Solicitation DE-SOL-0009148

View the file

Other files

File Type Posted
Attch_A_Specifications_4_27_2016.pdf PDF
Amendment_3.pdf PDF
Attch_B_Drawings_4_27_2016.pdf PDF
Amendment_2.pdf PDF
Attch_B_-_Dwgs_4_11_2016.pdf PDF
Amendment_1_Pricing_Schedule.pdf PDF
Attch_A_-_Specifications_4_11_2016.pdf PDF
Amendment_1.pdf PDF
Attch_D_Submittal_Log.pdf PDF
Attch_E_-_Foreign_National_Data_Card.pdf PDF
Attch_F_o442_21_(2).pdf PDF
Attch_B_Drawings.pdf PDF
Attch_A_Specifications_10_20_16.pdf PDF
Attch_C_Wage_Determination_WD_AZ150022.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

16WA115093

WAPA (DSW)

US DOE/WESTERN AREA POWER

DESERT SOUTHWEST REGIONAL OFFICE

PO BOX 6457

DSW

PHOENIX AZ 85005-6457

WESTERN AREA POWER ADMINISTRATION - DSW

ATTN: GREG CAGLE

IFB DE-SOL-0009148

Phoenix, AZ 85009-5313

Gregory Cagle 602-605-2921 x

04/05/2016

DE-SOL-0009148

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Sonoran Substation Communication Tower Addition Project.This project consists of furnishing all labor, supervision, materials, licenses, permits, insurance, transportation, and equipment necessary provide Communication tower additions. All work shall be in strict compliance with the specifications and drawings.

The project magnitude is estimated between $25,000 and $100,000.

This is a 100% Small Business Set-aside. The assigned NAICS Code is 238190 with a size standard of $15 Million

A site visit: is schedule for 18 April, 2016, at the site. See Provision DOE-L-2019, although not mandatory a site visit by interested parties is encouraged.

Note: The Government intends to issue "Notice to Proceed" on or about 10 days following contract award.

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 180 calendar days and complete it within ________________ ________________ calendar days after receiving

51.211-10

05/09/2016

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

WAPA (DSW)

US DOE/WESTERN AREA POWER

DESERT SOUTHWEST REGIONAL OFFICE

PO BOX 6457

DSW

PHOENIX AZ 85005-6457

Gregory K. Cagle

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

04/05/2016

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 47

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DE-SOL-0009148

FOB: Destination

00001 This line item is for funding purposes only for the Sonoran Substation Communication Tower

Addition.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Solicitation DE-SOL-0009148

SECTION B - SUPPLIES OR SERVICES AND PRICES

BIDDING SCHEDULE

Sonoran Substation Communication Tower Addition Project

CLIN Work or Material Estimated Quantity Unit Unit Price Amount

0001 Mobilization and Preparatory Work (Not to exceed 5% of Total.)

LS $

0002 Gravel Surfacing LS $ __________

0003 Communication Tower Concrete Foundation

3.8 CY $ ________ $ _________

0004 Grounding LS $ _________

0005 Install Communication Tower With Fall Arrest System

LS $ _________

0006 Furnish and Install New Waveguide Antennas

LS $ _________

TOTAL $ _________

ABBREVIATIONS

CLIN= Contract Line Item CY = cubic yards LS = for the lump sum of

SECTION C – DESCRIPTION/SPECIFICATIONS

The Specifications and Drawings are listed as Attachment A & B in Section J.

SECTION D – PACKINGAGING AND MARKING

Reserved

SECTION E – INSPECTION AND ACCEPTANCE

52.246-12 INSPECTION OF CONSTRUCTION (APR 1996)

DOE-E-2001 INSPECTION AND ACCEPTANCE

Inspection and acceptance of all items under this contract shall be accomplished by the Contracting Officer in accordance with the clause entitled FAR 52.246-12, Inspection of Construction. If the Contracting Officer assigns this responsibility to the Contracting Officer’s Representative or another representative of the Government, the Contracting Officer shall notify the Contractor in writing.

(End of clause)

SECTION F – DELIVERIES OR PERFORMANCE

52.211-10 COMMENCEMENT, PROCECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 calendar days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of Clause)

52.211-12 LIQUIDATED DAMAGES – CONSTRUCTION (SEPT 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,508.36, for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of Clause)

52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)

If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgment of the Contracting Officer, is justified.

