTAL POST-TYPE INSULATOR CHARACTERISTICS

HORIZONTAL POST-TYPE INSULATOR

CHARACTERISTICS

34.5-KV HF1-F

HORIZONTAL

POST

STEEL

34.5-KV HF1-F

HORIZONTAL

POST

WOOD

Minimum Cantilever Strength (LBS) 2800 2800

Minimum 60 Hz Wet Flashover (kV) 125 100

Minimum Positive Critical Impulse Flashover (kV)

260 215

Minimum Dry Arc Distance (IN) 14.4 11.7

Minimum Leakage Distance (IN) 34.3 26.1

Minimum Section Length (IN) 20.0 16.5

Base Fitting Flat Gain

Line End Fitting Horizontal Clamptop

Horizontal Clamptop

(18) The base material for the housing (sheath) and weathersheds of composite horizontal post insulators shall be a silicone or EPDM rubber, or a silicone compound blended with an EP rubber during the batching process such that an alloy of the two (2) is formed during the final vulcanization process.

(19) Pin-type insulators are composite and gray in color.

(20) Pin-type insulators shall comply with the characteristics of Table 10-4.

TABLE 10-4 – 34.5-kV PIN-TYPE INSULATOR CHARACTERISTICS

PIN-TYPE INSULATOR

CHARACTERISTICS

34.5-KV PIN

WOOD

Minimum Cantilever Strength (LBS) 3000

Minimum 60 Hz Wet Flashover (kV) 79

Minimum Positive Critical Impulse Flashover (kV)

Minimum Dry Arc Distance (IN) 11

Minimum Leakage Distance (IN) 24.5

Minimum Section Length 8.62

Base Fitting Pin

Line End Fitting Universal Clamptop

(21) The base material for the housing (sheath) and weathersheds of composite pin insulators shall be a silicone or EPDM rubber, or a silicone compound blended with an EP rubber during the bathing process such that an alloy of the two is formed during the final vulcanization process.

2. Bidding Schedule items for “Furnish and install overhead ground wire assemblies, complete with suspension clamp or compression dead end, suitable for 3/8-inch, high-strength (HS), 7-strand steel overhead ground wire” include furnishing material and performing work and tests to furnish and install overhead ground wire assemblies shown on Drawings 41 1018 and 41 1019. An estimate of material quantities for each type of structure is shown on Drawing GLA-GIV 1004.

a. Overhead ground wire assemblies shall comply with the characteristics of Table 10-5.

TABLE 10-5 – OVERHEAD GROUND WIRE ASSEMBLY CHARACTERISTICS

OVERHEAD GROUND WIRE

ASSEMBLY CHARACTERISTIC

STEEL

OGW-TV

TENSION

WOOD

OGW-PB

SUSPENSION

WOOD

OGW-PBY

SUSPENSION

WOOD

OGW-TH

TENSION

Minimum Ultimate Strength (LBS) 20,000 15,000 15,000 20,000

3. Bidding Schedule items for “Furnish and install three (3) 477 kcmil, ACSR, 26/7, “Hawk” conductors,” “Furnish and install three (3) 4/0, ACSR, 6/1, “Penguin” conductors,” “Furnish and install three (3) 1/0, ACSR, 6/1, “Raven” conductors,” “Furnish and install three (3) 3-strand #6 alumoweld conductors,” “Reinstall three (3) existing 266.8 kcmil, AAC, 7-strand, “Daisy” conductors,” “Reinstall three (3) existing 4/0, ACSR, 6/1, “Penguin” conductors,” “Reinstall three (3) existing 1/0, ACSR, 6/1, “Raven” conductors,” “Reinstall three (3) existing #2, ACSR, 6/1, “Sparrow” conductors,” “Reinstall three (3) existing #4, ACSR, 6/1, “Swan” conductors,” and “Reinstall three (3) existing 3-strand #6 Alumoweld conductors” include furnishing, stringing, splicing, repairing, sagging, and clipping in the conductors; installing jumper loops; and furnishing and installing material to complete the conductor installations, except for material furnished and installed as a part of insulator assemblies and accessories. Furnish and install material including conductor, conductor joints, conductor repair sleeves, and joint inhibitor compound required to complete conductor installation.

a. New 477 kcmil, ACSR, 26/7, “Hawk” Conductor:

(1) Measurement for furnishing and stringing conductors will be made horizontally along the centerline of the transmission line.

