Contractor_Safety_Evaluation_Form.pdf
PDF 85 KB Posted
- Solicitation number
- 2026-RFQ-075
- Issued by
- Polk County, Florida
About this file
This is a Contractor Safety Evaluation Form issued by the City of Lakeland, Risk Management and Purchasing Department, applicable to contractors bidding on the Continuing Contract for Professional Municipal Engineering Services under Florida's Consultant's Competitive Negotiation Act (CCNA). The form requires contractors to provide comprehensive safety documentation and program details, including company accident statistics for the past three years with frequency rates and lost time injury rates compared to Bureau of Labor Statistics national averages for their Standard Industrial Classification (SIC) code, current Experience Modification Rate (EMR) with insurance company documentation, and details regarding regularly scheduled safety meetings and their documentation procedures. Contractors must demonstrate compliance with safety requirements through written safety programs, field safety inspections, and documented safety and health training/orientation programs for new employees. The three-year contract includes options for two additional one-year renewals upon mutual consent.
The evaluation form specifically addresses Process Safety Management (PSM) Standard compliance for work on designated systems, requiring contractors to confirm their understanding and ability to provide documentation that all employees receive training on fire, explosion, and toxic release hazards relevant to their position and the applicable emergency plan. Contractors must complete Pre-Work Safety Assessments (PSA) or Job Hazard Analyses (JHA) for all PSM-covered systems work, with mandatory review by all personnel involved at job initiation and as needed throughout the project. Any PSA or JHA modifications must be approved by the senior contractor supervisor on site and either the City of Lakeland Safety Manager or North McIntosh Plant Superintendent. Company officers must sign the form confirming acceptance of these requirements. The form requests additional information about the contractor's safety program and compliance methodology, enabling the City of Lakeland to assess the contractor's safety qualifications prior to contract award.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Lakeland, Risk Management and Purchasing Contractor Safety Evaluation Form
Company Name P.O. Box
Street Address City State Zip Code
Business Contact Title Telephone Number
Safety Contact Title Telephone Number
What is your type of business? SIC Code
What is your company accident statistics for the Frequency Rate of Medical Injuries and Lost Time Injuries Rate as compared to the National Average for your industry as denoted by the Bureau of Labor Statistics for your SIC Code for the last three years? (*See explanation below)
Year Frequency Rate
National Average for your SIC Code
Lost Time Injury Rate
National Average for your SIC Code
*Frequency Rate is the number of injuries requiring medical attention multiplied by 200,000 divided by the number of Man-hours worked.
Example: Number of Accidents Requiring Medical Attention X 200,000 Number of Man-hours
*Lost Time Injury Rate is the number of Lost Time Injuries multiplied by 200,000 divided by the number of Man-hours worked, not considering injuries that only caused restricted work activity as Lost Time Accidents.
Example: Number of Lost Time Accidents X 200,000 Number of Man-hours
What is your company’s current Experience Modification Rate (EMR)? (*Please attach a copy rating received on Insurance Company Letterhead.)
Do you conduct regularly scheduled Safety Meetings for your employees? ☐ Yes
(If yes, how often?) ☐ No
How do you document the safety meetings?
Who conducts the Safety Meetings?
Name Title
Do you have a documented Safety & Health training/orientation program for new employees? (Write any comments in space below)
☐ Yes
☐ No
Do you have a written Safety Program? (Write any comments in space below) ☐ Yes
Do you conduct field Safety Inspections to determine compliance with state, federal, local and company regulations/procedures?
☐ Yes
☐ No If yes please provide the following:
Name Title
How do you follow up the inspections to ensure any needed corrections are made?
Does your company understand that if they were awarded the following contract they must do the following?
All contractors awarded work on the systems covered by the PSM Standard shall provide documentation that all employees have received training in the potential fire, explosion, or toxic release hazards related to his/her job and the process and the applicable provisions of the emergency plan. The documentation shall include the identity of the contract employee, the date of the training, and the means used to verify that the employee understood the training. In addition, a Pre-Work Safety Assessment (PSA) or Job Hazard Analysis (JHA) is required for all work on systems covered by the PSM Standard and the PSA or JHA must be reviewed by all personnel involved in the work beginning and as needed during the process of work. Any modification to the PSA or JHA during the job must be approved by the senior contractor supervisor on site and either the City of Lakeland Safety Manager, or the North McIntosh Plant Superintendent, or their designees.
Please have an officer of the company indicate “Yes” or “No” as an answer pertaining to the question above and sign in the space below:
☐ Yes
Name Date
How do you intend to comply with these requirements?
Do you have any other information you believe would be valuable in evaluating your company’s safety program? If so, please explain or attach to this document.
File details come from the government source that posted it. Updated .