This document is Addendum #3 for a contract opportunity issued by Colorado Northwestern Community College (CNCC) in Rangely, Colorado, for the Hefley Gym Floor Demolition and Abatement project. The project involves removing the existing gym floor, abating vermiculite material, and decontaminating the concrete slab, with all work to be completed by May 31st, 2024. Qualifications are due on April 24th by 10:00 AM, and a mandatory site meeting has been conducted. The project requires professional services for industrial hygienists to perform the demolition and abatement, with specific requirements including containment, negative air movement through HEPA filtration, and proper waste disposal according to Colorado state regulations.
The contract opportunity is limited to professional services as defined by Colorado Revised Statutes, with selection based on past experience with similar projects. CNCC will utilize Grande River Environmental for oversight and testing. The contractor will have flexibility in work hours, with access to the site including weekends, and will be responsible for their own disposal methods and equipment. The college will coordinate removing bleachers before demolition and will work with the selected contractor on electrical and logistical requirements. No on-campus housing will be provided, but local hotels are available. The project involves removing wood floors, joists, and associated materials, leaving an open, clean slab for future reconstruction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sign in Sheet.pdf | ||
| CNCC FY24-009 Addendum #1.docx | DOCX document | |
| CNCC Hefley Gymnasium Limited Asbestos Inspection Report (1).pdf | ||
| CNCCFY24-009 Addendum #6.docx | DOCX document | |
| Sample Agreement SC5.3 CON 2022.pdf | ||
| Response Sheet.docx | DOCX document | |
| CNCC FY24-009 Addendum #2.docx | DOCX document | |
| Sign in Sheet 2.pdf | ||
| CNCCFY24-009 Addendum #5.docx | DOCX document | |
| FY24-009 RFQ - Gym Floor Demo and Abatement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CNCC FY24-009
Hefley Gym Floor Demo and Abatement Addendum #3
Questions/Answers:
1) Is there any water damage?
a) CNCC does not anticipate water damage.
2) How deep
a) 2’’ from the bottom of the floor to the slab below.
3) Are you pushing due dates?
a) Please refer to Addendum #2 for an outlined bid schedule. Qualifications are due April 24th by 10:00 AM.
4) Are the bleachers going to be out of the way?
a) CNCC will coordinate removing the bleachers before demo.
5) If we have to put an anchor in for containment, is that ok?
a) Yes. The contractor will be required to fill in any holes with caulking or similar products to match existing colors.
6) Is there access to dumpsters?
a) The contractor is responsible for means and methods of disposal. There is access on the North side of the gym that the contractor can use for dumpers, vac trucks, dump trucks, etc.
7) Are you trying to save any of the flooring?
a) No.
8) Is Weekend Work, ok?
a) Yes, the selected contractor will be required to submit a schedule to include working hours and days. CNCC will not limit access.
9) Is a 7 to 5:30 Schedule, ok?
a) Yes, CNCC will require a schedule to reflect expected work hours, but will not limit.
10) Are there rooms on location for us to stay in?
a) CNCC will not provide on-campus housing. However, the Ride the Rockies event that was scheduled for June 11th – 14th has been canceled. Hotels should be available in town.
11) Do you want the nails pulled out or grounded down?
a) Means and method of removal are up to the selected contractor. The contractor must remove all wood floors, joists, and any other material. The floor will be an open, clean slap, once finished.
12) Is there an As-Built file?
a) Yes, and we will find a way to share it.
13) What about the roofing that will be going on, do we need to worry about that?
a) The roof deck will stay intact, there could be dust and small amounts of debris coming down, but nothing that should hinder the gym floor project.
14) Do we need our own testing firm or is the college providing that?
a) CNCC has contracted Grande River Environmental (GRE) for oversite and testing.
15) Do we need an application to the state of Colorado?
a) CNCC is not aware of a State requirement to submit an application.
16) Are there water hookups with 50-amp breakers for pigtails?
a) CNCC will contract the local electrician to provide electrical requirements. CNCC will work with the selected contractor to get an outline of needs, but will contract the work internally.
17) Will the bid date be extended due to the 2nd walk today 4/18/2024 at 3PM?
a) a. The pre-qualification submittals are due 4/24. Please review Addendum #2 for bid schedule.
18) Placement of dumpsters in the parking lot and will the dumpsters need to be fenced around?
a) No fencing required.
19) Will there be any conflict getting in and out of the building and moving dumpsters around with the roofing project going on at the same time?
a) CNCC will work with both contractors to coordinate spacing and access.
20) Are you leaving the basketball hoops?
a) Basketball hoops will remain in place.
All firms must complete the CNCC Response Sheet. Please find the document posted with Addendum #3.
Addendum #3 April 16/2024
End of Addendum #3 image1.jpeg