CN-550000-CAW60-W0040000.pdf
PDF 138 KB Posted
- Contract number
- CAW60
- Issued by
- Florida
About this file
This document is a Task Work Order for Professional Services issued by the State of Florida Department of Transportation (FDOT) to DRMP, Inc., a consulting firm located in Jacksonville, FL. The specific Task Work Order (No. 4) is associated with Contract No. CAW60 and involves a Right-of-Way Monumentation Survey and Mapping Project for State Road 15 (US17) in Putnam County.
The task order authorizes DRMP to perform survey and mapping services for a specific road segment from West of Dunn's Creek to Horse Landing Road, with a total compensation limit of $127,237.00. The project involves conducting field work according to the District Two Right-of-Way Monumentation Survey Map Check List, including preparing a Surveyor's Report, completing necessary mapping requirements, and submitting all required documentation. The work is to be completed by 3/2/2030, with the FDOT providing existing project information to support the survey and mapping efforts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAW60-W0010000.pdf | ||
| CN-550000-CAW60-W0020000.pdf | ||
| CN-550000-CAW60-W0030000.pdf | ||
| CN-550000-CAW60-00010000.pdf | ||
| CN-550000-CAW60.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
08/21
Consultant:
Address:
Date:
3/2/2030
*Limiting or Estimating/Budgeted Amount.
Distribution:
Task Work Order No.:
Contract No.: Payment FM No.:
CAW60 435444-1-62-08
$673,378.00
(name) (title) Signature
Clay Driggers, PSM PLS Supervisor II
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
(LA4) Units worked at loaded billing rates in Table 6
Page 1 Total
Page 2 thru 6 Subtotal
Total
Survey/Mapping Services
DRMP, INC.
8001 Belfort Parkway, Suite 200 Jacksonville, FL 32256
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$127,237.00
$127,237.00 Limit
SR15 US17 Monumentation Map in Putnam County
Signature
DRMP
$127,237.00
$0.00
(name) (title)
C. William Faust III, PSM
$127,237.00
Total authorizations to date (including this one):
Departmental Approval:
Consultant Acceptance:
Digitally signed by: Clay Driggers
DN: CN = Clay Driggers email = clay.
driggers@dot.state.fl.us C = AD O =
FDOT OU = Location Survey
Date: 2025.04.30 10:38:49 -04'00'
Clay Driggers
Docusign Envelope ID: 8DFE3628-F82A-4BD7-826F-3D4F46D91CA9
05/01/2025 | 2:57 PM EDT
A - 1
Stage III (4/16/2025)
SCOPE OF SERVICES
A. DESCRIPTION
Authorization Financial Project ID Number 435444-1-62-08, State Road 15 (US17) from West of Dunn’s Creek to Horse Landing Road. This is for a Right-of-Way Monumentation Survey and Mapping Project on SR15 in Putnam County.
B. Project Limits
1. The project is a portion of State Road Number 15 (US17). The limits should match the existing current R/W map for this project (R/W Maps are under FP#210028-5; Limits of Monumentation Map is from Station 1040+00 to Station 1150+00).
C. Survey: Right-of-Way Monumentation
Perform all necessary field work according to the current District Two Right Of Way Monumentation Survey Map Check List. (See Section 1 of checklist for requirements)
D. Map: Right-of-Way Monumentation Map
Complete all mapping requirements according to the current District Two Right Of Way Monumentation Survey Map Check List. (See Section 2 of checklist for requirements)
E. Survey: General
The following items apply to the entire project.
1. A Surveyor’s Report shall be prepared and submitted according to the current District Two Right Of Way Monumentation Survey Map Check List. (See Section 3 of checklist for requirements)
2. All submittals shall comply with the current District Two Right Of Way Monumentation Survey Map Check List. (See Section 4 of checklist for requirements)
I. PROVISIONS OF WORK
All work shall be coordinated and subject to the review of the District Survey Manager. Refer to all current guidelines and handbooks for compliance.
J. DEPARTMENT'S RESPONSIBILITIES
The DOT will furnish existing information for the project.
Docusign Envelope ID: 8DFE3628-F82A-4BD7-826F-3D4F46D91CA9
| SCOPE OF SERVICES |
| A. DESCRIPTION |
| B. Project Limits |
| J. DEPARTMENT'S RESPONSIBILITIES |
File details come from the government source that posted it. Updated .