(End of Clause)

SECTION G – CONTRACT ADMINISTRATION DATA

DOE-G-2001 Contracting Officer Authority (OCT 2014)

The Contracting Officer is responsible for administration of the contract. The Contracting Officer may appoint a Contracting Officer’s Representative (COR), in accordance with the clause entitled Contracting Officer’s Representative, to perform specifically delegated functions. The Contracting Officer is the only individual who has the authority on behalf of the Government, among other things, to take the following actions under the contract:

(a) Assign additional work within the general scope of the contract.

(b) Issue a change in accordance with the clause entitled Changes.

(c) Change the cost or price of the contract.

(d) Change any of the terms, conditions, specifications, or services required by the contract.

(e) Accept non-conforming work.

(f) Waive any requirement of the contract.

(End of clause)

WES-G-1002 ADMINISTRATIVE TIME FOR COMPLETION OF DRAWINGS (WAPA, JAN 2008)

a. The contractor is authorized up to 60 calendar days after the contract completion date to complete and submit final drawings, operation and maintenance manuals, and any other data required by the contract.

b. This period noted above is strictly for administrative purposes and is not an extension of the actual performance period of the contract. Liquidated damages are not applicable to this period.

(End of clause)

WES-G-1004 CONTRACTOR'S CONTRACT ADMINISTRATION (WAPA, FEB 2008)

The name, title, phone number, office name, and complete mailing address of the Contractor's point of contact for contract administration, including defective or improper invoices, is as follows:

Name: _________________________________________________

Title: __________________________________________________

Phone Number: _________________________________________

E-mail address: _________________________________________

Fax Number: ___________________________________________

Company Name: ________________________________________

Address: ______________________________________________

City/State/Zip: __________________________________________

(End of clause)

SECTION H – SPECIAL CONTRACT REQUIREMENTS

DOE-H-2012 Sustainable Acquisitions under DOE Construction Contracts (OCT 2014)

Pursuant to Executive Order 13423, Strengthening Federal Environmental, Energy and Transportation Management, and 13514, Federal Leadership in Environmental, Energy, and Economic Performance, the Department of Energy is committed to managing its facilities in an environmentally preferable manner that will promote the natural environment and protect the health and well being of its Federal employees and contractor service providers. In the performance of work under this contract, the Contractor shall exert its best efforts to provide its services in a manner that will promote the natural environment and protect the health and well being of Federal and contract employees at the facility. Sustainable acquisition or environmentally preferable contracting has several interacting initiatives. Among the initiatives are the following:

• Recycled Content Products are described at http://epa.gov/cpg

• Biobased Products are described at http://www.biopreferred.gov/

• Energy efficient products are at http://energystar.gov/products for Energy Star products

• Energy efficient products are at http://www.eere.energy.gov/femp/procurement for FEMP designated products

• Environmentally Preferable Computers are at http://www.epeat.net

• Non-Ozone Depleting Alternative Products are at http://www.epa.gov/ozone/strathome.html

• Water efficient plumbing products are at http://epa.gov/watersense To the extent that the services provided by the Contractor require provision of any of the above types of products, the Contractor is expected to provide the sustainable, environmentally preferable type of product unless that type of product is not available competitively within a reasonable time, at a reasonable price, is not life cycle cost efficient in the case of energy consuming products, or does not meet reasonable performance standards. The clauses at FAR 52.223-2, Affirmative Procurement of Biobased Products under Service and Construction Contracts, 52.223-15, Energy Efficiency in Energy Consuming Products, and 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts, in Section I of this contract require the use of products that have biobased content, are energy efficient, or have recycled content.

In case of an apparent inconsistency between this provision and any specification elsewhere in the contract, consult the contracting officer for resolution.

(End of clause)

DOE-H-2013 Consecutive Numbering (Oct 2014)

Due to automated procedures employed in formulating this document, clauses and provisions contained within may not always be consecutively numbered.

(End of clause)

DOE-H-2033 Alternative Dispute Resolution (OCT 2014)

(a) The DOE and the Contractor both recognize that methods for fair and efficient resolution of contractual issues in controversy by mutual agreement are essential to the successful and timely completion of contract requirements. Accordingly, DOE and the Contractor shall use their best efforts to informally resolve any contractual issue in controversy by mutual agreement. Issues of controversy may include a dispute, claim, question, or other disagreement. The parties agree to negotiate with each other in good faith, recognizing their mutual interests, and attempt to reach a just and equitable solution satisfactory to both parties.

(b) If a mutual agreement cannot be reached through negotiations within a reasonable period of time, the parties may use a process of alternate dispute resolution (ADR) in accordance with the clause at FAR 52.233-1, Disputes. The ADR process may involve mediation, facilitation, fact-finding, group conflict management, and conflict coaching by a neutral party. The neutral party may be an individual, a board comprised of independent experts, or a company with specific expertise in conflict resolution or expertise in the specific area of controversy. The neutral party will not render a binding decision, but will assist the parties in reaching a mutually satisfactory agreement. Any opinions of the neutral party shall not be admissible in evidence in any subsequent litigation proceedings.

(c) Either party may request that the ADR process be used. The Contractor shall make a written request to the Contracting Officer, and the Contracting Officer shall make a written request to the appropriate official of the Contractor. A voluntary election by both parties is required to participate in the ADR process. The parties must agree on the procedures and terms of the process, and officials of both parties who have the authority to resolve the issue must participate in the agreed upon process.

(d) ADR procedures may be used at any time that the Contracting Officer has the authority to resolve the issue in controversy. If a claim has been submitted by the Contractor, ADR procedures may be applied to all or a portion of the claim. If ADR procedures are used subsequent to issuance of a Contracting Officer’s final decision under the clause at FAR 52.233-1, Disputes, their use does not alter any of the time limitations or procedural requirements for filing an appeal of the Contracting Officer’s final decision and does not constitute reconsideration of the final decision.

(e) If the Contracting Officer rejects the Contractor’s request for ADR proceedings, the Contracting Officer shall provide the Contractor with a written explanation of the specific reasons the ADR process is not appropriate for the resolution of the dispute. If the Contractor rejects the Contracting Officer’s request to use ADR procedures, the Contractor shall provide the Contracting Officer with the reasons for rejecting the request.

DOE-H-2034 Contractor Interface With Other Contractors And/Or Government Employees (OCT 2014)

The Government may award contracts to other contractors for work to be performed at a DOE-owned or – controlled site or facility. The Contractor shall cooperate fully with all other on-site DOE contractors and Government employees. The Contractor shall coordinate its own work with such other work as may be directed by the Contracting Officer or a duly authorized representative. The Contractor shall not commit or permit any act which will interfere with the performance of work by any other contractor or by a Government employee.

(End of clause)

DOE-H-2044 Material Safety Data Sheet Availability (OCT 2014)

In implementation of the clause at FAR 52.223-3, Hazardous Material Identification and Material Safety Data, the Contractor shall obtain, review and maintain a Material Safety Data Sheet (MSDS) in a readily accessible manner for each hazardous material (or mixture containing a hazardous material) ordered, delivered, stored or used; and maintain an accurate inventory and history of use of hazardous materials at each use and storage location. The MSDS shall conform to the requirements of 29 CFR 1910.1200(g).

(End of clause)

DOE-H-2051 Annual Representations And Certifications And Other Statements Of The Offeror

(OCT 2014)

(a) Pursuant to the clause at FAR 52.204-8, Annual Representations and Certifications, the Contractor’s Online Representations and Certifications Application (ORCA) dated: ______________ is hereby incorporated into the contract by reference.

(b) The Contractor, by signing this contract, certifies that it has verified that its ORCA submission incorporated by reference into this contract pursuant to paragraph (a) above is current, accurate, complete, and applicable to this contract.

(End of clause)

DOE-H-2055 Government Furnished Property (OCT 2014)

In accordance with the clause 52.245-1, Government Property, the Government will provide the property as specified in the specifications.

DOE-H-2057 Department Of Labor Wage Determinations (OCT 2014)

The Contractor’s performance under this contract shall comply with the requirements of the U.S.

Department of Labor Wage Determination(s) located in Section J, Attachment C, and the clause at FAR 52.222-42, Statement of Equivalent Rates for Federal Hires.

(End of clause)

DOE-H-2059 Preservation Of Antiquities, Wildlife And Land Areas (OCT 2014)

(a) Federal Law provides for the protection of antiquities located on land owned or controlled by the Government. Antiquities include Indian graves or campsites, relics and artifacts. The Contractor shall control the movements of its personnel and its subcontractor's personnel at the job site to ensure that any existing antiquities discovered thereon will not be disturbed or destroyed by such personnel. It shall be the duty of the Contractor to report to the Contracting Officer the existence of any antiquities so discovered.

(b) The Contractor shall also preserve all vegetation (including wetlands) except where such vegetation must be removed for survey or construction purposes. Any removal of vegetation shall be in accordance with the terms of applicable habitat mitigation plans and permits. Furthermore, all wildlife must be protected consistent with programs approved by the Contacting Officer.

(c) Except as required by or specifically provided for in other provisions of this contract, the Contractor shall not perform any excavations, earth borrow, preparation of borrow areas, or otherwise disturb the surface soils within the job site without the prior approval of DOE or its designee.

(End of clause)

WES-H-1002 RETAINAGE/HOLDBACK FOR UNDELIVERED DATA (WAPA, APR 2009)

The Government may retain/holdback up to 10 percent of total amount and final payment will not be made until all final drawings, as-builts, operation and maintenance manuals, and any other data required under the contract have been delivered to and accepted by the Government.

(End of clause)

WES-H-1006 BREAKDOWN OF CONTRACT PRICES (WAPA, FEB 2008)

In addition to the requirements of the contract clause entitled "Payments under Fixed Price Construction Contracts", the contractor shall submit a detailed breakdown of the total contract price within 30 calendar days after the date of the notice to proceed. The price breakdown shall be submitted in triplicate to the Contracting Officer's Representative (COR) designated in this contract. The breakdown of contract costs shall be arranged by bid item with a further, more detailed division into the various kinds of work which make up the bid item. Contract costs shall be furnished for each bid item detailing the various kinds of work covered in the technical paragraphs of the specifications. The cost breakdown shall show the quantities of each type of work, the unit prices for materials, labor, and equipment, as well as the total price. The contractor shall obtain cost information from its subcontractor(s) as required, to provide the Government with a complete breakdown of the actual bid price.

(End of clause)

WES-H-1008 RIGHT TO USE AND OPERATE UNSATISFACTORY EQUIPMENT (WAPA, FEB 2008)

After installation of the equipment being purchased under this contract, if the operating parameters, materials, or equipment furnished by the contractor fail to comply with the specifications contained in this contract, the Government shall have the right to use the materials and/or operate the equipment until the defects, errors, or omissions can be corrected.

WES-H-1022 INDEMNITY (WAPA, FEB 2008)

The contractor shall hold harmless and indemnify the United States and its officers, representatives, and employees, from all claims, losses, damages, actions, causes of action, expenses, and/or liability resulting from, brought for, or on account of, any loss, personal injury, death, or property damage, including but not limited to incidents related to the transportation, removal, disposal, and/or accidental discharge of toxic and/or hazardous waste or material, received or sustained by any person or persons, including but not limited to the contractor, the United States, or third parties, and any of their employees, agents, officers, or representatives, to the extent caused by, growing out of, resulting from, incident to, or connected with, the contractor's negligent performance under this contract.

(End of clause)

WES-H-1023 REQUIRED INSURANCE (WAPA, FEB 2008)

a. The contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance:

(1) Workman's Compensation Insurance in accordance with the laws of the state where contract performance occurs; Occupational Disease Coverage; and Employees Liability Coverage.

(2) Comprehensive General and Automobile Liability Insurance with the following minimum coverages:

(i) GENERAL LIABILITY

(A) Bodily Injury $500,000.00 per occurrence.

(B) Property Damage $500,000.00 each accident;

$1,000,000.00 in the aggregate.

(ii) AUTOMOBILE INSURANCE

(A) Bodily Injury, $200,000.00 per person;

$500,000.00 per occurrence.

(B) Property Damage, per occurrence: $20,000.00.

b. These policies shall have appropriate language waiving all subrogation rights against the Government, unless otherwise approved by the Contracting Officer.

c. Prior to the commencement of work under this contract, the contractor shall furnish a copy of the insurance certificate (binder) or other objective evidence of the above-required insurance to the Contracting Officer. The policies shall contain an endorsement to the effect that cancellation or any material change in the insurance policies that adversely affect the interests of the Government in such insurance shall not be effective for such period as may be prescribed by the laws of the State in which this contract is to be performed, and in no event less than thirty (30) days after written notification is provided to the Contracting Officer.

d. The contractor agrees to insert the substance of this clause, including this paragraph (d), into any subcontracts issued under this contract.

(End of clause)

WES-H-1024 CONTRACT PRICES (WAPA, FEB 2008)

Payment for the various line items listed in Section B shall constitute full compensation for furnishing all plant, labor, equipment, appliances and materials; for performing all operations required to complete the work in conformity with the drawings and specifications, including installation and erection of the total system; necessary engineering services; and all drawings, data and/or reports.

(End of clause)

WES-H-1026 PROTECTION AND RESTORATION OF REAL ESTATE CROSSED BY RIGHT-OF-WAY

(WAPA, FEB 2008)

a. General. The contractor shall limit the movement of its crews and equipment to the right-of-way, including access routes. The contractor shall further limit movement on the right-of-way so as to minimize damage to grazing land, crops, orchards, or other real and personal property, and shall avoid marring the land. The contractor shall be responsible for all damages off the right-of-way and shall settle all such damage claims directly with the property owner. Pursuant to FAR 52.236-7 "Permits and Responsibilities," the contractor shall be responsible for all damages that are a result of its fault or negligence.

b. Restoration of Land to Original Conditions. When weather and ground conditions permit, the contractor shall obliterate all contractor caused ruts that are hazardous to farming operations and to movement of equipment. Such ruts shall be leveled, filled, and graded or otherwise eliminated in an approved manner.

Ruts, scars, and compacted soils in hay meadows, alfalfa fields, pastures, and cultivated productive lands shall have the soil loosened and leveled by scarifying, harrowing, disking, or other approved methods.

c. Hillside Erosion Prevention. Water turnoff bars or small terraces shall be constructed across all right-of-way trails on hillsides to prevent water erosion and to facilitate natural re-vegetation on the trails.

d. Irrigation Ditches, Drainage Ditches, Terraces, and Title Drains. The contractor shall take measures, especially during the irrigation season, to ensure that its operations do not affect the operation of irrigation and drainage ditches, terraces, and title drains, and ensure that any other irrigation features are adequately protected during contract performance.

e. Resolution of Damage Claims. The contractor shall promptly notify the property owner(s) of any damage caused by the contractor. The contractor, within 60 days of its knowledge of, or notice from, a landowner of damage off the right-of-way caused by the contractor's operations shall notify the Contracting Officer's Representative in writing of the disposition of each claim. In order to adequately protect the Government against landowner claims, demands, or liabilities arising out of the contractor's construction operations under this contract, the Contracting Officer may withhold progress payments, in whole or in part, due the contractor until landowner claims are settled.

(End of clause)

WES-H-1027 MOBILIZATION AND PREPARATORY WORK (WAPA, FEB 2008)

a. General. The contractor will be compensated for mobilization and preparatory work in accordance with the terms of this contract. Mobilization and preparatory work may include movement of personnel, equipment, supplies, and incidentals to the project site; establishment of offices, buildings, plants and other facilities at the project site; payment of premiums for bonds and insurance for the project; necessary costs for acquisition of equipment; and for any other work which must be performed incident to the start of construction at the site.

b. Facilities, plants, and equipment required for this project that are established at, or brought to, the worksite are subject to the provisions of this clause unless the Contracting Officer specifically excludes, in writing, a particular item or items. The contractor is solely responsible for the adequacy, efficiency, use, protection, maintenance, repair, and preservation of all its facilities, plants, and equipment. The facilities, plants, and equipment covered by this paragraph shall not be dismantled or removed from the worksite prior to completion of the work specified in the contract without the written permission of the Contracting Officer.

c. Termination for Default. In the event the contractor's right to proceed is terminated as provided by the contract clause entitled Default, all facilities, plants, and equipment on the worksite are subject to Western's right to take possession of and utilize the same for completion of the work. In addition, any encumbrance, lien, or other security interest on any such facilities, plants, or equipment shall be subordinate to Western's right to utilize these facilities, plants and equipment to complete the work under the contract.

d. Payment. Payment for mobilization and preparatory work will be made at the lump sum price specified in Section B of the contract. Progresspayments for mobilization and preparatory work will be made as follows:

(1) When 5 percent of the total amount of the original contract is earned from other schedule items, 50 percent of the amount agreed upon for mobilization and preparatory work will be paid.

