This document is a Task Work Order for Professional Services issued by the Florida Department of Transportation (FDOT) to ASA Consultants, Inc., a professional engineering and design consulting firm. The task work order is part of the Continuing Services for Project Design (BDI) contract, specifically for the SR-5/US-1 roadway project spanning from 25th Street to 45th Street in Palm Beach County. The contract is identified with the contract number CAV32 and the financial project number 438386-6-32-01.

The task work order authorizes ASA Consultants to perform professional design services with a total compensation limit of $75,394.31, to be paid on a lump sum basis according to percentage of completion. The project scope includes consulting support for structures and landscape design, involving tasks such as eliminating the median, shifting roadway elevation, widening sidewalks, full lighting replacement, adding school zone overhead structures, and replacing mast arms. The contract period runs from November 26, 2024, to November 25, 2029, with this specific task work order focused on design documentation, field assessments, plan development, and coordination with FDOT District 4 In-House Design team. The overall contract has a budgetary ceiling of $3,000,000, and was procured through a Request for Proposal method.

View the file

Other files

File Type Posted
CN-550000-CAV32-00020000.pdf PDF
CN-550000-CAV32-00030000.pdf PDF
CN-550000-CAV32.pdf PDF
CN-550000-CAS54-W0040100.pdf PDF
CN-550000-CAV32-00010000.pdf PDF
CN-550000-CAV32-W0030000.pdf PDF
CN-550000-CAV32-W0020000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

TASK WORK ORDER FOR PROFESSIONAL SERVICES

375-030-25

PROCUREMENT

08/21

Consultant:

Address:

Date:

11/25/2029

*Limiting or Estimating/Budgeted Amount.

Distribution:

Consultant Acceptance:

Signature

Consultant, Procurement, Financial Services, FDOT Project Manager, File

President

$75,394.31

$0.00

(name) (title)

Soheila Sadough, P.E.

$75,394.31

Total authorizations to date (including this one):

Departmental Approval:

$75,394.31 Limit

Consultant Support for Structures and Landscape Design for SR-5/US-1 from 25th Street to 45th Street

ASA Consultants, Inc.

510 Shotgun Road, Suite 402, Sunrise, Florida 33326

(To be entered upon execution of T.W.O.)

Brief Task Description:

In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).

Compensation elements are as follows:

Element Description Amount Estimate/LimitMethod of Compensation

The total amount or the limiting amount of the compensation will be:

All services required under this Task Work Order will be completed on or before:

$75,394.31

(LS2) Lump sum paid based on % of completion

Page 1 Total

Page 2 thru 6 Subtotal

Total

Basic Services

$75,394.31

(name) (title) Signature

Luciana Amato Contract Coordinator

Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.

Task Work Order No.:

Contract No.: Payment FM No.:

CAV32 438386-6-32-01

Docusign Envelope ID: 6EA0D03F-F17C-4DDD-8972-1E317C59B5A9

05/01/2025 | 7:11 AM EDT

Continuing Services Project Design (BDI)

CAV32 | FM No. 446589-1-32-01

Design Consultant: ASA Consultants, Inc.

April 29, 2025

Task Work Order 001

SR-5/US-1 from 25th Street to 45th Street

Cost Accounted to FM: 438386-6-32-01

SCOPE OF SERVICES

PURPOSE & SCOPE

The purpose of this Task Work Order (TWO) is to assist FDOT D4 In-House Design with construction documents for the above-mentioned project.

The scope of work includes, but is not limited to:

Eliminating the median and shifting the elevation of the roadway to widen the Eastside sidewalk to 12 feet and the Westside sidewalk to a minimum of 6 feet. This project includes full lighting replacement, an addition of the school zone with 2 Overhead Structures, and replacement of the NW and SW mast arms on

25th street to dual mast arm at the SW corner.

The scope of services includes, but is not limited to, the following items:

Structures:

Design Documents Deliverables

• Ancillary Structures Report o Mast Arm Analysis (Determine if Existing exceeds 10% loading and proposed) o Foundation Analysis for Lighting

• Mast Arm Data Table Sheet (to be included in the Signalization Plans)

• Foundation Detail Sheet(s) (to be included in the Lighting Plans)

Landscape:

• Data Collection for Selective Clearing and Grubbing, Tree Disposition, Tree

Relocation, and Irrigation Impacts. Utilize FDOT roadway construction project CADD files. Obtain irrigation as-built plans for existing irrigation systems.

• Master file setup for SC&G, Tree Disposition, Tree Relocation, and irrigation impacts.

• Conduct field assessments for SC&G, Tree Disposition, and Irrigation systems.

• Address tree disposition and tree relocation for trees located in the existing medians.

• Prepare selective clearing and grubbing, tree disposition, and tree relocation plan sheets.

• Prepare Irrigation removal and capping notes to address impacts to existing systems.

• Prepare Selective Clearing and Grubbing Detail sheet including a tree disposition table, tree relocation table, vegetation removal table, tree root and branch pruning table, SC&G legend, and vegetation removal and tree relocation details as needed.

• Prepare two summary tables for inclusion in the Estimated Quantities Report. Includes

Summary of Landscape Items and Summary of Clearing Grubbing and Removal Items.

Includes preparation of the 3-Way checklist at each submittal.

• Attendance at one Public Involvement Meeting.

• Complete Tree Disposition, Tree Relocation, and Selective Clearing and Grubbing Plans.

• SC&G Detail Sheets and Tree Disposition Chart Sheets.

• Irrigation Impact and Capping Notes.

• Estimated Quantities Report Summary Tables (Summary of Clearing Grubbing and Removal

Items and Summary of Landscape Items).

• Engineer’s Cost Estimates.

CONSULTANT RESPONSIBILITIES

The Consultant’s responsibilities remain the same as in the Original Agreement and any Supplemental

Amendments to date.

DEPARTMENT RESPONSIBILITIES

The Department’s responsibilities remain the same as in the Original Agreement and any

Supplemental Amendments to date.

METHOD OF COMPENSATION

Services for this Task Work Order will be lump sum.

Name of Consultant Project Information Sheet

Financial Project Identification Number: 438386-6-32-01 D424-040-B

Name of Prime / Subconsultant: ASA Consultants, Inc. County: Palm Beach

Project Description: SR-5/US-1 FROM 25TH STREET TO 45TH STREET

Begin Milepost: 1.14 Miles

Number of Lanes: (Urban / Rural / Int.) Lane Configuration: Divided (Divided / Undivided)

Project Type: Minor Roadway Classification: SHS/NHS (NHS/FIHS/Off Sys.)

CAP Level:

Design Variations:

Proposed Design Contract Time: months/days Date of Negotiation: Context Classification:

3. Project Common & Project General Tasks

4. Roadway Analysis

5. Roadway Plans

6a. Drainage Analysis

6b. Drainage Plans

6c. Selective C&G

7. Utilities

8. Environmental Permits and Env. Clearances

9. Structures Summary

10. Structures - Bridge Development Report

11. Structures - Temporary Bridge

12. Structures - Short Span Concrete

13. Structures - Medium Span Concrete

14. Structures - Structural Steel

15. Structures - Segmental Concrete

16. Structures - Movable Span

17. Structures - Retaining Walls

18. Structures - Miscellaneous

19. Signing and Pavement Marking Analysis

20. Signing and Pavement Marking Plans

21. Signalization Analysis

22. Signalization Plans

23. Lighting Analysis

24. Lighting Plans

25. Landscape Analysis

26. Landscape Plans

27. Survey

28. Photogrammetry

29. Mapping

30. Terrestrial Mobile LiDAR

31. Architecture Development

32. Noise Barriers Impact Design Assessment

33. Intelligent Transportation Systems Analysis

34. Intelligent Transportation Systems Plans

35. Geotechnical

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Federal Aid Project Identification Number:

10.293 End Milepost: 11.435 Project Length:

4 Typical Section: Urban

Project Activity:

Estimated By: Negotiated By: (name - firm)

Consultant FDOT Consultant FDOT

2. 2.

3. 3.

4. 4.

5. 5.

(Minor / Major)

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

Access Management Classification:

TTCP Level: Survey Level:

1. Design Exceptions: 1.

Enter name & firm Enter name & office Enter name & firm Enter name & office

Enter name & firm Enter name & office Enter name & firm Enter name & office

CAV32-TWO_001-43838663201-SHE_v1.xlsx

Project Information Page 1 of 11 4/29/2025

Project Staff Hour Summary

Name of Consultant: ASA Consultants, Inc.

Activity

No.

Activity

ASA

Consultants, Inc.

Cotleur &

Hearing Sub 2 Sub 3 Sub 4 Sub 5 Sub 6 Sub 7 Sub 8 Sub 9 Sub 10 Sub 11 Sub 12 Total Hours

3 Project Common and General Tasks 79 79

4 Roadway Analysis 0 0

5 Roadway Plans 0 0

6a Drainage Analysis 0 0

6b Drainage Plans 0 0

6c Selective C&G 0 108 108

7 Utilities 0 0

8 Env. Permits and Env. Clearances 0 0

9 Structures - Summary, Misc. Tasks, Dwgs. 70 70

10 BDR 0 0

11 Temporary Bridge 0 0

12 Short Span Concrete Bridge 0 0

13 Medium Span Concrete Bridge 0 0

14 Structural Steel Bridge 0 0

15 Segmental Concrete Bridge 0 0

16 Movable Span 0 0

17 Retaining Walls 0 0

18 Miscellaneous Structures 114 114

19 Signing & Pavement Marking Analysis 0 0

20 Signing & Pavement Marking Plans 0 0

21 Signalization Analysis 0 0

22 Signalization Plans 0 0

23 Lighting Analysis 0 0

24 Lighting Plans 0 0

25 Landscape Analysis 0 20 20

26 Landscape Plans 0 22 22

27 Survey - Field and Office Support 0 0

28 Photogrammetry 0 0

29 Mapping 0 0

30 Terrestrial Mobile LiDAR 0 0

31 Architecture Development 0 0

32 Noise Barriers Impact Design Assessment 0 0

33 ITS Analysis 0 0

34 ITS Plans 0 0

35 Geotechnical 0 0

263 150 0 0 0 0 0 0 0 0 0 0 0 413

27 Survey Field Crew Days 0 0

Notes: 1. Staff hours for prime consultant come directly from each discipline's worksheet.

2. Staff hours for subconsultants are to be entered manually into columns D through O.

3. For workbooks prepared by subconsultants, their project hours will be totaled in column C.

SR-5/US-1 FROM 25TH STREET TO 45TH STREET

Project Total

438386-6-32-01

Project Staff Hours

CAV32-TWO_001-43838663201-SHE_v1.xlsx

Summary Page 2 of 11 4/29/2025

ESTIMATE OF WORK EFFORT AND COST - PRIME CONSULTANT

Name of Project: SR-5/US-1 FROM 25TH STREET TO 45TH STREET Consultant Name: ASA Consultants, Inc.

