About this file
This document is a Task Work Order for Professional Services issued by the Florida Department of Transportation (FDOT), specifically for England, Thims & Miller, Inc., a consulting firm located in Orlando, Florida. The task work order is part of Contract CAN52, which is a districtwide contract for safety studies and highway design, procured through a Request for Proposal method.
The specific task involves conducting a Safety Study (Study Type II: Intersection Analysis) for SR 500/US 441 (Orange Blossom Trail) at Bradshaw Road. The total contract value is $26,582.56, paid as a lump sum based on percentage of completion. The scope of work includes a qualitative assessment of the intersection, an 8-hour turning movement count, detailed analysis to develop short-term and long-term improvement alternatives, and preparation of a comprehensive report. Deliverables include a draft report submitted within 30 days of task work order approval and a final report submitted within one week of receiving FDOT comments. The contract period runs from May 16, 2023, to May 15, 2028, with a total budgetary ceiling of $1,500,000.00.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CA015-S0020000.pdf | ||
| CN-550000-CAN52-00070000.pdf | ||
| CN-550000-CAN52-W0010000.pdf | ||
| CN-550000-CAN52-00020000.pdf | ||
| CN-550000-CAN52-00060000.pdf | ||
| CN-550000-CAN52-W0030000.pdf | ||
| CN-550000-CAN52-00040000.pdf | ||
| CN-550000-CAN52-00050000.pdf | ||
| CN-550000-CAN52-W0020000.pdf | ||
| CN-550000-CAN52.pdf | ||
| ContractBudgetExport.csv | CSV file |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
08/21
Consultant:
Address:
Date:
9/1/2025
*Limiting or Estimating/Budgeted Amount.
Distribution:
Consultant Acceptance:
Signature
ETM / FDOT
Executive Vice President
$26,582.56
$0.00
(name) (title)
Matt Maggiore
$26,582.56
Total authorizations to date (including this one):
Departmental Approval:
$26,582.56 Limit
The consultant will provide Safety Study work effort on SR 500 / US 441 at Bradshaw in support of Safe Strides to Zero - SS2Z 2023
England, Thims & Miller, Inc.
1411 Edgewater Drive, Suite 200 Orlando Florida 32084
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$26,582.56
(LS2) Lump sum paid based on % of completion
Page 1 Total
Page 2 thru 6 Subtotal
Total
Study Type IV - Safety Study
$26,582.56
(name) (title) Signature
Loreen Bobo, P.E. District 5 Safety Administrator
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
Task Work Order No.:
Contract No.: Payment FM No.:
CAN52 237995-1-32-21
DocuSign Envelope ID: 55BD4052-5067-4CCE-ACF2-4E76843C4E71
11/28/2023 | 2:28 PM EST
SR 500/US 441 (Orange Blossom Trail) at Bradshaw Road - Intersection Safety Study Scope
1. Purpose
The purpose of the intersection safety review is to evaluate/analyze the reported crashes at the SR 500/US 441 (Orange Blossom Trail) at Holden Avenue intersection to identify crash patterns and to determine the need for improvements that will reduce the frequency and severity of future crashes.
2. Scope of Work
The work identified in Task Work Order (TWO) 01 shall consist of the following efforts.
Study Type II: Intersection Analysis
• Sub-Task 1: Qualitative Assessment – 1 Intersection o Conduct field reviews during morning and afternoon peak traffic periods.
o Assess the intersection’s operational characteristics.
o Prepare an existing corridor condition diagram using an aerial-based diagram to document existing conditions. This effort includes photographing and documenting conditions which will be used to estimate quantities for recommended improvements.
o Obtain collision data from CARS/Signal Four Analytics for all reported crashes from January 1, 2019 to June 30, 2023. Prepare collision summary and collision diagrams, and note significant issues/trends related to crashes.
• Sub-Task 2: 8 Hour Turning Movement Count – 1 Intersection o Collect peak 8-hour turning movement counts for vehicles, heavy trucks and pedestrians.
o Review turning movement counts at the intersection and incorporate into study.
• Sub-Task 3: Analysis – 1 Intersection o Develop Alternatives (Short Term and Long Term) o Analyze Alternatives o Recommend Alternatives o Produce aerial-based conceptual improvement diagrams of recommended improvements.
o Develop final recommendations for intersection improvements.
• Sub-Task 4: Preparation and Submission of Report – 1 Intersection o This effort includes a brief study document detailing the requested evaluation; presenting existing conditions, crash summary and diagrams; and the proposed safety improvement recommendations. This will also include identifying all variations and exemptions, developing a construction cost estimate (including right-of-way and utility relocation needs) and assessing mitigated crashes and/or benefit-cost ratio evaluations. Contact local agencies and check the FDOT Work Program to determine if there are any projects that may conflict with this study.
SR 500/US 441 (Orange Blossom Trail) at Bradshaw Road - Intersection Safety Study Scope
3. Deliverables and Schedule
A draft report and final report for the intersection will be prepared using the information noted above.
These reports will be presented to FDOT for review and comment:
• Draft report submitted electronically in a PDF format within 30 days of approval of the Task Work Order.
• Final report submitted in a PDF format within 1 week of receiving comments from FDOT and/or other interested parties. Additional hard copies of the final report will be provided, as requested.
4. Contract Fee
Per Contract CAN52, the lump sum fee for Study Type II is $26,582.56.
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
CAN52
11/16/2023
CONTRACT INFORMATION
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR JASON ADANK, CPA, COMPTROLLER ON 11/16/2023
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55053010541
Expansion Option: A1
Object Code: 131512
Amount: $26,582.56
Financial Project: 23799513221
Work Activity (FCT): 119
CFDA:
Fiscal Year: 2024
Budget Entity: 55100100
Category/Category Year: 088849/24
Amendment ID: W001
Sequence: 00
User Assigned ID: LOA 1
Enc Line (6s)/Status: 0001/04
Total Amount: $26,582.56
Contract: CAN52
Contract Type: CA - ENGINEERING (ENGINEER)
Vendor Name: ENGLAND-THIMS, & MILLER, INC.
Vendor ID: F591773930002
Beginning Date of This Agreement: 05/16/2023
Ending Date of This Agreement: 05/15/2028
Contract Total/Budgetary Ceiling: bc = $1,500,000.00
Method of Procurement: C - REQUEST FOR PROPOSAL (287.55,F. S.)
Description: DISTRICTWIDE SAFETY STUDIES AND HIGHWAY DESIGN
Page1 of 1
To: Meagan.Prugh@dot.state.fl.us
DocuSign Envelope ID: 28C32F58-BB09-4ECB-8C60-4E14325C6F3EDocuSign Envelope ID: 55BD4052-5067-4CCE-ACF2-4E76843C4E71