(2) When 10 percent of the total amount of the original contract is earned from other schedule items, the balance of the amount agreed upon for mobilization and preparatory work will be paid.

e. Progress payments for mobilization and preparatory work shall be subject to retainage as provided by FAR 52.232-5, "Payments Under Fixed-Price Construction Contracts." In addition, the line item for mobilization and preparatory work will not be considered to be a separate division of the work, completion of which would permit the payment of the complete item price without retention.

(End of clause)

WES-H-1031 FOREIGN VISITORS AND CONTRACT EMPLOYEES (WAPA, MAY 2005)

The Contractor must receive prior, written approval from the appropriate Western Security Manager (WSM) before any non-U.S. Citizens (Foreign Nationals) visit or work at any Western Area Power Administration (Western) facility. The Contractor must certify in writing that:

1) each of their employees working under this contract that may visit or be assigned to work at any Western facility is a U.S. Citizen, or;

2) the Contractor shall provide an accurately completed Foreign National Data Card, WAPA Form 3000- 72, Attachment E for each of their Foreign National employees that may visit or work at any Western facility. The Contractor shall forward the completed Form to the COR at least 45 days in advance of each Foreign National employee's visit or their beginning of work. Foreign National employees shall not be allowed on-site at any Western facility without prior approval of the cognizant WSM. Circumstances which do not allow a 45 day notification require prior, written approval of the cognizant WSM. The Contractor shall include this requirement in any subcontract it issues under this contract. Western reserves the right to remove any contract employee from Western's property pending the conclusion of the Foreign National background check.

(End of clause)

WES-H-1033 ACCESS TO DOE OWNED OR LEASED FACILITIES (WAPA, SEP 2011)

(a) The performance of this contract requires that employees of the Contractor have physical access to DOE owned or leased facilities. The Contractor understands and agrees that DOE has a prescribed process with which the Contractor and its employees must comply in order to receive a security badge that allows such physical access. This process includes, but is not limited to an FBI fingerprint check and other background checks and investigations as required by DOE. The Contractor further understands that it must propose employees whose background offers the best prospect of obtaining a security badge approval for access, considering the following criteria, which are not all inclusive and may vary depending on access requirements:

(1) is, or is suspected of being, a terrorist;

(2) is the subject of an outstanding warrant;

(3) has deliberately omitted, concealed, or falsified relevant and material facts from any Questionnaire for National Security Positions (SF-86), Questionnaire for Non-Sensitive Positions (SF-85), or similar form;

(4) has presented false or forged identity source documents;

(5) has been barred from Federal employment;

(6) is currently awaiting a hearing or trial or has been convicted of a crime punishable by imprisonment of six (6) months or longer; or

(7) is awaiting or serving a form of pre-prosecution probation, suspended or deferred sentencing, probation or parole in conjunction with an arrest or criminal charges against the individual for a crime that is punishable by imprisonment of six (6) months or longer.

(b) The Contractor shall assure:

(1) In initiating the process for gaining physical access, (i) compliance with procedures established by DOE in providing its employee(s) with any forms directed by DOE, (ii) that the employee properly completes any forms, and (iii) that the employee(s) submits the forms to the person designated by the Contracting Officer.

(2) In completing the process for gaining physical access, that its employee (i) cooperates with DOE officials responsible for granting access to DOE owned or leased facilities and (ii) provides additional information, requested by those DOE officials.

(c) The Contractor understands and agrees that DOE may unilaterally deny a security badge to an employee and that the denial remains effective for that employee unless DOE subsequently determines that access may be granted. Upon notice from DOE that an employees application for a security badge is or will be denied, the Contractor shall promptly identify and submit the forms referred to in subparagraph (b)(1) of this clause for the substitute employee. The denial of a security badge to individual employees by DOE shall not be cause for extension of the period of performance of this Contract or any contractor claim against DOE.

