CN-550000-CAW25-00070000.pdf
PDF 58 KB Posted
- Contract number
- CAW25
- Issued by
- Florida
About this file
This document is a Task Work Order for Professional Services issued by the Florida Department of Transportation (FDOT) to SRD, Inc., a consulting firm located in Tampa, FL. The task work order is associated with Contract No. CAW25 and specifically relates to a utility project management support services contract for a highway improvement project on I-95 between the Brevard County Line and South of SR 442.
The task work order authorizes SRD, Inc. to provide professional services with a total compensation limit of $18,231.24, which will be paid based on (LA4) units worked at loaded billing rates specified in Table 6. The services are to be completed by 2/12/2030, and the document notes that an independent assessment has verified the staff hours and quantities as fair, reasonable, and competitive. The total authorizations to date for this contract, including this task work order, amount to $349,661.87. The task work order is signed by Staci Nester, District Utility Administrator for FDOT, and Jason Smith, Vice President of SRD, Inc.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
08/21
Consultant:
Address:
Date:
2/12/2030
*Limiting or Estimating/Budgeted Amount.
Distribution:
Consultant Acceptance:
Signature
Vice President
$18,231.24
$0.00
(name) (title)
Jason Smith
$18,231.24
Total authorizations to date (including this one):
Departmental Approval:
$18,231.24 Limit
This TWO is for the Prime Consultant SRD, to provide Utility Project Managment Support Services on FPN#453545-1-32-01, (I-95 from Brevard County Line to South of SR 442)
SRD, INC
17425 Bridge Hill Ct., STE 200
Tampa, FL 33647
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$18,231.24
(LA4) Units worked at loaded billing rates in Table 6
Page 1 Total
Page 2 thru 6 Subtotal
Total
Basic Services Prime (SRD)
$349,661.87
(name) (title) Signature
Staci Nester District Utility Administrator
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
Task Work Order No.:
Contract No.: Payment FM No.:
CAW25 241085-1-32-25