This document is an Amendment to a Standard Professional Services Agreement between the Florida Department of Transportation (FDOT) District Two and Kimley-Horn and Associates, Inc. The amendment pertains to a design project for State Road 222 (39th Avenue) located in Alachua County, Florida. The original agreement was executed on 11/30/2021 with the contract number CAG86, and this is Amendment Number 2 executed on 05/15/2023.
The amendment increases the total maximum limiting amount of the contract by $50,957.00, bringing the revised total to $1,077,660.00. The additional funds are to support an extension of the project limits from Mile Post 3.693 to Mile Post 3.851, just east of NW 40th Terrace. Key scope modifications include additional design survey coverage, geotechnical work to address pavement distress, coordination for green colored pavement markings at the NW 43rd Street intersection, and various design and planning adjustments to accommodate the extended project limits. The contract is set to run from 11/30/2021 to 11/28/2031, with the procurement method being a Request for Proposal under Florida Statute 287.55.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-AT107-W0010000.pdf | ||
| CN-550000-CAG86-00030000.pdf | ||
| CN-550000-CAG86-00010000.pdf | ||
| CN-550000-CAG86-00020000.pdf | ||
| CN-550000-CAG86-00050000.pdf | ||
| CN-550000-CAG86-S0020000.pdf | ||
| CN-550000-CAG86-00040000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
District Two Professional Services Office, 1109 South Marion Avenue MS 2016, Lake City, Florida 32025-5874, (386) 758-3709, www.fdot.gov
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
AMENDMENT TO
STANDARD PROFESSIONAL SERVICES AGREEMENT
375-030-97
PROCUREMENT
12/22
Amendment Number: 2 Amendment Execution Date:
Original Agreement No.: CAG86 Original Agreement Execution Date: 11/30/2021
Consultant Name: Kimley-Horn and Associates, Inc.
FM Number(s): 447032-1-32-01
FAP No.: D221 098 B
Agreement Description: Design: SR 222 (39th Avenue) from NW 92nd Ct to NW 43rd Street
Purpose of Amendment: Add Funds
The terms of the original agreement referenced above are hereby amended:
The total maximum limiting amount of $1,026,703.00 for all services required under the original agreement and all supplements and amendments thereto is herein increased by $50,957.00. The revised total maximum limiting amount for all services is $1,077,660.00. The services specified in Exhibit “A”, Scope of Services of the original agreement are amended and attached as Exhibit "A".
Except as hereby modified, amended, or changed, all of the terms and conditions of said original agreement and any supplements and amendments thereto will remain in full force and effect.
Method of Pay m ent Lim it /
Est im a t e Am ount AMD 02 Am ended T otal
% Completion of Services (LS-2) Limit $ 668,253.00 $ 29,980.00 $ 698,233.00
Defined loaded rates for each class/person/unit of work (LA-4) Limit $ 294,490.00 $ 20,97 7 .00 $ 315,467 .00
Defined loaded rates for each class/person/unit of work (LA-4) Limit $ 63,960.00 $ - $ 63,960.00
$ 1 ,026,703.00 $ 50,957 .00 $ 1 ,077 ,660.00
$ 1,07 7 ,660.00 T OT AL CONT RACT AMOUNT
Contract Com pensation Sum m ary T able
Financial Project Num ber 447 032-1-32-01
Com pensation
Elem ent
Description
Design Serv ices (LS2)
Survey /Geotech
Serv ices (LA4)
SUBTOTAL
Lighting Serv ices (LA4)
DocuSign Envelope ID: 8F262A57-87FC-4305-8A54-69838B57DBC0
05/15/2023 | 2:16 PM EDT
District Two Professional Services Office, 1109 South Marion Avenue MS 2016, Lake City, Florida 32025-5874, (386) 758-3709, www.fdot.gov
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
AMENDMENT TO
STANDARD PROFESSIONAL SERVICES AGREEMENT
375-030-97
PROCUREMENT
12/22
IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed, the day and year first above written.
CONSULTANT STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
Kimley-Horn and Associates, Inc.
Name of Consultant
BY: BY:
Name: Name: Karen F. Ross
Title: Title: Procurement Services Manager
District 2
FOR DEPARTMENT USE ONLY
PROCUREMENT OFFICE REVIEW: LEGAL OFFICE REVIEW:
Procurement Office Legal Office
George Roland
Assistant Secretary
SR 222 from NW 95th Blvd to NW 40th Terrace
FPID: 447032-1-52-01 (Contract No. CAG86)
Alachua County
Scope of Services Summary - Amendment No. 2
January 30, 2023
Project Activity 3: General Tasks
1.) Based on coordination with FDOT PM (Michael Blakely) for the adjacent resurfacing project (FPID: 207611-5-52-01) as well as Alachua County’s request to provide Green
Colored Pav’t Markings (GCPM) at the NW 43rd St intersection the Department requested that we extend our project limits east such that this project provides coverage for the full extent of the GCPM’s.
