CN-550000-CAN52-W0030000.pdf
PDF 98 KB Posted
- Contract number
- CAN52
- Issued by
- Florida
About this file
This document is a Task Work Order for Professional Services issued by the State of Florida Department of Transportation (FDOT), specifically involving England, Thims & Miller, Inc. (ETM), a consulting firm located in Orlando, Florida. The task work order is associated with Contract No. CAN52 and has a Payment FM No. of 237995-1-32-21, dated 02/06/2025.
The task work order authorizes ETM to perform professional services related to HSIP Improvements Safety Memo for SR 50 Resurfacing from Bennett Road to SR 417, with a total compensation amount of $11,806.27. The work is divided into two compensation elements: IV-12 Collision Analysis by England Thims & Miller Inc. (limited to $4,306.53) and IV-17 Preparation of report and benefit-to-cost analysis by ETM Inc. (limited to $7,499.74). Both elements will be compensated using a lump sum method based on percentage of completion, with all services to be completed by 6/1/2025. The document includes departmental approval by Loreen Bobo, District 5 Safety Administrator, and consultant acceptance by Matt Maggiore, Executive Vice President of ETM.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CA015-S0020000.pdf | ||
| CN-550000-CAN52-00070000.pdf | ||
| CN-550000-CAN52-W0010000.pdf | ||
| CN-550000-CAN52-00020000.pdf | ||
| CN-550000-CAN52-00060000.pdf | ||
| CN-550000-CAN52-00030000.pdf | ||
| CN-550000-CAN52-00040000.pdf | ||
| CN-550000-CAN52-00050000.pdf | ||
| CN-550000-CAN52-W0020000.pdf | ||
| CN-550000-CAN52.pdf | ||
| ContractBudgetExport.csv | CSV file |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
08/21
Consultant:
Address:
Date:
6/1/2025
*Limiting or Estimating/Budgeted Amount.
Distribution:
Consultant Acceptance:
Signature
ETM / FDOT
Executive Vice President
$11,806.27
$0.00
(name) (title)
Matt Maggiore
$11,806.27
Total authorizations to date (including this one):
Departmental Approval:
$4,306.53 Limit
IV-17: Prep report & benefit to cost analysis
ETM Inc $7,499.74 Limit
HSIP Improvements Safety Memo for SR 50 Resurfacing from Bennett Road to SR 417
PM- Anthony Nosse CM- Cory Caldwell
England, Thims & Miller, Inc.
1411 Edgewater Drive, Suite 200
Orlando Florida 32084
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$11,806.27
(LS2) Lump sum paid based on % of completion
(LS2) Lump sum paid based on % of completion
Page 1 Total
Page 2 thru 6 Subtotal
Total
IV-12: Collision Analysis-England Thims & Miller
Inc
(name) (title) Signature
Loreen Bobo District 5 Safety Administrator
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
Task Work Order No.:
Contract No.: Payment FM No.:
CAN52 237995-1-32-21
02/06/2025 | 8:17 AM EST
File details come from the government source that posted it. Updated .