County: Palm Beach Consultant No.: 351-1

FPN: 438386-6-32-01 Date: 4/29/2025

FAP No.: D424-040-B Estimator: C. Rodriguez

SH Salary Average

By Cost By Rate Per

$279.81 $224.01 $222.94 $150.45 $123.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Activity Activity Task

3. Project Common and Project General Tasks 79 47 32 0 0 0 0 0 0 0 0 0 0 79 $20,319 $257.21

4. Roadway Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

5. Roadway Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

6a. Drainage Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

6b. Drainage Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

6c. Selective C&G 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

7. Utilities 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

8. Environmental Permits,and Env. Clearances 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

9. Structures - Misc. Tasks, Dwgs, Non-Tech. 70 11 28 18 7 6 0 0 0 0 0 0 0 70 $15,158 $216.55

10. Structures - Bridge Development Report 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

11. Structures - Temporary Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

12. Structures - Short Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

13. Structures - Medium Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

14. Structures - Structural Steel Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

15. Structures - Segmental Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

16. Structures - Movable Span 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

17. Structures - Retaining Walls 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

18. Structures - Miscellaneous 114 17 29 23 23 22 0 0 0 0 0 0 0 114 $22,562 $197.92

19. Signing & Pavement Marking Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

20. Signing & Pavement Marking Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

21. Signalization Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

22. Signalization Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

23. Lighting Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

24. Lighting Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

25. Landscape Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

26. Landscape Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

27. Survey (Field & Office Support) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

28. Photogrammetry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

29. Mapping 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

30. Terrestrial Mobile LiDAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

31. Architecture Development 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

32. Noise Barriers Impact Design Assessment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

33. Intelligent Transportation Systems Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

34. Intelligent Transportation Systems Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

35. Geotechnical 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

Total Staff Hours 263 75 89 41 30 28 0 0 0 0 0 0 0 263

Total Staff Cost $20,985.75 $19,936.89 $9,140.54 $4,513.50 $3,463.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $58,040.28 $220.69

Check = $58,040.28

Survey Field Days by Subconsultant SALARY RELATED COSTS: $58,040.28

4 - Person Crew: OVERHEAD: 0% $0.00

OPERATING MARGIN: 0% $0.00

Notes: FCCM (Facilities Capital Cost Money): 0.00% $0.00

1. This sheet to be used by Prime Consultant to calculate the Grand Total fee. EXPENSES: 0.00% $0.00

2. Manually enter fee from each subconsultant. Unused subconsultant rows may be hidden. Survey (Field - if by Prime) 0

4-person crew days @ -$ / day $0.00

SUBTOTAL ESTIMATED FEE: $58,040.28

Subconsultant: Cotleur & Hearing $17,354.03

Subconsultant: Sub 2 $0.00

Subconsultant: Sub 3 $0.00

Subconsultant: Sub 4 $0.00

Subconsultant: Sub 5 $0.00

Subconsultant: Sub 6 $0.00

Subconsultant: Sub 7 $0.00

Subconsultant: Sub 8 $0.00

Subconsultant: Sub 9 $0.00

Subconsultant: Sub 10 $0.00

Subconsultant: Sub 11 $0.00

Subconsultant: Sub 12 $0.00

SUBTOTAL ESTIMATED FEE: $75,394.31

Geotechnical Field and Lab Testing $0.00

SUBTOTAL ESTIMATED FEE: $75,394.31

Optional Services $0.00

GRAND TOTAL ESTIMATED FEE: $75,394.31

Staff Classi-fication 12

Staff Classi-fication 9

Staff Classi-fication 10

Staff Classi-fication 11

Staff Classi-fication 6

Staff Classi-fication 7

Staff Classi-fication 8

Senior

Engineer 1

Home

Engineer 2

Home

Chief

Designer

Home

Senior

Engineering

Technician

Home

Staff Classification Total Staff

Hours From

"SH

Summary -

Firm"

Senior

Engineer 2

A Home -

Task Lead

CAV32-TWO_001-43838663201-SHE_v1.xlsx

Fee Sheet - Prime Page 11 of 3 4/29/2025 10:54 AM

ESTIMATE OF WORK EFFORT AND COST - SUBCONSULTANT

Name of Project: SR-5/US-1 from 25th Street to 45th Street Consultant Name: Cotleur & Hearing (ASA) County: Palm Beach Consultant No.: NA FPN: 438386-6-32-01 Date: 4/27/2025 FAP No.: D424-040-B Estimator: Aaron Wilbur

SH Salary Average

By Cost By Rate Per $166.30 $156.76 $139.34 $76.93 $96.61 $95.91 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Activity Activity Task

3. Project Common and Project General Tasks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

4. Roadway Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

5. Roadway Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

6a. Drainage Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

6b. Drainage Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

6c. Selective C&G 108 5 22 27 38 5 11 0 0 0 0 0 0 108 $12,504 $115.78

7. Utilities 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

8. Environmental Permits,and Env. Clearances 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

9. Structures - Misc. Tasks, Dwgs, Non-Tech. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

10. Structures - Bridge Development Report 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

11. Structures - Temporary Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

12. Structures - Short Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

13. Structures - Medium Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

14. Structures - Structural Steel Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

15. Structures - Segmental Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

16. Structures - Movable Span 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

17. Structures - Retaining Walls 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

18. Structures - Miscellaneous 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

19. Signing & Pavement Marking Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

20. Signing & Pavement Marking Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

21. Signalization Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

22. Signalization Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

23. Lighting Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

24. Lighting Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

25. Landscape Analysis 20 1 4 5 7 1 2 0 0 0 0 0 0 20 $2,317 $115.85

26. Landscape Plans 22 1 4 6 8 1 2 0 0 0 0 0 0 22 $2,533 $115.15

27. Survey (Field & Office Support) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

28. Photogrammetry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

29. Mapping 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

30. Terrestrial Mobile LiDAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

31. Architecture Development 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

32. Noise Barriers Impact Design Assessment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

33. Intelligent Transportation Systems Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

34. Intelligent Transportation Systems Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

35. Geotechnical 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!

Total Staff Hours 150 7 30 38 53 7 15 0 0 0 0 0 0 150 Total Staff Cost $1,164.10 $4,702.80 $5,294.92 $4,077.29 $676.27 $1,438.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $17,354.03 $115.69

Check = $17,354.03

SALARY RELATED COSTS: $17,354.03

OVERHEAD: 0% $0.00

OPERATING MARGIN: 0% $0.00

Notes: FCCM (Facilities Capital Cost Money): 0.00% $0.00

1. This sheet to be used by Subconsultant to calculate its fee. EXPENSES: 0.00% $0.00

SUBTOTAL ESTIMATED FEE: $17,354.03

Survey (Field) 0 4-person crew -$ / day $0.00 Geotechnical Field and Lab Testing $0.00

SUBTOTAL ESTIMATED FEE: $17,354.03

Optional Services $0.00

GRAND TOTAL ESTIMATED FEE: $17,354.03

Staff Classi-fication 12

Staff Classi-fication 9

Staff Classi-fication 10

Staff Classi-fication 11Staff Classification Designer

Home Staff Classi-fication 7 Staff Classi-fication 8

Chief Landscape Architect

Home

Senior Landscape Architect

Home

Project Landscape Architect

Home

Landscape Designer/

Landscape Planner Home

Chief Designer

HomeTotal Staff Hours From

"SH Summary - Firm"

438386-6-52-01_SR5 US1 from 25th St to 45th St_SHE-CH Fee Sheet - Sub Page 12 of 5 4/27/2025 8:05 PM

Project Activity 3: General Tasks

SR-5/US-1 FROM 25TH STREET TO 45TH STREET

438386-6-32-01

Signature / Date

NOTE: Signature Block is optional, per District preference

Task

No.

Task Units No of Units Hours/ Unit

Total

Hours Comments

3.1

3.1.1 Community Awareness Plan LS 1 0 0

3.1.2 Notifications LS 1 0 0

3.1.3 Preparing Mailing Lists LS 1 0 0

3.1.4 Median Modification Letters LS 1 0 0

3.1.5 Driveway Modification Letters LS 1 0 0

3.1.6 Newsletters LS 1 0 0

3.1.7 Renderings and Fly Throughs LS 1 0 0

3.1.8 PowerPoint Presentation LS 1 0 0

3.1.9 Public Meeting Preparations LS 1 0 0

3.1.10 Public Meeting Attendance/Followup LS 1 0 0

3.1.11 Other Agency Meetings LS 1 0 0

3.1.12 Web Site LS 1 0 0

3.2 Joint Project Agreements EA 0 0 0

3.3

3.3.1 Specifications Package Preparation LS 1 0 0

Report 0 Calculated

Hours

Components 0 0

3.4 Contract Maintenance and Project Documentation LS 1 70 70 16hrs (initial setup) + 2hrs/mo (update/maintenance) x 24mo + 6hrs (final documentation) = 70hrs

3.5 Value Engineering (Multi-Discipline Team) Review LS 1 0 0

3.6 Prime Consultant Project Manager Meetings LS 1 0 0 See listing below

3.7 Plans Update LS 1 0 0

Estimator: C. Rodriguez

3.1 Public Involvement Subtotal

Consultant Name C. Rodriguez

Representing Print Name

FDOT District

Public Involvement

Specifications & Estimates

3.3.2 Estimated Quantities Report Preparation

CAV32-TWO_001-43838663201-SHE_v1.xlsx

3. Project General Tasks Page 4 of 11 4/29/2025

Task

No.

Task Units No of Units Hours/ Unit

Total

Hours Comments

3.8 Post Design Services LS 1 0 0

3.9 Digital Delivery LS 1 9 9 6hrs 1st EOR Digital Signature + 3hrs for 2nd EOR

3.10 Risk Assessment Workshop LS 1 0 0

3.11 Railroad, Transit, and/or Airport Coordination LS 1 0 0

3.11.1 Aeronautical Evaluation LS 1 0 0

3.12 Landscape and Existing Vegetation Coordination LS 1 0 0

3.13 Other Project General Tasks LS 1 0 0

Units No of Units Hours/ Unit Total Hours Comments

EA 0 0 0

EA 0 0 0

EA 0 0 0

EA 0 0 0

EA 0 0 0

EA 0 0 0

EA 0 0 0

EA 0 0 0

EA 0 0 0

EA 0 0 0

EA 0 0 0

EA 0 0 0

EA 0 0 0

EA 0 0 0

EA 0 0 0

EA 0 0 0

EA 0 0 0

EA 0 0 0

EA 0 0 0

EA 0 0 0

EA 0 0 0

0 0 Total PM Meeting Hours carries to Task 3.6 above

Selective C&G

Photogrammetry

Survey

Landscape Architecture

Lighting

Signing & Pavement Marking

Total Project Manager Meetings

Field Reviews

Phase Reviews

Progress Meetings

Geotechnical

ITS Analysis

Structures

Environmental

Utilities

Drainage

Noise Barriers

Signalization

Architecture

Terrestrial Mobile LiDAR

ROW & Mapping

Roadway Analysis

3.6 - List of Project Manager Meetings

3. Project Common and Project General Tasks Total

CAV32-TWO_001-43838663201-SHE_v1.xlsx

3. Project General Tasks Page 5 of 11 4/29/2025

Task

No.

Task Units No of Units Hours/ Unit

Total

Hours Comments

Notes:

1. If the hours per meeting vary in length (hours) enter the average in the hour/unit column.

2. Do not double count agency meetings between permitting agencies.

3. Project manager meetings are calculated in each discipline sheet and brought forward to Column D.

CAV32-TWO_001-43838663201-SHE_v1.xlsx

3. Project General Tasks Page 6 of 11 4/29/2025

438386-6-32-01

Signature / Date

NOTE: Signature Block is optional, per District preference

Documentation

Description Units Complexity

Simple

Roadway Length (Miles) 1.14 Simple 10 10 10 Data collection.

Interchanges Rest Areas 0 Simple 0

6c.2 Assessment and Disposition Determination 1 Simple 16 16 16 Tree Disposition assessment and relocation analysis for trees that fall within the impacted US-1 medians.

Address shrub impacts and removals due to the proposed improvements.

6c.3 Selective C&G Maintenance Report Report 0 0

Roadway Length (Miles) 1.14 Simple 10 10 10 Selective Clearing and Grubbing and Tree Disposition Plan for landscape impacts along corridor.

Interchanges Rest Areas 0 Simple 0

Details 5 20 20 20 1 Tree Relocation/Tree Disposition Table, 1 Selective Clearing and Grubbing Work Table, 1 SC&G Legend, 1 Tree relocation detail including special staking, and 1 selective clearing and grubbing detail for shrub pruning.

6c.5 Selective C&G Quantities for EQ Report 1 Simple 8 8 8 EQR Summary of Clearing Grubbing and Removal Items table for SC&G and 1 Summary of Landscape Items for Tree Relocations. Included 3-way checklist at all phase submittals.

6c.6 Cost Estimate 1 Simple 3 3 3 Tree Relocation and Selective Clearing and Grubbing Cost Estimate. Now includes project estimate, which requires cost for all items and not only lump sum items.

67 0 67 67

6c.7 Quality Assurance/Quality Control % 1 5% 4 0 4 4

6c.8 Supervision % 1 5% 4 0 4 4

Meetings 8 16 16 16

Travel Time 0 0 0

6c.10 Field Reviews (listed below) LS 13 13 13

37 0 37 37

6c.11 Coordination % 1 3% 4 0 4 4

108 0 108 108 Carries to Summary Tab

Selective C&G Total

Selective C&G Technical Subtotal

6c.9 Selective C&G Meetings (listed below)

Selective C&G Non-Technical Subtotal

6c.4 Selective C&G Plan

Task No. Task

Project Parameter

Department Consultant Negotiated

6c.1 Data Collection and Inventory

Staff Hours

FDOT District Kaylee Kildare

Cotleur & Hearing Aaron Wilbur

Provide documentation when negotiated hours differ from the calculated hours.

What is the overall project complexity? (See Selective C&G Guidelines)

Calculated

Estimator: Aaron Wilbur 6c. Selective Clearing and Grubbing Staff Hours

Representing Print Name

C&H

Technical Meetings # Meetings Designer

Travel Time (Hours)

# Meetings

PM

Local Governments (cities, counties, MPO) 1 0 0 Public Involvement meeting.

30/60/90/100% Comment Review Meetings 3 0 0 Assumes comments only at Constructability, Biddability, and Production.

Utility Coordination 0 0 0

Other Meetings 2 0 0 Kick off meeting and meeting with DLM.

Subtotal Technical Meetings 6 0 0

Progress Meetings (if required by FDOT) 0 0

Phase Review Meetings 2 0

Total Meetings 8 0

Field Reviews # of Staff Site Time (per staff)

Travel Time (per staff) Total Hours

Field Review #1 - Tree Inventory and SC&G 1 7 1 8 Field Review #2 0 0 0 0 Field Review #3 0 0 0 0 Field Review #4 0 0 0 0 Plans-in-hand Field Review 1 4 1 5

13Total Field Review Hours

Documentation

Element Complexity Rating

N/A: No screening or buffering impacts

Simple: Minor screening or buffering impacts

Standard: Significant screening or buffering impacts

Complex: Commitments/Stakeholders involved

N/A: No Roadway (pond, rest area)

Simple: Existing Roadway

Standard: Roadway Widening

Complex: New Roadway Alignment

N/A: No Intersections

Simple: Minor Intersections

Standard: Standard intersections and Interchanges

Complex: Complex intersections and Multiple-Level Interchanges

N/A: No coordination

Simple: Minimum - 2 or less utilities and agencies

Standard: Moderate - 3 to 5 utilities and agencies

Complex: Extensive - 6 or more utilities and agencies

N/A: None

Simple: 1-3 Plant Species, 1 Method

Standard: 1-6 Plant Species, 1-2 Methods

Complex: 7+ Plant Species or 3+ Methods

N/A: No sensitive sites involvement

Simple: Minimal sensitive sites involvement

Standard: Part of the project site is sensitive

Complex: A large majority of the project site is sensitive

N/A: None

Simple: 1-20 Trees

Standard: 21-50 Trees

Complex: 51+ Trees

N/A: None

Simple: 1 to 3 Trees

Standard: 4 to 10 Trees

Complex: 11 Trees

Complexity of ROW Simple 1

SELECTIVE CLEARING AND GRUBBING GUIDELINES

The following matrix was developed to determine the overall level of complexity of a Selective Clearing and Grubbing analysis and plan development.

Complexity Guidance Comments

Roadway Type Standard 2

Roadway Elements Simple 1

Utility, and Local and State Agency Coordination Simple 1

Number of Species to Eradicate/Preserve Simple 1

Sensitive Sites (Wetlands, Submerged, Dune, Sensitive Vegetation, Environmental Permits Required)

N/A 0

Number of Trees to be Inventoried Standard 2 Approximately 42 trees. Maximum of 50 trees.

Number of Trees to be Root or Branch Pruned Standard 2

N/A: None

Simple: 1-10 Trees

Standard: 11 - 20 Trees

Complex: 21+ Trees

N/A: None

Simple: Minimum

Standard: Moderate

Complex: Extensive

13 Overall Complexity: Standard

Total Points 9 or less: Simple Total Points 10 to 20: Standard

Total Points 21 or more: Complex

Tree/Palm Relocation Standard 2

Total Points:

Adjacent Property Screening Concerns Simple 1

Project Activity 9: Structures Summary and Miscellaneous Tasks and Drawings

Estimator: C. Rodriguez SR-5/US-1 FROM 25TH STREET TO 45TH STREET

438386-6-32-01

NOTE: Signature Block is optional, per District preference

No. of Units Hours per

Unit No. of Sheets Total

General Drawings

9.1 Key Sheet and Index of Drawings Sheet 0 0 0 0

9.2 Project Layout Sheet 0 0 0 0

9.3 General Notes and Bid Item Notes Sheet 0 0 0 0

9.4 Miscellaneous Common Details Sheet 0 0 0 0

9.5 Incorporate Report of Core Borings Sheet 0 0 0 0

9.6 Standard Plans- Bridges LS 1 0 0

9.7 Existing Bridge Plans LS 1 0 0

Bridges 0

Walls 0

Box Culverts 0

9.9 Cost Estimate LS 1 0 0

9.10' Technical Special Provisions and Modified Special

Provisions

LS 1 0 0

0 0

Task

No.

Task Total Task 10 Task 11 Task 12 Task 13 Task 14 Task 15 Task 16 Task 17 Task 18

10-16 Bridge 1 0 0 0 0 0 0 0 0

10-16 Bridge 2 0

10-16 Bridge 3 0

10-16 Bridge 4 0

Calculated Hours

Design and Production Staffhours

Comments Task

No.

Task

Structures - Summary and Miscellaneous Tasks and Drawings

Units

9.8 Structures Quantites for EQ Report

Consultant Name C. Rodriguez

Representing Print Name

FDOT District

Signature / Date

CAV32-TWO_001-43838663201-SHE_v1.xlsx

9. Structures Summary Page 7 of 11 4/29/2025

10-16 Bridge 5 0

10-16 Bridge 6 0

10-16 Bridge 7 0

10-16 Bridge 8 0

10-16 Bridge 9 0

10-16 Bridge 10 0

17 Retaining Walls 0 0

18 Miscellaneous Structures 114 114

114 0 0 0 0 0 0 0 0 114

Task

No.

Task Units No. of Units

Hours per

Unit Total

9.11 Field Reviews LS 1 12 12

9.12 Technical Meetings LS 1 6 6

9.13 Quality Assurance/Quality Control LS % 5% 6

9.14 Independent Peer Review LS 1 0 0

9.15 Supervision LS % 5% 6

9.16 Coordination LS 1 40 40

Units No of Units Hours/ Unit Total Hours

PM Attendance at Meeting

Required?

Number

EA 0 0 0 0

EA 0 0 0 0

EA 0 0 0 0

EA 0 0 0 0

EA 0 0 0 0

EA 0 0 0 0

16hrs with Signals EOR for life the of project

12hrs for Utility Coordination for the life of the project

12hrs with Geotech EOR for the life of the project

Comments

Meetings are listed below

Comments

1 Field Review x 2 People x 6hrs/ea = 12hrs

9. Structures - Summary and Miscellaneous Tasks and Drawings

Structures Nontechnical Subtotal

Structures Technical Subtotal

Local Governments (cities, counties)

Utility Companies

Technical Meetings

BDR Coordination/Review

90/100% Comment Review

Aesthetics Coordination

Regulatory Agency

CAV32-TWO_001-43838663201-SHE_v1.xlsx

9. Structures Summary Page 8 of 11 4/29/2025

EA 3 2 6 0

6 0

EA 0 0 0 - -

EA 0 0 0 - -

6 0 Carries to 9.12 Carries to Tab 3

1 Initial Kick Off Meeting, 1 PS&E Meeting, 1 Design to Construction

Meeting

Total Meetings Total Project Manager Meetings (carries to Tab 3)

PM attendance at Phase Review Meetings is manually entered on General Task 3

PM attendance at Progress Meetings is manually entered on General Task 3

Subtotal Technical Meetings

Progress Meetings (if required by FDOT)

Phase Review Meetings

Other Meetings

CAV32-TWO_001-43838663201-SHE_v1.xlsx

9. Structures Summary Page 9 of 11 4/29/2025

Project Activity 18: Miscellaneous Structures

Estimator: C. Rodriguez SR-5/US-1 FROM 25TH STREET TO 45TH STREET

438386-6-32-01

NOTE: Signature Block is optional, per District preference

Task

No.

Task Unit

No. of

Units Hours/ Unit

No. of

Sheets

Total

Hours Comments

Concrete Box Culvert

18.1 Concrete Box Culverts EA 0 0 0

18.2 Concrete Box Culverts Extensions

EA

Extension 0 0 0

18.3 Concrete Box Culvert Data Table Plan Sheets Sheet 0 0 0 0

18.4 Concrete Box Culvert Special Details Plan Sheets Sheet 0 0 0 0

Strain Poles

Initial Config 0 0 0

EA Add'l

Config 0 0 0

Initial Config 0 0 0

EA Add'l

Config 0 0 0

18.7 Strain Pole Data Table Plan Sheets Sheet 0 0 0 0

18.8 Strain Pole Special Details Plan Sheets Sheet 0 0 0 0

Mast Arms

18.9 Mast Arms EA Design 3 14 42

1 Double Mast Arm @ 18hrs/ea = 18hrs

2 School Zone Mast Arms (Flashers and Signs) @ 12hrs/ea = 24hrs

(Hours include the initial analysis at 60% and any iterations needed afterwards (i.e. Move MA location due to

Utility Conflicts, ERC comment signal changes, etc.)

18.10 Mast Arms Data Table Plan Sheets Sheet 2 4 2 8

1 Sheet for Signalization Plans (Double Mast Arm)

1 Sheet for S&PM Plans (Overhead school zone signs)

18.11 Mast Arm Special Details Plan Sheets Sheet 0 0 0 0

Overhead/Cantilever Sign Structures

18.12 Cantilever Sign Structures EA Design 0 0 0

18.13 Overhead Span Sign Structures EA Design 0 0 0

18.14 Special (Long Span) Overhead Span Sign Structures EA Design 0 0 0

18.15 Monotube Overhead Sign Structure EA Design 0 0 0

18.16 Bridge Mounted Signs (Attached to Superstr.) EA Design 0 0 0

18.17 Overhead and Cantilever Sign Structures Data Table

Plan Sheets Sheet 0 0 0 0

18.18 Overhead and Cantilever Sign Structures Special

Details Plan Sheets Sheet 0 0 0 0

High Mast Lighting

18.19 Non-Standard High Mast Lighting Structures EA Design 0 0 0

18.20 High Mast Lighting Special Details Plan Sheets Sheet 0 0 0 0

Noise Barrier Walls (Ground Mount)

18.21 Horizontal Wall Geometry EA Wall 0 0 0

18.22 Vertical Wall Geometry EA Wall 0 0 0

18.23 Summary of Quantities - Aesthetic Requirements Sheet 0 0 0 0

18.24 Control Drawings Sheet 0 0 0 0

18.25 Design of Noise Barrier Walls Covered by Standards EA Design 0 0 0

18.26 Design of Noise Barrier Walls Not Covered by Standards EA Design 0 0 0

Consultant Name C. Rodriguez

Representing Print Name Signature / Date

FDOT District

18.5 Steel Strain Poles

18.6 Concrete Strain Poles

CAV32-TWO_001-43838663201-SHE_v1.xlsx

18. Structures-Miscellaneous Page 10 of 11 4/29/2025

Project Activity 18: Miscellaneous Structures

18.27 Aesthetic Details LS 1 0 0

Special Structures

18.28 Fender System LS 1 0 0

18.29 Fender System Access LS 1 0 0

18.30 Special Structures LS 1 0 0

18.31 Other Structures LS 1 24 24

Special Light Pole Foundation (Decorative Light poles)

2 Designs (Drilled Shaft and eccentric Spread Footer) = 24hrs

Ancillary Structures Report

18.32 Condition Evaluation of Signal and Sign Structures, and

High Mast Light Poles EA structure 7 2 7 14 Review of existing mast arm as-built plans and inspection reports

18.33

Condition Evaluation of Signal and Sign Structures, and

High Mast Light Poles (No As built or Design Plans

Available)

EA structure 0 0 0 0

18.34 Analytical Evaluation of Signal and Sign Structures, and

High Mast Light Poles EA structure 7 2 7 14

Analyze 7 existing mast arms for new signal head positioning. North/South Mast arms only due to lane shifts. (1 at 25th Street, 2 at 36th Street, 2 at 40th Street, and 2 at 45th Street)

Deterimine if the increased loading exceeds 10% (7 Structures at 2hrs/ea = 14hrs)

If greater than 10%, a TWO amendment will be required to provide additional hours for a detailed analysis.

18.35 Ancillary Structures Report LS 1 12 12 Structures Report in accordance with FDM 111.7.2 required documentation

16 11418. Structures - Miscellaneous Total

CAV32-TWO_001-43838663201-SHE_v1.xlsx

18. Structures-Miscellaneous Page 11 of 11 4/29/2025

438386-6-32-01

Signature / Date

NOTE: Signature Block is optional, per District preference

Documentation

Description Units Complexity

Low

25.1 Data Collection LS 0 0 0 0 0

25.2 Outdoor Advertising Assessment Sign Structure 0 0 0 0 0

25.3 Master Design File Setup (Base Files) LS 1 Simple 16 0 8 8 Landscape/selective clearing and grubbing master design file.

Length (Miles) 0.00 Low 0 0 0 0

Area Projects Area (Acre) 0.00 Low 0 0 0 0

Mainline Length (Miles) 0.00 0 0 0 0

Area Projects Area (Acre) 0.00 0 0 0 0

Report Preparation 0 Low 0 0 0 0

Mainline Length (Miles) 0.00 Low 0 0 0 0

Area Projects Area (Acre) 0.00 Low 0 0 0 0

Mainline Length (Miles) 0.00 Low 0 0 0 0

Area Projects Area (Acre) 0.00 Low 0 0 0 0

Feasibility Report 0 0 0 0 0

Mainline Length (Miles) 1.14 Simple 23 0 4 4 Existing Irrigation system assessment to determine required irrigation system removals. No new irrigation system design. Removal and capping only.

Area Projects 0 0 0 0 0

Mainline (per mile) 0.00 0 0 0 0

Area Projects 0 0 0 0 0

Report Preparation 0 0 0 0 0

LS 0 0 0 0 0

25.11 Final Hardscape Design LS 0 0 0 0 0

25.12 Landscape Quantities for EQ Report LS 0 Low 0 0 0 0

Engineer Estimate 0 Low 0 0 0 0

LRE Updates 0 Low 0 0 0 0

25.14 Technical or Modified Special Provisions TSPs & MSPs 0 0 0 0 0

25.15 Other Landscape Services LS 0 0 0 0

39 0 12 12

25.10 Conceptual Hardscape Design

25.13 Cost Estimates

Landscape Analysis Technical Subtotal

25.8 Conceptual Irrigation Design

25.9 Final Irrigation Design

25.6 Conceptual Planting Design

25.7 Final Planting Design

25.5 Landscape Opportunity Plan

Representing Print Name

25.4 Site Inventory and Analysis

FDOT District

Consultant Name

Estimator: AW 25. Landscape Analysis Staff Hours

Provide documentation when negotiated hours differ from the calculated hours.