(2) Conductor shall comply with the characteristics of Table 10-6.

TABLE 10-6 – CONDUCTOR CHARACTERISTICS

CONDUCTOR CHARACTERISTICS

Completed Conductor Size (circular mil)

477,000

Ultimate Strength, as computed for the strength of the individual strands, not less than (LBS)

19,500

Aluminum Strands Number 26

Diameter (IN) 0.1354

CONDUCTOR CHARACTERISTICS

Steel Strands Number 7

Diameter (IN) 0.1053

(3) The new 477 kcmil, ACSR, 26/7, “Hawk” conductor shall be installed on Alignment

A between APS Structure No. 10/3 (Station 186+18.65) and Structure No. 3/6 (Station 186+93.33) as shown on plan and profile drawing GLA-GIV 4015.

(4) The new 477 kcmil, ACSR, 26/7, “Hawk” conductor shall be installed on Alignment

E between APS Structure No. 10/3 (Station 650+99.34) and Structure No. 3/6E1 (Station 651+54.94) as shown on plan and profile drawing GLA-GIV 4022.

(5) The new 477 kcmil, ACSR, 26/7, “Hawk” conductor shall be installed in jumper loops on Alignment F at Structure No. 4/7 (Station 775+26.46) as shown on plan and profile drawing GLA-GIV 4023.

(6) The new 477 kcmil, ACSR, 26/7, “Hawk” conductor shall be installed on Alignment F from Structure No. 4/7 (Station 775+26.46) to APS Structure No. 8/7 (Station 776+09.46), APS Structure No. 8/7 (Station 776+09.46) to Structure No. 4/7F1 (Station 778+11.80), and Structure No. 4/7F9 (Station 801+95) to Structure No.

4/7F10 (Station 802+15.74) as shown on plan and profile drawing GLA-FIV 4023.

(7) The new 477 kcmil, ACSR, 26/7, “Hawk” conductor shall be installed in jumper loops on Alignment G at Structure No. 4/7 (Station 902+15.74) as shown on plan and profile Drawing GLA-GIV 4024.

(8) The new 477 kcmil, ACSR, 26/7, “Hawk” conductor shall be install on Alignment G between Structure No. 4/7 (Station 902+15.74) and Structure No. 4/7G1 (Station 905.16.05) as shown on plan and profile Drawing GLA-GIV 4024.

(9) The new 477 kcmil, ACSR, 26/7, “Hawk” conductor shall be installed on Alignment

H from Structure No. 5/5 (Station 1014+94.18) to APS Structure No. 7/14 (Station 1015+86.11) to Structure No. 5/5H1 (Station 1018+28.83) as shown on plan and profile Drawing GLA-GIV 4025.

b. New 4/0, ACSR, 6/1, “Penguin” Conductor:

(2) Conductor shall comply with the characteristics of Table 10-7.

TABLE 10-7 – CONDUCTOR CHARACTERISTICS

Completed Conductor Size 4/0

Ultimate Strength, as computed for the strength of the individual strands, not less than (LBS)

8,350

Aluminum Strands Number 6

Diameter (IN) 0.1878

CONDUCTOR CHARACTERISTICS

Steel Strands Number 1

Diameter (IN) 0.1878

(3) The new 4/0, ACSR, 6/1, “Penguin” conductor shall be installed in jumper loops on

Alignment C at Structure No. 0/9C2 (Station 385+29.10), Structure No. 0/9C3 (Station 388+36.09), Structure No. 0/9C11 (Station 414+56.45), and Structure No.

0/9C13 (Station 420+80.99) as shown on plan and profile drawings GLA-GIV 4019 and GLA-GIV 4020.

(4) The new 4/0, ACSR, 6/1, “Penguin” conductor shall be installed in jumper loops on

Alignment E at Structure No. 3/6E1 (Station 651+54.94) and Structure No. 3/6E4 (Station 661+37.95) as shown on plan and profile drawing GLA-GIV 4022.

c. New 1/0, ACSR, 6/1, “Raven” Conductor:

(2) Conductor shall comply with the characteristics of Table 10-8.

