CN-550000-CAU92-00020000.pdf
PDF 290 KB Posted
- Contract number
- CAU92
- Issued by
- Florida
About this file
This document is a Task Work Order for Professional Services issued by the Florida Department of Transportation (FDOT), specifically for District Four's Office of Modal Development (OMD), involving Hanson Professional Services Inc. and RS&H, Inc. as consultants. The contract (No. CAU92) is focused on the South Florida East Coast Corridor Commuter Rail project, spanning Miami-Dade, Broward, and Palm Beach Counties.
The Task Work Order authorizes professional services with a maximum limiting amount of $74,976.00, to be completed by October 15, 2029. The scope of work includes technical support for commuter rail planning and design efforts, encompassing tasks such as project management, providing general planning technical services, reviewing technical documents, attending meetings, preparing cost estimates, conducting multimodal studies and feasibility analyses, and coordinating with partner agencies. The compensation will be provided on a maximum limiting amount basis, with services to be rendered by both Hanson Professional Services Inc. and RS&H, Inc.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAU92-00050000.pdf | ||
| CN-550000-CAU92-00060000.pdf | ||
| CN-550000-CAU92.pdf | ||
| CN-550000-CAU92-00040000.pdf | ||
| CN-550000-CAU92-00070000.pdf | ||
| CN-550000-CAI75-00110000.pdf | ||
| CN-550000-CAU92-00010000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
08/21
Consultant:
Address:
Date:
10/15/2029
*Limiting or Estimating/Budgeted Amount.
Distribution:
Consultant Acceptance:
Signature
Consultant, Procurement, Financial Services, FDOT Project Manager, File
Sr. Vice President
$74,976.00
$0.00
(name) (title)
Jeffrey L. Bowen
$74,976.00
Total authorizations to date (including this one):
Departmental Approval:
$74,976.00 Limit
The purpose of this Task Work Order is to provide continuing technical support for new and existing planning and design efforts for commuter rail along the FEC tracks in Miami-Dade, Broward, and Palm Beach Counties.
Hanson Professional Services Inc.
8075 Gate Parkway West, Suite 204 Jacksonville, Florida 32216
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$74,976.00
(LA4) Units worked at loaded billing rates in Table 6
Page 1 Total
Page 2 thru 6 Subtotal
Total
Basic Services
$74,976.00
(name) (title) Signature
Shaneka Bolden Contract Coordinator
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
Task Work Order No.:
Contract No.: Payment FM No.:
CAU92 454345-1-22-01
Docusign Envelope ID: 80111A6C-160F-4C4D-B0E4-C5875FD86924
01/10/2025 | 4:59 PM EST
EXHIBIT "A"
CONTINUING SERVICES FOR SOUTH FLORIDA EAST COAST CORRIDOR
COMMUTER RAIL
Contract No.: CAU92
FDOT FM# 454345-1-22-01
Scope of Work – Task Work Order # 01
General Services & Technical Support
PURPOSE
The purpose of this Task Work Order is to provide continuing technical support for new and existing planning and design efforts for commuter rail along the FEC tracks in Miami-
Dade, Broward, and Palm Beach Counties. Work task could include planning services, grant agreements development and oversight, memorandum of understanding development, professional environmental analysis, station locations research and analysis, first and last mile activities, grade separations and safety analysis and technical personnel to support for the Florida Department of Transportation, District Four, Office of
Modal Development (OMD) staff.
Task Work Order # 01 - Scope of Work:
TASK 1: Project Management
Management and coordination activities will be conducted throughout the entire project to facilitate delivery of study tasks and deliverables. The objective of this task is to monitor the activities necessary to keep the work order on schedule and within budget. Ongoing administration activities will be performed including correspondence monthly progress reports, document control, maintenance of project file, and clerical services.
TASK 2: Technical Support
Professional assistance technical support may include but not be limited to the following:
Provide general planning technical services to staff in OMD.
Review technical documents and provide comments and suggestions to benefit the Department from a professional engineering and planning perspective.
Attend meetings when asked to do so on behalf of Department staff at the direction of the Project Manager.
Provide technical support for the South Florida East Coast Corridor Commuter Rail
Assist FDOT staff to prepare cost estimates for multimodal improvements.
Provide coordination and outreach with partner agencies.
Provide multimodal studies and feasibility analyses.
Assist with scope of services.
INFORMATION PROVIDED BY THE DEPARTMENT
The CONSULTANT shall be entitled to rely on the completeness and accuracy of all information provided by the Department. The Department shall provide information requested by the CONSULTANT during the project.
METHOD OF COMPENSATION
Services for this task work order will be provided on a maximum limiting amount basis.
The fee estimate for the work effort will be $74,976.00. A detailed fee sheet is contained in Attachment A.
This Task Work Order includes services to be provided by:
Hanson Professional Services Inc.
RS&H, Inc.
SCHEDULE
All services are to be completed on or before October 15, 2029.
File details come from the government source that posted it. Updated .