BLYTHE-HEADGATE ROCK

161-KV TRANSMISSION LINE

REROUTE

Spec No. 818 Amendment 003

SECTION C

DESCRIPTION/SPECIFICATIONS

CALIFORNIA

SECTION C

DESCRIPTION/SPECIFICATIONS

BLYTHE-HEADGATE ROCK 161-KV TRANSMISSION LINE REROUTE

DIVISION 1 – GENERAL REQUIREMENT

A. CONTRACT REQUIREMENT

B. DESCRIPTION OF WORK

1. Removing Existing Transmission Line

2. Transmission Line Steel Pole Structures

3. Transmission Line Electrical

C. DESCRIPTION OF BIDDING SCHEDULE ITEM

1. Bidding Schedule item “Mobilization and preparatory work”

D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

1. Commencement and Completion

2. Submittal Approval Time

3. Sequence of Work/Outage Restrictions

4. Maximum Available Fault Current

E. CONSTRUCTION PROGRAM

1. Submittal Time

2. Format and Detail

F. MATERIAL

1. Points-of-Delivery

G. RIGHTS-OF-WAY

1. General

H. GEOLOGIC INVESTIGATIONS

I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES

J. WATER FOR CONSTRUCTION PURPOSES

K. EXPLOSIVES AND BLASTING

L. SUBMITTALS

1. General

2. Approval Time

3. Address

DIVISION 2 – SITEWORK

A. DESCRIPTION OF BIDDING SCHEDULE ITEMS

1. Bidding Schedule item “Removing existing transmission line”

2. Bidding Schedule item “Removing existing transmission line structures in Area of Special

Cultural Concern”

3. Bidding Schedule does not contain separate items

DIVISION 3 – CONCRETE

A. GENERAL

1. Material

2. Test for Potential Reactivity of Sand and Coarse Aggregate

3. Bidding Schedule does not contain separate items

DIVISION 5 – TRANSMISSION LINE STEEL POLE STRUCTURES

A. GENERAL

B. DESCRIPTION OF BIDDING SCHEDULE ITEM

1. Bidding Schedule item “Installing Government-furnished transmission line steel pole structures”

C. STRUCTURE NUMBERS, DIMENSIONS, AND EMBEDMENT DEPTHS

1. Structure Embedment Depths

2. Minimum Foundation Excavation Diameter

D. GOVERNMENT-FURNISHED DRAWINGS

DIVISION 10 – TRANSMISSION LINE ELECTRICAL

A. DESCRIPTION OF BIDDING SCHEDULE ITEMS

1. Bidding Schedule items for “Furnishing and installing high temperature conductor insulator assemblies with porcelain insulators for 1,272,000 circular mil ACSS 54/19 conductor” and “Furnishing and installing conductor insulator assemblies with porcelain insulators for 477,000 circular mil ACSR 26/7 conductor single string tension assemblies Type T11-B”

2. Bidding Schedule items for “Furnishing and installing overhead groundwire assemblies for 1/2-inch-diameter, high-strength, 7-strand steel overhead groundwire” and “Furnishing and installing overhead groundwire assemblies for 3/8-inch diameter, high-strength, 7-strand steel overhead groundwire for tension assemblies for Type OGW-TV”

3. Bidding Schedule item “Furnishing and installing three (3) 1,272,000 circular mil ACSS 54/19 conductors”

4. Bidding Schedule item “Furnishing and installing one (1) 1/2-inch diameter, galvanized, high-strength steel, 7-strand overhead groundwire”

5. Bidding Schedule item “Furnishing and installing vibration dampers directly to 1,272,000 circular mil ACSS conductors”

6. Bidding Schedule item for “Furnishing and installing Stockbridge-type or Sprial-type vibration dampers directly to directly to the 1/2-inch diameter overhead groundwire”

7. Bidding Schedule item “Spare parts”

DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION

A. SPECIAL REQUIREMENTS

1. Contractor Furnished Data

2. Prevention of Air Pollution

3. Prevention of Water Pollution

4. Preservation of Cultural Resources

5. Conservation of Natural Resources

6. Other Resource Protection Measures

DIVISION 15 – DRAWINGS

A. GENERAL

1. Additional Copies of Drawings

DIVISION 1 – GENERAL REQUIREMENT

A. CONTRACT REQUIREMENT:

Construct and complete the Blythe-Headgate Rock 161-kV Transmission Line Reroute in accordance with the Construction Contract (Standard Form 1442); the Contract Clauses; Western Construction Standards, including Standard 1 – General Requirements (September 2013), Standard 2 – Sitework (September 2013), Standard 3 – Concrete (September 2013), Standard 5 – Transmission Line Steel Pole Structures (September 2013), Standard 10 – Transmission Line Electrical (September 2013), Standard 13 – Environmental Quality Protection (September 2013), Standard 15 Drawings (September 2013); Standard Drawings; and these project specifications and drawings.

If a conflict occurs between the Project Specifications and the Construction Standards, the Project Specifications shall govern. The Project Specifications and the drawings are used to take exceptions or provide additions to the Standard Specifications. Some paragraphs in the Standard Specifications will not apply to this job.

Western Construction Standards, Standard Drawings, and Electrical Equipment Standards are available at http://www.wapa.gov/business/buys.htm.

Western's Project Specifications and Standards are explained in Standard 1 – General Requirements, Section 1.1.1, “Standards and Project Specifications”.

B. DESCRIPTION OF WORK:

Paragraphs “Description of Bidding Schedule Items” in Divisions – 1, 2, 5, and 10 describe the work to be performed.

