CN-550000-CAA84-S0030000.pdf
PDF 178 KB Posted
- Contract number
- CAA84
- Issued by
- Florida
About this file
This document is an Amendment (Number 3) to a Standard Professional Services Agreement between the State of Florida Department of Transportation (FDOT) and Patel, Greene and Associates, LLC, located in District Five, covering a project in Osceola County. The original agreement (Contract No. CAA84) was initially executed on 11/23/2020 and involves the SR 60 roadway project from Blanket Bay Slough to Peavine Trail, with Financial Project ID 443702-1-32-01.
The amendment increases the total maximum limiting amount by $120,349.00, bringing the revised contract total to $1,620,291.00. The scope of services includes updating construction plans, performing plans updates to reflect right-of-way acquisition, making minor modifications based on 100% plans comments, and addressing various technical aspects such as environmental permits, wetland boundary assessments, utility certifications, signing and pavement markings, and 3D modeling updates. The amendment extends the project completion time through 12/1/2025 and incorporates additional attachments, including a detailed Contract Compensation Summary that breaks down costs for various services across multiple subconsultants like McKim & Creed, Inc. and Brindley Pieters and Associates, Inc.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAA84-S0050200.pdf | ||
| ContractBudgetExport.csv | CSV file | |
| CN-550000-CAA84-S0050000.pdf | ||
| CN-550000-CAA84-S0050100.pdf | ||
| CN-550000-CAA84.pdf | ||
| CN-550000-CAA84-S0040000.pdf | ||
| CN-550000-AT207-W0010000.pdf | ||
| CN-550000-CAA84-S0010000.pdf | ||
| CN-550000-CAA84-S0020000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
District Five Professional Services Office, 719 South Woodland Blvd. MS 4-524, Deland, Florida 32720, (386) 943-5526, www.fdot.gov
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
AMENDMENT TO
STANDARD PROFESSIONAL SERVICES AGREEMENT
375-030-97
PROCUREMENT
12/22
Amendment Number: 3 Amendment Execution Date:
Original Agreement No.: CAA84 Original Agreement Execution Date: 11/23/2020
Consultant Name: Patel, Greene and Associates, LLC
FM Number(s): 443702-1-32-01
Agreement Description: SR 60 passing lanes eastbound from MP 6.945 to MP 8.316 and westbound from MP 9.587 to MP 10.958, Osceola County; SR 60 Safety Improvements from West of Three Lakes WMA to East of Peavine Road, Osceola County
Purpose of Amendment: Add Funds, Time Extension, Incorporate attachments to the contract
The terms of the original agreement referenced above are hereby amended:
The total maximum limiting amount of $1,499,942.00 for all services required under the original agreement and all supplements and amendments thereto is herein increased by $120,349.00. The revised total maximum limiting amount for all services is $1,620,291.00. The services specified in Exhibit “A”, Scope of Services of the original agreement are amended and attached as Exhibit "A".
Section 2.B. of the Standard Professional Services Agreement is revised to extend the time period for completion of basic project services through 12/1/2025.
The following attachments are hereby incorporated into this Amendment:
Exhibit “A”, Scope of Services, pages A-1 to A-3 Attachment No. 1: Contract Compensation Summary
Except as hereby modified, amended, or changed, all of the terms and conditions of said original agreement and any supplements and amendments thereto will remain in full force and effect.
IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed, the day and year first above written.
CONSULTANT STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
Patel, Greene and Associates, LLC Name of Consultant
BY: BY:
Name: Name: C. Jack Adkins
Title: Title: Director of Transportation Development
District Five
FOR DEPARTMENT USE ONLY
PROCUREMENT OFFICE REVIEW: LEGAL OFFICE REVIEW:
Procurement Office Legal Office
DocuSign Envelope ID: CE977A02-A821-4858-9173-2FD99654D172
Hiren Patel
President
07/27/2023 | 11:44 AM EDT
FPID: 443702-1-32-01
A-1
EXHIBIT “A”
SUPPLEMENTAL AMENDMENT NO. 3
SCOPE OF SERVICES
FOR
SR 60 from BLANKET BAY SLOUGH TO PEAVINE TRAIL
OSCEOLA COUNTY
FINANCIAL PROJECT ID(S). 443702-1-32-01
CONTRACT NO. CAA84
I. BACKGROUND
The CONSULTANT was retained by the DEPARTMENT to update construction plans for SR 60 FROM BLANKET BAY SLOUGH TO PEAVINE TRAIL widening for EB/WB Passing Lanes in Osceola County.
II. OBJECTIVE
This amendment provides for the CONSULTANT to furnish Plans Updates as required for the project.
III. SERVICES
A. Plans Update
Plans Update consists of making modifications to the Construction Documents, as required by the completion of the R/W Acquisition process, pending comments and coordination efforts as of the 100% Plans submittal, and any other updates that were not covered by the initial design contract.
These services are intended to handle changed conditions and/or services not covered in either the original contract. The services are not intended for instances of CONSULTANT errors and/or omissions.
Services may include, but are not limited to:
DocuSign Envelope ID: CE977A02-A821-4858-9173-2FD99654D172
A-2
1. Project Common and Project General Tasks (Activity 3)
Specification Package Preparation: Complete Specifications package to include any TSPs or MSPs needed.
2. Roadway (Activities 4 and 5)
Plan Type: Plan only; 100% Plans to be updated to reflect R/W acquisition, minor updates based on comments received after 100% Plans, and any other remaining items at the 100% Plans submittal that were not previously covered under the original contract.
Pavement Design: Minor updates to pavement design package based on comments received after 100% Plans.
Level of TTCP: Level II TTCP; minor updates to TTCP to accommodate cross drain replacements decided after 100% Plans.
3. Drainage (Activities 6a and 6b)
Plan Type: Plan only; 100% Plans to be updated to reflect 2 full cross-drain replacements, minor updates based on comments received after 100% Plans, and any other remaining items at the 100% Plans submittal that were not previously covered under the original contract.
4. Utilities (Activity 7)
Utility Contact
Utility Certification
5. Environmental Permits and Environmental Clearances (Activity 8)
Field Work: Reflag wetland boundaries and location of Pond 100. Additional site visits required with FDEP to coordinate and verify wetland boundaries.
Complete and Submit All Required Permit Applications: Modify the permit applications to SFWMD and FDEP with the revised plans showing the culvert replacement locations and plans. Review and comment on revised dredge and fill sheets developed by engineer.
A-3
Regulatory Agency Support: Provide miscellaneous support for wetland boundaries and assessments, mitigation, and data forms.
Technical Meetings: Permitting discussions, field debriefs, and drafting notes after meetings with FDEP.
6. Signing and Pavement Markings (Activities 19 and 20)
Design updates: Change audible and vibratory pavement marking type per RDB 22-04 along edge lines and center lane lines of 2-lane undivided high-speed arterial. Conduct field review to verify any changes to signage after last field review.
Plan Type: Plans to be updated to reflect R/W acquisition, minor updates based on comments received after 100% Plans, and any other remaining items at the 100% Plans submittal that were not previously covered under the original contract.
7. 3D Modeling (Activity 36)
Updates to 3D model based on comments received at 100% Plans. Includes updates to Templates to address pavement design changes, incorporating the culvert replacements, and any other refinements needed for a complete 3D model.
IV. PROVISIONS FOR WORK
All services shall be performed in accordance with the governing provisions outlined in the Original Agreement except as modified herein.
V. DEPARTMENT RESPONSIBILITIES
The DEPARTMENT shall provide the services outlined in the Original Agreement except as modified herein.
This Amendment No. 3 Revised Contract
Totals
443702-1-32-01 445697-1-32-01 445697-1-62-02 443702-1-32-01
LUMP SUM AMOUNTS:
Basic Services (LS-2)
Patel, Greene and Associates, LLC $966,973.00 $205,141.00 $0.00 $110,286.00 $1,282,400.00
Brindley Pieters and Associates, Inc. $5,168.00 $10,335.00 $0.00 $10,063.00 $25,566.00
Right of Way Map (LS-2)
McKim & Creed, Inc. $19,542.00 $0.00 $0.00 $0.00 $19,542.00
Optional Services (LS-2)
Patel, Greene and Associates, LLC $44,478.00 $0.00 $0.00 $0.00 $44,478.00
SUBTOTAL LUMP SUM $1,036,161.00 $215,476.00 $0.00 $120,349.00 $1,371,986.00
Survey Services (LA-4) #
McKim & Creed, Inc. $24,031.00 $21,787.00 $0.00 $0.00 $45,818.00
Supplemental Survey Services (LA-4) #
McKim & Creed, Inc. $44,340.00 $8,797.00 $0.00 $0.00 $53,137.00
Legal Descriptions (LA-4) #
McKim & Creed, Inc. $2,973.00 $0.00 $0.00 $0.00 $2,973.00
McKim & Creed, Inc. $4,684.00 $0.00 $0.00 $0.00 $4,684.00
SUE Services (LA-4) #
McKim & Creed, Inc. $14,421.00 $8,653.00 $0.00 $0.00 $23,074.00
Geotechnical and Environmental Consultants, Inc. $98,674.00 $0.00 $0.00 $0.00 $98,674.00
Patel, Greene and Associates, LLC $0.00 $0.00 $19,945.00 $0.00 $19,945.00
SUBTOTAL LIMITING AMOUNT $189,123.00 $39,237.00 $19,945.00 $0.00 $248,305.00
$1,225,284.00 $254,713.00 $19,945.00 $120,349.00 $1,620,291.00 #Estimated, non-binding limits are provided for project management purposes.
POST DESIGN SERVICES:
Post Design Services (LA-4) #
TOTAL MAXIMUM LIMITING AMOUNT
ATTACHMENT NO. 1: CONTRACT COMPENSATION SUMMARY
Financial Project ID Nos.
LIMITING AMOUNTS:
Supplemental Mapping (LA-4) #
Original Agreement through Am No. 2
Geotechnical Services (LA-4) #
CAA84, Amendment #3
File details come from the government source that posted it. Updated .