What is the complexity of the planting plan? (See Landscape Guidelines)

Calculated Department Consultant Negotiated

Task No. Task

Project Parameter Staff Hours

25.16 Quality Assurance/Quality Control LS 1 5% 2 0 1 1

25.17 Supervision LS 1 5% 2 0 1 1

Meetings 0 0 0 0 0

Travel Time 0 0 0 0

25.19 Field Reviews (listed below) LS 5 0 5 5

9 0 7 7

25.20 Coordination LS 1 3% 2 0 1 1

50 0 20 20 Carries to Summary Tab

Technical Meetings # Meetings Designer

Travel Time (Hours)

# Meetings

PM

FDOT (kickoff, concept review) 0 0 0 Maintaining Agency (cities, counties) 0 0 0 Utility Owners 0 0 0 Local Agency for Tree Removal 0 0 0 Local Citizen Group(s) 0 0 0 Other Meetings 0 0 0

Subtotal Technical Meetings 0 0 0 Progress Meetings (if required by FDOT) 0 0 Phase Review Meetings 0 0

Total Landscape Meetings 0 0

Field Reviews # of Staff Site Time (per staff)

Travel Time (per staff) Total Hours

Field Review #1 - Irrigation System Assessment 1 4 1 5 Field Review #2 0 0 0 0 Field Review #3 0 0 0 0 Field Review #4 0 0 0 0 Plans-in-hand Field Review 0 0 0 0

5Total Field Review Hours

Documentation

Landscape Analysis Total

25.18 Landscape Meetings (listed below)

Landscape Analysis Non-Technical Subtotal

26. Landscape Plans

438386-6-32-01

Signature / Date

NOTE: Signature Block is optional, per District preference

Documentation

Description Units Complexity

Low

Key Sheet LS 0 0 0 0 0 Included in the roadway plan set.

Signature Sheet LS 0 0 0 0 0

26.2 Plant Schedule (Sheet no longer produced)

26.3 General Notes/Pay Item Notes LS 1 Simple 6 0 4 4 General, Project, Tree Relocation, SC&G, and Irrigation Capping notes.

26.4 Planting Plans For Linear Areas Linear Project

Length (Miles) 1.14 Low 16 0 16 16 Tree Disposition, Tree Relocation, Selective Clearing and Grubbing Plan Sheets.

26.5 Planting Plans for Non-Linear Areas (Stormwater

Facilities, Rest Areas, Interchanges, & Toll Plazas)

Area Projects Area (Acre) 0.00 Low 0 0 0 0

26.6 Planting Details Details 0 0 0 0 0

26.7 Irrigation Plans for Linear Areas Linear Project

Length (Miles) 0.00 0 0 0 0

26.8 Irrigation Plans for Non-Linear Areas (Stormwater

Facilities, Rest Areas, Interchanges, & Toll Plazas)

Area Projects Area (Acre) 0.00 0 0 0 0

26.9 Irrigation Details Details 0 0 0 0 0

26.10 Hardscape Plans 0 0 0 0 0

26.11 Maintenance Plan 0 0 0 0 0

22 0 20 20

26.12 Quality Assurance/Quality Control % 1 5% 2 0 1 1

26.13 Supervision % 1 5% 2 0 1 1

26 0 22 22

Provide documentation when negotiated hours differ from the calculated hours.

FDOT District

Consultant Name

Estimator: AW 26. Landscape Plans Staff Hours

Representing Print Name

Landscape Plans Technical Hours Subtotal

26.1

Task No. Task

Project Parameter Staff Hours

26. Landscape Plans Total

What is the complexity of the planting plan? (See Landscape Guidelines) Calculated Department Consultant Negotiated

438386-6-52-01_SR5 US1 from 25th St to 45th St_SHE-CH

26. Landscape Plans Page 12 of 12 4/27/2025

FLORIDA DEPARTMENT OF TRANSPORTATION

FUNDS APPROVAL

CAV32

4/30/2025

CONTRACT INFORMATION

FUNDS APPROVAL INFORMATION

FUNDS APPROVED/REVIEWED FOR JASON ADANK, CPA, COMPTROLLER ON 4/30/2025

Action: Task Work Order

Reviewed or Approved: APPROVED

Organization Code: 55043010452

Expansion Option: A1

Object Code: 131512

Amount: $75,394.31

Financial Project: 43838663201

Work Activity (FCT): 011

CFDA:

Fiscal Year: 2025

Budget Entity: 55100100

Category/Category Year: 088849/25

Amendment ID: W001

Sequence: 00

User Assigned ID: TWO1

Enc Line (6s)/Status: 0002/04

Total Amount: $75,394.31

Contract: CAV32

Contract Type: CA - ENGINEERING (ENGINEER)

Vendor Name: ASA CONSULTANTS, INC.

Vendor ID: F465512620001

Beginning Date of This Agreement: 11/26/2024

Ending Date of This Agreement: 11/25/2029

Contract Total/Budgetary Ceiling: bc = $3,000,000.00

Method of Procurement: C - REQUEST FOR PROPOSAL (287.55,F. S.)

Description: Continuing Services for Project Design (BDI)

Page1 of 1