2.) This amendment is for the extension of the end project limits from Mile Post 3.693 to
Mile Post 3.851. The new end project location will be just east of NW 40th Terrace.
3.) The additional design survey coverage will be accomplished under the original limiting amount survey task. No additional survey budget required for this amendment.
4.) Additional geotechnical effort is proposed to address additional areas of pavement distress identified during the Phase II plans review process as well as to provide soil parameters needed to support the design of an underdrain system to control groundwater seepage onto the sidewalk.
5.) Additional Project Manager Coordination effort for:
i. Coordination of end project location with adjacent in-house project PM
(Michael Blakely).
ii. Coordination to obtain design survey from adjacent project.
iii. Coordination with FDOT Gainesville Maintenance and FDOT Drainage regarding design of back of sidewalk underdrain system.
iv. ROW & Mapping: Discussion with FDOT regarding Right-of Entry
Agreements/PE's for any work outside SR 222 R/W.
v. Field Reviews: One (1) additional field review for project limit extension.
Project Activity 4: Roadway Analysis
1.) Typical Section Package: None - Assumes previously approved typical section package can be applied without any update required.
2.) Pavement Design Package: None – Assumes previously approved pavement design package ca be applied without any update required.
3.) Horizontal /Vertical Master Design Files: Extend BL of survey, proposed sidewalk replacement locations, proposed curb ramp and detectable warning surface replacement locations, proposed driveway replacement locations, and required labeling.
4.) Cross-Slope Correction: None anticipated – Extract and review existing cross-slope conditions from additional design survey data.
5.) Tree Disposition Plan: Included for coordination with District LA regarding tree trimming needed for new light poles proposed along side streets
SR 222 (39TH AVE) FROM NW 92ND CT TO NW 43RD ST
EXHIBIT "A"
6.) Design Report: Update 3R Report for additional project coverage.
7.) Quantities for EQ Report: Additional hours for the additional mileage due to project limits extension.
8.) Cost Estimate: Update Const Cost Estimate to include additional project limits.
9.) Field Reviews: One (1) additional site visit for the extended project limits.
Project Activity 5: Roadway Plans
1) Key Sheet: Update to reflect extended project limits.
2) Typical Sections: Update to reflected extended project limits as well as additional typical section details.
3) Project Layout: Modify one (1) sheet and add one (1) sheet to cover extended project limits.
4) Plan Sheet: Modify one (1) plan sheet and add one (1) new 40-scale sheet to cover extended project limits.
5) Project Control Sheet: Add (1) sheet to cover extended project limits.
Project Activity 6a: Drainage Analysis
1.) Other Drainage Analysis: Review of geotechnical data and design development of underdrain system to control groundwater seepage flowing over existing sidewalk
Project Activity 6b: Drainage Plans
1) Drainage Structures: Underdrain detail
2) Erosion Control Plan Sheets: Add two (2) sheets to cover the extended project limits.
Project Activity 7: Utilities
1) Collect and Review Plans and Data from UAO(s): Provide additional plan coverage limits to UAO’s. Incorporate additional RGB data into construction plans.
2) Design Meetings: Assumes no additional meeting will be required
Project Activity 19: Signing and Pavement Marking Analysis
1.) Traffic Data Analysis: Pull crash data records for additional plan coverage limits and incorporate data into 3R Report crash summary table
2.) Signing and Pavement Marking Master Design File: Update base file to reflect extended project limits.
3.) Quantities for EQ Report: Additional quantities for extended project limits.
4.) Cost Estimate: Included in roadway cost estimate effort
5.) Technical Special Provisions and Modified Special Provisions: Additional coordination and MSP approval for use of green colored pavement markings.
6.) Field Reviews: Included in roadway activity effort.
7.) Technical Meetings: Additional coordination with City of Gainesville for green colored pavement markings.
Project Activity 20: Signing & Pav’t Marking Plans
1) Key Sheet: Update to reflect extended project limits.
2) Plan Sheet: Modify One (1) plan sheet and add one (1) new sheet to cover extended project limits.
Project Activity 35: Geotechnical
1) Provide additional soil borings for areas of additional pavement distress identified by
FDOT Maintenance during phase II plans review.
2) Additional soil borings and testing to support design of underdrain system.
3) Develop recommendations for repair of pavement distress areas a well as design of underdrain system needed to control groundwater seepage over sidewalk
4) Update project geotechnical report to incorporate new geotechnical data and recommendations.
