This document is a Task Work Order for Professional Services issued by the Florida Department of Transportation (FDOT) to DRMP, Inc., a consulting firm located in Jacksonville, FL. The task work order is part of Contract No. CAW60 and specifically relates to a design survey project for the SR9/I95 at International Golf Parkway Interchange in St. Johns County, Florida.
The task work order authorizes DRMP to perform a design survey with a total compensation limit of $245,523.00, to be completed by 3/2/2030. The scope of services includes conducting a comprehensive survey with Subsurface Utility Engineering (SUE) and mapping efforts, in compliance with District Two Survey Database Guidelines. The work will be coordinated with and subject to review by the FDOT District Survey Department, with the department providing existing survey data pertinent to the project. The compensation method is based on loaded billing rates specified in a referenced table, and the work is intended to support the preparation of complete construction plans for the specified interchange project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAW60-00010000.pdf | ||
| CN-550000-CAW60.pdf | ||
| CN-550000-CAW60-W0020000.pdf | ||
| CN-550000-CAW60-W0040000.pdf | ||
| CN-550000-CAW60-W0030000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
08/21
Consultant:
Address:
Date:
3/2/2030
*Limiting or Estimating/Budgeted Amount.
Distribution:
Task Work Order No.:
Contract No.: Payment FM No.:
CAW60 210253-8-22-01
$245,523.00
(name) (title) Signature
Clay Driggers, PSM PLS Supervisor II
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
(LA4) Units worked at loaded billing rates in Table 6
Page 1 Total
Page 2 thru 6 Subtotal
Total
Survey/Mapping Services
DRMP, INC.
8001 Belfort Parkway, Suite 200 Jacksonville, FL 32256
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$245,523.00
$245,523.00 Limit
Design Survey (SUE effort and Mapping effort) on SR9/I95 at International Golf Parkway Interchange in St. Johns Co.
Signature
DRMP
$245,523.00
$0.00
(name) (title)
C. William Faust III, PSM
$245,523.00
Total authorizations to date (including this one):
Departmental Approval:
Consultant Acceptance:
Digitally signed by: Clay Driggers
DN: CN = Clay Driggers email = clay.
driggers@dot.state.fl.us C = AD O = FDOT
OU = Location Survey
Date: 2025.03.26 14:43:16 -04'00'
Clay Driggers
Docusign Envelope ID: 80BD23D1-D16A-4178-8C4C-64543FAEC7FA
04/04/2025 | 1:40 PM EDT
Stage III (2-25-25) A-1
SCOPE OF SERVICES
I. DESCRIPTION
Authorization Financial Project Number 210253-8-22-01. This authorization is for a Design Survey on SR9/I95 at International Golf Parkway Interchange in St. Johns County, Florida.
Project Limits
Highlighted locations on concept plans provided by the Engineer of Record.
II. SERVICES
For this authorization, the consultant shall provide all survey services necessary for the preparation of complete construction plans for the above referenced project. All work shall be in compliance with the latest District Two Survey Database Guidelines. This service will include, but not be limited to the following:
Perform Design Survey services based on instructions from the Engineer of Record and the Department.
Specifically the SUE effort and the Mapping effort should be completed.
III. PROVISIONS OF WORK
All work shall be coordinated and subject to the review of the District Survey Department. The survey data/notes shall be recorded in a FDOT approved database.
IV. DEPARTMENT’S RESPONSIBILITIES
The Department will furnish existing survey data pertinent to the project.