CN-550000-CAH69-S0010000.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|CAH69|f040e9dca6e623fa5c5ea55df84987a2
Contract number
CAH69
Issued by
Florida

About this file

This document is an Amendment to a Standard Professional Services Agreement between the State of Florida Department of Transportation (FDOT) and Civil Services, Inc., specifically Amendment Number 2 to Contract Number CAH69. The amendment pertains to a design project for State Road 13 (San Jose Boulevard) from I-295 to Sunbeam Road in Duval County, with the original agreement executed on February 2, 2022, and this amendment dated January 11, 2023.

The amendment increases the total maximum limiting amount by $94,073.00, bringing the revised total maximum limiting amount to $984,336.00. The scope of services involves roadway improvements, including signalization design at specific intersections (Hartley Road, Haley Road, and Old St. Augustine Road), with design activities encompassing roadway design, signalization design, structural engineering, and geotechnical engineering and laboratory testing. The compensation is broken down into three main categories: Basic Services (LS-2) at $548,612.00 (amended to $65,759.00), Survey/Geotechnical Services (LA-4) at $261,851.00 (amended to $28,314.00), and Lighting Services (LA-4) at $79,800.00 (amended to $0.00), with payment methods based on percentage of completion and defined loaded rates for each class/person/unit of work.

View the file

Other files

File Type Posted
CN-550000-CAH69-00030000.pdf PDF
CN-550000-CA574-00110000.pdf PDF
CN-550000-CAH69-S0020000.pdf PDF
CN-550000-CAH69-00050000.pdf PDF
CN-550000-CAH69-S0030000.pdf PDF
CN-550000-CAH69-00040000.pdf PDF
ContractBudgetExport.csv CSV file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .