Pre-Bid/Site Visit Meeting Attendance Sheet Poudre Substation
Name Organization Phone Email Corey Lieberth IPC 308/520-0526 clieberth@ipc.net Creek Kuser Sub Inc. 406/422-3400 creek.kuser@substationsinc.com Netter Kuser Sub Inc. 406/432-2820 Netterkuser@gmail.com Mike Korhonen WAPA 970/461-7267 korhonen@wapa.gov Mike Kaiser Addison 307/421-3118 mkaiser@q.com Mike Croniser NESI 315/53306288 michael@nesi.com
The site visit was conducted on 18 August 2015 at 10:00 A.M at the Poudre Substation. Introductions were made, attendance was taken and site visit rules were explained to the contractors. The rules were that there were to be no side-bar conversations. Questions were to be asked so that everyone could hear and the response to those questions would be given to the group. The site visit documentation would be sent to all contractors after the site visit.
Questions:
Q1: Page 10 of the spec refers to the design limitations of the bus tower, does the bus tower need modifications for future span?
A1: The bus tower design limitations are for information only, the bus tower does not need modifications for the future span.
Q2: PCB content
A2: Equipment to be removed must be tested for PCBs before it’s removed; refer to division 13.
Q3: Are the relays in the panel to be disposed of by the contractor as well?
A3: The entire panel must be removed and disposed of by the contractor, including any relays installed.
Q4: Page 17, paragraph 9.c, type of outdoor bus fittings and can the jumpers be welded?
A4: The project drawings specify what type of fittings to use. The jumpers cannot be welded, compression fittings only.
mailto:creek.kuser@substationsinc.com mailto:Netterkuser@gmail.com mailto:korhonen@wapa.gov mailto:mkaiser@q.com
Q5: What is the serial number of the transformer to be placed at the Poudre Substation?
A5: Please see attached.