This document is a Request for Technical Proposals from the Florida Department of Transportation (FDOT) for professional engineering services, specifically for design work on State Road (SR) 331 in Alachua County. The project involves two related roadway segments: SR 331 from SR 25 (US 441) to SR 26 and SR 222 from NW 95th Boulevard to NW 43rd Street. The advertisement (No. 22219) has shortlisted four consulting firms: G-A-I Consultants, Inc., Kimley-Horn and Associates, Inc., NV5, Inc., and Stantec Consulting Services, Inc.

The project is a resurfacing and rehabilitation effort with a total contract amount of approximately $1,396,531 across two projects. The primary objectives include extending the pavement service life, enhancing corridor safety, and implementing Americans with Disabilities Act (ADA) upgrades. The contract will be awarded using a Letter of Response and Abbreviated Technical Proposal selection method, with a professional liability insurance requirement of $250,000. The project has an under-utilized work group focus on Highway Design - Roadway, and consultants are encouraged to propose Disadvantaged Business Enterprises (DBE) or Small Businesses for these work groups. The contract duration is anticipated to be 24 months, with a planned execution date of November 3, 2021, and key design elements include pavement milling, intersection improvements, lighting retrofits, and pedestrian facility enhancements.

View the file

Other files

File Type Posted
CN-550000-AT107-W0010000.pdf PDF
CN-550000-CAG86-00030000.pdf PDF
CN-550000-CAG86-00020000.pdf PDF
CN-550000-CAG86-00050000.pdf PDF
CN-550000-CAG86-S0010000.pdf PDF
CN-550000-CAG86-S0020000.pdf PDF
CN-550000-CAG86-00040000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AD INFO

(/Advertisement/AdInfo?

(/AdContractProcr/Tracking?

adKey=11448)

CONTRACT

TRACKING

adKey=11448)

NOTES

(/AdContractProcr/Notes?

adKey=11448)

FINANCIAL

NUMBERS

(/AdContractProcr/Financial?

adKey=11448)

SCHEDULE

(/AdSchedule?

adKey=11448)

DOCUMENTS

(/Notice/Documents/11448)

PUBLISHING

(/AdPublishing?

adKey=11448)

SELECTION

(/AdSelection?

adKey=11448)

Professional Services Advertisement District: 02 Advertisement: 22219 | |

Design: SR331 from SR25 (US441) to SR26 (LEAD

PROJECT)

Read Mode

Publishing

Short List Posting:

Final Selection Posting:

Advertisement

Publication

Control

Published to Planned on this date:

1/13/21 4:00 PM

Published to Current on this date:

6/21/21 4:00 PM

Send Email of Advertisement

Changes

Yes No

Yes No

The following fields are required before you can publish this advertisement:

The following fields are optional for publishing this advertisement:

1. Financial

Management

Numbers

2. Longlist

Date/Time

3. Techinical

Review

Committee

Meeting

Date

(s)

Advertisement Preview

Advertisement Selection Results

Professional Services Advertisement - 22219

Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified

& Unlimited Audit required)

Page 1 of 4Procurement Development Application -

7/6/2021https://pdainternal.fdot.gov/AdPublishing?adKey=11448

District : 02

Major Work :

3.1— Minor Highway Design

Minor Work :

4.1.1— Miscellaneous Structures

7.1— Signing, Pavement Marking & Channelization

7.2— Lighting

7.3— Signalization

8.2— Design, Right of Way, Construction Surveying

8.3— Photogrammetric Mapping

9.1— Soil Exploration

9.2— Geotechnical Classification Lab Testing

Under-Utilized Work Groups :

GROUP 3 — Highway Design - Roadway

Selection Method : Letter of Response and Abbreviated Technical Proposal

Professional Liability Insurance : $250,000.00

Project Description :

Design: SR331 from SR25 (US441) to SR26 (LEAD PROJECT)

Project Manager : Orlando Cordero

Number of contracts that may be awarded from this advertisement : 2

Contract Amount/Limit : $548,772.00

TRC Members (Subject to Change) :

Aaron Kaster

Alan Owens

Orlando Cordero

See Standard Notes List :

Type Note

Page 2 of 4Procurement Development Application -

Type Note

Standard

Note 8

Standard Note 8 - Under-Utilization Goal for DBEs and Small Businesses - The goal of the Department’s Under-Utilization strategy is to encourage and promote use of

Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. The specific Under-

Utilized Work Groups are identified in the advertisement. Consultants are strongly encouraged to propose a DBE or Small Business to perform services for each Under-

Utilized Work Group identified in the advertisement. DBEs or Small Businesses can be proposed at either the Prime or Sub-level for the Under-Utilized Work Group(s). Use of

Under-Utilized DBEs or Small Businesses for Consultant teaming is a shortlist consideration factor for projects referencing this Standard Note. Consultants are requested to indicate your firm's proposed use of DBEs and/or Small Business primes or subconsultants to meet Under-Utilization goals on the table within the Professional

Services Letter of Response form (as designated in the advertisement) by checking the box under the Under-Utilization (UU) column. Failure to list DBEs and/or Small

Business prime or subconsultants on the response form shall indicate no proposed utilization. Please refer to the advertisement for other submittal directions. Reports are available at the following locations to validate status of firms as Small Businesses and

DBEs (Check DBE & Small Business columns for status): DBE listing for Professional

Services:https://www.fdot.gov/procurement/InternetReports.shtm#qual Small Business listing for Professional Services:

https://www.fdot.gov/procurement/InternetReports.shtm#qual Additionally, firms will submit the Professional Services Commitment form as required by the advertisement when selecting from Expanded Letters of Response, otherwise it will be required with the Request for Proposal.

Notes :

Type Note

Advertisement

Special Notes

FIRST PROJECT: 447962-1-32-01 (LEAD PROJECT)

$847,759.00

SR 331 from SR 25 (US441) to SW 26

Project Manager: Orlando Cordero

SECOND PROJECT: 447032-1-32-01

$548,772.00

SR 222 (39th Ave) from NW 92nd Ct to NW 95th Blvd

Project Manager: Aaron Kaster

Shortlist Designee: Will Lyons

When responding to the Advertisement reference the first project (FM Number

447962-1-32-01)

Shortlist Designee: Will Lyons

Scope of Services / Attachments :

44796213201 SOS Stage 1 (LEAD Project).pdf

44703213201 SOS Stage 1.pdf

Schedule - The times displayed are automatically adjusted for the time zone of your system :

Type Date - Time

Page 3 of 4Procurement Development Application -

Type Date - Time

Advertisement Date 6/21/2021

Response Deadline Date/Time 7/06/2021 05:00 pm

Shortlist Selection Date/Time 7/19/2021 10:00 am

Final Selection Date/Time 8/23/2021 10:00 am

Negotiations Period Begin Date 8/23/2021

Negotiations Period Ending Date 10/11/2021

Respond To :

Attn.: Lynne Crawford

Submittals must be sent to: d2.profserv@dot.state.fl.us

Phone: 386-961-7835

Physical Address:

1109 South Marion Avenue

MS 2016

Lake City , FL 32025-5874

Service Desk:

fdot.servicedesk@dot.state.fl.us (mailto:fdot.servicedesk@dot.state.fl.us?subject=Procurement Development Application (PDA)

Question)

Or call 1-866-955-4357(HELP)

Accessibility Statement (http://www.fdot.gov/agencyresources/notices/accessibility.shtm) Grid Help Web Policies & Notices

(https://www.fdot.gov/agencyresources/webpoliciesandnotices.shtm) MyFlorida.com (http://www.myFlorida.com)

Page 4 of 4Procurement Development Application -

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

PROFESSIONAL SERVICES LETTER OF RESPONSE

375-030-22

PROCUREMENT

04/18

Advertisement No.: 22219 DOT FM Number: 447962-1-32-01

Submittal Date: 7/6/2021 Project Name: Design Services: SR 331 from SR 25 (US 441) to

South of SR 26 (Univ. Ave).

Consultant’s Name: Kimley-Horn and Associates, Inc.

(Firm must use the name shown on the Consultant’s qualification letter.)

Street Address: 12740 Gran Bay Parkway West, Suite 2350

City: Jacksonville State: Florida Zip: 32258

Office Location: Jacksonville Contact person: Earl Wills, P.E.

Phone: 904.828.3942 Contact email: earl.wills@kimley-horn.com By submittal of this letter the Consultant certifies that all information provided in the letter is true and accurate. The Consultant further certifies that staff proposed are currently employed by the firm(s) identified, or the Consultant shall provide a statement indicating when staff will become employed by the identified firm(s).

The Letter of Response should address the following information:

• Proposed approach and understanding of critical issues.

• Relevant project experience – Similar type of work experience.

• Other content provided by firm.

• Proposed key personnel and their proposed roles (do not include resumes) .

Consultants: Please be aware that all font (including font in graphics, tables, and captions on photos) must be standard Arial

Narrow, 11 point, single line spacing with no modification of font or spacing allowed. ½” clear margin on all sides must be maintained on all pages. It is the Consultant’s responsibility, due to font and format restrictions within this form, to work within the constraints of the form and its format. Character styling such as use of color, bold, and italics is allowed. Use of a table is recommended for text boxes. The page layout may be modified to add columns, tables, graphics, and photos. All graphics and photos must be created in a clean, blank word document and the “text wrapping square” option applied before cutting and pasting into this form. Consultants may add their logo at the top of the first page (directly underneath the header), however, the Consultant shall not extend the form beyond the pages allocated for the Letter to accommodate insertion of the logo. Consultants are not permitted to insert any other information in the header other than the logo. After pasting your letter into this form, highlight all text and ensure the font size of Arial Narrow, 11 point was retained. Once your content is inserted, delete any additional blank pages that are generated by pressing your delete key after the last word in the Letter of Response. Recreation of the form in another software application to modify the form format is not permitted. This form works best when saved with a .docx extension. *Please retain the source document as it may be requested at a later date in the procurement, to verify adherence with aforementioned restrictions. Note: You may begin typing on this page.

Kimley-Horn values our longstanding relationship with District Two and we are extremely interested in continuing our very successful working relationship on this SR 331 resurfacing project. We are pleased to submit this letter of interest for professional engineering and plans production services for the resurfacing of SR 331 (SE 11th St) from east of US 441 to south of SR 26 (University Ave). We have assembled a highly skilled design team with proven arterial roadway resurfacing design expertise for District Two. In addition, Kimley-

Horn has a great deal of experience in the City of Gainesville having recently completed the SR 121 intersection improvement project and several FDOT lighting and signalization projects throughout the City. Over the last 15 years, Kimley-Horn has consistently delivered innovative, high-quality design services to District Two. A strong indication of our team’s commitment to District Two is demonstrated by the fact that the last three projects we completed for the District (SR 10, SR 5A, and SR 121) were all completed ahead of schedule, allowing the District to advance production and save time.

UNDERSTANDING Our team has a thorough understanding of the SR 331 corridor having completed several safety studies as well as the pushbutton construction plans for the signalized Gainesville-Hawthorne Trail crossing within this segment. It is this experience in the project corridor and our experience coordinating with the local agencies (City of Gainesville, Gainesville Regional Transit, and

Gainesville Regional Utilities) that gives our team unrivaled knowledge and understanding of what it will take to deliver this SR 331 project on or ahead of schedule, if needed. In anticipation of this project, our team conducted several site visits, and reviewed previous and ongoing project plans in the project limits. We also met with the Department’s Shortlist Designee (Will Lyons) and TRC members (Orlando Cordero, Aaron Kaster, and Alan Owens) to get a better understanding of the project’s objectives.

375-030-22

PROCUREMENT

PROJECT APPROACH/ISSUES The primary purpose of this project is to extend the service life of the existing SR 331 pavement through milling and resurfacing and to enhance the safety of the corridor. The milling and resurfacing will include mainline SR 331 pavement from the existing pavement seam just east of US 441 to the existing seam just south of SR 26. ADA features will be reviewed and required upgrades to current standards will be incorporated. Lighting for all existing crosswalks will be evaluated and where found to be non-compliant with current vertical illuminance standards, additional lighting will be included. As part of the RRR evaluation, we will review existing roadway and pedestrian facilities and compare them against current RRR criteria as defined in the FDOT Design Manual and provide cost-effective improvement recommendations for inclusion in the final contract documents. Some key issues to be addressed during the design phase include:

Coordination with Adjacent Projects Within the limits of this SR 331 resurfacing project, we understand the Department will be developing a concurrent signalization upgrade project (FPID 435890-1-32-01) for the SR 331 intersections with SE 2nd Ave and SE 4th Ave. Coordinating with the FDOT design project manager and consultant for these two signalized intersections will be important to enure there is no duplication/overlap of work and that each of these intersections are brought up to current ADA and FDOT lighting standards. Also, as part of a pushbutton construction project, Kimley-Horn is preparing midblock pedestrian signalization plans for the Gainesville/Hawthorne Trail crossing of SR 331 (MP 2.2) under FPID 447629-3-52-01. We will ensure early communication with all adjacent project representatives to ensure smooth coordination and efficient project delivery.

Safety Analysis A key element of all RRR design projects is the review and evaluation of existing crash data along with cost effective recommendations to mitigate high crash areas. During our field reviews, the Kimley-Horn team was approached by several residents in the northern portion of the project who expressed their concerns about excessive speeding. In this segment of SR 331, a total of 571 crashes have been reported within the last certified 5-year crash data period (2014-2018). Of these crashes, 220 resulted in serious injury—including 2 fatalities. Twenty-three percent of the crashes occurred under dark conditions and 17% occurred under wet pavement conditions. The predominant crash types were rear-end crashes (47%) followed by angle/left-turn crashes (20%). Of the total crashes, 13 involved pedestrians and bicyclists. The safety of all users is of utmost importance to us and will be prioritized in design.

Typical Section This segment of SR 331 is designated as an urban arterial with a Context Classification that ranges from C1-Rural to C4-Urban. The design speed established throughout the project limits is 45 mph and the posted speed varies from 45 mph for the southern half to 35 mph in the more developed northern half. This segment of SR 331 serves as a truck by-pass route around the east side of Gainesville and the consideration of truck traffic will be an important element of the RRR design evaluation and pavement design. The typical section is a four-lane urban typical section with 12-ft. travel lanes and 5-ft. buffered bike lanes along the outside.

The median is raised with type E curbing and an overall width of 19.5 ft. Pedestrians are accommodated via 5-ft. sidewalks. The sidewalk along the west side of the roadway is continuous throughout the project; however, along the east side, the sidewalk begins at SE 1st Street (north of Sweetwater Wetlands Park). We will address the connectivity of these sidewalks to ensure safe travel for pedestrians.

Transit Stop Access Our site review noted several bus transit stops along the west side of the corridor. These stops are officially designated Gainesville Regional Transit System (RTS) stops; however, they do not currently provide proper ADA access from the sidewalk to the roadside curb. As part of this project, we recommend that ADA-compliant landing areas be provided. In addition, as part of the design development, we will coordinate with RTS to establish temporary bus stop locations as needed during construction to ensure there is no interruption to bus service for the corridor.

Gravity Wall Repair During our site review, we confirmed the need to repair/replace a section of the existing back of sidewalk gravity wall system located along the west side of the project just south of SE 16th Ave. The extent of the wall cracking is evidenced in the adjacent site photo. Our field measurements confirm that approximately 50 ft. of the existing wall exhibits significant surface cracking and this same section of wall has also rotated from vertical. Based on our review of the old plans and R/W maps, there appears to be approximately 15 ft. of additional R/W behind the gravity wall that will allow for removal and replacement of the damaged wall section without the need for any additional R/W or temporary construction easements.

School Zone Signing & Pavement Markings A designated school zone for Abraham Lincoln Middle School exists between SE 12th Ave and SE 9th Ave. This school zone does not fully comply with the current standards. It does, however, provide the key elements of the current standard that Kimley-Horn developed for District Two as part of a past traffic operations study. As a cost savings initiative, we recommend that this existing school zone be allowed to remain with only minor sign panel upgrades, the addition of supplemental signing, and retention of the existing mast arm structures. Full compliance with the current standard at this location would require additional sign loading on the existing mast arm structures that they physically could not support. As a practical design approach, we would recommend a design variation for the school zone standard be approved thereby saving the Department more than $100,000 in replacement mast arm structure costs.

Damage to existing gravity wall

Intersection and Pedestrian Crosswalk Lighting Kimley-Horn’s lighting design engineers have extensive experience in intersection pedestrian lighting design retrofits—most recently on the SR 121 project (FPID 439488-1) in Gainesville. We have already designed new lighting for the future Gainesville-Hawthorne Trail crossing and have extensive experience coordinating lighting improvements with the local maintaining agency (GRU). Evaluating the current lighting at the five intersections where SR 331 pedestrian crossings are designated will be a key element of our Phase I RRR Report.

SIMILAR PROJECT EXPERIENCE The Kimley-Horn team has significant past design experience for District Two and most importantly, a proven record of delivering high-quality design plans on schedule.

Recent relevant projects our team has successfully completed (or are in the process of wrapping up) for the Department include:

▪ SR 121 (SW 34th St) from SR 26A to SR 26, FDOT District Two: Intersection operational and safety improvements including milling and resurfacing, signalization, specialized bicycle lane improvements, and pedestrian lighting.

▪ SR 5 (Philips Highway) from SR 154 to SR 109, FDOT District Two: Resurfacing of a 3-mile section of 4-lane urban arterial through heavy commercial/industrial land use. Project includes cross slope correction of substandard pavement sections and the reconstruction of three signalized intersections.

▪ SR 24 and SR 26 Pedestrian Lighting Retrofits, FDOT District Two: Retrofit lighting design/plans to bring existing signalized intersections in and around the University of Florida up to current FDOT illumination standards. Involved extensive coordination with Gainesville Regional Utilities to ensure lighting equipment specified would be maintained by GRU.

