This document is a Task Work Order for Professional Services issued by the Florida Department of Transportation (FDOT) District Three, awarded to Kimley-Horn and Associates, Inc., a consulting firm located in Atlanta, Georgia. The contract is identified as Contract No. CAR56 with a Financial Project Identification Number of 422541-4-12-13, and represents a professional services agreement for transportation systems planning.
The Task Work Order No. 2 provides for Districtwide Growth Management Assistance, with a maximum limiting amount of $50,000.00. The consultant will support FDOT District 3 Planning Staff by providing professional planning and engineering services, including evaluation of local government comprehensive plans, site impact studies, traffic operational studies, interchange access request studies, and assistance with MPO plan and program analyses. The contract is effective from 11/20/2024 to 11/30/2025, with compensation based on staff-hours and current approved loaded salary rates. The services will encompass multimodal planning, program management, intergovernmental coordination, and systems analysis to implement the department's programs and align with current legislative intent.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAR56-00050000.pdf | ||
| CN-550000-CAR56.pdf | ||
| CN-550000-CAR56-00030000.pdf | ||
| CN-550000-CA683-S0020000.pdf | ||
| CN-550000-CA683.pdf | ||
| CN-550000-CAR56-00020000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
08/21
Consultant:
Address:
Date:
11/30/2025
*Limiting or Estimating/Budgeted Amount.
Distribution:
Task Work Order No.:
Contract No.: Payment FM No.:
CAR56 42254141213
$100,000.00
(name) (title) Signature
Tim Smith, P.E. Director of Transportation Development
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
(LA4) Units worked at loaded billing rates in Table 6
Page 1 Total
Page 2 thru 6 Subtotal
Total
Basic Services (LA)
Kimley-Horn and Associates, Inc.
P.O. Box 932520, Atlanta, Georgia 31193
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$50,000.00
$50,000.00 Limit
DW Systems Planning Consultant- Growth Management Assistance. Scope of Services, attached.
Signature
Consultant, FS, PM, PSU A. Goines
Senior Vice President
$50,000.00
$0.00
(name) (title)
Richard Barr
$50,000.00
Remaining Balance: $50,000.00
Total authorizations to date (including this one):
Departmental Approval:
Consultant Acceptance:
Docusign Envelope ID: 5571B3D0-CA07-43E7-882C-95D0CA6CAAF5
11/20/2024
DISTRICTWIDE TRANSPORTATION SYSTEMS PLANNING
CONTRACT No.: CAR56
FPID:422541-4-12-13
EXHIBIT “A”, SCOPE OF SERVICES
TASK WORK ORDER NO. 2
DISTRICTWIDE GROWTH MANAGEMENT ASSISTANCE
I. DESCRIPTION OF SERVICES
The Florida Department of Transportation District Three (Department) has requested that Kimley-Horn & Associates, Inc. (Consultant) provide professional planning and engineering services to support District 3 Planning Staff in directing and coordinating transportation planning, which includes multimodal and intermodal planning, program management, non-production environmental management activities, intergovernmental coordination, and systems analysis studies necessary to implement the Department’s programs, policies, plans, and procedures in this District while assuring that all activities align with the most current legislative intent.
II. SERVICES TO BE PROVIDED
The consultant will provide assistance to the Department, as requested by the Department’s Project Manager. The specific timeframe for completion will be established by the Department’s Project Manager and Task Manager when the task assignment is made.
The consultant will support District Three Planning Staff in directing and coordinating the transportation planning programs that align with current legislation, multimodal planning and program management, intergovernmental coordination, and corridor studies necessary to implement the Department’s programs in this District. The Consultant will perform assignments as described in this Task Work Order when authorized in writing by the FDOT Project Manager. Consultant will be responsible for estimate of work for specific assignment.
Tasks for which consultant services may be required with this Task Work Order include:
Growth Management Services
Evaluation and analyses of Local Government Comprehensive Plans, Evaluation and Appraisal Reports, Sector Plan reviews, and plan amendments
Evaluation and analyses of Site Impact studies, DRIs, Monitoring Reports, and assistance to the District DRI Reporting System, as needed.
Evaluation and analyses of impacts as the result of various Growth Management activities which might encompass Level of Service, LOS Variances, Concurrency Management, Multi-modal Transportation Districts, Transportation Concurrency Exception Areas, designated Dense Urban Land Areas, and Urban Service Areas, etc.
Traffic Operational studies, including ITS
Interchange Access Request studies, and documentation
Assist in the application and eligibility process of the Transportation Enhancement program projects submitted by the MPOs or local governments
Docusign Envelope ID: CD405BD6-18A3-4BF0-9DE0-C6385F0C3A49Docusign Envelope ID: 5571B3D0-CA07-43E7-882C-95D0CA6CAAF5
DISTRICTWIDE TRANSPORTATION SYSTEMS PLANNING
CONTRACT No.: CAR56
FPID:422541-4-12-13
Assist MPO Liaison staff, as requested, in the evaluation and analyses of MPO Plans and Programs, such as Long Range Transportation Plans, Transportation Improvement Programs, Unified Planning Work Programs, and Transit Developments Plans, etc.
III. PROVISIONS FOR WORK
A. Key Personnel
The Consultant's work shall be performed and directed by the key personnel identified by the Consultant and approved by the FDOT project manager.
B. Progress Reporting
The Consultant will provide a monthly written Progress Report and Monthly Summary Report.
The Consultant will provide weekly progress emails to the FDOT Project Manager.
IV. DURATION OF SERVICES
The consultant will work with the FDOT Project Manager and each Task Manager in developing a mutually acceptable time schedule for each task.
V. DEPARTMENT RESPONSIBILITIES
The Department will provide the Consultant such information and/or staff cooperation as may be required to complete the task assignments. Such support will include:
A. Appropriate data on file and/or access to files so that Consultant can retrieve data.
B. Standards and procedures directives from the FDOT.
C. Staff review services.
D. Any future information which may come into the possession of the FDOT which is deemed to be necessary to the completion of the assignment.
VI. METHOD OF COMPENSATION
The compensation for this Task Work Order shall be the Maximum Limiting Amount Fee Method in accordance with the consultant agreement. The Consultant shall invoice for services performed on this Task Work Order based upon staff-hours and current approved loaded salary rates. An estimate of the work effort, rates, and fee is shown in Exhibit “B” (attached). In addition, the Consultant shall notify the Department Task Work Order Manager in writing or e-mail of any changes to staffing category, including the reason for the change prior to the submittal of any invoice utilizing the new rates.
Docusign Envelope ID: CD405BD6-18A3-4BF0-9DE0-C6385F0C3A49Docusign Envelope ID: 5571B3D0-CA07-43E7-882C-95D0CA6CAAF5
File details come from the government source that posted it. Updated .