The work is located approximately 13 miles northeast of Blythe, California, on the transmission line right-of-way between Stations 2516+00 and 2628+00 on the Blythe-Headgate Rock No. 1 161-kV Transmission Line, as shown on Drawing PAD-BLY1 0002.

The principal components of work include the following:

1. REMOVING EXISTING TRANSMISSION LINE:

a. Removing 0.685 mile of 161-kV transmission line.

b. Removing six (6) wood pole structures.

2. TRANSMISSION LINE STEEL POLE STRUCTURES:

a. Assembling and installing seven (7) Government-furnished Type 246L and 246Y direct-embedded steel pole structures with concrete backfill.

3. TRANSMISSION LINE ELECTRICAL:

a. Furnishing and installing conductor, overhead groundwire, conductor insulator assemblies, overhead groundwire assemblies, vibration dampers for conductor and overhead groundwire, and miscellaneous transmission line hardware.

b. New installation will be for 230-kV insulation levels, however the line will be operated at 161-kV.

C. DESCRIPTION OF BIDDING SCHEDULE ITEM:

1. Bidding Schedule item “Mobilization and preparatory work” includes the following:

a. Performing mobilization and preparatory work in accordance with Section H of the contract clauses.

b. Prepare and submit a Construction Schedule and a Safety and Health Program.

D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:

1. COMMENCEMENT AND COMPLETION: Refer to Section F clause 52.211-10.

2. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, Western will require 20-calendar days for review of drawings or data submitted for approval.

3. OUTAGE RESTRICTIONS: In addition to the outage restrictions listed in the Standard

Specifications, the following sequence of work shall be followed to complete the work required by these Specifications.

a. Only one outage will be allowed on the Parker-Headgate No. 1 230-kV Transmission Line.

This outage shall not exceed seven (7) calendar days, and shall be between November 19, 2014 and November 26, 2014.

b. Transmission Line Work: The Contractor shall request outages from the COR two-weeks prior to the planned outage. These outages shall be required to allow the Contractor to connect the new line section to the existing line.

4. CONSTRUCTION SEQUENCE OF WORK:

a. The Construction Contractor shall not mobilize or perform any work at the construction site until August 31, 2014.

b. Sequence of Work: The Contractor shall construct the new line section and have it ready to connect to the existing line before removing the existing line.

5. MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized to carry the maximum available fault current in accordance with the Standard 1 – General Requirements, Section 1.4 “Safety and Health” and the following:

a. The maximum available fault current in the area is 12,160 amps.

E. CONSTRUCTION SCHEDULE:

1. SUBMITTAL TIME: Refer to Contract Clause 52.236-15. The Schedule shall be submitted to the Contracting Officer no later than 15 calendar days after the issuance of the Notice to Proceed.

2. FORMAT AND DETAIL: The construction schedule shall be completed using Windows based

Microsoft Project and submitted both electronically (e.g., e-mail or CD-ROM). Dates on each item of Government-furnished material will be required. Do not program dates earlier than the estimated delivery dates shown in the “Material” paragraph.

F. MATERIAL:

Provide all material for completing the work, except material furnished by Western as listed below:

TABLE 1-1 – GOVERNMENT-FURNISHED MATERIAL

ITEM

ESTIMATED

WEIGHT

(LBS)

ESTIMATED

DELIVERY DATE

ESTIMATED

COST

1. Two (2) Type 246L-65 (DE) transmission line steel pole structures w/maintenance provisions

15,000 EA NST 5-19-14

NLT 9-30-14 $31,950 EA

2. One (1) Type 246L-70 (DE) transmission line steel pole structure w/maintenance provisions

16,000 NST 5-19-14

NLT 9-30-14 $34,080

3. Two (2) Type 246Y-50 (DE) transmission line steel pole structures w/maintenance provisions

30,000 EA NST 5-19-14

NLT 9-30-14 $63,900 EA

4. Two (2) Type 246Y-65 (DE) transmission line steel pole structures w/maintenance provisions

39,000 EA NST 5-19-14

NLT 9-30-14 $83,070 EA

1. POINTS-OF-DELIVERY: Material furnished by Western will be delivered to Western’s Blythe

Substation, approximately 5 miles west of Blythe, California, as shown on drawing BLY 0015.

Western has stored the Government-furnished material at Blythe Substation and the Contractor is responsible for loading, transporting, and unloading all Government-furnished material to the work sites.

G. RIGHTS-OF-WAY:

1. GENERAL: Contact Western for the 161-kV substation/transmission line right-of-way dimensions and physical restrictions. Orient construction methods and equipment to utilize Government-furnished rights-of-way or obtain additional temporary access or any required permits without additional cost to Western. During the contract period, Western reserves the right to use Contractor obtained access or any additional Environmental clearance needed during the performance period to complete the construction contract.

H. GEOLOGIC INVESTIGATIONS:

Geologic information has been obtained for this project. The boring logs are located on Drawing Nos. BLP 8000, BLP 8001, BLP 8002, BLP 8003, BLP 8004, BLP 8005, BLP 8006, and BLP 8007.

Western does not guarantee that the geologic information and records show the conditions that will be encountered in performing the work, but only that the geologic information and records show conditions encountered at the particular point and time the information and records were obtained.

The geologic information may not indicate variations, such as those caused by seasonal fluctuations in rainfall and other factors, which may affect the water level. The Contractor shall determine the nature of material to be excavated, the difficulties of making and maintaining required excavations, and doing other work affected by geology and ground water elevations at the work site.

I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:

Make arrangements and provide all electric power for construction purposes. Provide necessary transmission lines, distribution circuits, transformers, and other electrical equipment for distributing the power to the places of use. At contract completion, remove temporary electrical equipment and distribution lines.

J. WATER FOR CONSTRUCTION PURPOSES:

Furnish water for construction purposes. Make arrangements for obtaining the water and provide for conveying the water to the points of use.

K. EXPLOSIVES AND BLASTING:

Explosives shall not be used.

L. SUBMITTALS:

1. GENERAL: Submittals must be provided in accordance with the Construction Standards and Project Specifications. The Contractor shall furnish submittals electronically (i.e. e-mail), unless otherwise specified by the COR. Submittals received electronically shall be sent to DSW-G5600-CS@wapa.gov in standard PDF or electronic CAD “*.dwg” (AutoCAD 2010) formats. All submittals shall include Western's Specification No., project title, Submittal No., and corresponding Item No. Refer to the Submittal Log for the list of required submittals. This list may not be all-inclusive, and it remains the Contractor's responsibility to ensure conformance to the individual Specifications for possible additional submittal requirements.

The submittal cover sheet in Microsoft Word or PDF format shall be included.

2. APPROVAL TIME: Approval time for submittals shall be in accordance with the

“Commencement, Prosecution, and Completion of Work” paragraph.

3. ADDRESS: The Contractor shall transmit specified non-electronic submittals to the following address:

a. COR:

Western Area Power Administration Desert Southwest Construction Office

ATTN: G5600

P.O. Box 6457 Phoenix, AZ 85005-6457

DIVISION 2 – SITEWORK

A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule item “Removing existing transmission line” includes the following:

a. Removing electrical items, conductors, overhead groundwires, and wood pole structures.

Locations described by station are on the existing Blythe-Headgate Rock No. 1 161-kV transmission line as shown on Drawing PAD-BLY1 4027. Items removed from the existing line may not be reused in constructing the new line. Items removed become the property of the Contractor and shall be removed from the site at the Contractor’s expense.

b. Approximate quantities are listed in Tables 2-1 and 2-2. The Contractor shall determine the actual quantities to be removed and regardless of the quantities removed, payment will only be made for the lump sum price in the Bidding Schedule.

c. Remove the conductors and overhead groundwires, complete with accessories, listed in

Table 2-1.

TABLE 2-1 – ELECTRICAL ITEMS TO BE REMOVED

MATERIAL UNIT QUANTITY

Three (3) 477,000 circular mil, ACSR, 26/7 conductors MI 0.685 Two (2) 3/8-inch, high-strength steel, 7-strand overhead groundwires MI 0.685

Suspension insulator assemblies with porcelain insulators EA 12

Suspension overhead groundwire assemblies EA 8

d. Remove the wood pole structures, listed in Table 2-2 by cutting off the poles at ground level, located from Station 2578+60 to Station 2585+85 and Station 2609+25 to Station 2614+75.

TABLE 2-2 – WOOD POLE STRUCTURES TO BE REMOVED

WOOD POLE STRUCTURE TYPE OR MATERIAL QUANTITY

Suspension-type H-frame structures 4

Drawings are included showing typical structure details.

2. Bidding Schedule item “Removing existing transmission line structures in Area of Special Cultural Concern” includes the following:

a. Remove the electrical items from the Area of Special Cultural Concern, as listed in Table

2-3.

All work within the Area of Special Cultural Concern shall be restricted to foot traffic only.

No tracked or tired vehicles of any kind shall be allowed in the cultural site. Nothing can be rolled-in. No ground disturbance, poles must be cut-off flush with the ground. Nothing can be dropped or dragged. Because 49/7 is a running angle type 3-pole structure, removal of the conductor and groundwires is also a concern. Conductor and static wire removal shall be controlled, and wire shall not be allowed to drag on the ground.

TABLE 2-3 – ELECTRICAL ITEMS TO BE REMOVED FROM THE

AREA OF SPECIAL CULTURAL CONCERN

Suspension insulator assemblies with porcelain insulators 6

Suspension overhead ground wire assemblies 4

b. Remove the wood pole structures, complete with guys and anchors, for structures 49/6 and 49/7 by cutting off the poles and guy anchors at ground level as listed in Table 2-4 located at Stations 2593+90 and 2597+83 .

TABLE 2-4 – WOOD POLE STRUCTURES AND GUY ANCHORS TO BE

REMOVED FROM THE AREA OF SPECIAL CULTURAL CONCERN

Running angle Type 3 pole structure 1

Suspension Type H frame structure 1

Guy anchors 6

3. Bidding Schedule does not contain separate items for the following. Include these items in applicable Bidding Schedule items.

a. Clearing as directed by the COR.

b. Grading for structure sites and line clearance as directed by the COR.

c. Disposing of removed items.

d. Complying with Environmental Standards.

DIVISION 3 – CONCRETE

A. GENERAL:

1. MATERIAL:

a. Cement: Type IIA cement.

b. Fly-ash: Shall be used in accordance with the “Use of Products Containing Recovered Materials” paragraph of Standard 13. Where severe alkali conditions exist, use Type V cement. Otherwise use Type IIA cement. Types are according to ASTM C150.

c. Compressive Strength:

(1) 3000 psi at 28-days for concrete backfill for transmission line steel pole structures.

d. Water-Cement Ratio: Net water-cement ratio, exclusive of water absorbed by the aggregates, shall not exceed 0.52 by weight.

e. Type A and D water-reducing and retarding admixtures may be used if approved by the COR.

2. TEST FOR POTENTIAL REACTIVITY OF SAND AND COARSE AGGREGATE: Western may perform tests for each source used. If the tests determine the aggregate(s) to be unsuitable as a concrete aggregate, suitable source shall be obtained by the Contractor.

3. Bidding Schedule does not contain separate items for the following. Include these items in applicable Bidding Schedule items.

a. Excavation and concrete backfill for transmission line steel pole structures.

b. Unwatering auger excavations, if required.

c. Casing auger excavations, if required.

d. Disposing of excavated material. Material from the steel pole excavations shall be spread evenly around the work site.

DIVISION 5 – TRANSMISSION LINE STEEL POLE STRUCTURES

The three (3) Type 246L and four (4) Type 246Y three shaft sections unassembled steel pole structures listed in Table 5-1 are galvanized single-shaft structures, and are located at the location described in Division 1, Section F, Table 1-1. The work site is approximately 13 miles northeast of Blythe, California, on the transmission line right-of-way between Stations 2578+81 and 2620+25 on the Blythe-Headgate Rock No. 1 161-kV Transmission Line, as shown on Drawing PAD-BLY1 0002. Structure components include pole shaft sections, davit arms, fixed and removable climbing rung sections, work rings, connection bolts, nuts, and locknuts or lock washers.

B. DESCRIPTION OF BIDDING SCHEDULE ITEM:

1. Bidding Schedule item “Installing Government-furnished transmission line steel pole structures” includes the following:

a. Installing connection bolts, nuts, and locknuts.

b. Installing all pole shaft sections that shall be jacked together in accordance with manufacturer’s instructions.

c. Installing fixed climbing rung sections on all structures with bolts, nuts, and locknuts or lock washers

d. Excavating and concrete backfilling for all structures. Concrete backfill construction includes earthwork, formwork, fabric, material used in concrete, curing, finishing, joints, and other work and material needed to complete the required concrete construction.

e. Casing auger excavations, if required.

f. Furnishing and installing structure number signs, backer plates, and mounting hardware on all structures in accordance with the two-digit mile number detail on Standard Drawing 41 9027.

Structure numbers are listed in Table 5-1 below. Fourteen (14) structure number signs are required (two (2) per structure).

g. Furnishing six (6), thirty-six (36) inch marker balls, the color shall be international orange, as indicated on Standard Drawing 41 9029 for 1/2-inch-diameter 7-strand steel overhead groundwire, installing three (3) on each overhead groundwire that crosses over highway 95, one (1) at the center of the highway and two (2) twenty-five-feet each side of the center marker ball.

h. Furnishing and installing aerial patrol mile marker signs, backer plates, and mounting hardware on Structure No. 50/1, Type 246L-70, in accordance with Standard Drawing 41 9027. Two (2) aerial patrol mile marker signs are required.

i. Furnishing four (4) Warning Arrow aerial patrol warning signs as indicated on Standard

Drawing 41 9028, installing one (1) on structure 49/5 pointing to the right as seen from Structure 49/6. The remaining three (3) Warning Arrow signs will be turned over to Western’s Representatives at the worksite.

C. STRUCTURE NUMBERS, DIMENSIONS, AND EMBEDMENT DEPTHS:

1. Structure embedment depths, “E”, shall be as listed in Table 5-1.

TABLE 5-1 – STRUCTURE DIMENSIONS AND EMBEDMENT DEPTHS

Structure Type and Height "H"

1 (FT)

Structure Nos.

Approx. Pole Base Diameter

(IN)

Approx. Structure Weight

(LB)

Embedment Depth "E" (FT)

Normal "Keyed Into Rock"

246L-65 49/5, 49/7 43 12,500 22 8 246L-70 50/1 45 15,500 22 8 246Y-50 49/4, 50/2 64 29,500 31 11 246Y-65 49/6, 49/8 67 39,000 33 11

1 “H” refers to height portion of structure designation, which is height from ground line to bottom insulator attachment.

2. Structure embedment depths shall be as listed above under “Normal” unless rock is encountered.

If rock is encountered, structure embedment depths may be reduced to the overburden depth plus "Keyed Into Rock" depth.

3. MINIMUM FOUNDATION EXCAVATION DIAMETER: Minimum diameter for foundation excavations shall be maximum pole base diameter plus one-foot.

D. GOVERNMENT-FURNISHED DRAWINGS:

Western will furnish shop drawings for the steel pole structures after contract award.

DIVISION 10 – TRANSMISSION LINE ELECTRICAL

A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule items for “Furnishing and installing high temperature conductor insulator assemblies with porcelain insulators for 1,272,000 circular mil ACSS 54/19 conductor” and “Furnishing and installing conductor insulator assemblies with porcelain insulators for 477,000 circular mil ACSR 26/7 conductor single-string tension assemblies Type T11-B” include furnishing material and performing work and tests to provide insulator assemblies shown on Standard Drawings 41 1020, 41 1022, 41 1023, and 41 1024. An estimate of material quantities for each type of structure is shown on Drawing PAD-BLY 1 1005.

a. Insulators used in suspension and tension insulator assemblies shall be porcelain, ANSI Class

52-3, except that the combined Mechanical and Electrical Strength rating shall be 20,000 pounds. Porcelain insulators shall be brown in color.

b. Line post-type insulators shall be porcelain and brown in color. Line post-type insulators shall comply with the characteristics of Table 10-1.