TABLE 10-8 – CONDUCTOR CHARACTERISTICS

Completed Conductor Size 1/0

Ultimate Strength, as computed for the strength of the individual strands, not less than (LBS)

4,380

Aluminum Strands Number 6

Diameter (IN) 0.1327

Steel Strands Number 1

Diameter (IN) 0.1327

(3) The new 1/0, ACSR, 6/1, “Raven” conductor shall be installed in jumper loops on

Alignment F at APS Structure No. 8/7 (Station 776+09.46), Structure No. 4/7F1 (Station No. 778+11.80), Structure No. 4/7F8 (Station 801+48.58), and Structure No. 4/7F9 (Station 801+95) as shown on plan and profile Drawing GLA-GIV 4023.

(4) The new 1/0, ACSR, 6/1, “Raven” conductor shall be installed in jumper loops on

Alignment G at Structure No. 4/7G1 (Station 905+16.05), Structure No. 4/7G4 (Station 913+36.47), and Gila-Yuma Tap Structure No. 4/4 (Station 914+93.64) as shown on plan and profile Drawing GLA-GIV 4024.

(5) The new 1/0, ACSR, 6/1, “Raven” conductor shall be installed in jumper loops on Alignment H at Structure No. 5/5H1 (Station 1018+28.83), Structure No. 5/5H3 (Station 1023+86.29), Structure No. 5/5H8 (Station 1040+21.27), and Structure No.

5/5H9 (Station 1042+10.00) as shown on plan and profile Drawing GLA-GIV 4025.

d. New 3-strand #6 alumoweld conductor:

(2) Conductor shall comply with the characteristics of Table 10-9.

TABLE 10-9 – CONDUCTOR CHARACTERISTICS

Completed Conductor Size 3-Strand #6

Ultimate Strength, as computed for the strength of the individual strands, not less than (LBS)

10,280

Aluminum-Clad Wires Number 3

Diameter (IN) 0.1620

(3) The new 3-strand #6 alumoweld conductor shall be installed in jumper loops on

Alignment D at Structure No. 2/10D1 (Station 526+96.73), Structure No. 2/10D4 (Station 536+22.03), and Structure No. 2/10D9 (Station 550+79.45) as shown on plan and profile Drawing GLA-GIV 4021.

e. Existing 266.8 kcmil, AAC, 7-strand, “Daisy” Conductor:

(1) Measurement for stringing conductors will be made horizontally along the centerline of the transmission line.

(2) The existing 266.8 kcmil, AAC, 7-strand, “Daisy” conductor shall be installed on Alignment C from the tap near APS Structure No. 12/16 (Station 380+20.41) to 0/9C14 (Station 425+85.85) as shown on plan and profile drawings GLA-GIV 4019 and GLA-GIV 4020.

f. Existing 4/0, ACSR, 6/1, “Penguin” Conductor:

(1) Measurement for stringing the conductors will be made horizontally along the centerline of the transmission line.

(2) The existing 4/0, ACSR, 6/1, “Penguin” conductor shall be installed on Alignment D from Structure No. 3/6E1 (Station 651+54.94) to Structure No. 3/6E9 (Station 675+26.46) as shown on plan and profile drawing GLA-GIV 4022

g. Existing 1/0, ACSR, 6/1, “Raven” Conductor:

(2) The existing 1/0, ACSR, 6/1, “Raven” conductor shall be installed on Alignment F from Structure No. 4/7F1 (Station 778+11.80) to Structure No. 4/7F9 (Station 801+95) as shown on plan and profile drawing GLA-GIV 4023.

(3) The existing 1/0, ACSR, 6/1, “Raven” conductor shall be installed on Alignment H from Structure No. 5/5H1 (Station 1018+28.83) to Structure No. 5/5H9 (Station 1042+10.00), Structure No. 5/5H9 (Station 1042+10.00) to Structure No. 5/5H12

(Station 1052+59.67), and Structure 5/5H9 (Station 1152+60.20) to Structure No.

5/5H16 (Station No. 1164+48.40) as shown on plan and profile drawings GLA-GIV 4025 and GLA-GIV 4026.

h. Existing #2, ACSR, 6/1, “Sparrow” Conductor:

(2) The existing #2, ACSR, 6/1, “Sparrow” conductor shall be installed on Alignment G from Structure No. 3/10T (Station 199+02) to Gila-Yuma Tap Structure No. 3/11 (Station 200+90) and from the tap near Gila-Yuma Tap Structure No. 4/3 (Station 231+90) to Structure No.