This document is an Authorization of Optional Services letter from the Florida Department of Transportation (FDOT) District 4 to AECOM Technical Services, Inc., dated January 23, 2025. The contract is for the Managed Lanes Project Development and Environment (PD&E) Study for SR-9/I-95 from North of 6th Avenue South to North of SR 704/Okeechobee Boulevard in Palm Beach County, Florida. The document includes a contract number CAN90 and Financial Project Number 444202-2-22-02.
The optional services authorization is specifically for Design Services related to 3-D Modeling (Open Roads Design - ORD) for PD&E Alternatives and the 30% Preferred Alternative. The total authorized amount is $194,620.18, established based on rates included in Table 6 of the original contract. The scope of work involves 1,047 total project hours, focusing on 3D design modeling for approximately 12.69 miles of roadway, including I-95 mainline, SR 80 direct connections, and various ramps and intersections. The services will cover Phase I and Phase II 3D design model alignment, template and assembly development, quality assurance, supervision, and coordination, with specific limitations on the level of detail for this PD&E stage.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAN90-00020000.pdf | ||
| CN-550000-CAN90-W0010000.pdf | ||
| CN-550000-CAN90-00010000.pdf | ||
| CN-550000-CAN90-00070000.pdf | ||
| CN-550000-CAN90-00040000.pdf | ||
| CN-550000-CAN90-00060000.pdf | ||
| CN-550000-CAN90-00030000.pdf | ||
| CN-550000-CAN90.pdf | ||
| CN-550000-DOH78-W0010000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Authorization of Optional Services
January 23, 2025
Julio Boucle, P.E.
AECOM Technical Services, Inc.
110 East Broward Boulevard, Suite 700 Fort Lauderdale, FL 33301
RE: Authorization of Optional Services No. 2
Contract No.: CAN90
Financial Project No.: 444202-2-22-02
Description: Managed Lanes PD&E Study for SR-9/I-95 from North of 6th Avenue
South to North of SR 704/Okeechobee Blvd
Dear Julio Boucle:
In accordance with the identified activities outlined in Exhibit “A” of Contract CAN90, page(s) A49, your firm is hereby authorized to proceed with work, as outlined in the attached scope of services.
The total authorized amount for these optional services is $194,620.18 . This amount was established based on rates included in Table 6 of the contract. The method of payment for these services is as follows:
Element Description Compensation Element Amount
Design Services LS-2 $194,620.18
Services shall begin upon your acceptance of this letter. Should you have any questions or need additional information, please contact me at 954-777-4468 or via email at vanita.saini@dot.state.fl.us.
Signature: ________________________________ Vanita Saini, P.E.
Project Manager
Approved by: Consultant Acceptance:
Anson Sonnett, P.E. Julio Boucle, P.E.
District Consultant Management Engineer Vice President cc: Financial Services Office
Procurement Office
File
Docusign Envelope ID: 2582B3A0-7CD2-48CA-8E21-C0F1A254F77C
01/23/2025 | 1:17 PM EST
01/23/2025 | 5:06 PM EST
01/23/2025 | 2:33 PM PST
EXHIBIT A
SCOPE OF CONSULTANT SERVICES
OPTIONAL SERVICES AUTHORIZATION #2
CONTRACT #CAN90
PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDIES
SR 9/I-95 FROM NORTH OF 6TH AVE SOUTH TO NORTH OF SR
704/OKEECHOBEE BLVD
FDOT District 4
Palm Beach County
Financial Project ID: 444202-2-22-02
AECOM Technical Services, Inc. (AECOM) will provide the Florida Department of Transportation (FDOT) with Design Services for 3-D Modeling (ORD) identified as optional services in the original scope of services for the above referenced project.
These additional services will include:
Design Services – 3-D Modeling / Open Roads Design (ORD)
• ORD for PD&E Alternatives and 30% for Preferred Alternative
Docusign Envelope ID: 2582B3A0-7CD2-48CA-8E21-C0F1A254F77C
PROJECT DEVELOPMENT & ENVIRONMENT
PROJECT DATA
County:
Begin Milepost: 6.60 Miles
FDOT Project Manager:
Prepared By: FDOT X Final
Consultant Name:
SUMMARY
2.0 PROJECT DESCRIPTION AND OBJECTIVES 0
3.0 PUBLIC INVOLVEMENT 0
4.0 ENGINEERING ANALYSIS AND REPORTS 0
5.0 ENVIRONMENTAL ANALYSIS AND REPORTS 0
6.0 ENVIRONMENTAL DOCUMENT 0
8.0 DESIGN SERVICES 1047
PROJECT TOTAL HOURS 1047
AECOM Technical Services, Inc.
