This document is a Contract Amendment Summary from the Arizona Department of Transportation (ADOT), located in Phoenix, Arizona. The amendment involves McNeil Brothers as the contractor for an On-Call Diamond Grinding Services contract, with this being Amendment Number One (1), dated with a revision of 03/2025.
The amendment modifies the contract's diamond grinding requirements, specifying that grinding shall produce a uniform surface with proper drainage and no more than a 3/16 inch ridge. Two new line items have been added to the Contract Price List in the Arizona Procurement Portal: Removal of 1" Steel Bar Stock from Deck Joints at $300 per linear foot and Removal of 1" Raised Concrete from Deck Joints at $1,500 per linear foot. The contractor is now responsible for full and partial depth concrete repairs, as well as removing raised bar stock or concrete from joints and subsequent joint sealing after diamond grinding operations. All other terms, conditions, and provisions of the original contract remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CTR076219_Contract_Documents.pdf | ||
| Post Award Agenda.pdf | ||
| Post Award Meeting Sign-In Sheet.pdf | ||
| CTR076219_Contract_Amendment_Summary_Three__3_.pdf | ||
| CTR076219 Usage Report 2025 Q1.xlsx | XLSX spreadsheet | |
| 2025 Q2 Usage Report.xlsx | XLSX spreadsheet | |
| CTR076219_COI_ACCEPTED_CTR076219_GL_AL_WC_03.01.25-03.01.26.pdf | ||
| CTR076219_Contract_Amendment_Summary_Two__2_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARIZONA DEPARTMENT OF TRANSPORTATION
1655 W. Jackson Street, MD 100P
Phoenix, AZ 85007
Contract Amendment Summary CONTRACTOR: McNeil Brothers AMENDMENT NO.: One (1) DESCRIPTION: ON-Call Diamond Grinding Services
Rev. 03/2025
Pursuant to the Uniform Terms and Conditions, Section 5, Contract Changes, the above referenced contract is amended. Summary of changes is as follows:
1. Contract Document, Section 4 Specific Requirements; Section 4.3 Diamond Grinding, section 4.3.2 is hereby revised to read as follows:
• The diamond grinding shall produce a neat, uniform finished surface. Shoulders or ramp lane grinding shall transition from the edge of the mainline to provide drainage, leaving no more than a 3/16 inch ridge and a smooth riding surface. Full and partial depth concrete repairs shall be the Contractor’s responsibility. The Contractor shall perform any necessary removal of raised 1” bar stock or 1” raised concrete from joints as well as joint sealing subsequent to the diamond grinding operations.
2. The following line items have been added to the Contract Price List tab in the Arizona Procurement
Portal (APP).
• CTR076219-54 Removal of 1” Steel Bar Stock from Deck Joints - $300 per LF
• CTR076219-55 Removal of 1” Raised Concrete from Deck Joints- $1,500 per LF
3. All other terms, conditions and provisions of this contract remain unchanged.
javascript:void('0') javascript:void('0')
ARIZONA DEPARTMENT OF TRANSPORTATION
1655 W. Jackson Street, MD 100P
Phoenix, AZ 85007
Contract Amendment Summary CONTRACTOR: McNeil Brothers AMENDMENT NO.: One (1) DESCRIPTION: ON-Call Diamond Grinding Services