(d) The Contractor shall return to the Contracting Officer or designee the badge(s) or other credential(s) provided by DOE pursuant to this clause, granting physical access to DOE owned or leased facilities by the Contractors employee(s), upon:

(1) the termination of this Contract;

(2) the expiration of this Contract;

(3) the termination of employment on this Contract by an individual employee; or

(4) demand by DOE for return of the badge.

(e) The Contractor shall include this clause, including this paragraph (e), in any subcontract, awarded in the performance of this Contract, in which an employee(s) of the subcontractor will require physical access to DOE owned or leased facilities.

(End of clause)

WES-H-1033 ACCESS TO DOE OWNED OR LEASED FACILITIES (WAPA, SEP 2011)

(a) The performance of this contract requires that employees of the Contractor have physical access to DOE owned or leased facilities. The Contractor understands and agrees that DOE has a prescribed process with which the Contractor and its employees must comply in order to receive a security badge that allows such physical access. This process includes, but is not limited to an FBI fingerprint check and other background checks and investigations as required by DOE. The Contractor further understands that it must propose employees whose background offers the best prospect of obtaining a security badge approval for access, considering the following criteria, which are not all inclusive and may vary depending on access requirements:

(1) is, or is suspected of being, a terrorist;

(2) is the subject of an outstanding warrant;

(3) has deliberately omitted, concealed, or falsified relevant and material facts from any Questionnaire for National Security Positions (SF-86), Questionnaire for Non-Sensitive Positions (SF-85), or similar form;

(4) has presented false or forged identity source documents;

(5) has been barred from Federal employment;

(6) is currently awaiting a hearing or trial or has been convicted of a crime punishable by imprisonment of six (6) months or longer; or

(7) is awaiting or serving a form of pre-prosecution probation, suspended or deferred sentencing, probation or parole in conjunction with an arrest or criminal charges against the individual for a crime that is punishable by imprisonment of six (6) months or longer.

(b) The Contractor shall assure:

(1) In initiating the process for gaining physical access, (i) compliance with procedures established by DOE in providing its employee(s) with any forms directed by DOE, (ii) that the employee properly completes any forms, and (iii) that the employee(s) submits the forms to the person designated by the Contracting Officer.

(2) In completing the process for gaining physical access, that its employee (i) cooperates with DOE officials responsible for granting access to DOE owned or leased facilities and (ii) provides additional information, requested by those DOE officials.

(c) The Contractor understands and agrees that DOE may unilaterally deny a security badge to an employee and that the denial remains effective for that employee unless DOE subsequently determines that access may be granted. Upon notice from DOE that an employees application for a security badge is or will be denied, the Contractor shall promptly identify and submit the forms referred to in subparagraph (b)(1) of this clause for the substitute employee. The denial of a security badge to individual employees by DOE shall not be cause for extension of the period of performance of this Contract or any contractor claim.

(End of clause)

WES-H-1037 SAFETY AND HEALTH - HIGH RISK (WAPA, MAY 2005)

In performing the work required by this contract, the Contractor shall comply with all applicable Federal, State, or local safety, health, or industrial safety codes including the latest effective standards promulgated by the Department of Labor, Occupational Safety and Health Administration; Safety and Health Standards 29 CFR 1910, 29 CFR 1925; and the Construction Safety and Health regulations promulgated under Section 107 of the Contract Work Hours and Safety Standards Act, 29 CFR 1926. If there is a conflict between the requirements of the applicable Federal, State, or local safety, health, or industrial safety codes, the more stringent requirements shall prevail. For any cranes used in the performance of this contract, a copy of the crane inspection records shall be furnished to Western's on-site representative prior to the performance of work. The United States is liable only for negligence on the part of its employeees in accordance with the Federal Tort Claims Act, as amended. Prior to starting work, an on-site safety meeting shall be held with Western's representative to address and discuss safety procedures related to the work required.

In addition, the contractor agrees to the following requirements:

1. A hazard evaluation will be developed for each major work component.

2. The Contractor agrees that Western has the right to remove any supervisor that does not adhere to said requirements.

(End of clause)

WES-H-1048 LIMITATION OF COSTS RESULTING FROM SUBCONTRACTING PRICE

ADJUSTMENTS (WAPA, FEB 2008)

a. When contract price adjustments are allowed for performance wholly or substantially by subcontractors or suppliers, the Government will reimburse the prime contractor for actual associated indirect costs and profit up to a maximum adjustment of 10% of the total adjustment allowed for the subcontractor or supplier.

b. Where more than one tier of subcontractors or suppliers are involved in contract performance, the total allowance for the prime contractor's indirect cost and profit shall not exceed 10% of the total adjustment allowed for all subcontractors or suppliers who wholly or substantially perform the work.

SECTION I – CONTRACT CLAUSES

52.202-1 Definitions (NOV 2013)

52.203-3 Gratuities (APR 1984)

52.203-5 Covenant Against Contingent Fees (MAY 2014)

52.203-7 Anti-Kickback Procedures (MAY 2014)

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014)

52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010)

52.203-99, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements (DEVIATION 2015-02) (FEB 2015)

(a) The Contractor shall not require employees or subcontractors seeking to report fraud, waste, or abuse to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting such waste, fraud, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.

(b) The contractor shall notify employees that the prohibitions and restrictions of any internal confidentiality agreements covered by this clause are no longer in effect.

(c) The prohibition in paragraph (a) of this clause does not contravene requirements applicable to Standard Form 312, Form 4414, or any other form issued by a Federal department or agency governing the nondisclosure of classified information.

(d)(1) In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Resolution Appropriations Act, 2015 (Pub. L. 113-235), use of funds appropriated (or otherwise made available) under that or any other Act may be prohibited, if the Government determines that the Contractor is not in compliance with the provisions of this clause.

(2) The Government may seek any available remedies in the event the Contractor fails to comply with the provisions of this clause.

(End of clause)

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011)

52.204-13 System for Award Management Maintenance (JUL 2013)

(a) Definition. As used in this clause--

“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities, which is used as the identification number for Federal Contractors.

“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at subpart 32.11) for the same concern.

“Registered in the System for Award Management (SAM) database” means that—

(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, the Contractor and government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14), into the SAM database;

(2) The Contractor has completed the Core, Assertions, Representations and Certifications, and Points of Contact sections of the registration in the SAM database;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The Contractor will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and

(4) The Government has marked the record “Active”.

“System for Award Management (SAM)” means the primary Government repository for prospective Federal awardee and Federal awardee information and the centralized Government system for certain contracting, grants, and other assistance-related processes. It includes—

(1) Data collected from prospective Federal awardees required for the conduct of business with the Government;

(2) Prospective contractor-submitted annual representations and certifications in accordance with FAR subpart 4.12; and

(3) Identification of those parties excluded from receiving Federal contracts, certain subcontracts, and certain types of Federal financial and non-financial assistance and benefits.

(b) The Contractor is responsible for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data.

To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis, from the date of initial registration or subsequent updates, its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(c)

(1)

(i) If a Contractor has legally changed its business name, doing business as name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to—

(A) Change the name in the SAM database;

(B) Comply with the requirements of subpart 42.12 of the FAR; and

(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor shall provide with the notification sufficient documentation to support he legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (c)(1)(i) of this clause, or fails to perform the agreement at paragraph (c)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see FAR subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the SAM. Information provided to the Contractor’s SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the EFT clause of this contract.

(3) The Contractor shall ensure that the DUNS number is maintained with Dun & Bradstreet throughout the life of the contract. The Contractor shall communicate any change to the DUNS number to the Contracting Officer within 30 days after the change, so an appropriate modification can be issued to update the data on the contract. A change in the DUNS number does not necessarily require a novation be accomplished. Dun & Bradstreet may be contacted—

(i) Via the internet at http://fedgov.dnb.com/webform or if the Contractor does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office.

(d) Contractors may obtain additional information on registration and annual confirmation requirements at https://www.acquisition.gov.

(End of Clause)

52.204-18 Commercial and Government Entity Code Maintenance (JUL 2015)

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015)

52.209-10 – Prohibition on Contracting With Inverted Domestic Corporations (NOV 2015)5

52.214-29 Order of Precedence - Sealed Bidding (JAN 1986)

52.219-6 Notice of Total Small Business Set-Aside (NOV 2011)

52.219-8 Utilization of Small Business Concerns (OCT 2014)

52.219-28 Post-Award Small Business Program Rerepresentation (JUL 2013)

(a) Definitions. As used in this clause-

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern means a concern, including its affiliates, that is independently owned and…