TBD
Consultant
Vanita Saini, PE
Financial Project Identification Number:
Project Description:
Federal Aid Project Identification Number:
I-95 From 6th Ave S to N of SR 704 PDE
444202-2-22-02
Project Length:
Palm Beach
20.9 End Milepost: 27.5
Name of Consultant: AECOM Technical Services, Inc.
Activity No. Activity
AECOM
Technical
Services, Inc. ASA CED HRE ISCG JRI KHA PEL TCI Sub 9 Sub 10 Sub 11 Sub 12 Total Hours 2 Project Description and Objectives 0 0
3 Public Involvement 0 0
4 Engineering Analysis & Report 0 0
5 Environmental Analysis & Reports 0 0
6 Environmental Document 0 0
8 Design Services 1047 1047
1,047 0 0 0 0 0 0 0 0 0 0 0 0 1,047
Notes: 1. Staff hours for consultant come directly from each discipline's worksheet.
2. Staff hours for subconsultants are to be entered manually into columns D through O.
3. For workbooks prepared by subconsultants, their project hours will be totaled in column C.
Project Total
I-95 From 6th Ave S to N of SR 704 PDE
444202-2-22-02
Project Staff Hours
ESTIMATE OF WORK EFFORT AND COST - PRIME CONSULTANT
Name of Project: I-95 From 6th Ave S to N of SR 704 PDE Consult. Name: AECOM Technical Services, Inc.
County: Palm Beach Consult. No. LOA #2 FPN: 444202-2-22-02 Date: 1/16/2025 FAP No.: TBD Estimator: ATS - Page 1
SH Salary Average By Cost By Rate Per
$37.28 $53.88 $105.61 $100.91 $88.21 $29.53 $32.10 $36.14 $48.07 $40.19 $29.89 $44.19 Activity Activity Task
Project Description and Objectives 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Public Involvement 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Engineering Analysis & Report 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Environmental Analysis & Reports 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Environmental Document 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Design Services 1,047 40 44 48 0 0 0 0 0 132 34 0 0 298 $16,643 $55.85
Total Staff Hours 1,047 40 44 48 0 0 0 0 0 132 34 0 0 298
Total Staff Cost $1,491.20 $2,370.72 $5,069.28 $0.00 $0.00 $0.00 $0.00 $0.00 $6,345.24 $1,366.46 $0.00 $0.00 $16,642.90 $55.85 Check = $16,642.90
SALARY RELATED COSTS: Subtotal Page 1 $16,642.90 Subtotal Page 2 $55,159.65 Subtotal Page 3 $0.00 Total ATS $71,802.55
OVERHEAD: 123.50% $88,676.15
OPERATING MARGIN: 38.00% $27,284.97
FCCM (Facilities Capital Cost Money): 0.00% $0.00
Notes: EXPENSES: 9.55% $6,857.14
1. This sheet to be used by Prime Consultant to calculate the Grand Total fee. SALARY RELATED SUBTOTAL: $194,620.81
2. Manually enter fee from each subconsultant. Unused subconsultant rows may be hidden. Survey (Field - if by Prime) $0.00
3. Enter the rate for each classification in Row 9. SUBTOTAL - PRIM E $194,620.81
Subconsultant: ASA $0.00 Subconsultant: CED $0.00 Subconsultant: HRE $0.00 Subconsultant: ISCG $0.00 Subconsultant: JRI $0.00 Subconsultant: KHA $0.00 Subconsultant: PEL $0.00 Subconsultant: TCI $0.00
SUBTOTAL ESTIM ATED FEE: $194,620.81
Subconsultant: $0.00
GRAND TOTAL ESTIM ATED FEE: $194,620.81
GIS SpecialistEngineer 1 Engineering Intern Environmental SpecialistStaff Classification Comm Outreach
Specialist Comm Outreach Specialst Senior
Computer Programmer
CADD/Computer Tech Chief Designer Chief Engineer 2 Chief Planner Chief Scientist
Total Staff Hours From "SH
Summary - Firm"
ESTIMATE OF WORK EFFORT AND COST - PRIME CONSULTANT
Name of Project: I-95 From 6th Ave S to N of SR 704 PDE Consult. Name: AECOM Technical Services, Inc.
County: Palm Beach Consult. No. LOA #2 FPN: 444202-2-22-02 Date: 1/16/2025 FAP No.: TBD Estimator: ATS - Page 2
SH Salary Average By Cost By Rate Per
$43.12 $55.84 $30.55 $107.65 $29.35 $60.75 $70.23 $81.14 $45.51 $61.00 $65.73 $54.34 Activity Activity Task
Project Description and Objectives 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Public Involvement 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Engineering Analysis & Report 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Environmental Analysis & Reports 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Environmental Document 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Design Services 1,047 0 0 0 75 0 0 318 240 116 0 0 0 749 $55,160 $73.64
Total Staff Hours 1,047 0 0 0 75 0 0 318 240 116 0 0 0 749
Total Staff Cost $0.00 $0.00 $0.00 $8,073.75 $0.00 $0.00 $22,333.14 $19,473.60 $5,279.16 $0.00 $0.00 $0.00 $55,159.65 $73.64 Check = $55,159.65
SALARY RELATED COSTS: $55,159.65
OVERHEAD: 123.50% $68,122.17
OPERATING MARGIN: 38.00% $20,960.67
FCCM (Facilities Capital Cost Money): 0.00% $0.00
Notes: EXPENSES: 9.55% $5,267.75
1. This sheet to be used by Prime Consultant to calculate the Grand Total fee. SALARY RELATED SUBTOTAL: $149,510.24
2. Manually enter fee from each subconsultant. Unused subconsultant rows may be hidden. Survey (Field - if by Prime) $0.00
3. Enter the rate for each classification in Row 9. SUBTOTAL - PRIM E $149,510.24
Subconsultant: ASA $0.00 Subconsultant: CED $0.00 Subconsultant: HRE $0.00 Subconsultant: ISCG $0.00 Subconsultant: JRI $0.00 Subconsultant: KHA $0.00 Subconsultant: PEL $0.00 Subconsultant: TCI $0.00 Subconsultant: Sub 9 $0.00 Subconsultant: Sub 10 $0.00 Subconsultant: Sub 11 $0.00 Subconsultant: Sub 12 $0.00
SUBTOTAL ESTIM ATED FEE: $149,510.24
Project M anager 3Staff Classification Total Staff
Hours From "SH Summary -
Firm"
Graphic Designer Land Planner Planner Senior Landscape Architect Senior PlannerScientist Senior Computer
Programmer Senior Engineer 1 Senior Engineer 2 Senior Engineering Tech
Sr. Environmental Specialist
ESTIMATE OF WORK EFFORT AND COST - PRIME CONSULTANT
Name of Project: I-95 From 6th Ave S to N of SR 704 PDE Consult. Name: AECOM Technical Services, Inc.
County: Palm Beach Consult. No. LOA #2 FPN: 444202-2-22-02 Date: 1/16/2025 FAP No.: TBD Estimator: ATS - Page 3
SH Salary Average By Cost By Rate Per
$55.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $10.00 $0.00 Activity Activity Task
Project Description and Objectives 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Public Involvement 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Engineering Analysis & Report 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Environmental Analysis & Reports 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Environmental Document 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Design Services 1,047 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Total Staff Hours 1,047 0 0 0 0 0 0 0 0 0 0 0 0 0
Total Staff Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 #DIV/0!
Check = $0.00
SALARY RELATED COSTS: $0.00
OVERHEAD: 123.50% $0.00
OPERATING MARGIN: 38.00% $0.00
FCCM (Facilities Capital Cost Money): 0.00% $0.00
Notes: EXPENSES: 9.55% $0.00
1. This sheet to be used by Prime Consultant to calculate the Grand Total fee. SALARY RELATED SUBTOTAL: $0.00
2. Manually enter fee from each subconsultant. Unused subconsultant rows may be hidden. Survey (Field - if by Prime) $0.00
3. Enter the rate for each classification in Row 9. SUBTOTAL - PRIM E $0.00
Subconsultant: ASA $0.00 Subconsultant: CED $0.00 Subconsultant: HRE $0.00 Subconsultant: ISCG $0.00 Subconsultant: JRI $0.00 Subconsultant: KHA $0.00 Subconsultant: PEL $0.00 Subconsultant: TCI $0.00 Subconsultant: Sub 9 $0.00 Subconsultant: Sub 10 $0.00 Subconsultant: Sub 11 $0.00 Subconsultant: Sub 12 $0.00
SUBTOTAL ESTIM ATED FEE: $0.00
Staff Classification 4Staff Classification
Total Staff Hours From "SH
Summary - Firm"
Senior Utility Coordinator
Staff Classification
Staff Classification
Staff Classification
Staff Classification
Staff Classification
Staff Classification
Staff Classification
Staff Classification
Staff Classification
Staff Classification
8. DESIGN SERVICES
Estimator: I-95 From 6th Ave S to N of SR 704 PDE 444202-2-22-02
Signature / Date
NOTE: Signature Block is optional, per District preference
Task No. Task Units # of Units Hours / Unit Hours Comments
8 Design Services LS 1 1047 1047 For 3-D design for PD&E, details of the Preferred Alt, up to Phase 1 / 30% Design Plans (drainage commensurate with PD&E) - see attached back up for Sheet 36.
1047DESIGN SERVICES TOTAL HOURS
Representing Print Name
Page 6 of 6 1/16/2025
Project Activity 4: Roadway Analysis
Estimator: EC I-95 From 6th Ave S to N of SR 704 PDE 444202-2-22-02
NOTE: Signature Block is optional, per District preference
Task No. Task Units No of Units Hours/ Unit Total
Hours
36.1 Phase I 3D Design Model Alignment /
Corridor Mile 1 333.8 334
36.2 Phase II 3D Design Model Alignment /
Corridor Mile 1 505.8 506
36.3 Phase III 3D Design Model Alignment /
Corridor Mile 0 0 0
36.4 Final 3D Design Model Alignment /
Corridor Mile 0 0 0
36.5 Cross Section Design Files LS 1 0 0
36.6 Template and Assembly Development LS 1 86.7 87
36.7 Quality Assurance/Quality Control LS % 5% 46
36.8 Supervision LS % 5% 46
36.9 Coordination LS % 3% 28
This is PD&E 30% Preferred Alternative only - 20 hrs x 12.69 miles (only commensurate for PD&E level, includes pond sites, intersections, and side streets). No Roundabouts, driveways, curb cut ramps, closed drainage, bridge abutments, sign spans, or utilities. Up to 36 Bridges (representative superstructure only in ORD, bridge decks only) x 7hrs/each.
Representing Print Name Signature / Date
FDOT District Four
AECOM Technical Services, Inc.
Comments
I-95 mainline: 6.6 miles SR 80 direct connections total 3.06 miles: SR 80 approaches 1.13 x 2 (EB & WB with independent horizontal/vertical) = 2.26 miles; Flyovers and tie-downs 0.4 x 2 (NB & SB) = 0.8 miles SR 80 DDI total 2.2 miles: 0.25 x 2 (EB & WB) = 0.5 miles; Ramp reconstruction 0.85 x 2 (NB & SB) = 1.7 miles Belvedere SB exit ramp 0.83 miles [Total of 12.69 miles]
80 hrs for existing features + 20 hrs/mile (for C-4 Urban General, Interstate) x 12.69 miles PD&E project alternatives
3D Modeling Total DESIGN SERVICES n/a n/a
Project specific template/assembly, development effort of the 3D model
3D Modeling Technical Subtotal n/a
SHE - Sheet 36 - ORD 3D Modeling Back Up - 2025-01-16 - Final.xlsx
36. 3D Modeling Page 1 of 1 1/16/2025
| PROJECT DATA |
| Summary |
| Fee Sheet - Prime |
| Fee Sheet - Prime (2) |
| Fee Sheet - Prime (3) |
| 8. DESIGN SERVICES |
| SHE - Sheet 36 - ORD 3D Modeling Back Up - 2025-01-16 - Final.pdf |
| 36. 3D Modeling |
File details come from the government source that posted it. Updated .