CN-550000-CAO31-W0030100.pdf
PDF 323 KB Posted
- Contract number
- CAO31
- Issued by
- Florida
About this file
This document is a Task Work Order Amendment Form from the Florida Department of Transportation (FDOT), involving Kimley-Horn and Associates, Inc. as the consultant. The amendment is for Continuing Services for Project Design under Contract No. CAO31, specifically related to Task Work Order No. 3 for the resurfacing, rehabilitation, and restoration (3R) project of SR 704 / Royal Palm Way from Four Arts Plaza to S. County Rd.
The amendment details the removal of remaining lighting design analysis and plans production services for Activities 23 and 24. The existing lighting system will remain, with potential lighting retrofits to be evaluated at signalized intersections to meet pedestrian illumination criteria. The total task work order amount is decreased by $19,331.33, reducing the basic services from $317,285.71 to $297,954.38. The amendment stipulates that if the Town of Palm Beach desires decorative lighting instead of standard FDOT light poles, a local funding agreement would need to be established prior to incorporating such design elements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAO31-W0010000.pdf | ||
| CN-550000-CAO31-W0020000.pdf | ||
| CN-550000-CAE97-S0020000.pdf | ||
| ContractBudgetExport.csv | CSV file | |
| CN-550000-CAO31-00020000.pdf | ||
| CN-550000-CAO31-00030000.pdf | ||
| CN-550000-CAO31-00040000.pdf | ||
| CN-550000-CAO31-A0010000.pdf | ||
| CN-550000-CAO31-W0030000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER AMENDMENT FORM
FOR PROFESSIONAL SERVICES
375-030-26
PROCUREMENT
06/17 recovered is $ .
19,331.33 .
Subtotal Estimate/L imit
$297,954.38 Limit
$64,437.06 Limit
$49,024.70 Limit
$0.00
$0.00
$0.00
$411,416.14
$0.00
$411,416.14
Attachments:
Distribution:
Geotechnical $49,024.70
($19,331.33)
$0.00
($19,331.33)
Departmental Approval:
Total authorizations to date (including this one):
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
Exhibit A: Scope of services
Page 1 subtotal
Page 2 thru 6 Subtotal
Total authorized against this task work order beyond the date of execution of this amendment. The following amount is the remaining work order balance to be recovered
The time for completion of services for the subject task work order is extended thru
The total amount for services performed under this task work order is increased by $
The total amount for services performed under this task work order is decreased by $
The decrease in funds will be allocated to the following compensation elements described below.
elements are described below.
from this task work order $ . Note: for Prof. Serv. Task Work Order Amendments, the encumbrance line should never be closed
The subject task work order is hereby closed. Final payment for the task work order has been set to PAID status in CITS. No additional services or charges are
(Status 50) by Financial Services staff based on this selection. Additional Note: Please be sure you want to close out before marking. Premature close outs that must
The subject task work order is hereby canceled (no work has been performed and no payment is due). The total amount of the task work order which is
The additional funds will be allocated to the following compensation elements described below.
There is no increase/decrease in the task work order amount, funds are only redistributed between compensation elements. Revised compensation be corrected in CITS may require programmer time and costs borne by the program office.
(LA4) Units worked at loaded billing rates in
Table 6
(LA4) Units worked at loaded billing rates in
Table 6 $0.00
Compensation Element
Description
This Amendment
Amount
Basic Services ($19,331.33)
Survey & SUE Services $0.00
Previous
Amount
$317,285.71
$64,437.06
Method of Compensation
(LS2) Lump sum paid based on % of completion
(Title)
Burt Baldo Signature
Principal (Name)
$907,332.08
(Name) (Title) Signature
Ashley Dixon Contracts Coordinator
Consultant, PSU, Financial Services, FDOT PM
Consultant Acceptance:
Payment FM No. (must be the same as original Task Work Order):
449814-1-32-01
Check all applicable Terms:
Negative TWO amendment to remove the lighting effort from the project to better align with the 3R scope reduction for meeting the lane mile target.
1920 Wekiva Way, Suite 200, West Palm Beach, FL 33411
Kimley-Horn and Associates, Inc.
Address:
Consultant:
Date (To be entered upon execution of Task Work Order Amendment):Contract No.:
CAO31
Purpose of Amendment:
Amendment No.
to Task Work Order No.
Docusign Envelope ID: ADE17E20-599E-4994-8A2F-1C802F460022
02/19/2025 | 3:51 PM EST
February 18, 2025
Contract No.: CAO31 Supplemental Amendment No. 1 Financial ID No. 451496-5-32-01
CONTINUING SERVICES FOR PROJECT DESIGN
Scope of Services Task Work Order (TWO) No. 3 Financial ID No. 449814-1-32-01
The resurfacing, rehabilitation, and restoration (3R) of SR 704 / Royal Palm Way from Four Arts Plaza to S. County Rd
I. PURPOSE
The purpose of this Supplemental Amendment No. 1 is to describe the omission of remaining efforts of the CONSULTANT on Lighting analysis and plans.
II. SERVICES TO BE OMITTED BY THE CONSULTANT
Under this Amendment, the Consultant shall remove the remaining lighting design analysis and plans production services for Activities 23 and 24. The services rendered under these tasks include field review, identification of existing load center, initial coordination and meetings with Town of Palm Beach and the DEPARTMENT on decorative lighting preference and options, the required local funding agreement, as well as wildlife lighting criteria on restriction limits.
A. Specific Items of Work:
The Consultant shall omit the remaining design services for Activities 23 and 24 from the original basic services as described below:
6. Lighting (Activities 23 & 24)
a. Existing lighting system is to remain. Lighting retrofits to be evaluated at signalized intersections along the corridor to conform to FDM 231.3.2.1.
criteria for pedestrian illumination.
b. The lighting along the corridor is decorative lighting. However, FDOT standard light pole, if needed, will be proposed. If the Town desires a decorative lighting instead of FDOT’s standard, the Town is to make a request to the FDOT. A local funding agreement between FDOT and the Town of Palm Beach would have to be put in place prior to considering decorative lighting in design analysis and contract document.