About this file
This document is a Contract Amendment (Amendment No. 5) for Contract No. CTR054765 between the Arizona Department of Environmental Quality (ADEQ) and P G Environmental LLC. The contract pertains to Inspections and Audits of Clean Water Act Facilities, Programs and Activities, and is located in Phoenix, Arizona.
The amendment updates contract rates effective July 1, 2023, with a detailed rate schedule for various inspection types across different personnel levels, including Inspection Manager, Senior Scientist, Principal Inspector, Sr. Inspector, Inspector, and Scientist. The rate table outlines hourly rates and estimated hours for inspections such as Major Facility Inspection, Pretreatment Compliance Inspection, Significant Industrial User Inspection, Sludge/Biosolids Inspections, Sanitary Sewer System Audit, MS4 Phase I and II Audits, Industrial Stormwater Inspection, and Construction Stormwater Inspections. A note specifies that travel time is not included in estimated costs due to the pandemic, and preapproved travel will be reimbursed at the respective position's hourly rate. The estimated total cost per inspection varies, with some inspections like the Pretreatment Compliance Audit reaching up to $13,775.18.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Form approved by CPO, Rev. 12-18-2018
CONTRACT AMENDMENT
CONTRACT NO.:
AMENDMENT NO.:
TITLE:
CONTRACTOR:
CTR054765
Inspections and Audits of Clean Water Act Facilities, Programs and Activities P G Environmental LLC
ADEQ PROCUREMENT
1110 W. Washington Street Phoenix, AZ 85007 602-771-4140
THE PURPOSE OF THIS AMENDMENT IS:
In accordance with the Special Terms and Conditions, 5.1 Contract Amendments, this contract is hereby amended as follows:
1. New Contract Rates effective July 1, 2023, as per page 2:
2. All other Requirements, Specifications, Terms and Conditions remain unchanged.
P G ENVIRONMENTAL LLC
ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY
The Contractor hereby acknowledges receipt and understanding of the above Amendment.
The above referenced contract Amendment is hereby executed this day at Phoenix, Arizona.
Day of
Signature of Authorized Individual Date
Martha Williams, Contracts Manager
Typed or Printed Name and Title Ana Machiche, CPPB Procurement Specialist
Available online at Arizona Procurement Portal (APP) eProcurement System https://app.az.gov
6/4/2023 5th June https://app.az.gov/
PG Environmental LLC CTR054765
Hourly Rate
Hours per inspection
(estimated) Hourly Rate
Hours per inspection
(estimated) Hourly Rate
Hours per inspection
(estimated) Hourly Rate
Hours per inspection
(estimated) Hourly Rate Hours per inspection
(estimated) Hourly Rate
Hours per inspection
(estimated)
PG ENVIRONMENTAL $ 177.20 0 $ 125.98 0 $ 161.09 0 $ 107.39 0 $ 78.99 0 $ 68.57 0 $ - Major Facility Inspection $ 177.20 0 $ 125.98 2.5 $ 161.09 0 $ 107.39 6.8 $ 78.99 13.2 $ 68.57 0 2,087.92$ Non-major Facility Inspection $ 177.20 0 $ 125.98 2 $ 161.09 0 $ 107.39 8 $ 78.99 16 $ 68.57 0 2,374.99$ Pretreatment Compliance Inspection $ 177.20 27 $ 125.98 2 $ 161.09 5 $ 107.39 0 $ 78.99 0 $ 68.57 24 7,487.38$ Pretreatment Compliance Audit $ 177.20 32.00 $ 125.98 6.00 $ 161.09 32.00 $ 107.39 0 $ 78.99 0.00 $ 68.57 32 13,775.18$ Significant Industrial User (Oversight) Inspection $ 177.20 11 $ 125.98 2 $ 161.09 4 $ 107.39 0 $ 78.99 0 $ 68.57 11 3,599.74$ Sludge/biosolids Generator Inspection $ 177.20 6.6 $ 125.98 4.4 $ 161.09 0 $ 107.39 0 $ 78.99 0 $ 68.57 9.5 2,375.23$ Sludge/biosolids Applicator Inspection $ 177.20 6.6 $ 125.98 4.4 $ 161.09 0 $ 107.39 0 $ 78.99 0 $ 68.57 9.5 2,375.23$ Sanitary Sewer System Audit $ 177.20 0 $ 125.98 60 $ 161.09 0 $ 107.39 80 $ 78.99 80 $ 68.57 0 22,469.75$ MS4 Phase I Audit $ 177.20 2 $ 125.98 60 $ 161.09 0 $ 107.39 0 $ 78.99 90 $ 68.57 20 16,394.13$ MS4 Phase II Audit $ 177.20 0 $ 125.98 0 $ 161.09 0 $ 107.39 0 $ 78.99 80 $ 68.57 80 11,804.83$ Industrial Stormwater Inspection $ 177.20 0 $ 125.98 3.4 $ 161.09 0 $ 107.39 3.72 $ 78.99 0.6 $ 68.57 11.2 1,643.19$
Construction Stormwater (small) Inspection $ 177.20 0 $ 125.98 1.2 $ 161.09 0 $ 107.39 11.7 $ 78.99 0.8 $ 68.57 4.5 1,779.40$
Construction Stormwater (large) Inspection $ 177.20 0 $ 125.98 1.2 $ 161.09 0 $ 107.39 11.7 $ 78.99 0.8 $ 68.57 4.5 1,779.40$
CTR054765 Amendment #5 Rates
Travel time is not to be included in the esitmated cost (due to Pandemic). Preapproved travel will be reimbursed at the position hourly rate.
Instructions:
If not proposing to conduct an Inspection Type, state "No Bid" across all cells. If a Position is not applicable, state, "N/A" Offeror may add additional "Other" key personnel position type(s), as needed. Include a narrative description of the position.
Inspections and Audits of Clean Water Act Facilities Programs and Activities
Inspection Type
Inspection Manager Senior Scientist Principal Inspector Sr. Inspector Inspector Scientist
Estimated Total per Inspection = Sum of all positions ( "Hourly Rate" X "Hours per Inspection
Estimated")
| Pricing Sheet.pdf |
| Sheet1 |
| 2023-06-05T07:14:24-0700 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .