This document is an Amendment to a Standard Professional Services Agreement between the Florida Department of Transportation (FDOT) District Five and WBQ Design & Engineering, Inc., with involvement from several other consulting firms including Colliers Engineering & Design, DRMP, Inc., RES Florida Consulting, Florida Bridge and Transportation, Quest Corporation of America, Southeastern Archaeological Research, Geotechnical and Environmental Consultants, and Amdrill, Inc. The agreement is specifically for the SR 500 project from SR 50 to SR 414 Ramps in Orange County, with the financial project identification number 447104-1-32-01.
The amendment increases the total maximum limiting amount of the contract by $13,604.90, bringing the total to $2,981,813.90. The scope of services includes additional tasks such as a Railroad Preemption Study at the SR 500 and Silver Star Road intersection, survey services for right-of-way verification, underground utility designation, and work zone safety. The amendment incorporates new attachments including an updated Exhibit "A" Scope of Services and a Summary of Compensation that details the adjusted compensation for each consulting firm. The primary changes involve adding funds to WBQ Design & Engineering (increasing their basic services and survey services allocations), making minor adjustments to DRMP, Inc.'s compensation, and reducing Florida Bridge and Transportation's allocation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAG87-00020000.pdf | ||
| CN-550000-ARW85-S0100000.pdf | ||
| CN-550000-CAG87-00030000.pdf | ||
| CN-550000-CAG87-S0020000.pdf | ||
| CN-550000-CAG87.pdf | ||
| CN-550000-CAG87-00040000.pdf | ||
| CN-550000-CAG87-S0040000.pdf | ||
| ContractBudgetExport.csv | CSV file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
District Five Professional Services Office, 719 South Woodland Blvd. MS 4-524, Deland, Florida 32720, (386) 943-5526, www.fdot.gov
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
AMENDMENT TO
STANDARD PROFESSIONAL SERVICES AGREEMENT
375-030-97
PROCUREMENT
12/22
Amendment Number: 3 Amendment Execution Date:
Original Agreement No.: CAG87 Original Agreement Execution Date: 12/3/2021
Consultant Name: WBQ Design & Engineering, Inc.
FM Number(s): 447104-1-32-01
Agreement Description: SR 500 from SR 50 to SR 414 Ramps
Purpose of Amendment: Add Funds, Incorporate attachments to the contract
The terms of the original agreement referenced above are hereby amended:
The total maximum limiting amount of $2,968,209.00 for all services required under the original agreement and all supplements and amendments thereto is herein increased by $13,604.90. The revised total maximum limiting amount for all services is $2,981,813.90. The services specified in Exhibit “A”, Scope of Services of the original agreement are amended and attached as Exhibit "A".
The following attachments are hereby incorporated into this Amendment:
Exhibit “A”, Scope of Services, pages A-1 to A-6 Attachment No. 1, Summary of Compensation
Except as hereby modified, amended, or changed, all of the terms and conditions of said original agreement and any supplements and amendments thereto will remain in full force and effect.
IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed, the day and year first above written.
CONSULTANT STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
WBQ Design & Engineering, Inc.
Name of Consultant
BY: BY:
Name: Name: C. Jack Adkins
Title: Title: Director of Transportation Development
District Five
FOR DEPARTMENT USE ONLY
PROCUREMENT OFFICE REVIEW: LEGAL OFFICE REVIEW:
Procurement Office Legal Office
February 15, 2023 FDOT Contract # CAG87
EXHIBIT A
SCOPE OF SERVICES
FOR SUPPLEMENTAL AGREEMENT #3
Financial Project ID: 447104-1-32-01
SR 500
FROM SR 50 TO SR 414 RAMPS
FDOT District 5
ORANGE
Supplemental Agreement #3 February 15, 2023 A- 1 FPID: 447104-1-32-01
SCOPE OF SERVICES FOR CONSULTING ENGINEERING SERVICES
CONTRACT: Supplemental Agreement to FDOT Contract # CAG87
Financial Project ID: 447104-1-32-01
Federal Aid Project No.: D521-052-B
Roadway Id: 75020000 Begin milepost: 0.025 End milepost: 6.529
Project Description: SR 500 FROM SR 50 TO SR 414 RAMPS
PURPOSE
The Department has requested the additional Railroad Preemption Study and survey efforts for SR 500 from SR 50 to SR 414 Ramps be study and implemented. The new design elements are as follows:
WBQ Design & Engineering:
Project Activity:
3. PROJECT GENERAL TASKS
27. SURVEY
DRMP:
Project Activity:
21. SIGNALIZATION ANALYSIS
Signalization Analysis includes a railroad preemption study for the SR 500 at Silver Star Road intersection. The study will require a field review of the interaction of the signalized intersection with the railroad east of the intersection. The field review will determine the queueing of the signalized intersection to see if it crosses the railroad tracks. Central Florida Railroad will be coordinated with to provide the operations of the crossing signal.
February 15, 2023 A- 2 FPID: 447104-1-32-01
FBT:
Project Activity:
4 ROADWAY ANALYSIS
9 STRUCTURES – MISC.
17 STRUCTURES – RETAINING WALLS
Preparation of Design Variation for removal of crash walls within FCEN R/W.
WBQ Survey and Colliers Engineering & Design Survey:
2 7 S U R V E Y
The CONSULTANT shall perform
27.3 Right of Way
Verification at the SR 500 and Silver Star Rd. Intersection. Recon/Recover corners for Parcels in 4 quadrants of intersection. (Safety Requirements require Poles adjacent to R/W), Also Right of Way verification at the SR 500 and Shader Rd. Intersection. Recon/Recover corners for 3 Parcels in intersection (safety improvements) (WBQ)
27.10 Underground Utilities
Quality Level B Designating Proposed project improvements are planned to connect conduit from Silver Star north to Florida Central Rail Cabinet (Collier)
27.27 Work Zone Safety
Provide work zone as required by DEPARTMENT standards. (WBQ, Collier)
February 15, 2023 A- 3 FPID: 447104-1-32-01
27.32 Document Research
Perform research of documentation to support field and office efforts involving surveying and mapping.(WBQ)
27.35 Quality Assurance/Quality Control (QA/QC)
27.36 Supervision
27.37 Coordination
February 15, 2023 A- 4 FPID: 447104-1-32-01
February 1, 2023 FDOT Contract # CAG87
EXHIBIT A
SCOPE OF SERVICES
FOR SCOPE REDUCTION
Financial Project ID: 447104-1-32-01
SR 500
FROM SR 50 TO SR 414 RAMPS
FDOT District 5
ORANGE
Scope Reduction February 1, 2023 A- 5 FPID: 447104-1-32-01
SCOPE OF SERVICES FOR CONSULTING ENGINEERING SERVICES
CONTRACT: Supplemental Agreement to FDOT Contract # CAG87
Financial Project ID: 447104-1-32-01
Federal Aid Project No.: D521-052-B
Roadway Id: 75020000 Begin milepost: 0.207 End milepost: 6.529
Project Description: SR 500 FROM SR 50 TO SR 414 RAMPS
PURPOSE
Coordination with FCEN regarding the installation of crash walls within their R/W has resulted in their request to eliminate this project element.
FBT:
Project Activity:
9 STRUCTURES – MISC.
17 STRUCTURES – RETAINING WALLS
GEC:
Project Activity:
35 GEOTECHNICAL
Scope Reduction February 1, 2023 A- 6 FPID: 447104-1-32-01
Compensation Element/Firm
Original Amounts through Am.
No. 2
This Amendment
No. 3
Amended Total Amounts
Basic Services (LS-2) WBQ Design & Engineering, Inc. $1,564,475.00 $25,714.00 $1,590,189.00 Colliers Engineering & Design, d/b/a Maser Consulting $317,176.00 $0.00 $317,176.00 DRMP, Inc. $307,786.00 $9,426.00 $317,212.00 RES Florida Consulting, LLC d/b/a E Sciences $8,639.00 $0.00 $8,639.00 Florida Bridge and Transportation, Inc. $98,016.00 ($16,254.43) $81,761.57 Quest Corporation of America, Inc. $12,277.00 $0.00 $12,277.00 Southeastern Archaeological Research, Inc. $19,610.00 $0.00 $19,610.00
R/W Control Map (LS-2) WBQ Design & Engineering, Inc. $33,617.00 $0.00 $33,617.00
Survey Services (LA-4)# WBQ Design & Engineering, Inc. $386,540.00 $16,357.00 $402,897.00 Colliers Engineering & Design, d/b/a Maser Consulting $52,760.00 $4,085.00 $56,845.00
Supplemental Survey Services (LA-4)# WBQ Design & Engineering, Inc. $14,902.00 $0.00 $14,902.00
Supplemental Mapping Services (LA-4)# WBQ Design & Engineering, Inc. $6,710.00 $0.00 $6,710.00
Geotechnical Services (LA-4)# Geotechnical and Environmental Consultants, Inc. $133,964.00 ($25,722.67) $108,241.33 Amdrill. Inc. $11,737.00 $0.00 $11,737.00
TOTAL MAXIMUM LIMITING AMOUNT: $2,968,209.00 $13,604.90 $2,981,813.90
Estimated, non-binding limits are provided for project management purposes.
ATTACHMENT No. 1, SUMMARY OF COMPENSATION
CONTRACT CAG87, AMENDMENT NO. 3
Financial Project Number 447104-1-32-01