CTR045697_Amendment_03_Contract_Extension_and_Pricing_Modifications_-_Signed.pdf

PDF 221 KB Posted

Attached to
Master Agreement AZ|CTR045697
Contract number
CTR045697
Issued by
Arizona

About this file

This document is Amendment No. 3 to a contract between Pratt & Whitney Engine Services, Inc. and the Arizona Department of Public Safety (ADPS), specifically pertaining to an Engine Overhaul, Repair and Maintenance Contract originally effective August 1, 2019. The amendment extends the contract term for one year, from July 31, 2022 through July 31, 2023, for the support of Pratt & Whitney Canada Corp. PW207D2 and PT6A engines.

The price sheets detail comprehensive pricing for various engine-related services including standard overhauls, exchange units, rentals, and technical assistance for multiple PT6A engine models (PT6A-60A, PT6A-65B, PT6A-52, PT6A-42) and the PW 207D2 engine. Pricing structures include discounts on new OEM parts (20%), restocking fees (10%), and specific rates for labor, test cell performance, component exchanges, and rental services. The contract includes provisions for urgent AOG (Aircraft on Ground) requests, mobile repair team support, and standard terms for parts and materials purchases. Pricing is confidential and subject to standard terms and conditions, with all freight, taxes, and associated costs to be paid actuals.

View the file

Other files

File Type Posted
CTR045697_Amendment_05_Extension_for_6_Months_with_CI.pdf PDF
CTR045697_Amendment_06_Extension_for_6_Mo_with_CI.pdf PDF
CTR045697_Amendment_07_Contract_Extension_and_Price_Modifications_executed_07292025.pdf PDF
CTR045697_Award_Letter.pdf PDF
SPO_Form_101_CI__SW_10.17.23_Request_for_PW_Extension_signed.pdf PDF
ADPS19-00008492_Determination_of_Terms_and_Conditions_Exceptions.pdf PDF
ADPS19-00008492_Pratt_and_Whitney_Engine_Lease_Agreement.pdf PDF
CTR045697_COI_Valid_Thru_12-1-20.pdf PDF
CTR045697_COI_Valid_Thru_6-1-23.pdf PDF
Executive_Summary.pdf PDF
Participation_in_Boycott_of_Israel_Revision_Notification_10-22-18.pdf PDF
Pratt_and_Whitney_Warranty.pdf PDF
ADPS19-00008492_Part_1_Instructions_and_Attatchments_with_P_W_Modifications_5-19.pdf PDF
ADPS19-00008492_Part_2_Technical_and_Commercial_with_P_W_Modifications_5-19.pdf PDF
ADPS19-00008492_Pratt_and_Whitney_Responses_to_Part_1.pdf PDF
CI_DPS_PW_Extension_Approved_6.26.2025.pdf PDF
CTR045697_Amendment_04_Contract_Extension_and_Pricing_Modifcations-Confidential-Signed.pdf PDF
CTR045697_COI_Valid_Thru_6-1-24.pdf PDF
CTR045697_COI_Valid_Thru_7-1-25.pdf PDF
CTR045697_COI_Valid_Thru_7-1-26.pdf PDF
Determination_Confidential_Information.pdf PDF
Determination_One_Offer_Received.pdf PDF
ADPS19-00008492_Part_3_Terms_and_Conditions_with_P_W_modifications_5-19.pdf PDF
ADPS19-00008492_Pratt_and_Whitney_Certifications.pdf PDF
CTR045697_COI_Valid_Thru_6-1-21.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pratt & Whitney PT6A Engine Series Price Sheet PT6A-60A PT6A-65B PT6A-52 PT6A-42

*Offeror shall offer pricing less than the advertised Web list price

OverHaul Items Total Price

Engine - Standard Overhaul: To include all replacement parts/components required for a standard overhaul (ie. replacement parts, kits, consumable and non consumable items) labor, packing and freight charges to and from DPS Aviation Bureau. Miscellaneous shop supplies/environmental charges. Tum around time (60 calendar days). Applicable Taxes and all other related cost required to complete and recertify as airworthy. DPS may at it's sole discretion supply documented airworthy parts as required, DPS supplied airworthy shall not be subject to additional reinspection or certification fees.

ea

Basic Labor:

$54,001.00

Rework Labor:

As required at $155.00 per hour

New Replacement Parts: List Price Less 27%

Exchange Parts: List Price less 10%

Subcontract: As required, Mark up +15%

Consumable Build Kits and 100% replacement items: $23,177.00

Bulk Issue and Environmental Charges: $5,724.00

Test Cell Fee: $4,255.00

Packing Materials: $3,136.00

Basic Labor:

$54,342.00

Rework Labor:

As required at $155.00 per hour

New Replacement Parts: List Price Less 27%

Exchange Parts: List Price less 10%

Subcontract: As required, Mark up +15%

Consumable Build Kits and 100% replacement items: $29509.20

Bulk Issue and Environmental Charges: $5,226.00

Test Cell Fee: $4,035.00

Packing Materials: $2,974.00

Basic Labor:

$54,001.00

Rework Labor:

As required at $155.00 per hour

New Replacement Parts: List Price Less 27%

Exchange Parts: List Price less 10%

Subcontract: As required, Mark up +15%

Consumable Build Kits and 100% replacement items: $29,213.80

Bulk Issue and Environmental Charges: $5,724.00

Test Cell Fee: $4,255.00

Packing Materials: $3,136.00

Basic Labor:

$45,869.00

Rework Labor:

As required at $155.00 per hour

New Replacement Parts: List Price Less 30%

Exchange Parts: List Price less 10%

Subcontract: As required, Mark up +15%

Consumable Build Kits and 100% replacement items: $23,200.00

Bulk Issue and Environmental Charges: $5,446.00

Test Cell Fee: $4,236.00

Packing Materials: $2,039.00

*** Flat rate Overhaul Option if OH Price exceeds published FRO price plus

Accessories to meet advertised Web List Price***

PN: 3120644-01 / 8061-333 or similar PN: 3038456 / 8063-032 or similar PN: 3073442-01 / 8061-345 PN: 3036367 / 3244799-2 or similar

Fuel Control Unit- Standard Overhaul: To include all replacement parts/components required for a standard overhaul (i.e. replacement parts, kits, consumable and non consumable items); Labor, packing and freight charges to and from DPS Aviation Bureau;· Miscellaneous shop supplies/environmental!

charges; Turn around time (30 calendar days); Applicable Taxes and all other related cost required to complete and recertify as airworthy. DPS may at its sole discretion supply documented airworthy parts as required. DPS supplied airworthy parts sha11 not be subject to additional re-inspection fees. ea

$13,576.00 $13,576.00 $20,092.00 $16,974.00

PN: 3100456-001, 3100458-01, 3100451-01 PN: 3119855-01, 3116307-01 PN: 3100456-01, 3100458-01, 3100451-01 PN: 3100456-03, 3100458-03

Fuel Nozzel - Standard Overhaul: To include all replacement parts/components required for a standard overhaul (i.e. replacement parts, kits, consumable and non consumable items); Labor, packing and freight charges to and from DPS Aviation Bureau;· Miscellaneous shop supplies/environmental! charges; Turn around time (2 calendar days); Applicable Taxes and all other related cost required to complete and recertify as airworthy. DPS may at its sole discretion supply documented airworthy parts as required. DPS supplied airworthy parts sha11 not be subject to additional re-inspection fees. ea

$406.00 $406.00 $406.00 $406.00

PN: 3040760 / 825600 or similar PN: 3040760 / 825600 or similar PN: 3040760 / 825600 or similar 3033808 or similar

High Pressure Fuel Pump - Standard Overhaul: To include all replacement parts/components required for a standard overhaul (i.e. replacement parts, kits, consumable and non consumable items); Labor, packing and freight charges to and from DPS Aviation Bureau;· Miscellaneous shop supplies/environmental!

charges; Turn around time (2 calendar days); Applicable Taxes and all other related cost required to complete and recertify as airworthy. DPS may at its sole discretion supply documented airworthy parts as required. DPS supplied airworthy parts sha11 not be subject to additional re-inspection fees. ea

$8,554.98 $8,554.98 $8,554.98 $8,554.98

Exceptions:

Customer Embodiment Fee of 12.5% of List Price for non-PWC tagged parts, no PMA hardware will be embodied, PWES / PWC will not embody third party tagged hardware unless re-inspected.

All freight, taxes and other associated costs are actuals and are extra. AZ - Phoenix State sales tax is 8.6%

PWCS Standard Terms and Conditions apply to all Accessory Exchange, Overhaul and New Part Orders

PWCS Accessory Exchange and Standard Overhaul Pricing is standard, non standard replacement items, including SB upgrades, will incur additional charges

Fuel Nozzle Quotes reflect a complete set per nozzle. Individual fuel nozzles are quote only.

For PWCS Accessory Exchange and Standard Overhauls, lead time is available at time of transaction.

'Urgent' AOG requests need to be initiated with the PWC Customer First Centre at 1-800-268-8000 or CFirst@pwc.ca MRT personnel to be on site within 24 hours of the state issuing a Work Order and required engine data sheets.

Mobile Repair Team Travel Labor time and Expenses (per diem) are pass through and billed upon job completion.

Pratt & Whitney PT6A Engine Series Price Sheet

PT6A-60A PT6A-65B PT6A-52 PT6A-42

Exchange Items Total Price

Fuel Control Unit - Exchange DPS unit for Contactor unit: To include all labor, packing and freight charges (pick up of DPS unit and delivery of exchange unit) for Contractors overhauled, refurbished, flight worthy certified unit ea

19,950$ 17,567$ 22,919$ 20,273$

Fuel / Oil Heater - Exchange DPS unit for Contactor unit: To include all labor, packing and freight charges (pick up of DPS unit and delivery of exchange unit) for Contractors overhauled, refurbished, flight worthy certified unit ea

3,396$ 3,396$ 3,396$ 3,396$

Exceptions:

Customer Embodiment Fee of 12.5% of List Price for non-PWC tagged parts, no PMA hardware will be embodied, PWES / PWC will not embody third party tagged hardware unless re-inspected.

All freight, taxes and other associated costs are actuals and are extra. AZ - Phoenix State sales tax is 8.6%

PWCS Standard Terms and Conditions apply to all Accessory Exchange, Overhaul and New Part Orders

PWCS Accessory Exchange and Standard Overhaul Pricing is standard, non standard replacement items, including SB upgrades, will incur additional charges

Fuel Nozzle Quotes reflect a complete set per nozzle. Individual fuel nozzles are quote only.

For PWCS Accessory Exchange and Standard Overhauls, lead time is available at time of transaction.

'Urgent' AOG requests need to be initiated with the PWC Customer First

Centre at 1-800-268-8000 or CFirst@pwc.ca MRT personnel to be on site within 24 hours of the state issuing a Work Order and required engine data sheets.

Mobile Repair Team Travel Labor time and Expenses (per diem) are pass through and billed upon job completion.

Rental Items Hrly Rate PT6A-60A PT6A-65B PT6A-52 PT6A-42

Engine - Rental: To include all labor, packing and freight charges (to and from DPS Aviation Bureau); recertification fees, and all other items of expense for Contractor's flight worthy certified unit. DPS shall not be subject to rental return re-inspection fees or minimum flight hours.

hr

Hourly Rate: $168 per flight Hour

Daily Rate: $151 per Day

Exception: ADPS must agree to the PWC Leasing

Rental Engine Agreement and provide a

Certificate of Hull Insurance in the amount of

$1,504,177.00 per Engine.

Hourly Rate: $207 per flight Hour

Daily Rate: $160 per Day

(ONLY 1 Rental engine available)

Exception: ADPS must agree to Rental Engine

Agreement and provide a Certificate of Hull

Insurance in the amount of $1,646,402.00 per

Engine.

Hourly Rate: $168 per flight Hour

Daily Rate: $151 per Day

Exception: ADPS must agree to Rental

Engine Agreement and provide a

Certificate of Hull Insurance in the amount of $1,511,035.00 per Engine

Hourly Rate: $156 per flight Hour

Daily Rate: $146 per Day

Exception: ADPS must agree to Rental

Engine Agreement and provide a

Certificate of Hull Insurance in the amount of $1,268,073.00 per Engine

Exceptions:

Customer Embodiment Fee of 12.5% of List Price for non-PWC tagged parts, no PMA hardware will be embodied, PWES / PWC will not embody third party tagged hardware unless re-inspected.

All freight, taxes and other associated costs are actuals and are extra. AZ - Phoenix State sales tax is 8.6%

PWCS Standard Terms and Conditions apply to all Accessory Exchange, Overhaul and New Part Orders

PWCS Accessory Exchange and Standard Overhaul Pricing is standard, non standard replacement items, including SB upgrades, will incur additional charges

Fuel Nozzle Quotes reflect a complete set per nozzle. Individual fuel nozzles are quote only.

For PWCS Accessory Exchange and Standard Overhauls, lead time is available at time of transaction.

'Urgent' AOG requests need to be initiated with the PWC Customer First Centre at 1-800-268-8000 or CFirst@pwc.ca MRT personnel to be on site within 24 hours of the state issuing a Work Order and required engine data sheets.

Mobile Repair Team Travel Labor time and Expenses (per diem) are pass through and billed upon job completion.

Test Cell Item Total Price PT6A-60A PT6A-65B PT6A-52 PT6A-42

Engine - Test Cell Performance Test: to include all labor, packing and freight charges

(to and from DPS Aviation Bureau); recertification fees, and all other items of expense per test at a certified test facility.

ea

Test labor: $9,543

Bulk Issue & Environmental: $4,058

Test Fee: $4,255

Ship Prep Labor: $1,934

Pack Material: $3,136

Exception: All freight, taxes and other associated costs are actuals and are extra.

AZ - Phoenix State sales tax is 8.6%

Pricing will be escalated annually

Test labor: $9,543

Bulk Issue & Environmental: $4,058

Test Fee: $4,255

Ship Prep Labor: $1,934

Pack Material: $3,136

Exception: All freight, taxes and other associated costs are actuals and are extra.

AZ - Phoenix State sales tax is 8.6%

Pricing will be escalated annually

Test labor: $9,543

Bulk Issue & Environmental: $4,058

Test Fee: $4,255

Ship Prep Labor: $1,934

Pack Material: $3,136

Exception: All freight, taxes and other associated costs are actuals and are extra.

AZ - Phoenix State sales tax is 8.6%

Pricing will be escalated annually

Test labor: $9,543

Bulk Issue & Environmental: $4,058

Test Fee: $4,236

Ship Prep Labor: $1,934

Pack Material: $2,039

Exception: All freight, taxes and other associated costs are actuals and are extra.

AZ - Phoenix State sales tax is 8.6%

Pricing will be escalated annually

Exceptions:

Customer Embodiment Fee of 12.5% of List Price for non-PWC tagged parts, no PMA hardware will be embodied, PWES / PWC will not embody third party tagged hardware unless re-inspected.

All freight, taxes and other associated costs are actuals and are extra. AZ - Phoenix State sales tax is 8.6%

PWCS Standard Terms and Conditions apply to all Accessory Exchange, Overhaul and New Part Orders

PWCS Accessory Exchange and Standard Overhaul Pricing is standard, non standard replacement items, including SB upgrades, will incur additional charges

Fuel Nozzle Quotes reflect a complete set per nozzle. Individual fuel nozzles are quote only.

For PWCS Accessory Exchange and Standard Overhauls, lead time is available at time of transaction.

'Urgent' AOG requests need to be initiated with the PWC Customer First Centre at 1-800-268-8000 or CFirst@pwc.ca MRT personnel to be on site within 24 hours of the state issuing a Work Order and required engine data sheets.

Mobile Repair Team Travel Labor time and Expenses (per diem) are pass through and billed upon job completion.

Parts and Materials Purchase PT6A-60A PT6A-65B PT6A-52 PT6A-42

Percent

Discount

New OEM Parts Catalogue Discount - Single Price Discount Percent ("SPDP") off Current Pratt and

Whitney OEM Engine Parts Catalogue: Catalogue shall be current Pratt and Whitney OEM Engine

Parts catalogue/price sheet (aka established catalog pricing) as published and maintained by Pratt and

Whiney. SPDP (%) off catalogue pricing offered shall be inclusive of all shipping charges, F.O.B.

Destination for individual orders/deliveries weighing less than 60 lbs; F.O.B. Destination freight charges allowed and added to invoices for individual orders exceeding 60 lbs. SPDP shall not include tax.

percentage 20% 20% 20% 20%

Percent Fee

Restocking fee: Fee for each New and /or Used serviceable part, component, assemble and subassembly returned by DPS. percentage 10% 10% 10% 10%

Hot Section

Parts

New OEM parts for a Standard Base Kit for Hot Section Removal and Installation.

ea

Exception: N/A. Parts can be ordered from

PWES LGB once a work order is issued or over the counter from PWC Component

Solutions at any time.

Exception: N/A. Parts can be ordered from

PWES LGB once a work order is issued or over the counter from PWC Component

Solutions at any time.

Exception: N/A. Parts can be ordered from PWES LGB once a work order is issued or over the counter from PWC

Component Solutions at any time.

Exception: N/A. Parts can be ordered from

PWES LGB once a work order is issued or over the counter from PWC Component

Solutions at any time.

Exceptions:

Customer Embodiment Fee of 12.5% of List Price for non-PWC tagged parts, no PMA hardware will be embodied, PWES / PWC will not embody third party tagged hardware unless re-inspected.

All freight, taxes and other associated costs are actuals and are extra. AZ - Phoenix State sales tax is 8.6%

PWCS Standard Terms and Conditions apply to all Accessory Exchange, Overhaul and New Part Orders

PWCS Accessory Exchange and Standard Overhaul Pricing is standard, non standard replacement items, including SB upgrades, will incur additional charges

Fuel Nozzle Quotes reflect a complete set per nozzle. Individual fuel nozzles are quote only.

For PWCS Accessory Exchange and Standard Overhauls, lead time is available at time of transaction.

'Urgent' AOG requests need to be initiated with the PWC Customer First Centre at 1-800-268-8000 or CFirst@pwc.ca MRT personnel to be on site within 24 hours of the state issuing a Work Order and required engine data sheets.

Mobile Repair Team Travel Labor time and Expenses (per diem) are pass through and billed upon job completion.

Technical Assistance Hrly Rate PT6A-60A PT6A-65B PT6A-52 PT6A-42

Standard Hourly Labor Shop Rate : To include standard labor shop rate for a service technician. hr

$232.50 $232.50 $232.50 $232.50

Standard Hourly Rate for On Site Technical Assistance: To include all labor, travel (round trip) from service technician and/or contractors place of business to the DPS Aviation

Bureau, 2615 East Air Lane, Phoenix, Arizona 85034, per diem, applicable taxes and all other associated costs. Technical assistance personal are to be available/on site @ DPS within 24 hrs if the request submitted is identified as "Urgent". All DPS phone requests and email request are to receive a same day response.

hr

AOG rates per Hour:

Travel Labor Rate: $232.50

On Site Rate: $232.50

Overtime: $348.75

Sunday, Double Time: $465.00

AOG rates per Hour:

Travel Labor Rate: $232.50

On Site Rate: $232.50

Overtime: $348.75

Sunday, Double Time: $465.00

AOG rates per Hour:

Travel Labor Rate: $232.50

On Site Rate: $232.50

Overtime: $348.75

Sunday, Double Time: $465.00

AOG rates per Hour:

Travel Labor Rate: $232.50

On Site Rate: $232.50

Overtime: $348.75

Sunday, Double Time: $465.00

Standard Hourly Labor Rate for Hot Section Removal and Installation: To include all labor, travel/freight (if needed) charges, miscellaneous shop supplies/environmental charges above those firm fixed prices contained elsewhere in the price sheet(s) for unforeseen situations directly related to the scope of work specification section.

hr

On site Labor: $11,625.00 if scheduled at least 10 days in advance, otherwise, $17,437.50 at MRT rate

Flat Rate Shop Labor: $5,735.00

New Replacement Parts: List Price Less 25%

Exchange Parts: As required

Subcontract: As required, Mark up +15%

Consumable Build Kits and 100% replacement items: $13,900.86

Bulk Issue and Environmental Charges: $300.00

MRT per diem: (hotels, transportation, food): passed through

On site Labor: $11,625.00 if scheduled at least 10 days in advance, otherwise, $17,437.50 at MRT rate

Flat Rate Shop Labor: $5,735.00

New Replacement Parts: List Price Less 25%

Exchange Parts: As required

Subcontract: As required, Mark up +15%

Consumable Build Kits and 100% replacement items: $18,688.97

Bulk Issue and Environmental Charges: $300.00

MRT per diem: (hotels, transportation, food): passed through

On site Labor: $11,625.00 if scheduled at least 10 days in advance, otherwise, $17,437.50.00 at MRT rate

Flat Rate Shop Labor: $5,735.00

New Replacement Parts: List Price Less 25%

Exchange Parts: As required

Subcontract: As required, Mark up +15%

Consumable Build Kits and 100% replacement items: $13,390.81

Bulk Issue and Environmental Charges: $300.00

MRT per diem: (hotels, transportation, food): passed through

On site Labor: $11,025.00 if scheduled at least 10 days in advance, otherwise, $16,538.00 at MRT rate

Flat Rate Shop Labor: $5,735.00

New Replacement Parts: List Price Less 25%

Exchange Parts: As required

Subcontract: As required, Mark up +15%

Consumable Build Kits and 100% replacement items: $10,783.72

Bulk Issue and Environmental Charges: $300.00

MRT per diem: (hotels, transportation, food): passed through

Standard Hourly Labor Rate for Blade Replacement: To include all labor, travel/freight (if needed) charges, miscellaneous shop supplies/environmental charges above those firm fixed prices contained elsewhere in the price sheet(s) for unforeseen situations directly related to the scope of work specification section.

hr

On site Labor: $11,625.00 if scheduled at least 10 days in advance, otherwise, $17,437.50 at MRT rate

Flat Rate Shop Labor: $5,735

New Replacement Parts: List Price Less 25%

Exchange Parts: As required

Subcontract: As required, Mark up +15%

Consumable Build Kits and 100% replacement items: $12,964.48

Bulk Issue and Environmental Charges: $300.00

MRT per diem: (hotels, transportation, food): passed through

On site Labor: $11,625.00 if scheduled at least 10 days in advance, otherwise, $17,437.50 at MRT rate

Flat Rate Shop Labor: $5,735.00

New Replacement Parts: List Price Less 25%

Exchange Parts: As required

Subcontract: As required, Mark up +15%

Consumable Build Kits and 100% replacement items: $17,400.33

Bulk Issue and Environmental Charges: $300.00

MRT per diem: (hotels, transportation, food): passed through

On site Labor: $11,625.00 if scheduled at least 10 days in advance, otherwise, $17,437.50 at MRT rate

Flat Rate Shop Labor: $5,735.00

New Replacement Parts: List Price Less 25%

Exchange Parts: As required

Subcontract: As required, Mark up +15%

Consumable Build Kits and 100% replacement items: $19,284.18

Bulk Issue and Environmental Charges: $300.00

MRT per diem: (hotels, transportation, food): passed through

On site Labor: $11,625.00 if scheduled at least 10 days in advance, otherwise, $17,437.50 at MRT rate

Flat Rate Shop Labor: $5,735.00

New Replacement Parts: List Price Less 25%

Exchange Parts: As required

Subcontract: As required, Mark up +15%

Consumable Build Kits and 100% replacement items: $17939.72

Bulk Issue and Environmental Charges: $300.00

MRT per diem: (hotels, transportation, food): passed through

Exceptions:

Customer Embodiment Fee of 12.5% of List Price for non-PWC tagged parts, no PMA hardware will be embodied, PWES / PWC will not embody third party tagged hardware unless re-inspected.

All freight, taxes and other associated costs are actuals and are extra. AZ - Phoenix State sales tax is 8.6%

PWCS Standard Terms and Conditions apply to all Accessory Exchange, Overhaul and New Part Orders

PWCS Accessory Exchange and Standard Overhaul Pricing is standard, non standard replacement items, including SB upgrades, will incur additional charges

Fuel Nozzle Quotes reflect a complete set per nozzle. Individual fuel nozzles are quote only.

For PWCS Accessory Exchange and Standard Overhauls, lead time is available at time of transaction.

'Urgent' AOG requests need to be initiated with the PWC Customer First Centre at 1-800-268-8000 or CFirst@pwc.ca MRT personnel to be on site within 24 hours of the state issuing a Work Order and required engine data sheets.

Mobile Repair Team Travel Labor time and Expenses (per diem) are pass through and billed upon job completion.

PRATT & WHITNEY PW 207D2 ENGINE PRICE SHEET

* Offeror shall offer pricing less than the advertised Web list price

OverHaul Items Total Price PW 207D2

1 Engine - Standard Overhaul: To include all replacement parts/components required for a standard overhaul (ie.

replacement parts, kits, consumable and non consumable items) labor, packing and freight charges to and from DPS Aviation Bureau. Miscellaneous shop supplies/environmental charges. Tum around time (60 calendar days). Applicable Taxes and all other related cost required to complete and recertify as airworthy. DPS may at it's sole discretion supply documented airworthy parts as required, DPS supplied airworthy shall not be subject to additional reinspection or certification fees.

ea Basic Labor: $40,111

Rework Labor: As required, shop Labor at $155.00 per Hour

New Replacement Parts: List Price Less 25%

Exchange Parts: List Price less 10%

Subcontract: As required, Mark up +15%

Consumable Build Kits and 100% replacement items: New Parts as required, List Price less 25%

Bulk Issue and Environmental Charges: $5,190.00

Test Cell Fee: $3,989.00

Shippng Materials: $2,314.00

Fuel Management Module (FMM )- Standard Overhaul: To include all replacement parts/components required for a standard overhaul (i.e. replacement parts, kits, consumable and non consumable items); Labor, packing and freight charges to and from DPS Aviation Bureau;· Miscellaneous shop supplies/environmental! charges; Turn around time (30 calendar days); Applicable Taxes and all other related cost required to complete and recertify as airworthy. DPS may at its sole discretion supply documented airworthy parts as required. DPS supplied airworthy parts sha11 not be subject to additional re-inspection fees.

ea

$47,013

Includes standard replacement items. Non standard replacement items, including Service Bulletin upgrades, will an additional charge.

Pricing does not include conusmables to assemble unit to engine.

Fuel Nozzel - Standard Overhaul: To include all replacement parts/components required for a standard overhaul (i.e. replacement parts, kits, consumable and non consumable items); Labor, packing and freight charges to and from DPS Aviation Bureau;· Miscellaneous shop supplies/environmental! charges; Turn around time (2 calendar days); Applicable Taxes and all other related cost required to complete and recertify as airworthy. DPS may at its sole discretion supply documented airworthy parts as required. DPS supplied airworthy parts sha11 not be subject to additional re-inspection fees.

ea

$261.00

Quote reflects a complete set. Individual fuel nozzles are quote only.

Exchange Items Total Price PW 207D2

Fuel Mangement Module - Exchange DPS unit for Contactor unit: To include all labor, packing and freight charges (pick up of DPS unit and delivery of exchange unit) for Contractors overhauled, refurbished, flight worthy certified unit ea

$52,734.61

Includes standard replacement items. Non standard replacement items, including Service

Bulletin upgrades, will an additional charge.

2 Fuel Nozzles - Exchange DPS unit for Contactor unit: To include all labor, packing and freight charges (pick up of DPS unit and delivery of exchange unit) for

Contractors overhauled, refurbished, flight worthy certified unit ea $614.50

Quote reflects a complete set. Individual fuel nozzles are quote only.

3 Electronic Engine Control (EEC)- Exchange DPS unit for Contactor unit: To include all labor, packing and freight charges (pick up of DPS unit and delivery of exchange unit) for

Contractors overhauled, refurbished, flight worthy certified unit.

ea $25,490.31

Overhaul repair not available. These are time continued units

4 Fuel / Oil Heater - Exchange DPS unit for Contactor unit: To include all labor, packing and freight charges (pick up of DPS unit and delivery of exchange unit) for

Contractors overhauled, refurbished, flight worthy certified unit ea $10,817.61

NOTES:

Pricing reflects 2021 pricing and is valid for parts delivered on or before 07/31/2022

Exclusions may apply

PWCS Standard Terms and Conditions apply to this quotation

Leadtimes available at time of transaction.

All pricing excludes freight to and from DPS

Rental Items Hrly Rate PW 207D2

1 Engine - Rental: To include all labor, packing and freight charges (to and from DPS

Aviation Bureau); recertification fees, and all other items of expense for Contractor's flight worthy certified unit. DPS shall not be subject to rental return re-inspection fees or minimum flight hours.

hr Rental Rates Hourly: $176.00

Daily Rates: $386.00

2 Fuel Mangement Module (FMM) - Rental: To include all labor, packing and freight charges (to and from

DPS Aviation Bureau); recertification fees, and all other items of expense for Contractor's flight worthy certified unit. DPS shall not be subject to rental return re-inspection fees or minimum flight hours.

hr Seller’s affiliate, Pratt & Whitney Component Solutions

Inc. (“P&WCS”), will sell new parts and exchange parts to ADPS in accordance with P&WCS’ standard terms and conditions of sale. ADPS shall submit purchase orders directly to P&WCS (spares@pwc.ca, 4905

Stariha Drive, Muskegon MI USA 49441).

3 Electronic Engine Control (EEC) Rental: To include all labor, packing and freight charges (to and from DPS Aviation Bureau); recertification fees, and all other items of expense for

Contractor's flight worthy certified unit. DPS shall not be subject to rental return re-inspection fees or minimum flight hours.

hr Seller’s affiliate, Pratt & Whitney Component Solutions

Inc. (“P&WCS”), will sell new parts and exchange parts to ADPS in accordance with P&WCS’ standard terms and conditions of sale. ADPS shall submit purchase orders directly to P&WCS (spares@pwc.ca, 4905

Stariha Drive, Muskegon MI USA 49441).

1 Test Cell Item Total Price PW 207D2

Engine - Test Cell Performance Test: to include all labor, packing and freight charges (to and from DPS Aviation Bureau); recertification fees, and all other items of expense per test at a certified test facility.

ea

Test Labor: $6,319.35

Test Fee: $3,989.00

Ship Prep Labor: $1,777.00

Packaging Material: $2,314.00

Bulk issue & Environmental: $2,905.00

Parts and Materials Purchase PW 207D2 PWCS Comment

Percent

Discount

1 New OEM Parts Catalogue Discount - Single Price Discount Percent ("SPDP") off Current Pratt and

Whitney OEM Engine Parts Catalogue: Catalogue shall be current Pratt and Whitney OEM Engine

Parts catalogue/price sheet (aka established catalog pricing) as published and maintained by Pratt and

Whiney. SPDP (%) off catalogue pricing offered shall be inclusive of all shipping charges, F.O.B.

Destination for individual orders/deliveries weighing less than 60 lbs; F.O.B. Destination freight charges allowed and added to invoices for individual orders exceeding 60 lbs. SPDP shall not include tax.

percentage 20% - ELM 1&2

List Price - ELM 3&4

Discount does not include freight

Percent Fee

2 Restocking fee: Fee for each New and /or Used serviceable part, component, assemble and subassembly returned by DPS.

percentage 10%

Hot Section

Parts

3 New OEM parts for a Standard Base Kit for Hot Section Removal and Installation. ea 20%

Parts would be ordered individually by DPS

Pricing reflects 2020 pricing and is valid for parts delivered on or before 12/31/2020

Exclusions may apply

PWCS Standard Terms and Conditions apply to this quotation

Leadtimes available at time of transaction.

All pricing excludes freight to and from DPS

Technical Assistance Hrly Rate

1 Standard Hourly Labor Shop Rate : To include standard labor shop rate for a service technician.

hr Exception: Not Applicable. Engine removal by State or a Third Party and shipment to Plant 5 is the only MX option for Hot Section Inspection, Repair and Overhaul at this time.

2022 Update: Same, P&WES LGB now offers PW207D2 Hot Section and minor Repair, still no on-site capability.

2 Standard Hourly Rate for On Site Technical Assistance: To include all labor, travel (round trip) from service technician and/or contractors place of business to the DPS Aviation

Bureau, 2615 East Air Lane, Phoenix, Arizona 85034, per diem, applicable taxes and all other associated costs. Technical assistance personal are to be available/on site @ DPS within 24 hrs if the request submitted is identified as "Urgent". All DPS phone requests and email request are to receive a same day response.

hr Exception: Not Applicable. Engine removal by State or a Third Party and shipment to Plant 5 is the only MX option for Hot Section Inspection, Repair and Overhaul at this time.

2022 Update: Same, P&WES LGB now offers PW207D2 Hot Section and minor Repair, still no on-site capability.

3 Standard Hourly Labor Rate for Hot Section Removal and Installation: To include all labor, travel/freight (if needed) charges, miscellaneous shop supplies/environmental charges above those firm fixed prices contained elsewhere in the price sheet(s) for unforeseen situations directly related to the scope of work specification section.

hr Exception: Not Applicable. Engine removal by State or a Third Party and shipment to Plant 5 is the only MX option for Hot Section Inspection, Repair and Overhaul at this time.

2022 Update: Same, P&WES LGB now offers PW207D2 Hot Section and minor Repair, still no on-site capability.

File details come from the government source that posted it. Updated .