TABLE 10-1 – 230-kV Line Post Insulator Characteristics

Insulator Characteristics Horizontal Line Post Insulator

Base Type Flat

Specified (working) mechanical load rating (pounds) 2800

Minimum 60-Hz wet flashover (kV) 575

Minimum positive critical impulse flashover (kV) 1025

Minimum dry arc distance (inches) 71

Minimum leakage distance (inches) 167

2. Bidding Schedule items for “Furnishing and installing overhead groundwire assemblies for 1/2-inch diameter, high-strength, 7-strand steel overhead groundwire” and “Furnishing and installing overhead groundwire assemblies for 3/8-inch diameter, high-strength, 7-strand steel overhead groundwire for tension assemblies for Type OGW-TV” include furnishing material and performing work and tests to provide overhead groundwire assemblies shown on Standard Drawing 41 1018. An estimate of material quantities for each type of structure is shown on Drawing PAD-BLY 1 1005.

3. Bidding Schedule item “Furnishing and installing three (3) 1,272,000 circular mil ACSS 54/19 conductors” includes furnishing, stringing, splicing, repairing, sagging, and clipping in the conductors; installing jumper loops; and furnishing and installing material to complete the conductor installations, except for material furnished and installed as a part of insulator assemblies and accessories. Furnish and install material including conductor, conductor joints, conductor repair sleeves, and joint inhibitor compound required to complete conductor installation.

Measurement for furnishing and stringing conductors will be made horizontally along the centerline of the transmission line. The Contractor shall determine the actual quantities to be furnished and installed and regardless of the quantities furnished and installed, payment will only be made for the lump sum price in the Bidding Schedule.

TABLE 10-2 – ACSS CONDUCTOR CHARACTERISTICS

COMPLETED CONDUCTOR SIZE

(CIRCULAR MIL) 1,272,000

Ultimate strength, as computed for the strength of the individual strands, not less than (LBS) 34,100

Aluminum strands number 54 Aluminum strand diameter (IN) 0.1535 Steel strands number 19 Steel strand diameter (IN) 0.0921

*Allowable minus tolerance 5 percent, no upper limit on length.

Conductor shall be non-specular type having the outer surface treated to produce a dull finish in accordance with the requirements of AMSI C7-69.

4. Bidding Schedule item “Furnishing and installing one (1) 1/2-inch diameter, galvanized, high-strength steel, 7-strand overhead groundwire” includes furnishing, stringing, splicing, sagging, and clipping in the overhead groundwire, as described; and furnishing and installing material to complete the overhead groundwire installations, except for material furnished and installed as a part of suspension and tension assemblies for overhead groundwire and accessories.

The Contractor shall determine the actual quantities to be furnished and installed and regardless of the quantities furnished and installed, payment will only be made for the lump sum price in the Bidding Schedule.

5. Bidding Schedule item “Furnishing and installing vibration dampers directly to

1,272,000 circular mil ACSS conductors” includes determining the number of vibration dampers needed, furnishing material, and performing all work, including testing, required to furnish and install vibration dampers for ACSS conductors. The vibration dampers shall be in accordance with the manufacturer’s recommendations based on the information on the “Vibration Damper” Drawing PAD-BLY 1 1006. Vibration dampers for conductor shall be stockbridge-type. Regardless of the manufacturer’s recommendations, one vibration damper shall be installed on each conductor in each span.

6. Bidding Schedule item for “Furnishing and installing Stockbridge-type or Sprial-type vibration dampers directly to 1/2-inch-diameter overhead groundwire” includes determining the number of vibration dampers needed, furnishing material, and performing all work, including testing, required to furnish and install vibration dampers for steel-strand overhead groundwire. The vibration dampers shall be in accordance with the manufacturer’s recommendations based on the information on the “Vibration Damper” Drawing PAD-BLY 1 1006. Vibration dampers for overhead groundwire shall be stockbridge or spiral types. Regardless of the manufacturer’s recommendations, one vibration damper shall be installed on the overhead groundwire in each span.

7. Bidding Schedule item “Spare parts” includes furnishing three (3) high temperature suspension clamps with BNK for SI11-B and three (3) high temperature compression deadends with BNK for T21-C assemblies for 1,272,000 circular mil 54/19, ACSS conductor. Deliver spare parts, suitably packaged for long-term storage, to the Western Area Power Administration Desert Southwest warehouse.

DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION

A. SPECIAL REQUIREMENTS:

In addition to the requirements of Standard 13, the following special requirements shall apply:

1. CONTRACTOR-FURNISHED DATA:

a. As per the Standard 13 requirements, please submit one (1) copy of all data to the COR, Department of Energy, Western Area Power Administration, ATTN: G5600 P.O. Box 6457, Phoenix, AZ, 85005. The data includes but not limited to, recycled Material Quantity Report, Demolition Plan, Products Containing Recovered Material Report, Spill Prevention Notification and Cleanup Plan, Prevention of Air Pollution, and Water Pollution Permits.

b. The Contractor shall notify Western 14-calendar-days prior to the initiation of on-site activities to allow sufficient time to arrange for on-site cultural, tribal, and Biological Monitors. Refer to Division 13, Sections A.4 and A.5 below.

c. Copies of all permits and plans, approved by the appropriate regulating agencies, shall be submitted to the COR 14-calendar-days prior to start of work.

2. PREVENTION OF AIR POLLUTION:

a. The Contractor shall follow the Dust Control Plan Guidance document listed by the Mojave Desert Air Quality Management District. Refer to http://www.mdaqmd.ca.gov/Modules/ShowDocument.aspx?documentid=3417 for information that is required by the Mojave Desert Air Quality Management District. The District will provide a written notification of approval or disapproval. If no disapproval is received within 30-days of submittal, the Dust Control Plan was approved by the District.

Submit a copy of your Dust Control Plan to the COR 14-calendar days prior to the start of work.

3. PREVENTION OF WATER POLLUTION:

a. Additional permitting is required as follows:

(1) DSW Environmental will submit the Notice of Intent to the California Environmental

Protection Agency State Water Resources Control Board using the Storm Water Multiple Application and Report Tracking System (SMARTS).

(2) The Construction General Permit requires the development and implementation of a

Storm Water Pollution Prevention Plan (SWPPP) that stratifies the conditions of the permit. In California, SWPPP’s are required to be prepared by a Qualified SWPPP Developer (QSD) and implemented by a Qualified SWPPP and subcontract a QSD to implement the SWPPP.

(3) The SWPPP shall be kept on-site of the construction activities. The SWPPP is site specific and shall meet the following conditions listed below:

(a) Identifies potential sources of stormwater pollution at the construction site.

(b) Describes practices to reduce pollutants in stormwater discharges from construction site. Reduction of pollutants is often achieved by controlling the volume of Stormwater runoff (e.g., taking steps to allow Stormwater to infiltrate into the soil).

http://www.mdaqmd.ca.gov/Modules/ShowDocument.aspx?documentid=3417

(c) Identifies procedures the operator will implement to comply with the terms and conditions submitted to the COR 14-calendar-days prior to start of work.

(4) Copies of permits and plans, approved by the appropriate regulating agencies, shall be submitted to the COR 14-calendar-days prior to start of work.

4. PRESERVATION OF CULTURAL RESOURCES:

a. General: Do not remove or alter cultural artifacts. Artifacts of potential scientific or cultural importance, including bones and tools, are protected by Federal regulations.

b. Unknown Cultural Sites: On rare occasions cultural sites may be discovered during excavation or other earth moving activities.

(1) Reporting: If evidence of a potential cultural site(s) is discovered, immediately notify the COR and give the location and nature of the findings. Stop all activities within a 50-foot-radius of the discovery, and do not proceed with work within that radius until directed to do so by the COR.

(2) Care of Evidence: Do not damage artifacts or fossils uncovered during construction. Should any impacts occur, the Contractor may be liable under the Archaeological Resources Protection Act for any resource damaged.

(3) Contract Adjustments: Where appropriate by reason of delays caused by a discovery, the Contracting Officer may make adjustments to contract requirements/agreements.

c. Known Cultural Sites: There are multiple cultural resource sites located in the project vicinity. These sites have specific requirements of mitigation and avoidance.

(1) Training: All Contractor personnel visiting or working at the project site will be required to attend cultural resource awareness training provided by Western prior to accessing the project area.

(2) Mitigation and Avoidance of Sites: The Contractor including all personnel and equipment will avoid and not access a site or pass by a site other than under the guidance and direction of a Western provided on-site Archaeological Monitor.

Access near sites will be marked and limited.

(3) Marking Sites: The materials for avoidance will be provided, installed and removed by the Western provided on-site Archaeological Monitor.

5. CONSERVATION OF NATURAL RESOURCES:

a. General: Federal law prohibits the taking of endangered, threatened, proposed or candidate wildlife and plants, or designated Critical Habitat. Federal law also prohibits the taking of birds protected by the Migratory Bird Treaty Act. “Take” means to pursue, hunt, shoot, wound, kill, trap, capture or collect a protected animal or any part thereof, or attempt to do any of those things.

b. Unknown Occurrence of Protected Species or Habitat: If evidence of a protected species is found in the project area, the Contractor shall immediately notify the COR and provide the location and nature of the findings. The Contractor shall stop all activity in the vicinity of the species or habitat, and not proceed until directed to do so by the COR.

c. Known Species: There is the possibility for special status (protected) species to occur in the project area. In order to alleviate potential impacts to these species, the following special conditions must be followed:

(1) Limit Disturbance Area: At all proposed work areas, limit the mechanical disturbance of previously undisturbed habitats (including soils) to the greatest extent practicable.

(2) Pre-construction Clearance Surveys: Western will assign a qualified Biologist to the project to conduct pre-construction clearance surveys for Desert Tortoise, Burrowing Owls (year-around), nesting birds (from February 15th to May 10th, and from August 25th to August 31st), and other special-status species.

(a) Project activities may not disturb an active bird nest. If an active bird nest is located on or adjacent to the site, a qualified Biologist will designate and flag an appropriate buffer area around the nest where activities will not be permitted.

(b) At Western’s direction, a qualified Biologist may also perform monitoring onsite during construction activities as needed, based on the results of the pre-construction clearance surveys, to ensure minimization of impacts to special-status species and other biological resources.

(c) The qualified Biologist is authorized by Western to temporarily halt construction activity if needed to prevent potential harm to special status spe-cies. The work supervisor will co-ordinate with the qualified Biologist, if present, on planned or on-going activities and any specific pre-construction survey or monitoring requirements for each activity in those areas.

(3) Threatened and Endangered Species Avoidance Dates: Within riparian scrubland habitat, Project construction or O&M activities will not be conducted between May 10th and August 25th.

(4) Drainage Ditch: Western will avoid discharge of any material into the mapped drainage ditch within the project area, and avoid any construction activity within the ditch. No dirt, raw cement, concrete or washings thereof, asphalt, paint, oil, solvents, or other petroleum products, or any other substances that could be hazardous to aquatic wildlife will be allowed to enter the drainage ditch.

(5) Worker Training: Western will conduct employee training to ensure that all workers on the project site (including Contractors) are aware of all applicable Conservation Measures for biological resources, including information regarding civil and criminal penalties for violations of the Federal Endangered Species Act, the Migratory Bird Treaty Act, and the Bald and Golden Eagle Protection Act.

(6) Animals: No pets will be permitted on the work site. Workers will not be permitted to feed, harm, approach, harass, or handle wildlife at any time, except to move animals out of harm’s way, and only as directed by a supervisor. This condition will not exempt workers, including the biologist, from any Western safety policy with regard to venomous reptiles.

(7) Conform to APLIC Design Guidelines: In order to minimize any potential electrocution hazard for Golden Eagles or other large birds, energized and ground conductors and hardware will be separated by 60-inches or more, or will be covered.

(8) Trash, Refuse, Concrete, and Other Materials: All trash and food materials will be properly contained within vehicles or closed refuse bins while on the site, and will regularly be removed from the site (at least on a weekly basis) for proper disposal.

All construction refuse will be removed from each work site upon completion of construction. No raw cement, concrete or washings thereof, asphalt, paint, oil, solvents, or other petroleum products, or any other substances that could be hazardous to vegetation or wildlife resources, shall be disposed of onsite or allowed to spill onto soil. Cleanup of any spilled material shall begin immediately.

(9) Minimize Standing Water: Within desert shrubland habitat, water applied to dirt roads and construction areas for dust abatement shall use the minimal amount needed to meet safety and air quality standards, to prevent the formation of puddles, which could attract wildlife to construction sites.

(10) Speed Limit: To minimize potential impacts to special-status wildlife, no vehicles will be permitted to exceed 25 miles per hour while traveling on access roads.

d. Contract Adjustments: Where appropriate by reason of delays caused by a discovery, the Contracting Officer may make adjustments to contract requirements/agreements.

6. OTHER RESOURCE PROTECTION MEASURES: Resource Protection Measures (RPM) shall be implemented as follows, per the Environmental Assessment for the Blythe-Headgate Rock 161-kV Transmission Line Structure Replacement and Black Point Mesa Reroute Project (EA No. DOE/EA-1427, 2005):

a. Sensitive plants shall be avoided. Sensitive plant species include fishhook, cottontop, and barrel cactus; beavertail prickly pear; ocotillo, buckhorn, and Wiggin’s cholla; saguaros, and other small or viable Opuntia, or Cylindropuntia species.

b. No construction would occur during periods where the soil is too wet to adequately support construction equipment because construction equipment would cause ruts in the soil in excess of six-inches or greater. If grading operations associated with replacing a pole have altered the original ground topography, the ground surface would be reshaped to approximate the original topography.

DIVISION 15 - DRAWINGS

1. ADDITIONAL COPIES OF DRAWINGS: After Award of contract, Western will furnish the following:

a. Additional two copies of the Specifications, which include reduced-size drawings.

b. Two B-size drawings 11x17.

c. Two C-size drawings 18x24.

d. Two D-size drawings 24x36.

Message from the Administrator

At Western, we show our commitment to safety every day through the actions we take, the training we offer and the work conditions we provide. We expect the same commitment to safety from each of our contractors who provide products or services to Western. In performing work for Western, all contractors must make the right decisions to ensure that the work environment is as safe as possible.

Our safety program is based on four points:

Safety procedures or common sense must be applied by each

Federal and contract employee. Safety should not be set aside to meet a project schedule or for personal convenience.

Employees and contractors must believe that they have the right and the responsibility to identify and take action to reduce, if not eliminate, hazardous work environments and hazardous work practices.

Managers and supervisors must lead by example and execute their responsibility to ensure each job is accomplished in a safe and healthy way.

Safety is a personal responsibility. Each individual makes the decision on what action to take to accomplish a task.

By integrating these principles into every task we take, together we can ensure Western is a safe place to work.