EXCEPTIONAL PROJECT TEAM We have assembled a highly qualified team of proven professionals with a record of delivering roadway design projects for District Two. Our team has extensive experience coordinating with the local agencies involved in this project (City of Gainesville, Regional Transit System and GRU). The City of Gainesville is typically very engaged in design and safety reviews; having a consultant who has a successful working history with the City will be key to delivering this project on time. The Kimley-Horn team is pre-qualified in all the required work groups and is available to begin work on this contract immediately. Key team members include Earl Wills, P.E. who will serve as Kimley-Horn’s project manager and the District’s primary point of contact. Earl has more than 30 years of FDOT roadway design experience—the last 20 years of which have been within District Two. Working with Earl as lead roadway design engineer will be Brandon Kern, P.E. Brandon and Earl have worked together most recently on the SR 121 project just constructed in Gainesville and the SR 5 Resurfacing project in Jacksonville. Brandon has extensive experience in similar roadway resurfacing design, as well as coordinating projects for FDOT within the City of Gainesville. Michelle Mecca, P.E., RSP1 will serve as task manager for all safety evaluation efforts. Michelle has unmatched safety experience having served as project manager on Districtwide Safety Study contracts in District Two for the past 16 years.

To complete our design team, we have partnered with subconsultants with whom we have a successfully working relationship and who have a thorough understanding of what it takes to efficiently complete design projects for District Two. Our proposed design support subconsultants along with their proposed roles are noted on the chart to the right. Kimley-Horn is committed to helping the Department meet its DBE goals, as evidenced by our DBE utilization grades of A and A+ for the past two years.

AVAILABILITY Kimley-Horn has only one active roadway design contract (SR 5) and needs this SR 331 project to keep our staff working for District Two. If needed, our team can commit to producing this project on an accelerated schedule. We are currently on schedule to complete the SR 5 project in Fall 2021, which makes our entire Jacksonville-based design team available to immediately begin work on this contract.

QUALITY ASSURANCE/QUALITY CONTROL (QA/QC) One of the key elements to Kimley-Horn’s success has been the incorporation of an exceptional QA/QC program. Quality assurance is initiated at the kick-off of every project. An independent QC team is established and led by a senior design professional. The success of our QA/QC program is reflected in the high grades received on recent projects we have delivered for District Two.

We look forward to presenting our qualifications in greater detail and to partnering with you to deliver another successful project.

Key Kimley-Horn Team Members

Project Manager Earl Wills, P.E.

QA/QC

Gary Nadeau, P.E.

Roadway Brandon Kern, P.E.

George Roland, P.E.

Earl Wills, P.E.

Alex Cremeans, E.I.

Drainage

Victor Gallo, P.E.

Safety Evaluation

Michelle Mecca, P.E., RSP1 Signing/Pavement Marking

Hao Chau, P.E.

Signalization

Wendy Krehbiel, P.E., RSP2I Lighting

Jordan Leep, P.E., PMP

Subconsultants

Survey Eddie Shaffer, PSM1 Pablo Ferrari, PSM2

Geotechnical Matt Landschoot, P.E.3

Roadway Design Support Ali Najafi, P.E.4

Miscellaneous Structures Chris Morse, P.E.4

1. Southeastern Surveying

2. Geomatics Corp. (DBE)

3. Enviro & Geotech Specialists, Inc. (DBE)

4. Civil Services, Inc. (DBE)

FDOT District Two, Average Kimley-Horn Work Group 3 & 6 Grades

Quality Schedule Management Construction

3.9 4.0 4.0 4.7

Prequalification of Prime Consultant and any proposed Subconsultants by advertised type(s) of work :

Consultant Name Project Advertised Major & Minor Work Types

3.1 4.1.1 7.1 7.2 7.3 8.2 8.3 9.1 9.2 DBE SB UU

Prime Kimley-Horn and Associates, Inc.

S u b c o n s u lt a n ts

Civil Services, Inc.

Southeastern Surveying and Mapping Corporation

Environmental and Geotechnical Specialtists, Inc.

Geomatics Corp.

SB = Small Business UU = Under-utilized work type; subconsultant is a professional services firm and is prequalif ied in the Under-Utilized Work Group. Refer to the advertisement for applicability.

My firm has submitted a Bid Opportunity List through the Equal Opportunity Compliance System for this project.

https://fdotwp1.dot.state.fl.us/EqualOpportunityCompliance/Account.aspx/LogIn?ReturnUrl=%2fEqualOpportunityCompliance

File details come from the government source that posted it. Updated .