Day Use V.T. scope~1.docx
DOCX document 28 KB Posted
- Attached to
- DNR Day Use Privy, Kaskaskia
- Solicitation number
- 19-422DNR-LNDMG-B-5146
- Issued by
- Pope County, Bartelso Village, Illinois
About this file
This document is a Project Scope & Bid Requirements from the Illinois Department of Natural Resources (IDNR) for the construction of a new Double Vault Toilet at the Day Use Area of the Baldwin Lake / Kaskaskia River State Fish and Wildlife Area. The project involves constructing a new restroom building with concrete masonry walls on top of pre-cast concrete vaults, installing a new paved sidewalk, and providing associated site work. The project is located at specific geographic coordinates and the restroom will be ADA accessible. Bids are to be held open for 90 calendar days, and the contractor must comply with prevailing wage requirements, be registered as a small business, and utilize apprenticeship programs. Insurance, change order, warranty, and other standard contract requirements are outlined.
The bid submittal process requires electronic submission through the BidBuy program as well as a hardcopy submission. The contract will be awarded to the lowest, responsible, qualified bidder, though IDNR reserves the right to reject any or all bids. The project engineer and site superintendent contact information is provided for any inquiries.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DRAFT_SHEET_2OF1.pdf | ||
| DRAFT_SHEET3.pdf | ||
| DRAFT_SHEET2_2.pdf | ||
| DRAFT_SHEET4.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
PROJECT SCOPE & BID REQUIREMENTS
Date: December , 2018 File # 4-17-024
LOCATION: Kaskaskia River State Fish and Wildlife Area
PROJECT TITLE: Construct New Vault Toilet at Day Use Area
PROJECT COORDINATES: N: 38° 11’ 39”
| W: 89° 53’ 59” |
| T. 4 S. R. 7 W. Sec. 8 S.W. 1/4 |
PROJECT NARRATIVE:
The Illinois Department of Natural Resources, hereinafter referred to as IDNR, is seeking bids to construct new Double Vault Toilet at the Day Use Area, Baldwin Lake / Kaskaskia River State Fish and Wildlife Area. The project will improve the facility for visitors by providing an ADA accessible restroom.
PROJECT SCOPE OF WORK: (note any quantities shown are to be verified by contractor)
The project consists of the following summary of work items:
1. New Vault Toilet: The restroom building borrows design elements originally developed by the United States Forest Service. Principally, this involves using a convection ventilation system that draws fresh air from a sidewall vent near ground level that is drawn into the building, down the riser and then out of the vault tank through the exterior vent pipe. A key component of this design is that the interior of the building remains cooler than the exterior vent pipe. Therefore, the building uses an insulated ceiling and there are no gable vents. The new restroom building is built using concrete masonry walls on top of the new pre-cast concrete vaults. The masonry units will have a split face exterior face with a smooth interior wall. The color of the units must be approved by IDNR prior to ordering by the contractor. The interior of the restrooms will have a painted finish on all walls and ceiling (white) in color. The interior floors are the sealed tops of the vault tanks. A tubed skylight provides interior lighting. Note: Skylight tube in the interior ceiling must not be located directly over the riser.
2. New paved sidewalk: This pathway will provide access from the existing paved parking areas to the proposed vault toilet entryway. Approximately twenty-five (25) feet length by five (5) feet wide of concrete sidewalk will need to be formed, furnished and installed. This sidewalk shall be placed over a properly compacted aggregate base.
SPECIFICATIONS: Refer to attached Specifications
SPECIAL PROVISIONS:
The area where this construction will take place is open to the public. The contractor is responsible to install any temporary barricades as needed to prevent the pubic from venturing into the construction zone. Access to the site is via local roadways. Contractor must comply with all load limits (if any) that local jurisdictions might have in place during the time of construction.
The contractor will be required to abide to all site regulation and work with the Site Superintendent, Mic Middleton at 618-785-2555, and site staff regarding working hours, staging areas and securing the work site. The restroom will not be open to the public until the contractor is completely finished with the project. Once all of the construction is complete the contractor is required to clean-up his work site and legally depose of all construction debris off-site.
Warranty information and shop drawings covering all installed products will be required prior to construction.
BIDDING & CONTRACT INFORMATION:
| √ | Duration of Bids |
| Bids shall be held open for ninety (90) calendar days after the bid opening or for an extended | |
| period of time, if agreed to in writing by the Bidder and IDNR. | |
| √ | Prevailing Wage Rates |
| The Contractor must comply with provisions of the “Prevailing Wage Act,” 820 ILCS 130/1 | |
| et. seq., which applies to the wages of laborers, mechanics and other workers employed | |
| in any public works. The Contractor is responsible for contacting the Illinois Department | |
| of Labor (217/782-6206); http://www.state.il.us/agency/idol/index/htm to ensure | |
| understanding of the prevailing wage requirements (30 ILCS 500/25-60 (b)). | |
| √ | Small Business Set-Aside |
The contractor awarded the bid must be registered as a small business, as required by the Small Business Set-Aside program. (For complete requirements, to become registered, or certify your business in the Small Business Set-Aside Program, visit http://www.sell2.illinois.gov/sbsp/set_aside.htm. or contact the Department of Central Management Services’ small business coordinator at 1-866-455-2897.)
