Columbia_Avenue_Complete_Street_-_Pre-Bid_Meeting_Presentation.pptx

PPTX presentation 2 MB Posted

Attached to
Columbia Avenue Complete Street
Solicitation number
RFQ2026004
Issued by
Polk County, Lake Harbor CDP, Florida

About this file

This is a pre-bid meeting presentation for the Columbia Avenue Complete Street project prepared by the City of Kissimmee, Florida, in coordination with TOHO Water Authority and multiple state and local agencies. The project seeks to design a 2.3-mile complete streets corridor from North Hoagland Boulevard to North Central Avenue, with potential extensions of up to 500 feet on adjacent roadways. The scope of services encompasses roadway design, multimodal network improvements, drainage, pedestrian infrastructure, lighting, utilities coordination, landscape design, and traffic signals to address ADA deficiencies and enhance connectivity and safety within the Vine Street District. Key deliverables include planning studies, design documents at 30%, 60%, 90%, and 100% completion phases, public outreach components, cost estimates, geotechnical and environmental assessments, permitting coordination with FDOT, SFWMD, and FDEP, and post-design services. The project will follow a phased construction approach based on logical segmentation and funding availability, with mandatory design reviews by FDOT at 60%, 90%, and 100% completion stages, each requiring approximately two weeks. Project closeout is expected by June 30, 2027.

The estimated design cost is $2.9 million with a total construction budget of $50 million distributed across all project phases. Funding sources include local City of Kissimmee funds, state appropriation, a $500,000 state grant administered through the FDOT Local Agency Program, and an Interlocal Agreement with TOHO Water Authority supporting infrastructure improvements. The procurement is structured as a Request for Qualifications for one FDOT pre-qualified consulting engineering firm under work type 3.2, with evaluation criteria allocating 40 points initially and 50 points during interviews for work task qualification and project approach, 40 points initially and 30 points during interviews for experience and capability, and 20 points for personnel background information. Proposers must have at least two professional engineers registered with the Florida State Board of Professional Engineers with civil engineering proficiency and minimum two years post-registration experience. The project requires DBE program participation reporting and coordination with Osceola County, Kissimmee Utility Authority, LYNX transit, and state environmental and transportation agencies. Design will be treated as LAP-funded and must comply with FDOT standards, ADA requirements, AASHTO guidelines, and NEPA provisions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Columbia Avenue Complete Street

Public Works and Engineering

Agenda Overview Location Map Proposed Typical Sections Background Design and Construction Approach Scope of Services Standards & Guidelines Stakeholders Points of Contact Coordination Schedule Questions

Overview Name: Columbia Avenue Complete Street

Limits: From N Hoaghland Blvd to N Central Ave

Length: 2.3 miles

Scope:

roadway- multimodal network
drainage- pedestrian lighting
utilities- landscape

signals

Funding Sources:

Local State ILA with TOHO Water

Goals:

safety- connectivity- infrastructure improvements
ADA compliance- aesthetics- capacity

Location Map

Proposed Typical Section

Proposed Typical Section

Study:

- 2016 Case Study by Kittelson & Associates for MetroPlan Orlando.

Existing Conditions:

- multi-family residential complexes- single family houses
- churches- schools
- bus stops- retail shopping centers

Constrains:

- limited to the existing ROW

- utilities

- drainage system

Public Involvement:

- Not conducted yet.

Background

City will lead the design and construction phases and TOHO will join with an ILA.

Design cost is mostly covered by City, TOHO and grant funds that are available for FY26.

Due to the high construction cost, we are implementing a construction phased approach based on logical segmentation, constructability, funding considerations, and anticipated implementation timelines that will be established through the planning study.

Once the design is finalized and full plan sets are available, we will apply for grants to support construction funding.

Design will be treated as a LAP funded project.

Design and Construction Approach

Planning study- Multimodal design
Public Involvement- Surveying and ROW Mapping
Cost Estimates- Geotechnical/Environmental
Roadway design- Landscape/Hardscape design
Stormwater design- Permitting (FDOT, SFWMD, FDEP, etc.)
Utilities design- Design and construction phasing
Traffic engineering- Post Design Services

Scope of Services

Standards and Guidelines

- FDOT Standard Plans

- FDOT Design Manual

- Americans with Disabilities Act (ADA) Standards for Accessible Design

- FDOT Standard Specifications for Road and Bridge Construction

- Florida Greenbook

- Toho Water Authority – Standards and Specifications

- South Florida Water Management District (SFWMD)

- Florida Department of Environmental Protection (FDEP)

- Samples Testing and Reporting Guide

- FDOT Materials Manual

- Manual on Uniform Traffic Control Devices (MUTCD)

- FHWA – National Cooperative Highway Research Program (NCHRP)

- AASHTO - Guide for Development of Bicycle Facilities

- Uniform Relocation Assistance and Real Property Acquisition Policies Act

- National Environmental Policy Act (NEPA)

- Build America, Buy America (BABA)

- LAP Checklist for Federally Funded Professional Services Contracts (Federal and State Requirements)

Stakeholders City of Kissimmee Public Works and Engineering Planning Department Community Redevelopment Agency TOHO Water Authority

Points of Contact

- Public Works & Engineering Victor M Mercado, PE Planning Department John Hambley Community Redevelopment Agency Samia Singleton TOHO Water Authority Jose Lamboy-Ruiz

Coordination Osceola County Kissimmee Utility Authority

LYNX

South Florida Water Management District Florida Department of Environmental Protection Florida Department of Transportation – LAP Office Business Owners Residents

Schedule

Questions image1.png image2.png image3.png image4.png image5.png image6.png