Mark A. Gabriel Administrator

DIVISION 1 – GENERAL REQUIREMENT
A. CONTRACT REQUIREMENT:
B. DESCRIPTION OF WORK:
1. REMOVING EXISTING TRANSMISSION LINE:
2. TRANSMISSION LINE STEEL POLE STRUCTURES:
3. TRANSMISSION LINE ELECTRICAL:
C. DESCRIPTION OF BIDDING SCHEDULE ITEM:
1. Bidding Schedule item “Mobilization and preparatory work” includes the following:
D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:
1. COMMENCEMENT AND COMPLETION: Refer to Section F clause 52.211-10.
2. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, Western will require 20-calendar days for review of drawings or data submitted for approval.
3. OUTAGE RESTRICTIONS: In addition to the outage restrictions listed in the Standard Specifications, the following sequence of work shall be followed to complete the work required by these Specifications.
4. CONSTRUCTION SEQUENCE OF WORK:
5. MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized to carry the maximum available fault current in accordance with the Standard 1 – General Requirements, Section 1.4 “Safety and H...
E. CONSTRUCTION SCHEDULE:
1. SUBMITTAL TIME: Refer to Contract Clause 52.236-15. The Schedule shall be submitted to the Contracting Officer no later than 15 calendar days after the issuance of the Notice to Proceed.
2. FORMAT AND DETAIL: The construction schedule shall be completed using Windows based Microsoft Project and submitted both electronically (e.g., e-mail or CD-ROM). Dates on each item of Government-furnished material will be required. Do not progra...
F. MATERIAL:
Provide all material for completing the work, except material furnished by Western as listed below:
1. POINTS-OF-DELIVERY: Material furnished by Western will be delivered to Western’s Blythe Substation, approximately 5 miles west of Blythe, California, as shown on drawing BLY 0015. Western has stored the Government-furnished material at Blythe Sub...
G. RIGHTS-OF-WAY:
1. GENERAL: Contact Western for the 161-kV substation/transmission line right-of-way dimensions and physical restrictions. Orient construction methods and equipment to utilize Government-furnished rights-of-way or obtain additional temporary access ...
H. GEOLOGIC INVESTIGATIONS:
I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:
J. WATER FOR CONSTRUCTION PURPOSES:
K. EXPLOSIVES AND BLASTING:
L. SUBMITTALS:
1. GENERAL: Submittals must be provided in accordance with the Construction Standards and Project Specifications. The Contractor shall furnish submittals electronically (i.e. e-mail), unless otherwise specified by the COR. Submittals received elec...
2. APPROVAL TIME: Approval time for submittals shall be in accordance with the “Commencement, Prosecution, and Completion of Work” paragraph.
3. ADDRESS: The Contractor shall transmit specified non-electronic submittals to the following address:
DIVISION 2 – SITEWORK
A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule item “Removing existing transmission line” includes the following:
2. Bidding Schedule item “Removing existing transmission line structures in Area of Special Cultural Concern” includes the following:
3. Bidding Schedule does not contain separate items for the following. Include these items in applicable Bidding Schedule items.
DIVISION 3 – CONCRETE
A. GENERAL:
1. MATERIAL:
2. TEST FOR POTENTIAL REACTIVITY OF SAND AND COARSE AGGREGATE: Western may perform tests for each source used. If the tests determine the aggregate(s) to be unsuitable as a concrete aggregate, suitable source shall be obtained by the Contractor.
3. Bidding Schedule does not contain separate items for the following. Include these items in applicable Bidding Schedule items.
DIVISION 5 – TRANSMISSION LINE STEEL POLE STRUCTURES
A. GENERAL:
B. DESCRIPTION OF BIDDING SCHEDULE ITEM:
1. Bidding Schedule item “Installing Government-furnished transmission line steel pole structures” includes the following:
C. STRUCTURE NUMBERS, DIMENSIONS, AND EMBEDMENT DEPTHS:
1. Structure embedment depths, “E”, shall be as listed in Table 5-1.
2. Structure embedment depths shall be as listed above under “Normal” unless rock is encountered. If rock is encountered, structure embedment depths may be reduced to the overburden depth plus "Keyed Into Rock" depth.
3. MINIMUM FOUNDATION EXCAVATION DIAMETER: Minimum diameter for foundation excavations shall be maximum pole base diameter plus one-foot.

D. GOVERNMENT-FURNISHED DRAWINGS:

DIVISION 10 – TRANSMISSION LINE ELECTRICAL
A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule items for “Furnishing and installing high temperature conductor insulator assemblies with porcelain insulators for 1,272,000 circular mil ACSS 54/19 conductor” and “Furnishing and installing conductor insulator assemblies with porc...
2. Bidding Schedule items for “Furnishing and installing overhead groundwire assemblies for 1/2-inch diameter, high-strength, 7-strand steel overhead groundwire” and “Furnishing and installing overhead groundwire assemblies for 3/8-inch diameter, high...
3. Bidding Schedule item “Furnishing and installing three (3) 1,272,000 circular mil ACSS 54/19 conductors” includes furnishing, stringing, splicing, repairing, sagging, and clipping in the conductors; installing jumper loops; and furnishing and insta...
4. Bidding Schedule item “Furnishing and installing one (1) 1/2-inch diameter, galvanized, high-strength steel, 7-strand overhead groundwire” includes furnishing, stringing, splicing, sagging, and clipping in the overhead groundwire, as described; and...
5. Bidding Schedule item “Furnishing and installing vibration dampers directly to 1,272,000 circular mil ACSS conductors” includes determining the number of vibration dampers needed, furnishing material, and performing all work, including testing, req...
6. Bidding Schedule item for “Furnishing and installing Stockbridge-type or Sprial-type vibration dampers directly to 1/2-inch-diameter overhead groundwire” includes determining the number of vibration dampers needed, furnishing material, and performi...
7. Bidding Schedule item “Spare parts” includes furnishing three (3) high temperature suspension clamps with BNK for SI11-B and three (3) high temperature compression deadends with BNK for T21-C assemblies for 1,272,000 circular mil 54/19, ACSS conduc...
DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION
A. SPECIAL REQUIREMENTS:
1. CONTRACTOR-FURNISHED DATA:
2. PREVENTION OF AIR POLLUTION:
3. PREVENTION OF WATER POLLUTION:
4. PRESERVATION OF CULTURAL RESOURCES:
5. CONSERVATION OF NATURAL RESOURCES:
6. OTHER RESOURCE PROTECTION MEASURES: Resource Protection Measures (RPM) shall be implemented as follows, per the Environmental Assessment for the Blythe-Headgate Rock 161-kV Transmission Line Structure Replacement and Black Point Mesa Reroute Proje...
1. ADDITIONAL COPIES OF DRAWINGS: After Award of contract, Western will furnish the following: