CPO Signed EEPS.pdf

PDF 3 MB Posted

Attached to
Emergency Extension water damaged files
Solicitation number
25-532EPA-FISCP-B-48052
Issued by
Peoria County, Peoria City, Illinois

About this file

This document is an Emergency Purchase Extension Approval form from the State of Illinois Chief Procurement Office for General Services, involving the EPA's Environmental Protection Agency Bureau of Water and Serv Pro of Peoria. The emergency contract pertains to the restoration of water-damaged paper documents following a water leak. The original emergency contract was initiated on March 3, 2025, with an initial term ending June 2, 2025, and is now seeking an extension from June 3, 2025, to August 2, 2025. The scope of work involves cleaning, drying, separating, and restoring approximately 80 total file drawers across three document types: 42 BOW File Drawers, 31 BOL File Drawers, and 7 BOA File Drawers.

The original contract amount was $60,000, and the extension request is for $0, with the vendor already in possession of the documents and near completion of the restoration process. The extension is justified by the vendor's need for additional time to finish drying and restoring the remaining documents. The agency argues that switching vendors could compromise document preservation and potentially cause molding during a transition period. The emergency purchase extension was approved on May 29, 2025, with signatures from the Agency Procurement Officer (Andrew Shackelford), State Procurement Officer (Robert Brice), and Chief Procurement Officer (Ellen Holzman Daley).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EMERGENCY PURCHASE EXTENSION APPROVAL

State of Illinois Chief Procurement Office for General Services Emergency Purchase Extension Approval v.25.2 Page 1 of 3

Section 20-30(a) of the Procurement Code provides that a contract for an emergency may be extended beyond 90 calendar days with the approval of the chief procurement officer (CPO). Prior to execution of the extension, the CPO shall receive this completed form justifying the extension. The duration of the extension shall be limited to the scope of the emergency.

Zip: 61554State: ILCity: PeoriaAddress: 113 Sapp St.

Vendor: Serv Pro of Peoria

Zip: 61602State: ILCity: PeoriaAddress: 412 SW Washing St.

Requesting Agency: EPA - Environmental Protection Agency Division: Bureau of Water

Extension Justification BidBuy Reference #: 25-532EPA-FISCP-B-48052

Amount of original contract: $ 60,000

Actual or Estimated: Estimated

Original BidBuy Reference #: 25-532EPA-WATER-P-79651

Original Emergency Term Start Date:Mar 3, 2025 Original Emergency Term End Date: Jun 2, 2025

Expected Extension Start Date: Jun 3, 2025 Expected Extension End Date: Aug 2, 2025

Amount of extension contract: $ 0 Actual or Estimated: Actual

Is there BEP participation on this contract? If no, explain why

There are not enough vendors in the vendor pool for BEP participation. Additionally, the current vendor has nearly completed the work.

Has this emergency contract been extended before? Please detail in the space below:

BidBuy Reference # Amount Start Date End Date

Not Applicable $0.00

$0.00

$0.00

1. Provide detail about the events that led the agency to conduct an emergency procurement:

The Agency had a water leak that damaged paper records. An Emergency was needed to get these documents restored.

2. What is the scope of work of the initial emergency contract? Please detail below:

Clean up and restoration of flooded IEPA documents. The documents will need to be dried, separated and restored. This is quite an extensive process.

• There are 7 file drawers that were hung out to dry today.

• Files remaining in the file room are currently being rotated 90° or 180° inside the drawer to expose the wet part over the weekend.

• All BOL, BOA and miscellaneous BOW boxes that were on the ground (the most saturated files) were moved next door to the

Emergency Purchase Extension Approval v.25.2 Page 2 of 3

Section 20-30(a) of the Procurement Code provides that a contract for an emergency may be extended beyond 90 calendar days with the approval of the chief procurement officer (CPO). Prior to execution of the extension, the CPO shall receive this completed form justifying the extension. The duration of the extension shall be limited to the scope of the emergency.

Zip: 61554State: ILCity: PeoriaAddress: 113 Sapp St.

Vendor: Serv Pro of Peoria

Zip: 61602State: ILCity: PeoriaAddress: 412 SW Washing St.

Requesting Agency: EPA - Environmental Protection Agency Division: Bureau of Water

Larkin Building.

The approximate total drawers needing restored are as follows: 80 drawers total:

42 BOW File Drawers (8 Drawers Dry or Drying, 34 Remaining) 31 BOL File Drawers (31 Remaining) 7 BOA File Drawers (7 Remaining)

3. Does this extension change the scope of work? Yes No If yes, please detail below:

4. Provide justification for extending the original emergency contract:

The vendor needs more time to complete restoring the documents. The Vendor is in the final stages of this project and are finishing drying and restoring the rest of the documents.

5. Does this emergency contract correct or eliminate the emergency condition?

Yes No Please detail:

The emergency condition will still exist until the work is completed.

6. Explain why the need cannot be met through a competitive procurement process.

The Emergency vendor is already doing the work. This vendor has already taken all of the files and started to recover them all that is left to do is dry the documents.

7. Is a competitive procurement in process to replace this emergency contract?

Yes No Status: other, please explain below

The Vendor is in possession of the documents and there is very little work remaining to be completed. Switching to another vendor may compromise the documents being restored and may they may mold during a transition period. Additionally, the vendor could finish restoring the documents prior to finishing a transition period.

8. What is the effect of a denial of this extension request?

If the Emergency Extension is denied then the agency will lose important paper documents that are not able to be replaced or recovered in any other way.

Emergency Purchase Extension Approval v.25.2 Page 3 of 3

Section 20-30(a) of the Procurement Code provides that a contract for an emergency may be extended beyond 90 calendar days with the approval of the chief procurement officer (CPO). Prior to execution of the extension, the CPO shall receive this completed form justifying the extension. The duration of the extension shall be limited to the scope of the emergency.

Zip: 61554State: ILCity: PeoriaAddress: 113 Sapp St.

Vendor: Serv Pro of Peoria

Zip: 61602State: ILCity: PeoriaAddress: 412 SW Washing St.

Requesting Agency: EPA - Environmental Protection Agency Division: Bureau of Water

BidBuy Reference #: 25-532EPA-FISCP-B-48052

Signatures below cannot be delegated.

APO Signature I am requesting an extension of the requested emergency contract. I believe all statements herein are true and correct to the best of my knowledge.

APO Signature: Date: May 29, 2025

SPO Signature

SPO Signature: Date: May 29, 2025

CPO Signature Based on my review, I approve the Agency to proceed in accordance with the emergency contract extension detailed in this document.

Based upon my review, I approve the Agency to proceed with the following changes:

CPO Signature: Date: May 29, 2025

Page of

Section 20-30(a) of the Procurement Code provides that a contract for an emergency may be extended beyond 90 calendar days with the approval of the chief procurement officer (CPO). Prior to execution of the extension, the CPO shall receive this completed form justifying the extension. The duration of the extension shall be limited to the scope of the emergency.

State of Illinois Chief Procurement Office for General Services Emergency Purchase Extension Approval v. 25.2

EMERGENCY PURCHASE EXTENSION APPROVAL

State of Illinois Chief Procurement Office for General Services Emergency Purchase Extension Approval v.25.2 Page of Section 20-30(a) of the Procurement Code provides that a contract for an emergency may be extended beyond 90 calendar days with the approval of the chief procurement officer (CPO). Prior to execution of the extension, the CPO shall receive this completed form justifying the extension. The duration of the extension shall be limited to the scope of the emergency.

Extension Justification Actual or Estimated:

Has this emergency contract been extended before? Please detail in the space below:

BidBuy Reference # Amount Start Date End Date

1. Provide detail about the events that led the agency to conduct an emergency procurement:

2. What is the scope of work of the initial emergency contract? Please detail below:

3. Does this extension change the scope of work?

If yes, please detail below:

4. Provide justification for extending the original emergency contract:

5. Does this emergency contract correct or eliminate the emergency condition?

Please detail:

6. Explain why the need cannot be met through a competitive procurement process.

7. Is a competitive procurement in process to replace this emergency contract?

8. What is the effect of a denial of this extension request?

Signatures below cannot be delegated.

APO Signature I am requesting an extension of the requested emergency contract. I believe all statements herein are true and correct to the best of my knowledge.

SPO Signature CPO Signature 11.0.0.20130303.1.892433.887364

DropDownList1: If no, explain why
DropDownList1: EPA - Environmental Protection Agency
DropDownList1: EPA - Environmental Protection Agency
DropDownList1: EPA - Environmental Protection Agency
CurrentPage:
PageCount:
VendorZip: 61554
VendorState: IL
VendorCity: Peoria
VendorAddress: 113 Sapp St.
Vendor: Serv Pro of Peoria
AgencyZip: 61602
AgencyState: IL
AgencyCity: Peoria
AgencyAddress: 412 SW Washing St.
AgencyDivision: Bureau of Water
ReferenceNumber: 25-532EPA-FISCP-B-48052
AmountOfOriginal: 60000.00000000
ActualOrEstimated2: Estimated
TextField15: 25-532EPA-WATER-P-79651
Start: 2025-03-03
End: 2025-06-02
ExpectedExtensionStartDate: 2025-06-03
ExpectedExtensionEnd: 2025-08-02
AmtExtensionExpenditure: 0.00000000
ActualOrEstimated3: Actual
TextField5: There are not enough vendors in the vendor pool for BEP participation. Additionally, the current vendor has nearly completed the work.
TextField7: Not Applicable
NumericField4: 0
DateField3:
DateField4:
TextField8:
NumericField2: 0
DateField5:
DateField6:
TextField9:
NumericField3: 0
DateField7:
DateField8:
TextField6: The Agency had a water leak that damaged paper records. An Emergency was needed to get these documents restored.
TextField13: Clean up and restoration of flooded IEPA documents. The documents will need to be dried, separated and restored. This is quite an extensive process.

• There are 7 file drawers that were hung out to dry today.

• Files remaining in the file room are currently being rotated 90° or 180° inside the drawer to expose the wet part over the weekend.

• All BOL, BOA and miscellaneous BOW boxes that were on the ground (the most saturated files) were moved next door to the Larkin Building.

The approximate total drawers needing restored are as follows: 80 drawers total:

42 BOW File Drawers (8 Drawers Dry or Drying, 34 Remaining) 31 BOL File Drawers (31 Remaining) 7 BOA File Drawers (7 Remaining)

CheckBox7: 0
CheckBox8: 1
TextField1:
TextField2: The vendor needs more time to complete restoring the documents. The Vendor is in the final stages of this project and are finishing drying and restoring the rest of the documents.
WhoAuthorizedWork:
CheckBox3: 0
CheckBox4: 1
TextField10: The emergency condition will still exist until the work is completed.
TextField12: The Emergency vendor is already doing the work. This vendor has already taken all of the files and started to recover them all that is left to do is dry the documents.
CheckBox6: 0
CheckBox5: 1
DropDownList2: other, please explain below
TextField11: The Vendor is in possession of the documents and there is very little work remaining to be completed. Switching to another vendor may compromise the documents being restored and may they may mold during a transition period. Additionally, the vendor could finish restoring the documents prior to finishing a transition period.
TextField14: If the Emergency Extension is denied then the agency will lose important paper documents that are not able to be replaced or recovered in any other way.
TextField3: 25-532EPA-FISCP-B-48052
AuthorizedSignature:
TitleField: 2025-05-29
SignatureField2:
DateField2: 2025-05-29
CheckBox1: 1
CheckBox2: 0
TextField4:
SignatureField1:
DateField1: 2025-05-29

File details come from the government source that posted it. Updated .