CN-550000-CAV95-W0030000.pdf
PDF 549 KB Posted
- Contract number
- CAV95
- Issued by
- Florida
About this file
This document is a Task Work Order for Professional Services issued by the Florida Department of Transportation (FDOT) District 4, awarded to GPI Geospatial, Inc., a surveying and mapping services consultant. The contract is part of the statewide continuing services contract CAV95, with a specific task order (No. 13) focused on a survey project for State Road 810 (W. Hillsboro Boulevard) at the intersection with NW 45th Avenue in Broward County.
The task work order authorizes GPI Geospatial to perform a comprehensive 3D topographic and subsurface utility engineering (SUE) survey for a transportation infrastructure project. The total contract value for this specific task is $19,511.18, which covers secondary horizontal and vertical project control, a complete 3D survey using Terrestrial Mobile LiDAR extending 100 linear feet from the stop bars, and underground utility designation and mapping. The contract has a defined scope of work, with services to be completed by January 14, 2030, and is part of a larger contract with a total budgetary ceiling of $5,000,000. The contract was procured through a Request for Proposal (RFP) method and is categorized as an engineering continuing services contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAV95-W0020000.pdf | ||
| CN-550000-CAV95-00010000.pdf | ||
| CN-550000-CAV95.pdf | ||
| CN-550000-CAV95-W0010000.pdf | ||
| CN-550000-CAV95-W0040000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
06/17
Consultant:
Address:
Date:
1/14/2030
*Limiting or Estimating/Budgeted Amount.
Distribution:
Consultant Acceptance:
Signature
Project Manager
$19,511.18
$0.00
(name) (title)
Frank Paruas, PSM
$19,511.18
Remaining Funds: $182,019.98
Total authorizations to date (including this one):
Departmental Approval:
$19,511.18 Estimate
SR 810/Hillboro Blvd & NW 45th Ave
Topo & SUE survey
GPI Geospatial Inc.
3051 E Livingston St
Suite 300
Orlando, FL 32803
(To be entered upon execution of T.W.O.)
3/14/2025
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$19,511.18
(LS2) Lump sum paid based on % of completion
Page 1 Total
Page 2 thru 6 Subtotal
Total
Mapping Services
$160,234.41
(name) (title) Signature
Evan Bain, PSM District Surveyor & Mapper
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
Task Work Order No.:
Contract No.: Payment FM No.:
CAV95 451576 2 32 01
Docusign Envelope ID: 22CA4D00-757F-4B09-8FAC-40BCA6F47E2B
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
CAV95
6/2/2025
CONTRACT INFORMATION
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR JASON ADANK, CPA, COMPTROLLER ON 6/2/2025
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55043030454
Expansion Option: A1
Object Code: 131512
Amount: $19,511.18
Financial Project: 45157623201
Work Activity (FCT): 119
CFDA:
Fiscal Year: 2025
Budget Entity: 55100100
Category/Category Year: 088849/25
Amendment ID: W003
Sequence: 00
User Assigned ID: TWO 13
Enc Line (6s)/Status: 0004/04
Total Amount: $19,511.18
Contract: CAV95
Contract Type: CA - ENGINEERING (ENGINEER)
Vendor Name: GPI GEOSPATIAL, INC.
Vendor ID: F450535502005
Beginning Date of This Agreement: 01/15/2025
Ending Date of This Agreement: 01/14/2030
Contract Total/Budgetary Ceiling: bc = $5,000,000.00
Method of Procurement: C - REQUEST FOR PROPOSAL (287.55,F. S.)
Description: Continuing Services for Surveying, Mapping, and SUE
Page1 of 1
To: Evan.Bain@dot.state.fl.us
April 18, 2025
Evan Bain, P.S.M.
District Surveyor and Mapper Florida Department of Transportation – District IV Office Phone: (954) 777-4560 Email: evan.bain@dot.state.fl.us
SUBJECT: Contract FM No.: 448043-1-32-01
Contract No.: CAV95 Project FM No.: 451576-2 State Road: 810 (W. Hillsboro Boulevard) County/Zip Code: Broward County CITS Work Order No.: 8
Requested By: Claudia Vinitskiy-Calvo, P.E., CPM Limits: At intersection with NW 45 Ave
GPI Geospatial Proposal No. 2400368.08
3D Topo and SUE for TSMA Installation at this intersection .
Dear Mr. Bain:
GPI Geospatial, Inc. (GPI) greatly appreciates this opportunity to provide Florida Department of Transportation District 4 (FDOT4), hereafter referred to as the Client, with our proposal to perform professional Surveying & Mapping services as requested. The following proposal is based on our understanding of the scope of work.
All geospatial tasks will be performed in accordance with the current Standards of Practice for Surveying and Mapping in the State of FL.
Project Description mailto:evan.bain@dot.state.fl.us
Proposal No. 2400368.08 3D Topo and SUE for TSMA Installation at this intersection FPID 451576-2
Scope of Services
27.1 Horizontal Project Control (HPC)
Provide Secondary Horizontal Control at this intersection to complete the survey. Expected to set and control a minimum of 4 Secondary points.
27.2 Vertical PC / Bench Line
Provide Secondary Vertical Control at this intersection to complete the survey. Expected to set and control a minimum of 4 Secondary points.
27.3 Alignment and Existing R/W Lines (NA)
RW Line as provided by FDOT (FPID 44767915201). The hours listed here will be to verify completeness and compare with the Broward County Property Appraiser.
27.3 Alignment and Existing R/W Lines
Perform a complete 3D Survey for this intersection, extending 100 LF from the stop bars. The 3D Survey will be completed using Terrestrial Mobile LiDAR. Prepare the SURVRD file.
27.10 Underground Utilities
Designates all the underground utilities (Quality LEVEL) at the intersection. The underground lines will be marked on the field using color codes and will be surveyed and added to the SURVRD file.
Deliverables GPI will prepare the SURVRD file, including underground designated lines. Reviewed title report with GPI comments.
Schedule The project will start immediately after receiving the Notice to Proceed.
Fees GPI Geospatial Inc. …… $19,511.18 Total Fees …………............ $ 19,511.18
Sincerely, Frank Paruas Frank Paruas, PSM Miami Survey Manager fparuas@gpinet.com 786-831-2251 mailto:fparuas@gpinet.com
ESTIMATE OF WORK EFFORT AND COST - PRIME CONSULTANT
Name of Project: 810 (W. Hillsboro Boulevard) At intersection with NW 45 Ave Consultant Name: GPI Geospatial, Inc.
County: Broward Consultant No.: 2400368.08 FPN: 451576-2 Date: 4/18/2025 FAP No.: 54321 Estimator: Frank Paruas
SH Salary Average
By Cost By Rate Per
$351.69 $264.74 $250.09 $154.35 $131.84 $193.19 $141.42 $111.05 $123.09 $134.81 $85.97 $113.32 Activity Activity Task
27. Survey (Field & Office Support) 39 1 4 5 18 11 0 0 0 0 0 0 0 39 $6,890 $176.66
28. Photogrammetry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
29. Mapping 17 1 1 2 7 6 0 0 0 0 0 0 0 17 $2,988 $175.77
30. Terrestrial Mobile LiDAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Total Staff Hours 56 2 5 7 25 17 0 0 0 0 0 0 0 56 Total Staff Cost $703.38 $1,323.70 $1,750.63 $3,858.75 $2,241.28 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $9,877.74 $176.39
Check = $9,877.74 Survey Field Days by Subconsultant SALARY RELATED COSTS: $9,877.74 4 - Person Crew: SUR Crew Chief Home 16 126.02$ / day $2,016.32
SUR Intrument Operator Home 16 91.17$ / day $1,458.72 Notes: SUR Rod Person Home 16 84.01$ / day $1,344.16
1. This sheet to be used by Prime Consultant to calculate the Grand Total fee. EXPENSES: $0.00
2. Manually enter fee from each subconsultant. Unused subconsultant rows may be hidden.
SUR SUE Techiniccian 3 Home 16 136.77$ / day $2,188.32 SUR SUE Techiniccian 1 Home 16 80.11$ / day $1,281.76 SUR Rod Person Home 16 84.01$ / day $1,344.16
SUBTOTAL ESTIMATED FEE: $9,633.44
Geotechnical Field and Lab Testing $0.00
SUBTOTAL ESTIMATED FEE: $19,511.18
Optional Services $0.00
GRAND TOTAL ESTIMATED FEE: $19,511.18
SUR Survey
GIS/SUE
Analyst 3
Home
SUR Survey
GIS/SUE
Analyst 2
Home
Staff Classification Total Staff Hours From
"SH
Summary -
Firm"
SUR Chief Surveyor
Home
SUR Senior Surveyor 2
Home
SUR Survey Project
Manager 3 Home
SUR
Secretary/Cleri cal Home
SUR Mobile Survey
Operator Home
SUR Multi Engine
Aircraft Pilot Home
SUR Aerial Sensor
Operator Home
SUR Mobile Survey
Analyst 3 Home
SUR Mobile Survey
Analyst 2 Home
SUR Mobile Survey
Analyst 1 Home
451576-23 SR 810 W Hillsboro and NW 45 Ave_SHE.xlsx Fee Sheet - Prime Page 7 of 1 4/18/2025 8:50 AM
27. Survey
810 (W. Hillsboro Boulevard) At intersection with NW 45 Ave
451576-2
NOTE: Signature Block is optional, per District preference
Task No. Task Units No of
Units Field Crew Days/Unit
Crew Days
Field Support Hours /
Crew Days
Field Support Hours
Office Support Hours /
Crew Days
Office Support Hours
Comments
27.1 Horizontal Project Control (HPC)
2-Lane Roadway Mile 0.00 0.00 0.00
Multi-lane Roadway Mile 0.10 5.00 0.50 0.50 0.25 3.00 1.50
Interstate Mile 0.00 0.00 0.00
27.2 Vertical PC / Bench Line
2-Lane Roadway Mile 0.00 0.00 0.00
Multi-lane Roadway Mile 0.10 5.00 0.50 0.50 0.25 3.00 1.50
Interstate Mile 0.00 0.00 0.00
27.3 Alignment and Existing R/W Lines
Mile 0.00 0.00 0.00
27.4 Aerial Targets Units/Day
2-Lane Roadway EA 0.00 0.00 0.00
Multi-lane Roadway EA 0.00 0.00 0.00
Interstate EA 0.00 0.00 0.00
27.5 Reference Points "A" Units/Day
2-Lane Roadway EA 0.00 0.00 0.00
Multi-lane Roadway EA 0.00 0.00 0.00
Interstate EA 0.00 0.00 0.00
Reference Points "B" Units/Day
Non Alignment Points/Approximate EA 0.00 0.00 0.00
Frank Paruas, PSM
Evan Bain, P.S.M.
Print NameRepresenting Signature / Date
FDOT District
Consultant Name
Provide Secondary Vertical Control at this intersection to complete the survey.
Expected to set and control a minimum of 4 Secondary points.
Estimator:
Provide Secondary Horizontal Control at this intersection to complete the survey.
Expected to set and control a minimum of 4 Secondary points.
RW Line as provided by FDOT (FPID 44767915201). The hours listed here will be to verify completeness and compare with the Broward County Property Appraiser.
451576-23 SR 810 W Hillsboro and NW 45 Ave_SHE.xlsx
27. Survey Page 2 of 7 4/18/2025
Task No. Task Units No of
Units Field Crew Days/Unit
Crew Days
Field Support Hours /
Crew Days
Field Support Hours
Office Support Hours /
Crew Days
Office Support Hours
Comments
27.6 Topography/DTM (3D)
Mile 0.10 10.00 1.00 0.50 0.50 20.00 20.00
27.7 Planimetric (2D)
Mile 0.00 0.00 0.00
27.8 Roadway Cross-Sections/Profiles
Mile 0.00 0.00 0.00
27.9 Side Street Surveys
Mile 0.00 0.00 0.00
27.10 Underground Utilities
Designates Mile/Site 0.10 15.00 1.50 0.50 0.75 3.00 4.50
Locates Point 0 0 0.00 0.50 0.00 0.00 0.00
Survey 25% 1.50 0.38 0.00 0.00 3.00 1.13
27.11 Outfall Survey
Mile 0.00 0.00 0.00
27.12 Drainage Survey Units/Day
EA 0.00 0.00 0.00
27.13 Bridge Survey
Minor / Major EA 0.00 0.00 0.00
27.14 Channel Survey
EA 0.00 0.00 0.00
27.15 Pond Site Survey
EA 0.00 0.00 0.00
27.16 Mitigation Survey
Mile 0.00 0.00 0.00
27.17 Jurisdiction Line Survey
Mile 0.00 0.00 0.00
27.18 Geotechnical Support Units/Day
EA 0.00 0.00 0.00
Designates all the underground utilities (Quality LEVEL) at the intersection. The underground lines will be marked on the field using color codes, and will be surveyed and added to the SURVRD file.
Perform a complete 3D Survey for this intersection, extending 100 LF from the stop bars. The 3D Survey will be completed using Terrestrial Mobile LiDAR. Prepare the
SURVRD file
451576-23 SR 810 W Hillsboro and NW 45 Ave_SHE.xlsx
27. Survey Page 3 of 7 4/18/2025
No. Task Units No of
Units Field Crew Days/Unit
Crew Days
Field Support Hours /
Crew Days
Field Support Hours
Office Support Hours /
Crew Days
Office Support Hours
Comments
27.19 Sectional / Grant Survey
Corner 0.00 0.00 0.00
Mile 0.00 0.00 0.00
27.20 Subdivision Location
Block 0.00 0.00 0.00
27.21 Maintained R/W
Mile 0.00 0.00 0.00
27.22 Boundary Survey
EA 0.00 0.00 0.00
27.23 Water Boundary Survey
EA 0.00 0.00 0.00
27.24 R/W Staking / R/W Line
EA 0.00 0.00 0.00
Mile 0.00 0.00 0.00
27.25 R/W Monumentation
Point 0.00 0.00 0.00
27.26 Line Cutting
Mile 0.00
27.27 Work Zone Safety
4 0.125 0.48
27.28 Vegetation Survey
LS 0
27.29 Tree Survey
LS 0
27.30 Miscellaneous Surveys
0.00 0.00 0.00
Crew Days 4 Field
Support Hours
Office
Support Hours
27.31 Supplemental Surveys
4 0 0 0
Survey Subtotal
THE % FOR SUPPLEMENTAL WILL BE DETERMINED AT NEGOTIATIONS. THIS
ITEM CAN ONLY BE USED IF AUTHORIZED IN WRITING BY THE DISTRICT
SURVEYOR
451576-23 SR 810 W Hillsboro and NW 45 Ave_SHE.xlsx
27. Survey Page 4 of 7 4/18/2025
No. Task Units No of
Units Field Crew Days/Unit
Crew Days
Field Support Hours /
Crew Days
Field Support Hours
Office Support Hours /
Crew Days
Office Support Hours
Comments
27.32 Document Research Units
4.00 4
27.33 Field Reviews Units
27.34 Technical Meetings LS
0.00 0
27.35 Quality Assurance / Quality Control LS
5% 1
27.36 Supervision LS
5% 2
27.37 Coordination LS
3% 1
Crew Days 4 Field
Support Hours
Office
Support Hours
SPLS =
PLS =
Office Support = Total Hours = 39
Units No of Units Hours/ Unit Total
Hours Number Comments
EA 0 0 0 0
EA 0 0 0 0
EA 0 0 0 0
EA 0 0 0 0
EA 0 0 0 0
EA 0 0 0 0
EA 0 0 0 0
0 0
EA 0 0 0 - -
EA 0 0 0 - -
0 0 Carries to 27.34 Carries to Tab 3
** Project Manager attendance at progress, phase and field review meetings are manually entered on General Task 3
PM Attendance at Meeting Required?
Local Governments (cities, counties)
Technical Meetings
Kickoff Meeting with FDOT
Baseline Approval Review
Network Control Review
Phase Review Meetings
Total Meetings Total PM Mtgs (carries to Tab 3)
Subtotal PM Meetings
Vertical Control Review
Final Submittal Review
Other Meetings
Subtotal Technical Meetings Progress Meetings (if required by FDOT)
27. Survey Total
451576-23 SR 810 W Hillsboro and NW 45 Ave_SHE.xlsx
27. Survey Page 5 of 7 4/18/2025
810 (W. Hillsboro Boulevard) At intersection with NW 45 Ave 451576-2
Signature / Date
NOTE: Signature Block is optional, per District preference
Documentation
Description Units Complexity Calculated Department Consultant Negotiated Provide documentation when negotiated hours differ from the calculated hours.
29.1 Alignment Length (Miles) 0.00 0 0 0 0
29.2 Section and 1/4 Section Lines Section 0 0 0 0 0
29.3 Subdivisions Block 0 0 0 0 0
29.4 Property Lines Tract 0 0 0 0 0
29.5 Existing R/W Length (Miles) 0.00 0 0 0 0
29.6 Topography Length (Miles) 0.00 0 0 0 0
29.7 Parent Tract Properties/Existing Easements Parcel 0 0 0 0 0
29.8 Proposed R/W Requirements Parcel 0 0 0 0 0
29.9 Limits of Construction Length (Miles) 0.00 0 0 0 0
29.10 Jurisdictional/Agency Lines Linear Mile 0.00 0 0 0 0
29.11 Control Survey Cover Sheet LS 0 0 0 0 0
29.12 Control Survey Key Sheet Sheet
(24" X 36") 0 0 0 0 0
29.13 Control Survey Detail Sheet Sheet
(24" X 36") 0 0 0 0 0
29.14 R/W Map Cover Sheet LS 0 0 0 0 0
29.15 R/W Map Key Sheet Sheet
(24" X 36") 0 0 0 0 0
29.16 R/W Map Detail Sheet Sheet
(24" X 36") 0 0 0 0 0
29.17 Maintenance Map Cover Sheet LS 0 0 0 0 0
29.18 Maintenance Map Key Sheet Sheet
(24" X 36") 0 Standard 0 0 0 0
29.19 Maintenance Map Detail Sheet Sheet
(24" X 36") 0 Standard 0 0 0 0
29.20 Reference Point Sheet EA 0 0 0 0 0
29.21 Project Control Sheet Sheet
(24" X 36") 0 0 0 0 0
29.22 Table of Ownerships Sheet Parcel 0 0 0 0 0
29.23 Parcel Sketches Parcel 0 Standard 0 0 0 0
29.24 TIITF Sketches Parcel 0 0 0 0 0
29.25 Other Specific Purpose Survey(s) EA 0 0 0 0 0
29.26 Boundary Survey(s) Map EA 0 0 0 0 0
Master CADD File
Sheet Files
Miscellaneous Surveys & Sketches
Task No. Task
Project Parameter Staff Hours
Estimator: Frank Paruas 29. Mapping Staff Hours
Representing Print Name
FDOT District Evan Bain, P.S.M.
Consultant Name Frank Paruas, PSM
29.27 R/W Monumentation Map Sheet
(24" X 36") 0 0 0 0 0
29.28 Title Search Map LS 0 0 0 0 0
29.29 Title Search Report LS 1 2 0 0 0 Request Title Search Reports
29.30 Legal Descriptions Parcel 0 Standard 0 0 0 0
2 0 0 0
29.31 Quality Assurance/Quality Control % 1 5% 1 0 0 0
29.32 Supervision % 1 5% 1 0 0 0
Meetings 0 0 0 0 0
Travel Time 0 0 0 0
29.34 Field Reviews (listed below) LS 0 0 0 0
2 0 0 0
29.35 Coordination % 1 3% 1 0 0 0
29.36 Supplemental Mapping LS 12 0 0 0 Three title search reports at this intersection. The hours here are for reviewing the Reports and making any necessary adjustments to the RW file.
17 0 0 0 Carries to Summary Tab
Technical Meetings # Meetings Designer
Travel Time (Hours)
# Meetings
PM
Local Governments (cities, counties, MPO) 0 0 0
30/60/90/100% Comment Review Meetings 0 0 0
Utility Coordination 0 0 0
Other Meetings 0 0 0
Subtotal Technical Meetings 0 0 0 Progress Meetings (if required by FDOT) 0 0
Phase Review Meetings 0 0
Total Meetings 0 0
Field Reviews # of Staff Site Time (per staff)
Travel Time (per staff) Total Hours
Field Review #1 0 0 0 0 Field Review #2 0 0 0 0 Field Review #3 0 0 0 0 Field Review #4 0 0 0 0 Plans-in-hand Field Review 0 0 0 0
0Total Field Review Hours
Documentation
29.33 Mapping Meetings (listed below)
Mapping Non-Technical Subtotal
Mapping Total
Mapping Technical Subtotal