BidBuy Program Contractors submitting quotes must be registered in BidBuy https://www.bidbuy.illinois.gov/bso/ and a copy of the quote should be submitted electronically on the BidBuy website.
√ Apprenticeship-in-Training The contractor and all subcontractors must be participants in apprenticeship and training programs that are both approved by and registered with the U.S. Department of Labor’s Bureau of Apprenticeship and Training. The program(s) must be in the same trade(s) in which the contractor or subcontractor performs work. A Certificate of Registration or a verification letter from the US Department of Labor (USDOL) shall be submitted with the bid certifying the contractor’s and subcontractor’s membership or participation in approved programs. For information on how to participate in or set up a program, contractors may call the U.S. Department of Labor at 312/596-5508 or visit their website http://www.doleta.gov/oa/ .
√ Subcontractors
| The Contractor shall identify the names and addresses of all subcontractors to be utilized by them | |
| Contractor in the performance of this contract, together with the anticipated amount of money that | |
| each subcontractor is expected to receive pursuant to this contract, in an amount exceeding | |
| $25,000. The State may request updated information at any time. For the purposes of this | |
| section, subcontractors are those specifically hired to perform all or part of the work of this | |
| contract, or to provide the supplies requested by the State. The Contractor shall provide to DNR | |
| a copy of the subcontract within 20 days of execution of | the State contract or execution of the |
| subcontract, whichever is later, unless information in the subcontract has been determined by the | |
| State to be proprietary or confidential. |
√ Insurance
| Vendor shall, at all times during the term of the contract and any renewals, maintain and |
| provide a Certificate of Insurance naming the State as additional insured for all required |
| bonds and insurance. Certificates may not be modified or canceled until at least |
| 30 days notice has been provided to the State. Vendor shall provide: (a) General |
| Commercial Liability-occurrence form in amount of $1,000,000 per occurrence |
| (Combined Single Limit Bodily Injury and Property Damage) and $2,000,000 |
| Annual Aggregate; (b) Auto Liability, including Hired Auto and Non-owned Auto, |
| (Combined Single Limit Bodily Injury and Property Damage) in amount of |
| $1,000,000 per occurrence; and (c) Worker’s Compensation Insurance in amount |
| required by law. Insurance shall not limit Vendor’s obligation to indemnify, defend, |
| or settle any claims. |
√_ Change Orders When changes in or modifications to the work become necessary which involve a change in the contract amount, a contract modification will be issued by IDNR. The Contractor shall submit an itemized proposal and shall include appropriate documentation to support the cost for the labor, material and equipment for the items in the proposal (including proposals from material suppliers and sub-contractors). Contractor’s overhead and profit should also be included in the proposal.
Change orders must be determined by the IDNR Engineer to be germane to the original contract and that the price is fair and reasonable.
√ Highway Permits The Contractor is responsible for contacting the appropriate County
| Superintendent(s) of Highways and/or other appropriate local officials concerning the | |
| proposed work activities on the project as they may relate to use of the County and | |
| local road system. Coordination of any activities of concern to the County or | |
| Township shall be the responsibility of the Contractor. Special attention shall be | |
| given to load limits and seasonal restrictions. | |
| √ | Warranties |
The Contractor warrants that all work provided under the contract will be in conformance with the contract and free from defects in workmanship, materials, and equipment for a period of one year from the goods acceptance date.
| √ | Bid Submittal |
| Quotes shall be returned on the contractor’s letterhead. Contractors submitting quotes must be | |
| registered in BidBuy (https://www.bidbuy.illinois.gov/bso/) and a copy of the quote should be | |
| submitted electronically on the BidBuy website. A copy of the quote may also be submitted to | |
| the address below (in addition to the electronic submission of said quote on the BidBuy | |
| website). |
| Submit quote to: | BidBuy Website- see following link for information about | |
| registering and submitting bids: | ||
| https://www.bidbuy.illinois.gov/bso/ |
| √ | Contract Award |
| Contract award will be made to the lowest, responsible, qualified bidder. The Department of | |
| Natural Resources reserves the right to reject any or all bids. | |
| √ | Contact Information |
| √ | Project Engineer: | Rob Giesing, Region 4 Engineer | |
| Illinois Department of Natural Resources | |||
| One Natural Resources Way |
Springfield, Illinois 62702
| Phone: | 217-782-5721 | |||
| E-mail: | rob.giesing@illinois.gov | |||
| √ _ | Site Superintendent: | Mic Middleton, Site Superintendent | ||
| 10981 Conservation Road | ||||
| Baldwin, Illinois 62217 | ||||
| Phone: 618-785-2555 | ||||
| E-mail: joseph.middleton@illinois.gov |