CN-550000-CAW25-00020000.pdf
PDF 57 KB Posted
- Contract number
- CAW25
- Issued by
- Florida
About this file
This document is a Task Work Order for Professional Services issued by the State of Florida Department of Transportation (FDOT). The contract is with SRD, Inc., a consulting firm located in Tampa, Florida, under Contract No. CAW25. The task work order is identified with Payment FM No. 241085-1-32-25 and is dated 2/12/2030.
The task work order authorizes SRD, Inc. to provide Basic Support Services to the District Utility office on an as-needed basis, with a total compensation limit of $75,663.00. The services will be compensated using (LA4) units worked at loaded billing rates specified in Table 6, with all services to be completed by 2/12/2030. The document includes an independent assessment confirming that the staff hours and quantities for the proposed services are fair, reasonable, and competitive. The task work order is signed by Staci Nester, District Utility Administrator for FDOT, and Jason Smith, Vice President of SRD, Inc.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
08/21
Consultant:
Address:
Date:
2/12/2030
*Limiting or Estimating/Budgeted Amount.
Distribution:
Task Work Order No.:
Contract No.: Payment FM No.:
CAW25 241085-1-32-25
$75,663.00
(name) (title) Signature
Staci Nester Distict Utility Adminstrator
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
(LA4) Units worked at loaded billing rates in Table 6
Page 1 Total
Page 2 thru 6 Subtotal
Total
Basic Services Prime Consultant (SRD)
SRD, INC
17425 Bridge Hill Ct., STE 200
Tampa, FL 33647
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$75,663.00
$75,663.00 Limit
Basic Support Services to provide additional support staff to the District Utility office on an as needed basis. See scope of services.
Signature
Vice President
$75,663.00
$0.00
(name) (title)
Jason Smith
$75,663.00
Total authorizations to date (including this one):
Departmental Approval:
Consultant Acceptance:
File details come from the government source that posted it. Updated .