XS-1_Proposers'_Day_Management_Sponable.pdf
PDF 715 KB Posted
- Attached to
- Experimental Spaceplane (XS-1) Federal contract opportunity
- Solicitation number
- DARPA-BAA-14-01
About this file
Management Presentation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| XS-1_BAA-14-01_Amendment_3_20140321.pdf | ||
| XS-1_Q A_(12-12-13).pdf | ||
| XS-1_Bidders'_Library_Access_Information.pdf | ||
| XS-1_BAA_Executive_Summary_Template.pptx | PPTX presentation | |
| XS-1_Proposers'_Day_Contracting_Glista.pdf | ||
| XS-1_Proposers'_Day_Contact_List.pdf | ||
| XS-1_Proposers'_Day_Airworthiness_Notes_Thieman.pdf | ||
| XS-1_Proposers'_Day_TTO_Overview_Tousley.pdf | ||
| Program_Management-Lessons_Learned.pdf | ||
| XS-1_Proposers'_Day_Commercial_License_Murray.pdf | ||
| XS-1_Proposers'_Day_Airworthiness_Thieman.pdf | ||
| XS-1_Proposers'_Day_Program_Overview_Sponable.pdf | ||
| XS-1_Proposers'_Day_Agenda_Final.pdf | ||
| XS-1_Proposers'_Day_Public_Q_and_A_Sponable Glista.pdf | ||
| DARPA-BAA-14-01_(XS-1).pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Experimental Spaceplane (XS-1)
Mr. Jess Sponable, TTO Program Manager
XS-1 Programmatics & Management Strategy
6 November 2013
Distribution Statement A – Approved for Public Release, Distribution Unlimited. 1
• Milestones and Budget
• Transition Expectations
• Elaboration on Phase 1 Goals
• Identification of Anticipated Phase 1 Deliverables
• Management Expectations
Purpose
Distribution Statement A – Approved for Public Release, Distribution Unlimited. 2
XS-1 Anticipated Schedule, Major Milestones & Budget
FY13 FY14 FY15 FY16 FY17 FY18
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Phase 1 Phase 3 Phase 2
Mid-phase Review
Preliminary Design Review
Test Readiness
Review
Orbital Flight
1st Stage Vehicle
Effort & Focus
• Trade Studies
• Operational Concept
• Preliminary Design
• Refine Final Design
• Integration
Assembly &Test
• Flight Test
• Plan to
Transition
• Fabrication
Critical Design Review
Contract Signed
Funding $M 3 or 4 contracts
$3 to 4M ea.
1 Prime contract Design to Cost Goal
Approx. $140M including flight test at range
Tailored & streamlined reviews expected
Phase 2/3 funding would be approved during Phase 1
Distribution Statement A – Approved for Public Release, Distribution Unlimited. 3
Transition Expectations
• DARPA XS-1 transition partner is YOU (industry)!
• Open to all – traditional defense primes and emerging entrepreneurial companies
• Seeking low cost intrapreneuring or entrepreneuring solutions!
• Akin to ELV – Gov’t funded development & continues to purchase recurring flights
• Industry leads transition planning
• Commercial, military and civil launch missions
• Hypersonic testbed missions
• Other military missions
• Follow-on capabilities
• Industry can bid other transaction or conventional contract
… But leverage of OT may be important to achieving transition expectations
• Gov’t expectation is technology (not system) would be transitioned back to industry and entrepreneurial sector
• Data rights would be negotiated accordingly…please make it easy on us
Distribution Statement A – Approved for Public Release, Distribution Unlimited. 4
Program Goals - Elaboration
Fly 10 times in 10 days
• No velocity requirement, must take off and land
• Fundamental objective is logical incremental envelope expansion
Fly XS-1 to Mach 10+ at least once
• Drives aero-thermal capability, enables test of future space access vehicles and hypersonic aircraft (No dynamic pressure or g requirement)
• Upper stage small if you stage at Mach 10, but OK to stage at lower Mach
• XS-1 itself must reach this speed, not just a subsequent stage
Launch demo payload to orbit
• No payload mass requirement, can use off the shelf hardware or stage
• Fundamental objective is to demonstrate potential for orbital flight
Design for recurring cost ≤ 1/10 Minotaur IV
(< $5M/flight for 3,000 – 5,000 lbs to LEO at 10+ flts/yr)
• This requirement sizes XS-1
• Govt expects rigorous tracking of scalability and traceability from/to XS-1
• Learning curve efficiencies of 10+ flts/yr can be used to achieve cost goal
Industry Can Recommend Changes to Requirements in Phase 1 Studies Distribution Statement A – Approved for Public Release, Distribution Unlimited. 5
The Experimental Spaceplane (XS-1) reusable vehicle capability will aim to provide approaches to an alternate cost effective means for space access.
Collectively the space portfolio is supporting responsiveness and cost reduction of launch through ground base systems.
Artist concept
DARPA Leadership Perspective Attack the cost equation
Distribution Statement A – Approved for Public Release, Distribution Unlimited. 6
Propulsion
• Three off the shelf engines Gov’t has considered
• Merlin 1D
• NK-33/AJ-26
• LOX/LH2 Engines
• Other engines also acceptable
• Engines that are partially developed or have developed components
• Cost / risk trade is up to proposer
• Gov’t has NO preference …
• But industry must make case for acceptable risk and cost
• Limited dollars
• Priority is demonstration of operable, high energy airframe
Distribution Statement A – Approved for Public Release, Distribution Unlimited. 7
Funding Options
1. Primary airframe system design bid
• Can propose for up to $3M
2. Potential optional funding for airframe system design
• Can propose for up to $1M extra if tasks can be shown to improve Phase II/III outcome
3. Potential funding for component risk reduction
• Can propose small funding – hundreds of thousands each <<$1M
• Awarded if needed only
• Focus is how to transition existing or relatively mature technology to XS-1
(vs. developing new technology)
• Main objective is transitioning propulsion options to industry
• Potential for airframe/other subsystem risk reduction as well
Distribution Statement A – Approved for Public Release, Distribution Unlimited. 8
Anticipated Phase I Schedule Program Meetings/Deliverables
Month 0 Contract Award / Kickoff.
Month 6 Mid-phase Conceptual Design and System Requirements
Review for system design task performers.
Month 6 Mid-phase Risk Reduction Review for risk reduction task performers.
Month 9 Technology Interchange Meeting, Deliver draft Technology
Maturation Plan, Phase II/III cost recommendations.
Month 12 Phase II Proposal for system design performers.
Month 12 Final Risk Reduction Review for task performers.
Month 12 PDR for system design performers.
Month 13 Phase I Final Report and Technology Maturation Plan.
Phase I Deliverables
Distribution Statement A – Approved for Public Release, Distribution Unlimited. 9
• Gov’t ranges and/or commercial spaceports are acceptable
• Minimizing range infrastructure and cost is important
• Don’t forget to leverage ALASA (not restricted to ALASA solutions)
• Automated Flight Termination System and
• Space-based rangeless range concepts
• Selection of launch site for proposal purposes is up to industry
• Gov’t launch site selection study to be initiated at start of Phase 1
• Industry and range inputs to be gathered
• Launch site options to be identified
• DARPA goal is to make decision on a launch site or limit launch site options midway through Phase 1
Launch site selection for planning
Distribution Statement A – Approved for Public Release, Distribution Unlimited. 10
Management Approach
I Agree to clearly defined program objectives in advance
II Single manager under one agency
III Small government and contractor program offices
IV Build competitive hardware, not paper
V Focus on key demonstrations, not everything
VI Streamlined documentation and reviews
VII Contractor integrates and tests prototype VIII Develop minimum realistic funding profiles IX Track cost/schedule in near real time X Mutual trust essential
Challenge to Industry:
Follow through to affordable flying hardware!
Efficient Management Essential DARPA Will Manage As “Fast Track” Program – Can Industry?
Streamline Your Processes!
Distribution Statement A – Approved for Public Release, Distribution Unlimited. 11
History Says Low Cost Programs Are Possible
Requires Right Fundamental Culture Within Organizations
• Takes real government and corporate commitment
• Needs empowered program managers/contracting officers
• Only small teams, of the best players, with minimum interference, will get the job done
DARPA is committed; Industry must be as well
Numerous past successes must be our guide
Words1000
Picture 1
Pictures 1000
Demo 1 X = Demonstrator is Worth 1,000,000 Words
Distribution Statement A – Approved for Public Release, Distribution Unlimited. 12
Pick The Right Program Manager & Right Team
• Should understand technology and system trades
• Tailored systems engineering process key to success
• Operative word is “tailored” to achieve min. cost demonstration
• Should implement program objectives as honest broker
• Program success should be more important than next promotion
• Requires ability to make decisions
• at the right time, and
• at the right level (push responsibility to lowest level)
• Program Manager should personally approve all costs in advance/real time AND share information with Gov’t counterpart
• Pick program manger for life of program
• Minimize personnel turnover
Distribution Statement A – Approved for Public Release, Distribution Unlimited. 13
Mutual Trust Is Essential
Government and contractor PMs should interactively share all Program
Information, Critical Decisions and Risks
Government Must Trust Contractor
• To do its job and test/fly hardware
• By not second guessing every contractor decision
Contractor Must Trust Government
• To provide stable programmatic direction
• Not to drive cost/schedule with unreasonable demands
Build Joint Program Team Philosophy and Esprit de Corps
• Think: team, team, team… anyone can, we do
Allows Empowered Government and Contractor Team to Push Ahead Decisively and Succeed or Fail Together
Distribution Statement A – Approved for Public Release, Distribution Unlimited. 14 www.darpa.mil
Distribution Statement A – Approved for Public Release, Distribution Unlimited. 15
File details come from the government source that posted it. Updated .