This document is a Task Work Order for Professional Services issued by the Florida Department of Transportation (FDOT) to ASA Consultants, Inc., a professional engineering and design consulting firm. The task work order is part of the Continuing Services for Project Design (BDI) contract, specifically for the SR-5/US-1 roadway project spanning from 25th Street to 45th Street in Palm Beach County. The contract is identified with the contract number CAV32 and the financial project number 438386-6-32-01.
The task work order authorizes ASA Consultants to perform professional design services with a total compensation limit of $75,394.31, to be paid on a lump sum basis according to percentage of completion. The project scope includes consulting support for structures and landscape design, involving tasks such as eliminating the median, shifting roadway elevation, widening sidewalks, full lighting replacement, adding school zone overhead structures, and replacing mast arms. The contract period runs from November 26, 2024, to November 25, 2029, with this specific task work order focused on design documentation, field assessments, plan development, and coordination with FDOT District 4 In-House Design team. The overall contract has a budgetary ceiling of $3,000,000, and was procured through a Request for Proposal method.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAV32-00020000.pdf | ||
| CN-550000-CAV32-00030000.pdf | ||
| CN-550000-CAV32.pdf | ||
| CN-550000-CAS54-W0040100.pdf | ||
| CN-550000-CAV32-00010000.pdf | ||
| CN-550000-CAV32-W0030000.pdf | ||
| CN-550000-CAV32-W0020000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
08/21
Consultant:
Address:
Date:
11/25/2029
*Limiting or Estimating/Budgeted Amount.
Distribution:
Consultant Acceptance:
Signature
Consultant, Procurement, Financial Services, FDOT Project Manager, File
President
$75,394.31
$0.00
(name) (title)
Soheila Sadough, P.E.
$75,394.31
Total authorizations to date (including this one):
Departmental Approval:
$75,394.31 Limit
Consultant Support for Structures and Landscape Design for SR-5/US-1 from 25th Street to 45th Street
ASA Consultants, Inc.
510 Shotgun Road, Suite 402, Sunrise, Florida 33326
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$75,394.31
(LS2) Lump sum paid based on % of completion
Page 1 Total
Page 2 thru 6 Subtotal
Total
Basic Services
$75,394.31
(name) (title) Signature
Luciana Amato Contract Coordinator
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
Task Work Order No.:
Contract No.: Payment FM No.:
CAV32 438386-6-32-01
Docusign Envelope ID: 6EA0D03F-F17C-4DDD-8972-1E317C59B5A9
05/01/2025 | 7:11 AM EDT
Continuing Services Project Design (BDI)
CAV32 | FM No. 446589-1-32-01
Design Consultant: ASA Consultants, Inc.
April 29, 2025
Task Work Order 001
SR-5/US-1 from 25th Street to 45th Street
Cost Accounted to FM: 438386-6-32-01
SCOPE OF SERVICES
PURPOSE & SCOPE
The purpose of this Task Work Order (TWO) is to assist FDOT D4 In-House Design with construction documents for the above-mentioned project.
The scope of work includes, but is not limited to:
Eliminating the median and shifting the elevation of the roadway to widen the Eastside sidewalk to 12 feet and the Westside sidewalk to a minimum of 6 feet. This project includes full lighting replacement, an addition of the school zone with 2 Overhead Structures, and replacement of the NW and SW mast arms on
25th street to dual mast arm at the SW corner.
The scope of services includes, but is not limited to, the following items:
Structures:
Design Documents Deliverables
• Ancillary Structures Report o Mast Arm Analysis (Determine if Existing exceeds 10% loading and proposed) o Foundation Analysis for Lighting
• Mast Arm Data Table Sheet (to be included in the Signalization Plans)
• Foundation Detail Sheet(s) (to be included in the Lighting Plans)
Landscape:
• Data Collection for Selective Clearing and Grubbing, Tree Disposition, Tree
Relocation, and Irrigation Impacts. Utilize FDOT roadway construction project CADD files. Obtain irrigation as-built plans for existing irrigation systems.
• Master file setup for SC&G, Tree Disposition, Tree Relocation, and irrigation impacts.
• Conduct field assessments for SC&G, Tree Disposition, and Irrigation systems.
• Address tree disposition and tree relocation for trees located in the existing medians.
• Prepare selective clearing and grubbing, tree disposition, and tree relocation plan sheets.
• Prepare Irrigation removal and capping notes to address impacts to existing systems.
• Prepare Selective Clearing and Grubbing Detail sheet including a tree disposition table, tree relocation table, vegetation removal table, tree root and branch pruning table, SC&G legend, and vegetation removal and tree relocation details as needed.
• Prepare two summary tables for inclusion in the Estimated Quantities Report. Includes
Summary of Landscape Items and Summary of Clearing Grubbing and Removal Items.
Includes preparation of the 3-Way checklist at each submittal.
• Attendance at one Public Involvement Meeting.
• Complete Tree Disposition, Tree Relocation, and Selective Clearing and Grubbing Plans.
• SC&G Detail Sheets and Tree Disposition Chart Sheets.
• Irrigation Impact and Capping Notes.
• Estimated Quantities Report Summary Tables (Summary of Clearing Grubbing and Removal
Items and Summary of Landscape Items).
• Engineer’s Cost Estimates.
CONSULTANT RESPONSIBILITIES
The Consultant’s responsibilities remain the same as in the Original Agreement and any Supplemental
Amendments to date.
DEPARTMENT RESPONSIBILITIES
The Department’s responsibilities remain the same as in the Original Agreement and any
Supplemental Amendments to date.
METHOD OF COMPENSATION
Services for this Task Work Order will be lump sum.
Name of Consultant Project Information Sheet
Financial Project Identification Number: 438386-6-32-01 D424-040-B
Name of Prime / Subconsultant: ASA Consultants, Inc. County: Palm Beach
Project Description: SR-5/US-1 FROM 25TH STREET TO 45TH STREET
Begin Milepost: 1.14 Miles
Number of Lanes: (Urban / Rural / Int.) Lane Configuration: Divided (Divided / Undivided)
Project Type: Minor Roadway Classification: SHS/NHS (NHS/FIHS/Off Sys.)
CAP Level:
Design Variations:
Proposed Design Contract Time: months/days Date of Negotiation: Context Classification:
3. Project Common & Project General Tasks
4. Roadway Analysis
5. Roadway Plans
6a. Drainage Analysis
6b. Drainage Plans
6c. Selective C&G
7. Utilities
8. Environmental Permits and Env. Clearances
9. Structures Summary
10. Structures - Bridge Development Report
11. Structures - Temporary Bridge
12. Structures - Short Span Concrete
13. Structures - Medium Span Concrete
14. Structures - Structural Steel
15. Structures - Segmental Concrete
16. Structures - Movable Span
17. Structures - Retaining Walls
18. Structures - Miscellaneous
19. Signing and Pavement Marking Analysis
20. Signing and Pavement Marking Plans
21. Signalization Analysis
22. Signalization Plans
23. Lighting Analysis
24. Lighting Plans
25. Landscape Analysis
26. Landscape Plans
27. Survey
28. Photogrammetry
29. Mapping
30. Terrestrial Mobile LiDAR
31. Architecture Development
32. Noise Barriers Impact Design Assessment
33. Intelligent Transportation Systems Analysis
34. Intelligent Transportation Systems Plans
35. Geotechnical
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Federal Aid Project Identification Number:
10.293 End Milepost: 11.435 Project Length:
4 Typical Section: Urban
Project Activity:
Estimated By: Negotiated By: (name - firm)
Consultant FDOT Consultant FDOT
2. 2.
3. 3.
4. 4.
5. 5.
(Minor / Major)
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Access Management Classification:
TTCP Level: Survey Level:
1. Design Exceptions: 1.
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
CAV32-TWO_001-43838663201-SHE_v1.xlsx
Project Information Page 1 of 11 4/29/2025
Project Staff Hour Summary
Name of Consultant: ASA Consultants, Inc.
Activity
No.
Activity
ASA
Consultants, Inc.
Cotleur &
Hearing Sub 2 Sub 3 Sub 4 Sub 5 Sub 6 Sub 7 Sub 8 Sub 9 Sub 10 Sub 11 Sub 12 Total Hours
3 Project Common and General Tasks 79 79
4 Roadway Analysis 0 0
5 Roadway Plans 0 0
6a Drainage Analysis 0 0
6b Drainage Plans 0 0
6c Selective C&G 0 108 108
7 Utilities 0 0
8 Env. Permits and Env. Clearances 0 0
9 Structures - Summary, Misc. Tasks, Dwgs. 70 70
10 BDR 0 0
11 Temporary Bridge 0 0
12 Short Span Concrete Bridge 0 0
13 Medium Span Concrete Bridge 0 0
14 Structural Steel Bridge 0 0
15 Segmental Concrete Bridge 0 0
16 Movable Span 0 0
17 Retaining Walls 0 0
18 Miscellaneous Structures 114 114
19 Signing & Pavement Marking Analysis 0 0
20 Signing & Pavement Marking Plans 0 0
21 Signalization Analysis 0 0
22 Signalization Plans 0 0
23 Lighting Analysis 0 0
24 Lighting Plans 0 0
25 Landscape Analysis 0 20 20
26 Landscape Plans 0 22 22
27 Survey - Field and Office Support 0 0
28 Photogrammetry 0 0
29 Mapping 0 0
30 Terrestrial Mobile LiDAR 0 0
31 Architecture Development 0 0
32 Noise Barriers Impact Design Assessment 0 0
33 ITS Analysis 0 0
34 ITS Plans 0 0
35 Geotechnical 0 0
263 150 0 0 0 0 0 0 0 0 0 0 0 413
27 Survey Field Crew Days 0 0
Notes: 1. Staff hours for prime consultant come directly from each discipline's worksheet.
2. Staff hours for subconsultants are to be entered manually into columns D through O.
3. For workbooks prepared by subconsultants, their project hours will be totaled in column C.
SR-5/US-1 FROM 25TH STREET TO 45TH STREET
Project Total
438386-6-32-01
Project Staff Hours
CAV32-TWO_001-43838663201-SHE_v1.xlsx
Summary Page 2 of 11 4/29/2025
ESTIMATE OF WORK EFFORT AND COST - PRIME CONSULTANT
Name of Project: SR-5/US-1 FROM 25TH STREET TO 45TH STREET Consultant Name: ASA Consultants, Inc.
County: Palm Beach Consultant No.: 351-1
FPN: 438386-6-32-01 Date: 4/29/2025
FAP No.: D424-040-B Estimator: C. Rodriguez
SH Salary Average
By Cost By Rate Per
$279.81 $224.01 $222.94 $150.45 $123.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Activity Activity Task
3. Project Common and Project General Tasks 79 47 32 0 0 0 0 0 0 0 0 0 0 79 $20,319 $257.21
4. Roadway Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
5. Roadway Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6a. Drainage Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6b. Drainage Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6c. Selective C&G 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
7. Utilities 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
8. Environmental Permits,and Env. Clearances 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
9. Structures - Misc. Tasks, Dwgs, Non-Tech. 70 11 28 18 7 6 0 0 0 0 0 0 0 70 $15,158 $216.55
10. Structures - Bridge Development Report 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
11. Structures - Temporary Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
12. Structures - Short Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
13. Structures - Medium Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
14. Structures - Structural Steel Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
15. Structures - Segmental Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
16. Structures - Movable Span 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
17. Structures - Retaining Walls 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
18. Structures - Miscellaneous 114 17 29 23 23 22 0 0 0 0 0 0 0 114 $22,562 $197.92
19. Signing & Pavement Marking Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
20. Signing & Pavement Marking Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
21. Signalization Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
22. Signalization Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
23. Lighting Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
24. Lighting Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
25. Landscape Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
26. Landscape Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
27. Survey (Field & Office Support) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
28. Photogrammetry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
29. Mapping 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
30. Terrestrial Mobile LiDAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
31. Architecture Development 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
32. Noise Barriers Impact Design Assessment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
33. Intelligent Transportation Systems Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
34. Intelligent Transportation Systems Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
35. Geotechnical 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Total Staff Hours 263 75 89 41 30 28 0 0 0 0 0 0 0 263
Total Staff Cost $20,985.75 $19,936.89 $9,140.54 $4,513.50 $3,463.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $58,040.28 $220.69
Check = $58,040.28
Survey Field Days by Subconsultant SALARY RELATED COSTS: $58,040.28
4 - Person Crew: OVERHEAD: 0% $0.00
OPERATING MARGIN: 0% $0.00
Notes: FCCM (Facilities Capital Cost Money): 0.00% $0.00
1. This sheet to be used by Prime Consultant to calculate the Grand Total fee. EXPENSES: 0.00% $0.00
2. Manually enter fee from each subconsultant. Unused subconsultant rows may be hidden. Survey (Field - if by Prime) 0
4-person crew days @ -$ / day $0.00
SUBTOTAL ESTIMATED FEE: $58,040.28
Subconsultant: Cotleur & Hearing $17,354.03
Subconsultant: Sub 2 $0.00
Subconsultant: Sub 3 $0.00
Subconsultant: Sub 4 $0.00
Subconsultant: Sub 5 $0.00
Subconsultant: Sub 6 $0.00
Subconsultant: Sub 7 $0.00
Subconsultant: Sub 8 $0.00
Subconsultant: Sub 9 $0.00
Subconsultant: Sub 10 $0.00
Subconsultant: Sub 11 $0.00
Subconsultant: Sub 12 $0.00
SUBTOTAL ESTIMATED FEE: $75,394.31
Geotechnical Field and Lab Testing $0.00
SUBTOTAL ESTIMATED FEE: $75,394.31
Optional Services $0.00
GRAND TOTAL ESTIMATED FEE: $75,394.31
Staff Classi-fication 12
Staff Classi-fication 9
Staff Classi-fication 10
Staff Classi-fication 11
Staff Classi-fication 6
Staff Classi-fication 7
Staff Classi-fication 8
Senior
Engineer 1
Home
Engineer 2
Home
Chief
Designer
Home
Senior
Engineering
Technician
Home
Staff Classification Total Staff
Hours From
"SH
Summary -
Firm"
Senior
Engineer 2
A Home -
Task Lead
CAV32-TWO_001-43838663201-SHE_v1.xlsx
Fee Sheet - Prime Page 11 of 3 4/29/2025 10:54 AM
ESTIMATE OF WORK EFFORT AND COST - SUBCONSULTANT
Name of Project: SR-5/US-1 from 25th Street to 45th Street Consultant Name: Cotleur & Hearing (ASA) County: Palm Beach Consultant No.: NA FPN: 438386-6-32-01 Date: 4/27/2025 FAP No.: D424-040-B Estimator: Aaron Wilbur
SH Salary Average
By Cost By Rate Per $166.30 $156.76 $139.34 $76.93 $96.61 $95.91 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Activity Activity Task
3. Project Common and Project General Tasks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
4. Roadway Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
5. Roadway Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6a. Drainage Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6b. Drainage Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6c. Selective C&G 108 5 22 27 38 5 11 0 0 0 0 0 0 108 $12,504 $115.78
7. Utilities 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
8. Environmental Permits,and Env. Clearances 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
9. Structures - Misc. Tasks, Dwgs, Non-Tech. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
10. Structures - Bridge Development Report 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
11. Structures - Temporary Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
12. Structures - Short Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
13. Structures - Medium Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
14. Structures - Structural Steel Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
15. Structures - Segmental Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
16. Structures - Movable Span 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
17. Structures - Retaining Walls 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
18. Structures - Miscellaneous 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
19. Signing & Pavement Marking Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
20. Signing & Pavement Marking Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
21. Signalization Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
22. Signalization Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
23. Lighting Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
24. Lighting Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
25. Landscape Analysis 20 1 4 5 7 1 2 0 0 0 0 0 0 20 $2,317 $115.85
26. Landscape Plans 22 1 4 6 8 1 2 0 0 0 0 0 0 22 $2,533 $115.15
27. Survey (Field & Office Support) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
28. Photogrammetry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
29. Mapping 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
30. Terrestrial Mobile LiDAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
31. Architecture Development 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
32. Noise Barriers Impact Design Assessment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
33. Intelligent Transportation Systems Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
34. Intelligent Transportation Systems Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
35. Geotechnical 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Total Staff Hours 150 7 30 38 53 7 15 0 0 0 0 0 0 150 Total Staff Cost $1,164.10 $4,702.80 $5,294.92 $4,077.29 $676.27 $1,438.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $17,354.03 $115.69
Check = $17,354.03
SALARY RELATED COSTS: $17,354.03
OVERHEAD: 0% $0.00
OPERATING MARGIN: 0% $0.00
Notes: FCCM (Facilities Capital Cost Money): 0.00% $0.00
1. This sheet to be used by Subconsultant to calculate its fee. EXPENSES: 0.00% $0.00
SUBTOTAL ESTIMATED FEE: $17,354.03
Survey (Field) 0 4-person crew -$ / day $0.00 Geotechnical Field and Lab Testing $0.00
SUBTOTAL ESTIMATED FEE: $17,354.03
Optional Services $0.00
GRAND TOTAL ESTIMATED FEE: $17,354.03
Staff Classi-fication 12
Staff Classi-fication 9
Staff Classi-fication 10
Staff Classi-fication 11Staff Classification Designer
Home Staff Classi-fication 7 Staff Classi-fication 8
Chief Landscape Architect
Home
Senior Landscape Architect
Home
Project Landscape Architect
Home
Landscape Designer/
Landscape Planner Home
Chief Designer
HomeTotal Staff Hours From
"SH Summary - Firm"
438386-6-52-01_SR5 US1 from 25th St to 45th St_SHE-CH Fee Sheet - Sub Page 12 of 5 4/27/2025 8:05 PM
Project Activity 3: General Tasks
SR-5/US-1 FROM 25TH STREET TO 45TH STREET
438386-6-32-01
Signature / Date
NOTE: Signature Block is optional, per District preference
Task
No.
Task Units No of Units Hours/ Unit
Total
Hours Comments
3.1
3.1.1 Community Awareness Plan LS 1 0 0
3.1.2 Notifications LS 1 0 0
3.1.3 Preparing Mailing Lists LS 1 0 0
3.1.4 Median Modification Letters LS 1 0 0
3.1.5 Driveway Modification Letters LS 1 0 0
3.1.6 Newsletters LS 1 0 0
3.1.7 Renderings and Fly Throughs LS 1 0 0
3.1.8 PowerPoint Presentation LS 1 0 0
3.1.9 Public Meeting Preparations LS 1 0 0
3.1.10 Public Meeting Attendance/Followup LS 1 0 0
3.1.11 Other Agency Meetings LS 1 0 0
3.1.12 Web Site LS 1 0 0
3.2 Joint Project Agreements EA 0 0 0
3.3
3.3.1 Specifications Package Preparation LS 1 0 0
Report 0 Calculated
Hours
Components 0 0
3.4 Contract Maintenance and Project Documentation LS 1 70 70 16hrs (initial setup) + 2hrs/mo (update/maintenance) x 24mo + 6hrs (final documentation) = 70hrs
3.5 Value Engineering (Multi-Discipline Team) Review LS 1 0 0
3.6 Prime Consultant Project Manager Meetings LS 1 0 0 See listing below
3.7 Plans Update LS 1 0 0
Estimator: C. Rodriguez
3.1 Public Involvement Subtotal
Consultant Name C. Rodriguez
Representing Print Name
FDOT District
Public Involvement
Specifications & Estimates
3.3.2 Estimated Quantities Report Preparation
CAV32-TWO_001-43838663201-SHE_v1.xlsx
3. Project General Tasks Page 4 of 11 4/29/2025
Task
No.
Task Units No of Units Hours/ Unit
Total
Hours Comments
3.8 Post Design Services LS 1 0 0
3.9 Digital Delivery LS 1 9 9 6hrs 1st EOR Digital Signature + 3hrs for 2nd EOR
3.10 Risk Assessment Workshop LS 1 0 0
3.11 Railroad, Transit, and/or Airport Coordination LS 1 0 0
3.11.1 Aeronautical Evaluation LS 1 0 0
3.12 Landscape and Existing Vegetation Coordination LS 1 0 0
3.13 Other Project General Tasks LS 1 0 0
Units No of Units Hours/ Unit Total Hours Comments
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
0 0 Total PM Meeting Hours carries to Task 3.6 above
Selective C&G
Photogrammetry
Survey
Landscape Architecture
Lighting
Signing & Pavement Marking
Total Project Manager Meetings
Field Reviews
Phase Reviews
Progress Meetings
Geotechnical
ITS Analysis
Structures
Environmental
Utilities
Drainage
Noise Barriers
Signalization
Architecture
Terrestrial Mobile LiDAR
ROW & Mapping
Roadway Analysis
3.6 - List of Project Manager Meetings
3. Project Common and Project General Tasks Total
CAV32-TWO_001-43838663201-SHE_v1.xlsx
3. Project General Tasks Page 5 of 11 4/29/2025
Task
No.
Task Units No of Units Hours/ Unit
Total
Hours Comments
Notes:
1. If the hours per meeting vary in length (hours) enter the average in the hour/unit column.
2. Do not double count agency meetings between permitting agencies.
3. Project manager meetings are calculated in each discipline sheet and brought forward to Column D.
CAV32-TWO_001-43838663201-SHE_v1.xlsx
3. Project General Tasks Page 6 of 11 4/29/2025
438386-6-32-01
Signature / Date
NOTE: Signature Block is optional, per District preference
Documentation
Description Units Complexity
Simple
Roadway Length (Miles) 1.14 Simple 10 10 10 Data collection.
Interchanges Rest Areas 0 Simple 0
6c.2 Assessment and Disposition Determination 1 Simple 16 16 16 Tree Disposition assessment and relocation analysis for trees that fall within the impacted US-1 medians.
Address shrub impacts and removals due to the proposed improvements.
6c.3 Selective C&G Maintenance Report Report 0 0
Roadway Length (Miles) 1.14 Simple 10 10 10 Selective Clearing and Grubbing and Tree Disposition Plan for landscape impacts along corridor.
Interchanges Rest Areas 0 Simple 0
Details 5 20 20 20 1 Tree Relocation/Tree Disposition Table, 1 Selective Clearing and Grubbing Work Table, 1 SC&G Legend, 1 Tree relocation detail including special staking, and 1 selective clearing and grubbing detail for shrub pruning.
6c.5 Selective C&G Quantities for EQ Report 1 Simple 8 8 8 EQR Summary of Clearing Grubbing and Removal Items table for SC&G and 1 Summary of Landscape Items for Tree Relocations. Included 3-way checklist at all phase submittals.
6c.6 Cost Estimate 1 Simple 3 3 3 Tree Relocation and Selective Clearing and Grubbing Cost Estimate. Now includes project estimate, which requires cost for all items and not only lump sum items.
67 0 67 67
6c.7 Quality Assurance/Quality Control % 1 5% 4 0 4 4
6c.8 Supervision % 1 5% 4 0 4 4
Meetings 8 16 16 16
Travel Time 0 0 0
6c.10 Field Reviews (listed below) LS 13 13 13
37 0 37 37
6c.11 Coordination % 1 3% 4 0 4 4
108 0 108 108 Carries to Summary Tab
Selective C&G Total
Selective C&G Technical Subtotal
6c.9 Selective C&G Meetings (listed below)
Selective C&G Non-Technical Subtotal
6c.4 Selective C&G Plan
Task No. Task
Project Parameter
Department Consultant Negotiated
6c.1 Data Collection and Inventory
Staff Hours
FDOT District Kaylee Kildare
Cotleur & Hearing Aaron Wilbur
Provide documentation when negotiated hours differ from the calculated hours.
What is the overall project complexity? (See Selective C&G Guidelines)
Calculated
Estimator: Aaron Wilbur 6c. Selective Clearing and Grubbing Staff Hours
Representing Print Name
C&H
Technical Meetings # Meetings Designer
Travel Time (Hours)
# Meetings
PM
Local Governments (cities, counties, MPO) 1 0 0 Public Involvement meeting.
30/60/90/100% Comment Review Meetings 3 0 0 Assumes comments only at Constructability, Biddability, and Production.
Utility Coordination 0 0 0
Other Meetings 2 0 0 Kick off meeting and meeting with DLM.
Subtotal Technical Meetings 6 0 0
Progress Meetings (if required by FDOT) 0 0
Phase Review Meetings 2 0
Total Meetings 8 0
Field Reviews # of Staff Site Time (per staff)
Travel Time (per staff) Total Hours
Field Review #1 - Tree Inventory and SC&G 1 7 1 8 Field Review #2 0 0 0 0 Field Review #3 0 0 0 0 Field Review #4 0 0 0 0 Plans-in-hand Field Review 1 4 1 5
13Total Field Review Hours
Documentation
Element Complexity Rating
N/A: No screening or buffering impacts
Simple: Minor screening or buffering impacts
Standard: Significant screening or buffering impacts
Complex: Commitments/Stakeholders involved
N/A: No Roadway (pond, rest area)
Simple: Existing Roadway
Standard: Roadway Widening
Complex: New Roadway Alignment
N/A: No Intersections
Simple: Minor Intersections
Standard: Standard intersections and Interchanges
Complex: Complex intersections and Multiple-Level Interchanges
N/A: No coordination
Simple: Minimum - 2 or less utilities and agencies
Standard: Moderate - 3 to 5 utilities and agencies
Complex: Extensive - 6 or more utilities and agencies
N/A: None
Simple: 1-3 Plant Species, 1 Method
Standard: 1-6 Plant Species, 1-2 Methods
Complex: 7+ Plant Species or 3+ Methods
N/A: No sensitive sites involvement
Simple: Minimal sensitive sites involvement
Standard: Part of the project site is sensitive
Complex: A large majority of the project site is sensitive
N/A: None
Simple: 1-20 Trees
Standard: 21-50 Trees
Complex: 51+ Trees
N/A: None
Simple: 1 to 3 Trees
Standard: 4 to 10 Trees
Complex: 11 Trees
Complexity of ROW Simple 1
SELECTIVE CLEARING AND GRUBBING GUIDELINES
The following matrix was developed to determine the overall level of complexity of a Selective Clearing and Grubbing analysis and plan development.
Complexity Guidance Comments
Roadway Type Standard 2
Roadway Elements Simple 1
Utility, and Local and State Agency Coordination Simple 1
Number of Species to Eradicate/Preserve Simple 1
Sensitive Sites (Wetlands, Submerged, Dune, Sensitive Vegetation, Environmental Permits Required)
N/A 0
Number of Trees to be Inventoried Standard 2 Approximately 42 trees. Maximum of 50 trees.
Number of Trees to be Root or Branch Pruned Standard 2
N/A: None
Simple: 1-10 Trees
Standard: 11 - 20 Trees
Complex: 21+ Trees
N/A: None
Simple: Minimum
Standard: Moderate
Complex: Extensive
13 Overall Complexity: Standard
Total Points 9 or less: Simple Total Points 10 to 20: Standard
Total Points 21 or more: Complex
Tree/Palm Relocation Standard 2
Total Points:
Adjacent Property Screening Concerns Simple 1
Project Activity 9: Structures Summary and Miscellaneous Tasks and Drawings
Estimator: C. Rodriguez SR-5/US-1 FROM 25TH STREET TO 45TH STREET
438386-6-32-01
NOTE: Signature Block is optional, per District preference
No. of Units Hours per
Unit No. of Sheets Total
General Drawings
9.1 Key Sheet and Index of Drawings Sheet 0 0 0 0
9.2 Project Layout Sheet 0 0 0 0
9.3 General Notes and Bid Item Notes Sheet 0 0 0 0
9.4 Miscellaneous Common Details Sheet 0 0 0 0
9.5 Incorporate Report of Core Borings Sheet 0 0 0 0
9.6 Standard Plans- Bridges LS 1 0 0
9.7 Existing Bridge Plans LS 1 0 0
Bridges 0
Walls 0
Box Culverts 0
9.9 Cost Estimate LS 1 0 0
9.10' Technical Special Provisions and Modified Special
Provisions
LS 1 0 0
0 0
Task
No.
Task Total Task 10 Task 11 Task 12 Task 13 Task 14 Task 15 Task 16 Task 17 Task 18
10-16 Bridge 1 0 0 0 0 0 0 0 0
10-16 Bridge 2 0
10-16 Bridge 3 0
10-16 Bridge 4 0
Calculated Hours
Design and Production Staffhours
Comments Task
No.
Task
Structures - Summary and Miscellaneous Tasks and Drawings
Units
9.8 Structures Quantites for EQ Report
Consultant Name C. Rodriguez
Representing Print Name
FDOT District
Signature / Date
CAV32-TWO_001-43838663201-SHE_v1.xlsx
9. Structures Summary Page 7 of 11 4/29/2025
10-16 Bridge 5 0
10-16 Bridge 6 0
10-16 Bridge 7 0
10-16 Bridge 8 0
10-16 Bridge 9 0
10-16 Bridge 10 0
17 Retaining Walls 0 0
18 Miscellaneous Structures 114 114
114 0 0 0 0 0 0 0 0 114
Task
No.
Task Units No. of Units
Hours per
Unit Total
9.11 Field Reviews LS 1 12 12
9.12 Technical Meetings LS 1 6 6
9.13 Quality Assurance/Quality Control LS % 5% 6
9.14 Independent Peer Review LS 1 0 0
9.15 Supervision LS % 5% 6
9.16 Coordination LS 1 40 40
Units No of Units Hours/ Unit Total Hours
PM Attendance at Meeting
Required?
Number
EA 0 0 0 0
EA 0 0 0 0
EA 0 0 0 0
EA 0 0 0 0
EA 0 0 0 0
EA 0 0 0 0
16hrs with Signals EOR for life the of project
12hrs for Utility Coordination for the life of the project
12hrs with Geotech EOR for the life of the project
Comments
Meetings are listed below
Comments
1 Field Review x 2 People x 6hrs/ea = 12hrs
9. Structures - Summary and Miscellaneous Tasks and Drawings
Structures Nontechnical Subtotal
Structures Technical Subtotal
Local Governments (cities, counties)
Utility Companies
Technical Meetings
BDR Coordination/Review
90/100% Comment Review
Aesthetics Coordination
Regulatory Agency
CAV32-TWO_001-43838663201-SHE_v1.xlsx
9. Structures Summary Page 8 of 11 4/29/2025
EA 3 2 6 0
6 0
EA 0 0 0 - -
EA 0 0 0 - -
6 0 Carries to 9.12 Carries to Tab 3
1 Initial Kick Off Meeting, 1 PS&E Meeting, 1 Design to Construction
Meeting
Total Meetings Total Project Manager Meetings (carries to Tab 3)
PM attendance at Phase Review Meetings is manually entered on General Task 3
PM attendance at Progress Meetings is manually entered on General Task 3
Subtotal Technical Meetings
Progress Meetings (if required by FDOT)
Phase Review Meetings
Other Meetings
CAV32-TWO_001-43838663201-SHE_v1.xlsx
9. Structures Summary Page 9 of 11 4/29/2025
Project Activity 18: Miscellaneous Structures
Estimator: C. Rodriguez SR-5/US-1 FROM 25TH STREET TO 45TH STREET
438386-6-32-01
NOTE: Signature Block is optional, per District preference
Task
No.
Task Unit
No. of
Units Hours/ Unit
No. of
Sheets
Total
Hours Comments
Concrete Box Culvert
18.1 Concrete Box Culverts EA 0 0 0
18.2 Concrete Box Culverts Extensions
EA
Extension 0 0 0
18.3 Concrete Box Culvert Data Table Plan Sheets Sheet 0 0 0 0
18.4 Concrete Box Culvert Special Details Plan Sheets Sheet 0 0 0 0
Strain Poles
Initial Config 0 0 0
EA Add'l
Config 0 0 0
Initial Config 0 0 0
EA Add'l
Config 0 0 0
18.7 Strain Pole Data Table Plan Sheets Sheet 0 0 0 0
18.8 Strain Pole Special Details Plan Sheets Sheet 0 0 0 0
Mast Arms
18.9 Mast Arms EA Design 3 14 42
1 Double Mast Arm @ 18hrs/ea = 18hrs
2 School Zone Mast Arms (Flashers and Signs) @ 12hrs/ea = 24hrs
(Hours include the initial analysis at 60% and any iterations needed afterwards (i.e. Move MA location due to
Utility Conflicts, ERC comment signal changes, etc.)
18.10 Mast Arms Data Table Plan Sheets Sheet 2 4 2 8
1 Sheet for Signalization Plans (Double Mast Arm)
1 Sheet for S&PM Plans (Overhead school zone signs)
18.11 Mast Arm Special Details Plan Sheets Sheet 0 0 0 0
Overhead/Cantilever Sign Structures
18.12 Cantilever Sign Structures EA Design 0 0 0
18.13 Overhead Span Sign Structures EA Design 0 0 0
18.14 Special (Long Span) Overhead Span Sign Structures EA Design 0 0 0
18.15 Monotube Overhead Sign Structure EA Design 0 0 0
18.16 Bridge Mounted Signs (Attached to Superstr.) EA Design 0 0 0
18.17 Overhead and Cantilever Sign Structures Data Table
Plan Sheets Sheet 0 0 0 0
18.18 Overhead and Cantilever Sign Structures Special
Details Plan Sheets Sheet 0 0 0 0
High Mast Lighting
18.19 Non-Standard High Mast Lighting Structures EA Design 0 0 0
18.20 High Mast Lighting Special Details Plan Sheets Sheet 0 0 0 0
Noise Barrier Walls (Ground Mount)
18.21 Horizontal Wall Geometry EA Wall 0 0 0
18.22 Vertical Wall Geometry EA Wall 0 0 0
18.23 Summary of Quantities - Aesthetic Requirements Sheet 0 0 0 0
18.24 Control Drawings Sheet 0 0 0 0
18.25 Design of Noise Barrier Walls Covered by Standards EA Design 0 0 0
18.26 Design of Noise Barrier Walls Not Covered by Standards EA Design 0 0 0
Consultant Name C. Rodriguez
Representing Print Name Signature / Date
FDOT District
18.5 Steel Strain Poles
18.6 Concrete Strain Poles
CAV32-TWO_001-43838663201-SHE_v1.xlsx
18. Structures-Miscellaneous Page 10 of 11 4/29/2025
Project Activity 18: Miscellaneous Structures
18.27 Aesthetic Details LS 1 0 0
Special Structures
18.28 Fender System LS 1 0 0
18.29 Fender System Access LS 1 0 0
18.30 Special Structures LS 1 0 0
18.31 Other Structures LS 1 24 24
Special Light Pole Foundation (Decorative Light poles)
2 Designs (Drilled Shaft and eccentric Spread Footer) = 24hrs
Ancillary Structures Report
18.32 Condition Evaluation of Signal and Sign Structures, and
High Mast Light Poles EA structure 7 2 7 14 Review of existing mast arm as-built plans and inspection reports
18.33
Condition Evaluation of Signal and Sign Structures, and
High Mast Light Poles (No As built or Design Plans
Available)
EA structure 0 0 0 0
18.34 Analytical Evaluation of Signal and Sign Structures, and
High Mast Light Poles EA structure 7 2 7 14
Analyze 7 existing mast arms for new signal head positioning. North/South Mast arms only due to lane shifts. (1 at 25th Street, 2 at 36th Street, 2 at 40th Street, and 2 at 45th Street)
Deterimine if the increased loading exceeds 10% (7 Structures at 2hrs/ea = 14hrs)
If greater than 10%, a TWO amendment will be required to provide additional hours for a detailed analysis.
18.35 Ancillary Structures Report LS 1 12 12 Structures Report in accordance with FDM 111.7.2 required documentation
16 11418. Structures - Miscellaneous Total
CAV32-TWO_001-43838663201-SHE_v1.xlsx
18. Structures-Miscellaneous Page 11 of 11 4/29/2025
438386-6-32-01
Signature / Date
NOTE: Signature Block is optional, per District preference
Documentation
Description Units Complexity
Low
25.1 Data Collection LS 0 0 0 0 0
25.2 Outdoor Advertising Assessment Sign Structure 0 0 0 0 0
25.3 Master Design File Setup (Base Files) LS 1 Simple 16 0 8 8 Landscape/selective clearing and grubbing master design file.
Length (Miles) 0.00 Low 0 0 0 0
Area Projects Area (Acre) 0.00 Low 0 0 0 0
Mainline Length (Miles) 0.00 0 0 0 0
Area Projects Area (Acre) 0.00 0 0 0 0
Report Preparation 0 Low 0 0 0 0
Mainline Length (Miles) 0.00 Low 0 0 0 0
Area Projects Area (Acre) 0.00 Low 0 0 0 0
Mainline Length (Miles) 0.00 Low 0 0 0 0
Area Projects Area (Acre) 0.00 Low 0 0 0 0
Feasibility Report 0 0 0 0 0
Mainline Length (Miles) 1.14 Simple 23 0 4 4 Existing Irrigation system assessment to determine required irrigation system removals. No new irrigation system design. Removal and capping only.
Area Projects 0 0 0 0 0
Mainline (per mile) 0.00 0 0 0 0
Area Projects 0 0 0 0 0
Report Preparation 0 0 0 0 0
LS 0 0 0 0 0
25.11 Final Hardscape Design LS 0 0 0 0 0
25.12 Landscape Quantities for EQ Report LS 0 Low 0 0 0 0
Engineer Estimate 0 Low 0 0 0 0
LRE Updates 0 Low 0 0 0 0
25.14 Technical or Modified Special Provisions TSPs & MSPs 0 0 0 0 0
25.15 Other Landscape Services LS 0 0 0 0
39 0 12 12
25.10 Conceptual Hardscape Design
25.13 Cost Estimates
Landscape Analysis Technical Subtotal
25.8 Conceptual Irrigation Design
25.9 Final Irrigation Design
25.6 Conceptual Planting Design
25.7 Final Planting Design
25.5 Landscape Opportunity Plan
Representing Print Name
25.4 Site Inventory and Analysis
FDOT District
Consultant Name
Estimator: AW 25. Landscape Analysis Staff Hours
Provide documentation when negotiated hours differ from the calculated hours.
What is the complexity of the planting plan? (See Landscape Guidelines)
Calculated Department Consultant Negotiated
Task No. Task
Project Parameter Staff Hours
25.16 Quality Assurance/Quality Control LS 1 5% 2 0 1 1
25.17 Supervision LS 1 5% 2 0 1 1
Meetings 0 0 0 0 0
Travel Time 0 0 0 0
25.19 Field Reviews (listed below) LS 5 0 5 5
9 0 7 7
25.20 Coordination LS 1 3% 2 0 1 1
50 0 20 20 Carries to Summary Tab
Technical Meetings # Meetings Designer
Travel Time (Hours)
# Meetings
PM
FDOT (kickoff, concept review) 0 0 0 Maintaining Agency (cities, counties) 0 0 0 Utility Owners 0 0 0 Local Agency for Tree Removal 0 0 0 Local Citizen Group(s) 0 0 0 Other Meetings 0 0 0
Subtotal Technical Meetings 0 0 0 Progress Meetings (if required by FDOT) 0 0 Phase Review Meetings 0 0
Total Landscape Meetings 0 0
Field Reviews # of Staff Site Time (per staff)
Travel Time (per staff) Total Hours
Field Review #1 - Irrigation System Assessment 1 4 1 5 Field Review #2 0 0 0 0 Field Review #3 0 0 0 0 Field Review #4 0 0 0 0 Plans-in-hand Field Review 0 0 0 0
5Total Field Review Hours
Documentation
Landscape Analysis Total
25.18 Landscape Meetings (listed below)
Landscape Analysis Non-Technical Subtotal
26. Landscape Plans
438386-6-32-01
Signature / Date
NOTE: Signature Block is optional, per District preference
Documentation
Description Units Complexity
Low
Key Sheet LS 0 0 0 0 0 Included in the roadway plan set.
Signature Sheet LS 0 0 0 0 0
26.2 Plant Schedule (Sheet no longer produced)
26.3 General Notes/Pay Item Notes LS 1 Simple 6 0 4 4 General, Project, Tree Relocation, SC&G, and Irrigation Capping notes.
26.4 Planting Plans For Linear Areas Linear Project
Length (Miles) 1.14 Low 16 0 16 16 Tree Disposition, Tree Relocation, Selective Clearing and Grubbing Plan Sheets.
26.5 Planting Plans for Non-Linear Areas (Stormwater
Facilities, Rest Areas, Interchanges, & Toll Plazas)
Area Projects Area (Acre) 0.00 Low 0 0 0 0
26.6 Planting Details Details 0 0 0 0 0
26.7 Irrigation Plans for Linear Areas Linear Project
Length (Miles) 0.00 0 0 0 0
26.8 Irrigation Plans for Non-Linear Areas (Stormwater
Facilities, Rest Areas, Interchanges, & Toll Plazas)
Area Projects Area (Acre) 0.00 0 0 0 0
26.9 Irrigation Details Details 0 0 0 0 0
26.10 Hardscape Plans 0 0 0 0 0
26.11 Maintenance Plan 0 0 0 0 0
22 0 20 20
26.12 Quality Assurance/Quality Control % 1 5% 2 0 1 1
26.13 Supervision % 1 5% 2 0 1 1
26 0 22 22
Provide documentation when negotiated hours differ from the calculated hours.
FDOT District
Consultant Name
Estimator: AW 26. Landscape Plans Staff Hours
Representing Print Name
Landscape Plans Technical Hours Subtotal
26.1
Task No. Task
Project Parameter Staff Hours
26. Landscape Plans Total
What is the complexity of the planting plan? (See Landscape Guidelines) Calculated Department Consultant Negotiated
438386-6-52-01_SR5 US1 from 25th St to 45th St_SHE-CH
26. Landscape Plans Page 12 of 12 4/27/2025
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
CAV32
4/30/2025
CONTRACT INFORMATION
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR JASON ADANK, CPA, COMPTROLLER ON 4/30/2025
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55043010452
Expansion Option: A1
Object Code: 131512
Amount: $75,394.31
Financial Project: 43838663201
Work Activity (FCT): 011
CFDA:
Fiscal Year: 2025
Budget Entity: 55100100
Category/Category Year: 088849/25
Amendment ID: W001
Sequence: 00
User Assigned ID: TWO1
Enc Line (6s)/Status: 0002/04
Total Amount: $75,394.31
Contract: CAV32
Contract Type: CA - ENGINEERING (ENGINEER)
Vendor Name: ASA CONSULTANTS, INC.
Vendor ID: F465512620001
Beginning Date of This Agreement: 11/26/2024
Ending Date of This Agreement: 11/25/2029
Contract Total/Budgetary Ceiling: bc = $3,000,000.00
Method of Procurement: C - REQUEST FOR PROPOSAL (287.55,F. S.)
Description: Continuing Services for Project Design (BDI)