5) Field Review: One meeting to review existing pavement distress areas and area of groundwater seepage.
DocuSign Envelope ID: D8672457-3FDB-4433-B6BD-D400CBF83D85DocuSign Envelope ID: 8F262A57-87FC-4305-8A54-69838B57DBC0
DocuSign Envelope ID: D8672457-3FDB-4433-B6BD-D400CBF83D85DocuSign Envelope ID: 8F262A57-87FC-4305-8A54-69838B57DBC0
INSR ADDL SUBR
LTR INSR WVD
DATE (MM/DD/YYYY)
PRODUCER CONTACT
NAME:
FAXPHONE
(A/C, No):(A/C, No, Ext):
ADDRESS:
INSURER A :
INSURED INSURER B :
INSURER C :
INSURER D :
INSURER E :
INSURER F :
POLICY NUMBER
POLICY EFF POLICY EXP
TYPE OF INSURANCE LIMITS(MM/DD/YYYY) (MM/DD/YYYY)
COMMERCIAL GENERAL LIABILITY
AUTOMOBILE LIABILITY
UMBRELLA LIAB
EXCESS LIAB
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
AUTHORIZED REPRESENTATIVE
INSURER(S) AFFORDING COVERAGE NAIC #
Y / N
N / A (Mandatory in NH)
ANY PROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED?
EACH OCCURRENCE $
DAMAGE TO RENTED
$PREMISES (Ea occurrence)CLAIMS-MADE OCCUR
MED EXP (Any one person) $
PERSONAL & ADV INJURY $
GENERAL AGGREGATE $GEN'L AGGREGATE LIMIT APPLIES PER:
PRODUCTS - COMP/OP AGG $
PRO-
OTHER:
LOCJECT
COMBINED SINGLE LIMIT
$(Ea accident)
BODILY INJURY (Per person) $ANY AUTO OWNED SCHEDULED BODILY INJURY (Per accident) $AUTOS ONLY AUTOS
AUTOS ONLY
HIRED PROPERTY DAMAGE $
AUTOS ONLY (Per accident)
OCCUR EACH OCCURRENCE $
CLAIMS-MADE AGGREGATE $
DED RETENTION $ $
PER OTH-
STATUTE ER
E.L. EACH ACCIDENT $
E.L. DISEASE - EA EMPLOYEE $
If yes, describe under
E.L. DISEASE - POLICY LIMIT $DESCRIPTION OF OPERATIONS below
POLICY
NON-OWNED
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer any rights to the certificate holder in lieu of such endorsement(s).
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
CERTIFICATE HOLDER CANCELLATION
© 1988-2015 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORDACORD 25 (2016/03)
ACORDTM CERTIFICATE OF LIABILITY INSURANCE
Lloyd's of London
4/13/2023
Edgewood Partners Ins. Center 3780 Mansell Rd. Suite 370 Alpharetta, GA 30022
Jerry Noyola 770-220-7699 greylingcerts@greyling.com
Kimley-Horn and Associates, Inc.
421 Fayetteville Street Suite 600 Raleigh, NC 27601
085202
23-24
A Professional Liab B0146LDUSA2304949 04/01/2023 04/01/2024 Per Claim $2,000,000 Aggregate $2,000,000
Re: District Wide Traffic Operations Studies; CA056; FEID #F560885615; Michelle Mecca
Florida Department of Transportation District 2 Insurance Compliance 1109 South Marion Avenue, MS 2009 Lake City, FL 32025-0000
#S5482102/M5396862
KIMLASSClient#: 238109
JNO02
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
CAG86
5/11/2023
CONTRACT INFORMATION
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR ROBIN M. NAITOVE, CPA, COMPTROLLER ON 5/11/2023
Action: Supplemental
Reviewed or Approved: APPROVED
Organization Code: 55023010248
Expansion Option: A9
Object Code: 131500
Amount: $50,957.00
Financial Project: 44703213201
Work Activity (FCT): 119
CFDA:
Fiscal Year: 2023
Budget Entity: 55100100
Category/Category Year: 088849/23
Amendment ID: S001
Sequence: 00
User Assigned ID: AMD 02
Enc Line (6s)/Status: 0002/04
Total Amount: $50,957.00
Contract: CAG86
Contract Type: CJ - DESIGN BUILD PROPOSAL COMPENSATION (D/B PRO)
Vendor Name: KIMLEY-HORN AND ASSOCIATES,INC
Vendor ID: F560885615001
Beginning Date of This Agreement: 11/30/2021
Ending Date of This Agreement: 11/28/2031
Contract Total/Budgetary Ceiling: ct = $1,077,660.00
Method of Procurement: C - REQUEST FOR PROPOSAL (287.55,F. S.)
Description: Design: SR 222