CN-550000-C9Z54-00110000.pdf
PDF 367 KB Posted
- Contract number
- CAU41
- Issued by
- Florida
About this file
This document is a Task Work Order Amendment (Revision 05) issued by the Florida Department of Transportation (FDOT) to H.W. Lochner, Inc., a consulting firm, for the Tampa Bay Next (TBNext) Support Services Continuing Contract. The contract is identified by Contract No. C9Z54 and Financial Project No. 437199-4-32-02, and involves professional engineering and support services for a transportation infrastructure project in the Tampa Bay region.
The amendment increases the task work order amount by $1,000,000, bringing the total authorization to $4,174,976.00. The scope of services includes comprehensive engineering support across multiple disciplines such as roadway analysis, structures design, drainage, utilities, environmental permits, signing and pavement marking, signalization, lighting, intelligent transportation systems, and 3D modeling. The services are to be performed using various job classifications including engineers, planners, designers, and technical specialists, with a detailed fee estimate breaking down man-hours and loaded rates for each classification. The contract allows for flexibility, with all classifications listed in the contract being eligible to work on this task work order.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAU41.pdf | ||
| CN-550000-CAU41-00010000.pdf | ||
| CN-550000-CAU41-00020000.pdf | ||
| CN-550000-CAU41-00030000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER AMENDMENT FORM
FOR PROFESSIONAL SERVICES
375-030-26
PROCUREMENT
06/17 recovered is $ .
1,000,000.00 .
Subtotal Estimate/L imit
$3,900,000.00 Estimate
$0.00
$0.00
$0.00
$0.00
$0.00
$3,900,000.00
$0.00
$3,900,000.00
Attachments:
Distribution:
Payment FM No. (must be the same as original Task Work Order):
437199 4 32 02
Check all applicable Terms:
Change in staff hours due to fluctuations in responsibilities and to add additional funds.
All classifications listed in the contract are eligible to work on this task work order.
4350 West Cypress Street, Suite 800 Tampa, FL 33607 Attn: David Twiddy, Jr.
H.W. Lochner, Inc.
Address:
Consultant:
Date (To be entered upon execution of Task Work Order Amendment):Contract No.:
C9Z54
Purpose of Amendment:
Amendment No.
to Task Work Order No.
$4,174,976.00
(Name) (Title) Signature
Rebecca L. Schwarz Procurement Services Manager
M.L. Godfrey, M.C. Turosz, I. Ríos Santiago, D7FSContractDocs
Consultant Acceptance:
(Title) Signature(Name)
Compensation Element
Description
This Amendment
Amount
Loaded Labor Rates $1,000,000.00
Previous
Amount
$2,900,000.00
Method of Compensation
(LA4) Units worked at loaded billing rates in
Table 6 authorized against this task work order beyond the date of execution of this amendment. The following amount is the remaining work order balance to be recovered
The time for completion of services for the subject task work order is extended thru
The total amount for services performed under this task work order is increased by $
The total amount for services performed under this task work order is decreased by $
The decrease in funds will be allocated to the following compensation elements described below.
elements are described below.
from this task work order $ . Note: for Prof. Serv. Task Work Order Amendments, the encumbrance line should never be closed
The subject task work order is hereby closed. Final payment for the task work order has been set to PAID status in CITS. No additional services or charges are
(Status 50) by Financial Services staff based on this selection. Additional Note: Please be sure you want to close out before marking. Premature close outs that must
The subject task work order is hereby canceled (no work has been performed and no payment is due). The total amount of the task work order which is
The additional funds will be allocated to the following compensation elements described below.
There is no increase/decrease in the task work order amount, funds are only redistributed between compensation elements. Revised compensation be corrected in CITS may require programmer time and costs borne by the program office.
$1,000,000.00
$0.00
$1,000,000.00
Tampa Bay Next (TBNext) Support Services - Continuing
Departmental Approval:
Total authorizations to date (including this one):
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
Page 1 subtotal
Page 2 thru 6 Subtotal
Total
G:\Professional Services\CONTRACT.398\437xxxx\43719943.202 C 9Z54 18740\TWOs\1A5 TWO
DocuSign Envelope ID: 41E9C51C-4D51-4611-8914-4EF881CA43CE
Donald Skelton, PE Vice President
March 2, 2021
ATTACHMENT “A”
SCOPE OF SERVICES
TAMPA BAY NEXT (TBNext) SUPPORT SERVICES - CONTINUING
CONTRACT NO. C9Z54
FINANCIAL PROJECT NO. 437199-4-32-02
TASK WORK ORDER NO. ONE (01) Revision 05
General Support Services
1. PURPOSE
H.W. Lochner, Inc. (hereinafter referred to as the CONSULTANT) shall act as an extension of the Florida Department of Transportation (hereinafter referred to as
DEPARTMENT) for the purpose of General Support Services for the Tampa Bay Next
(TBNext) project. The management and administrative services necessary to the
DEPARTMENT program, but not specific to any individual project assigned, are addressed herein. Included shall be services of a general nature such as overall management, administrative support, development of procedures and guidelines and other general work efforts which apply to work assignments and management of sub-consultants. Engineering and design services shall include, but not be limited to, plans review, pavement design, traffic modelling, concept design, Concept Development Plans (CDP), proof of concept evaluation, 3-D design, 3-D modelling, drainage design, permitting, traffic control, traffic design, master signing plans, constructability, value engineering, cost estimating, project management services, project scheduling and technical services required in connection with services performed by Consultants to the DEPARTMENT. Perform Work Program support as requested by the DEPARTMENT.
2. SCOPE OF SERVICES
This Revision to the Original Task Work Order is for a change in staff hours due to fluctuations in responsibilities and to add additional funds to the contract. The Scope of Services headings correspond to the executed Tampa Bay Next (TBNext) Continuing Services Contract Supplemental Amendment 01. The CONSULTANT shall provide the following services:
2.1 Project General and Roadway
3 PROJECT GENERAL AND COMMON TASKS
3.1 Public Involvement
3.1.1 Community Awareness Plan
DocuSign Envelope ID: 41E9C51C-4D51-4611-8914-4EF881CA43CE
FPN: 437199 4 32 02
Task Work Order 1 – Rev 05
3.1.2 Notifications
3.1.3 Preparing Mailing Lists
3.1.4 Median Modification Letters
3.1.5 Driveway Modification Letters
3.1.6 Newsletters
3.1.7 Renderings and Fly-Throughs
The CONSULTANT shall prepare renderings and fly-throughs for use in public meetings. Including 3-D renderings.
3.1.8 PowerPoint Presentations
The CONSULTANT shall prepare PowerPoint presentations for use in
Public meetings.
3.1.9 Public Meeting Preparations
3.1.10 Public Meeting Attendance and Follow-up
3.1.11 Other Agency Meetings
3.1.12 Web Site
3.4 Contract Maintenance and Electronic Document Management
System (EDMS)
Contract maintenance includes, but is not limited to, the project management effort for complete setup and maintenance of files, developing weekly and monthly progress reports, schedule updates, financial tracking, and work effort to develop and execute subconsultant agreements, etc.
3.5 Value Engineering (Multi-Discipline Team) Review
The design for the project may be subjected to a Value Engineering (VE) review. The VE review will be conducted by a multi-disciplined independent team of DEPARTMENT and CONSULTANT personnel for the purpose of the improving the value of the project.
3.6 Prime Consultant Project Manager Meetings
Attend meetings as requested by the DEPARTMENT.
3.7 Plans Update
3.8 Post Design Services
3.9 Digital Delivery
The CONSULTANT shall deliver to the DEPARTMENT, a 3D Model (using OpenRoads Technology) of the CDP in digital format.
3.10 Risk Assessment Workshop
3.11 Railroad, Transit and/or Airport Coordination
3.12 Landscape and Existing Vegetation Coordination
3.13 Other Project General Tasks
Provide miscellaneous support to FDOT as requested by the FDOT Project Manager.
Support disciplines and programs as directed by the DEPARTMENT including but not limited to PD&E, Cultural Resource, SHPO, FHWA and
ACHP.
Perform document reviews and provide comments. Provide engineering support, including performing engineering evaluations, preparing engineering reports, reviewing engineering aspects of PD&E documents, assisting with development of manhours for engineering aspects of project scopes, and assisting with development of engineering aspects of project scopes.
Review and comment on the preparation by Section Design Consultants of construction plans at preliminary design phases (15%, Phase I, 45%, Phase II, Phase III, Phase IV), construction specifications at any percent plans review stage, and of preliminary and final estimates of construction costs. Based upon such reviews, recommend acceptance and approval by the DEPARTMENT of such plans, specifications and estimates. Upon completion of the plan review process, certify to the DEPARTMENT by letter that the plans, specifications and estimates have been reviewed and that the design is in general accordance with both the applicable and current standards of AASHTO, FDOT, FHWA (where applicable), and with the intended scope of work.
Review design development compliance with approved project design criteria.
Review and provide written response on the adequacy of design consultant submittals of component plans and roadway plans.
Provide miscellaneous drafting services as requested by DEPARTMENT.
Evaluate impacts of re-purposing auxiliary lanes to express lanes.
Advise and consult on questions of engineering with respect to project design intent.
Review and provide written response regarding the development of design and construction comparative cost estimates.
Assist in expediting and obtaining necessary permits and other authorizations approved for advertisement for construction.
Advise and consult on questions of engineering with respect to the construction of the project.
Accomplish minor design activities as may be authorized such as Maintenance of Traffic Plans and drafting/CADD support, etc.
Provide assistance in hearings, condemnation proceedings, and other litigation including the preparation of trial exhibits.
Provide special engineering services including special studies and economic advisory/analytical services.
Provide miscellaneous pavement designs.
Review drainage design and stormwater management. Drainage design shall be in accordance with DEPARTMENT criteria.
Review roadway plans, ensuring that all information obtained or developed from other sources is included, and that applicable DEPARTMENT standards and criteria have been incorporated.
Review and provide comments on proposed cross-section drawings, and proposed plan profile drawings.
Review and comment on proposed scopes of services, supplemental agreements and man-hour estimates in connection with various projects, as requested.
Project and Program Management Services shall be provided to support/assist DEPARTMENT in managing selected project for compliance with DEPARTMENT Work program schedules.
4 ROADWAY ANALYSIS
The CONSULTANT shall analyze and document Roadway Tasks in accordance with all applicable manuals, guidelines, standards, handbooks, procedures, and current design memoranda.
4.1 Typical Section Package
4.2 Pavement Type Selection Report
4.3 Pavement Design Package
The DEPARTMENT shall provide the CONSULTANT with a pavement evaluation report with pavement cores, milling recommendations, and
Resilient Modulus. In addition, the DEPARTMENT shall provide ESALS for the pavement design.
4.4 Cross-Slope Correction
4.5 Horizontal/Vertical Master Design Files
4.6 Access Management
4.7 Roundabout Evaluation
4.8 Roundabout Final Design Analysis
4.9 Cross Section Design Files
4.10 Traffic Control Analysis
4.11 Master TCP Design Files
4.12 Selective Clearing and Grubbing
4.13 Tree Disposition Plan
4.14 Design Variations and Exceptions
4.15 Design Report
4.16 Quantities
4.17 Cost Estimate
4.18 Technical Special Provisions
4.19 Other Roadway Analysis
4.20 Field Reviews
4.21 Monitor Existing Structures
4.22 Technical Meetings
4.23 Quality Assurance/Quality Control
4.24 Independent Peer Review
4.25 Supervision
4.26 Coordination
5 ROADWAY PLANS
5.1 Key Sheet
5.2 Summary of Pay Items Including Quantity Input
5.3 Typical Section Sheets
5.4 General Notes/Pay Item Notes
5.5 Summary of Quantities Sheets
5.6 Project Layout
5.7 Plan/Profile Sheet
5.8 Profile Sheet (Roll Plot)
5.9 Plan Sheet (Roll Plot)
5.10 Special Profile
5.11 Back-of-Sidewalk Profile Sheet
5.12 Interchange Layout Sheet
5.13 Ramp Terminal Details (Plan View)
5.14 Intersection Layout Details
5.15 Special Details
5.16 Cross-Section Pattern Sheet(s)
5.17 Roadway Soil Survey Sheet(s)
5.18 Cross Sections
5.19 Temporary Traffic Control Plan Sheets
5.20 Temporary Traffic Control Cross Section Sheets
5.21 Temporary Traffic Control Detail Sheets
5.22 Utility Adjustment Sheet
5.23 Selective Clearing and Grubbing Sheet(s)
5.24 Tree Disposition Plan Sheet(s)
5.25 Project Control Network Sheet(s)
5.26 Environmental Detail Sheets
5.27 Utility Verification Sheet(s) (SUE Data)
5.28 Quality Assurance/Quality Control
5.29 Supervision
6 DRAINAGE
6a DRAINAGE ANALYSIS
6a.1 Drainage Map Hydrology
6a.2 Base Clearance Report
6a.3 Pond Siting Analysis and Report
6.a4 Design of Cross Drains
6a.5 Design of Ditches
6a.6 Design of Stormwater Management Facility (Offsite or Infield Pond)
6a.7 Design of Stormwater Management Facility (Roadside Treatment Swales and Linear Ponds)
6a.8 Design of Floodplain Compensation
6a.9 Design of Storm Drains
6a.10 Optional Culvert Material
6a.11 French Drain Systems
6a.11a Existing French Drain Systems
6a.12 Drainage Wells
6a.13 Drainage Design Documentation Report
6a.14 Bridge Hydraulic Report
6a.15 Temporary Drainage Analysis
6a.16 Cost Estimate
6a.17 Technical Special Provisions
6a.18 Hydroplaning Analysis
6a.19 Existing Permit Analysis
6a.20 Other Drainage Analysis
6a.21 Field Reviews
6a.22 Technical Meetings
6a.23 Environmental Look-Around Meetings
6a.24 Quality Assurance/Quality Control
6a.25 Independent Peer Review
6a.26 Supervision
6a.27 Coordination
6b DRAINAGE PLANS
6b.1 Drainage Map (Including Interchanges)
6b.2 Bridge Hydraulics Recommendation Sheets
6b.3 Summary of Drainage Structures
6b.4 Optional Pipe/Culvert Material
6b.5 Drainage Structure Sheet(s) (Per Structure)
6b.6 Miscellaneous Drainage Detail Sheets
6b.7 Lateral Ditch Plan/Profile
6b.8 Lateral Ditch Cross Sections
6b.9 Retention/Detention Pond Detail Sheet(s)
6b.10 Retention Pond Cross Sections
6b.11 Erosion Control Plan Sheet(s)
6b.12 SWPPP Sheet(s)
6b.13 Quality Assurance/Quality Control
6b.14 Supervision
7 UTILITIES
7.1 Kickoff Meeting
7.2 Identify Existing UAO(s)
7.3 Make Utility Contacts
7.4 Exception Processing
7.5 Preliminary Utility Meeting
7.6 Individual/Field Meetings
7.7 Collect and Review Plans and Data from UAO(s)
7.8 Subordination of Easements Coordination
7.9 Utility Design Meeting
7.10 Review Utility Markups & Work Schedules and Processing of Schedules & Agreements
7.11 Utility Coordination/Follow-up
7.12 Utility Constructability Review
7.13 Additional Utility Services
7.14 Processing Utility Work by Highway Contractor (UWHC)
7.15 Contract Plans to UAO(s)
7.16 Certification/Close-Out
7.17 Other Utilities
8 ENVIRONMENTAL PERMITS, COMPLIANCE AND
CLEARANCES
8.1 Preliminary Project Research
8.2 Field Work
8.3 Agency Verification of Wetland Data
8.4 Complete and Submit All Required Permit Applications
8.5 Prepare Dredge and Fill Sketches (as needed)
8.6 Prepare USCG Permit
8.7 Prepare Water Management District Right-of-Way Occupancy Permit
8.8 Prepare Coastal Construction Control Line (CCCL) Permit
Application (as needed)
8.9 Prepare Tree Permit Information (as needed)
8.10 Mitigation Design
8.11 Mitigation Coordination and Meetings
8.12 Other Environmental Permits
8.13 Technical Support To The Department For Environmental
Clearances and Re-evaluations
8.14 Preparation of Environmental Clearances and Reevaluations
8.15 Contamination Impact Analysis
8.16 Asbestos Survey
8.17 Technical Meetings
8.18 Quality Assurance/Quality Control
8.19 Supervision
8.20 Coordination
9 STRUCTURES - SUMMARY AND MISCELLANEOUS
TASKS AND DRAWINGS
9.1 Key Sheet and Index of Drawings
9.2 Project Layout
9.3 General Notes and Bid Item Notes
9.4 Miscellaneous Common Details
9.5 Incorporate Report of Core Borings
9.6 Standard Plans - Bridges
9.7 Existing Bridge Plans
9.8 Assemble Plan Summary Boxes and Quantities
9.9 Cost Estimate
9.10 Technical Special Provisions and Modified Special Provisions
9.11 Field Reviews
9.12 Technical Meetings
9.13 Quality Assurance/Quality Control
9.14 Independent Peer Review
9.15 Supervision
9.16 Coordination
10 STRUCTURES - BRIDGE DEVELOPMENT REPORT
General Requirements
10.1 Bridge Geometry
10.2 Ship Impact Data Collection
10.3 Ship Impact Criteria
Superstructure Alternatives
10.4 Short-Span Concrete
10.5 Medium-Span Concrete
10.6 Long Span Concrete
10.7 Structural Steel
Foundation and Substructure Alternatives
10.8 Pier/Bent
10.9 Shallow Foundations / GRS Abutments
10.10 Deep Foundations
Moveable Span
10.11 Data Collection and Design Criteria
10.12 Movable Span Geometrics and Clearances
10.13 Deck System Evaluation
10.14 Framing Plan Development
10.15 Main Girder Preliminary Design
10.16 Conceptual Span Balance/Counterweight
10.17 Support System Development
10.18 Drive Power Calculations
10.19 Drive System Development
10.20 Power and Control Development
10.21 Conceptual Pier Design
10.22 Foundation Analysis (FL PIER)
10.23 Tender Visibility Study
Other BDR Issues
10.24 Aesthetics
10.25 TCP/Staged Construction Requirements
10.26 Constructability Requirements
10.27 Load Rating for Damaged/Widened Structures
10.28 Quantity and Cost Estimates
10.29 Quantity and Cost Estimates - Movable Span
10.30 Wall Type Justification
Report Preparation
10.31 Exhibits
10.32 Exhibits - Movable Span
10.33 Report Preparation
10.34 Report Preparation - Movable Span
10.35 BDR Submittal Package
12 STRUCTURES – SHORT SPAN CONCRETE BRIDGE
General Layout Design and Plans
12.1 Overall Bridge Final Geometry
12.2 Expansion/Contraction Analysis
12.3 General Plan and Elevation
12.4 Construction Staging
12.5 Approach Slab Plan and Details
12.6 Miscellaneous Details
End Bent Design and Plans
12.7 End Bent Geometry
12.8 End Bent Structural Design
12.9 End Bent Plan and Elevation
12.10 End Bent Details
Intermediate Bent Design and Plans
12.11 Bent Geometry
12.12 Bent Stability Analysis
12.13 Bent Structural Design
12.14 Bent Plan and Elevation
12.15 Bent Details
Miscellaneous Substructure Design and Plans
12.16 Foundation Layout
Superstructure Design and Plans
12.17 Finish Grade Elevation Calculation
12.18 Finish Grade Elevations
Cast-In-Place Slab Bridges
12.19 Bridge Deck Design
12.20 Superstructure Plan
12.21 Superstructure Sections and Details
Prestressed Slab Unit Bridges
12.22 Prestressed Slab Unit Design
12.23 Prestressed Slab Unit Layout
12.24 Prestressed Slab Unit Details and Schedule
12.25 Deck Topping Reinforcing Layout
12.26 Superstructure Sections and Details
Reinforcing Bar Lists
12.27 Preparation of Reinforcing Bar List
Load Rating
12.28 Load Rating
13 STRUCTURES – MEDIUM SPAN CONCRETE BRIDGE
13.1 Overall Bridge Final Geometry
13.2 Expansion/Contraction Analysis
13.3 General Plan and Elevation
13.4 Construction Staging
13.5 Approach Slab Plan and Details
13.6 Miscellaneous Details
End Bent Design and Plans
13.7 End Bent Geometry
13.8 Wingwall Design and Geometry
13.9 End Bent Structural Design
13.10 End Bent Plan and Elevation
13.11 End Bent Details
Intermediate Bent Design and Plans
13.12 Bent Geometry
13.13 Bent Stability Analysis
13.14 Bent Structural Design
13.15 Bent Plan and Elevation
13.16 Bent Details
Pier Design and Plans
13.17 Pier Geometry
13.18 Pier Stability Analysis
13.19 Pier Structural Design
13.20 Pier Plan and Elevation
13.21 Pier Details
Miscellaneous Substructure Design and Plans
13.22 Foundation Layout
Superstructure Deck Design and Plans
13.23 Finish Grade Elevation (FGE) Calculation
13.24 Finish Grade Elevations
13.25 Bridge Deck Design
13.26 Bridge Deck Reinforcing and Concrete Quantities
13.27 Diaphragm Design
13.28 Superstructure Plan
13.29 Superstructure Section
13.30 Miscellaneous Superstructure Details
Reinforcing Bar Lists
13.31 Preparation of Reinforcing Bar List
Continuous Concrete Girder Design
13.32 Section Properties
13.33 Material Properties
13.34 Construction Sequence
13.35 Tendon Layouts
13.36 Live Load Analysis
13.37 Temperature Gradient
13.38 Time Dependent Analysis
13.39 Stress Summary
13.40 Ultimate Moments
13.41 Ultimate Shear
13.42 Construction Loading
13.43 Framing Plan
13.44 Girder Elevation, Including Grouting Plan and Vent Locations
13.45 Girder Details
13.46 Erection Sequence
13.47 Splice Details
13.48 Girder Deflections and Camber
Simple Span Concrete Design
13.49 Prestressed Beam
13.50 Prestressed Beam Schedules
13.51 Framing Plan
Beam Stability
13.52 Beam/Girder Stability
Bearing
13.53 Bearing Pad and Bearing Plate Design
13.54 Bearing Pad and Bearing Plate Details
13.55 Load Ratings
14 STRUCTURES – STRUCTURAL STEEL BRIDGE
14.1 Overall Bridge Final Geometry
14.2 Expansion/Contraction Analysis
14.3 General Plan and Elevation
14.4 Construction Staging
14.5 Approach Slab Plan and Details
14.6 Miscellaneous Details
End Bent Design and Plans
14.7 End Bent Geometry
14.8 Wingwall Design and Geometry
14.9 End Bent Structural Design
14.10 End Bent Plan and Elevation
14.11 End Bent Details
Intermediate Bent Design and Plans
14.12 Bent Geometry
14.13 Bent Stability Analysis
14.14 Bent Structural Design
14.15 Bent Plan and Elevation
14.16 Bent Details
Pier Design and Plans
14.17 Pier Geometry
14.18 Pier Stability Analysis
14.19 Pier Structural Design
14.20 Pier Plan and Elevation
14.21 Pier Details
Miscellaneous Substructure Design and Plans
14.22 Foundation Layout
Superstructure Deck Design and Plans
14.23 Finish Grade Elevation (FGE) Calculation
14.24 Finish Grade Elevations
14.25 Bridge Deck Design
14.26 Bridge Deck Reinforcing and Concrete Quantities
14.27 Superstructure Plan
14.28 Superstructure Section
14.29 Miscellaneous Bridge Deck Details
Reinforcing Bar Lists
14.30 Preparation of Reinforcing Bar List
Structural Steel Plate Girder Design
14.31 Unit Modeling
14.32 Section Design
14.33 Stiffener Design and Locations
14.34 Cross-frame Design
14.35 Connections
14.36 Bearing Assembly Design and Detailing (With Jacking Analysis)
14.37 Splice Design
14.38 Shear Stud Connectors
14.39 Deflection Analysis
14.40 Framing Plan
14.41 Girder Elevation
14.42 Structural Steel Details
14.43 Splice Details
14.44 Girder Deflections and Camber
Structural Steel Box Girder Design
14.45 Unit Modeling
14.46 Section Design
14.47 Stiffener Design and Locations
14.48 Interior Cross-Frame Design
14.49 Exterior Cross-Frame Design
14.50 Connections
14.51 Bearing Assembly Design and Detailing (with Jacking Analysis)
14.52 Splice Design
14.53 Shear Stud Connectors
14.54 Deflection Analysis
14.55 Framing Plan
14.56 Girder Elevation
14.57 Structural Steel Details
14.58 Splice Details
14.59 Girder Deflections and Camber
Erection Scheme
14.60 Erection Scheme Analysis
14.61 Erection Scheme
14.62 Load Rating
15 STRUCTURES – SEGMENTAL CONCRETE BRIDGE
15.1 Final Bridge Geometry
15.2 Casting Geometry Calculation
15.3 Finish Grade Geometry Calculation
15.4 Finish Grade Elevations
15.5 Construction Schedule
15.6 General Plan and Elevation
15.7 Approach Slab Plan and Details
15.8 Miscellaneous Details
15.9 Existing Bridge Plans
End Bent Design and Plans
15.10 End Bent Geometry
15.11 Wingwall Geometry and Design
15.12 End Bent Structural Design
15.13 End Bent Plan and Elevation
15.14 End Bent Details
Pier Design and Plans
15.15 Pier Geometry
15.16 Pier Stability Analysis
15.17 Pier Construction Loads
15.18 Pier Structural Design
15.19 Pier Plan and Elevation
15.20 Pier Details
Miscellaneous Substructure Design and Plans
15.21 Foundation Layout
Longitudinal Analysis
15.22 Section Properties
15.23 Material Properties
15.24 Superimposed Dead Loads
15.25 Construction Sequence
15.26 Tendon Layouts
15.27 Live Load Analysis
15.28 Temperature Gradient
15.29 Time Dependent Analysis
15.30 Stress Summary
15.31 Ultimate Moments
15.32 Ultimate Shear
15.33 Construction Loading
Transverse Analysis
15.34 Time Dependent Analysis
15.35 Live Load Analysis
15.36 Temperature Gradient
15.37 Stress Summary
15.38 Ultimate Moments
15.39 Construction Loading
Superstructure Design
15.40 Typical Segment
15.41 Pier Segment
15.42 Expansion Joint Segment
15.43 Blister Details
15.44 Deviator Blocks
15.45 Bearings
15.46 Expansion Joints
15.47 Special Analysis
Superstructure Plans
15.48 Typical Sections
15.49 Finish Grade Elevations
15.50 Segment Layout / Designations
15.51 Typical Segments
15.52 Variable Depth Segments
15.53 Pier Segments
15.54 Expansion Joint Segments
15.55 CIP Closure Joint Details
15.56 Casting Geometry
15.57 Integrated 3-D Drawings
Post-Tensioning Details
15.58 Bulkhead Details
15.59 Transverse Tendon Layout
15.60 Longitudinal Tendon Layout
15.61 Temporary Post-Tensioning
15.62 Quantities and Stressing Schedule
15.63 Future Post-Tensioning
15.64 Anchorage Blisters
15.65 Deviation Blocks
15.66 PT Grouting Plan Details
Miscellaneous Details
15.67 Erection Sequence and Details
15.68 Access Opening Details
15.69 Bearings
15.70 Expansion Joints
15.71 Vermin Screen Details
15.72 Railing Details
15.73 Lighting and Luminaries
15.74 Architectural Details
15.75 Special Systems
Reinforcing Bar Lists
15.76 Preparation of Reinforcing Bar Lists
15.77 Load Rating (LRFR)
17 STRUCTURES – RETAINING WALLS
General Requirements
17.1 Key Sheet
17.2 Horizontal Wall Geometry
Permanent Proprietary Walls
17.3 Vertical Wall Geometry
17.4 Semi-Standard Drawings
17.5 Wall Plan and Elevations (Control Drawings)
17.6 Details
Temporary Proprietary Walls
17.7 Vertical Wall Geometry
17.8 Semi-Standard Drawings
17.9 Wall Plan and Elevations (Control Drawings)
17.10 Details
Cast-In-Place Retaining Walls
17.11 Design
17.12 Vertical Wall Geometry
17.13 General Notes
17.14 Wall Plan and Elevations (Control Drawings)
17.15 Sections and Details
17.16 Reinforcing Bar List
Other Retaining Walls and Bulkheads
17.17 Design
17.18 Vertical Wall Geometry
17.19 General Notes, Tables and Miscellaneous Details
17.20 Wall Plan and Elevations
17.21 Details
18 STRUCTURES – MISCELLANEOUS
Concrete Box Culverts
18.1 Concrete Box Culverts
18.2 Concrete Box Culverts Extensions
18.3 Concrete Box Culvert Data Table Plan Sheets
18.4 Concrete Box Culvert Special Details Plan Sheets
Strain Poles
18.5 Steel Strain Poles
18.6 Concrete Strain Poles
18.7 Strain Pole Data Table Plan Sheets
18.8 Strain Pole Special Details Plan Sheets
Mast Arms
18.9 Mast Arms
18.10 Mast Arms Data Table Plan Sheets
18.11 Mast Arms Special Details Plan Sheets
Overhead/Cantilever Sign Structure
18.12 Cantilever Sign Structures
18.13 Overhead Span Sign Structures
18.14 Special (Long Span) Overhead Sign Structures
18.15 Monotube Overhead Sign Structure
18.16 Bridge Mounted Signs (Attached to Superstructure) 18.17 Overhead/Cantilever Sign Structures Data Table Plan Sheets
18.18 Overhead/Cantilever Sign Structures Special Details Plan Sheets
High Mast Lighting
18.19 Non-Standard High Mast Lighting Structures
18.20 High Mast Lighting Special Details Plan Sheets
Noise Barrier Walls (Ground Mount)
18.21 Horizontal Wall Geometry
18.22 Vertical Wall Geometry
18.23 Summary of Quantities – Aesthetic Requirements
18.24 Control Drawings
18.25 Design of Noise Barrier Walls Covered by Standards
18.26 Design of Noise Barrier Walls Not Covered by Standards
18.27 Aesthetic Details
Special Structures
18.28 Fender System
18.29 Fender System Access
18.30 Special Structures
18.31 Other Structures
Ancillary Structures Report
18.32 Condition Evaluation of Signal and Sign Structures, and High Mast Light Poles
18.33 Condition Evaluation of Signal and Sign Structures, and High Mast Light Poles (No As-Built or Design Plans Available)
18.34 Analytical Evaluation of Signal and Sign Structures, and High Mast Light Poles
18.35 Ancillary Structures Report
19 SIGNING AND PAVEMENT MARKING ANALYSIS
19.1 Traffic Data Analysis
19.2 No Passing Zone Study
19.3 Reference and Master Design File
19.4 Multi-Post Sign Support Calculations
19.5 Sign Panel Design Analysis
19.6 Sign Lighting/Electrical Calculations
19.7 Quantities
19.8 Cost Estimate
19.9 Technical Special Provisions
19.10 Other Signing and Pavement Marking Analysis
19.11 Field Reviews
19.12 Technical Meetings
19.13 Quality Assurance/Quality Control
19.14 Independent Peer Review
19.15 Supervision
19.16 Coordination
20 SIGNING AND PAVEMENT MARKING PLANS
20.1 Key Sheet
20.2 Summary of Pay Items Including TRNS*Port Input
20.3 Tabulation of Quantities
20.4 General Notes/Pay Item Notes
20.5 Project Layout
20.6 Plan Sheet
20.7 Typical Details
20.8 Guide Sign Work Sheet(s)
20.9 Traffic Monitoring Site
20.10 Cross Sections
20.11 Special Service Point Details
20.12 Special Details
20.13 Interim Standards
20.14 Quality Assurance/Quality Control
20.15 Supervision
21 SIGNALIZATION ANALYSIS
21.1 Traffic Data Collection
21.2 Traffic Data Analysis
21.3 Signal Warrant Study
21.4 Systems Timings
21.5 Reference and Master Signalization Design File
21.6 Reference and Master Interconnect Communication Design File
21.7 Overhead Street Name Sign Design
21.8 Pole Elevation Analysis
21.9 Traffic Signal Operation Report
21.10 Quantities
21.11 Cost Estimate
21.12 Technical Special Provisions and Modified Special Provisions
21.13 Other Signalization Analysis
21.14 Field Reviews
21.15 Technical Meetings
21.16 Quality Assurance/Quality Control
21.17 Independent Peer Review
21.18 Supervision
21.19 Coordination
22 SIGNALIZATION PLANS
22.1 Key Sheet
22.2 Summary of Pay Items Including Designer Interface Quantity Input
22.3 Tabulation of Quantities
22.4 General Notes/Pay Item Notes
22.5 Plan Sheet
22.6 Interconnect Plans
22.7 Traffic Monitoring Site
22.8 Guide Sign Worksheet
22.9 Special Details
22.10 Special Service Point Details
22.11 Mast Arm/Monotube Tabulation Sheet
22.12 Strain Pole Schedule
22.13 TCP Signal (Temporary)
22.14 Temporary Detection Sheet
22.15 Utility Conflict Sheet
22.16 Interim Standards
22.17 Quality Assurance/Quality Control
22.18 Supervision
23 LIGHTING ANALYSIS
23.1 Lighting Justification Report
23.2 Lighting Design Analysis Report
23.3 Voltage Drop Calculations
23.4 FDEP Coordination and Report
23.5 Reference and Master Design Files
23.6 Temporary Lighting
23.7 Design Documentation
23.8 Quantities
23.9 Cost Estimate
23.10 Technical Special Provisions and Modified Special Provisions
23.11 Other Lighting Analysis
23.12 Field Reviews
23.13 Technical Meetings
23.14 Quality Assurance/Quality Control
23.15 Independent Peer Review
23.16 Supervision
23.17 Coordination
24 LIGHTING PLANS
24.1 Key Sheet
24.2 Summary of Pay Item Sheet Including Designer Interface Quantity Input
24.3 Tabulation of Quantities
24.4 General Notes/Pay Item Notes
24.5 Pole Data, Legend & Criteria
24.6 Service Point Details
24.7 Project Layout
24.8 Plan Sheet
24.9 Special Details
24.10 Temporary Lighting Data and Details
24.11 Traffic Control Plan Sheets
24.12 Interim Standards
24.13 Quality Assurance/Quality Control
24.14 Supervision
33 INTELLIGENT TRANSPORTATION SYSTEMS ANALYSIS
33.1 ITS Analysis
33.2 Communications
33.3 Grounding and Lightning Protection
33.4 Power Subsystem
33.5 Voltage Drop Calculations
33.6 Design Documentation
33.7 Existing ITS
33.8 Queue Analysis
33.9 Reference and Master ITS Design File
33.10 Reference and Master Communications Design File
33.11 Pole Elevation Analysis
33.12 Sign Panel Design Analysis
33.13 Quantities
33.14 Cost Estimate
33.15 Technical Special Provisions and Modified Special Provisions
33.16 Other ITS Analyses
33.17 Field Reviews
33.18 Technical Meetings
33.19 Quality Assurance / Quality Control
33.20 Supervision
33.21 Coordination
34 INTELLIGENT TRANSPORTATION SYSTEMS PLANS
34.1 Key Sheet
34.2 Summary of Pay Items Including Designer Interface Quantity Input
34.3 Tabulation of Quantities
34.4 General Notes / Pay Item Notes
34.5 Project Layout
34.6 Typical and Special Details
34.7 Plan Sheet
34.8 ITS Communications Plans
34.10 Grounding and Lightning Protection Plans
34.11 Cross Sections
34.12 Guide Sign Work Sheet(s)
34.13 Special Service Point Details
34.14 Strain Pole Schedule
34.15 Overhead / Cantilever Sign Structure
34.16 Other Overhead Sign Structures (Long Span, Monotube, etc.)
34.17 Traffic Control Plans
34.18 Interim Standards
34.19 GIS Data and Asset Management Requirements
34.20 Quality Assurance / Quality Control
34.21 Supervision
32 NOISE BARRIERS IMPACT DESIGN ASSESSMENT IN THE
DESIGN PHASE
32.1 Noise Barrier Analysis
32.2 Noise Barrier Evaluation
32.3 Public Involvement
32.4 Outdoor Advertising Identification
32.5 Noise Study Report (NSR) Addendum
32.6 Technical Meetings
32.7 Quality Assurance/Quality Control
32.8 Supervision
32.9 Coordination
36 3D MODELING
36.1 Phase I 3D Design Model (30% Plans)
36.2 Phase II 3D Design Model (60% Plans)
36.3 Phase III 3D Design Model (90% Plans)
36.4 Final 3D Model Design (100% Plans)
36.5 Cross Section Design Files
36.6 Template and Assembly Development (Optional)
36.7 Quality Assurance/Quality Control
36.8 Supervision
36.9 Coordination
3. LENGTH OF SERVICE
Services are to commence upon issuance of the task work order from the DEPARTMENT’s
Procurement Services Manager.
4. DEPARTMENT RESPONSIBILITIES
The DEPARTMENT will facilitate (and/or direct) the exchange and delivery of previously obtained survey and relevant proposed designs within the study area.
Provide training as required to perform related DEPARTMENT unique tasks.
Provide a central point of authority for tasks assigned.
Provide all available existing project maps, files and supporting data.
Provide design review and approval of the design services submitted.
Provide authorization for the tasks as assigned
Provide available right-of-way maps, inspection reports, studies, plans, and documentation for the tasks as assigned.
5. ESTIMATE OF SERVICES
For details of the estimated costs to perform the required General Engineering Consultant
Administrative Management Services, see Attachment "B."
ATTACHMENT "B"
FEE ESTIMATE - TBNext SUPPORT SERVICES - CONTINUING
JOB CLASSIFICATION
MAN
HOURS
OFFICE
MAN
HOURS
FIELD
Unit Rates
- Home
Unit Rates
- Field
TOTAL
SALARIES
OFFICE
TOTAL
SALARIES
FIELD
FINANCIAL PROJECT NO. Cadd/Computer Technician 400 0 $110.59 44,236.00$ -$
437199-4-32-02 CEI Senior Project Engineer 1 0 $285.44 285.44$ -$
Chief Engineer 300 0 $292.61 87,783.00$ -$
CONTRACT NO. Chief Planner 180 0 $279.21 50,257.80$ -$
C9Z54 Chief Scientist 200 0 $197.69 39,538.00$ -$
Designer 350 0 $105.55 36,942.50$ -$
TASK WORK ORDER NO. Engineer 350 0 $120.15 42,052.50$ -$
001 - Revision 05 Engineer Intern 350 0 $95.48 33,418.00$ -$
Graphic Designer 350 0 $115.51 40,428.50$ -$
DATE Planner 351 0 $88.74 31,147.74$ -$
Principal Engineer 380 0 $241.88 91,914.40$ -$
Project Engineer 400 0 $142.48 56,992.00$ -$
Project Manager 450 0 $257.80 116,010.00$ -$
Project Planner 350 0 $156.31 54,708.50$ -$
Secretary/Clerical 100 0 $75.62 7,562.00$ -$
Senior Designer 350 0 $162.83 56,990.50$ -$
Negotiated Senior Engineer 349 0 $211.17 73,698.33$ -$
Senior Environmental Specialist 150 0 $153.03 22,954.50$ -$
Senior Planner 301 0 $212.90 64,082.90$ -$
DESCRIPTION Senior Project Engineer 280 0 $174.99 48,997.20$ -$
CONSULTANT
H. W. Lochner, Inc.
5,942 - 999,999.81$ -$
TOTAL LOADED 999,999.81$
SUB-CONSULTANT SERVICES -$
TOTAL TASK WORK ORDER 1,000,000$
***All classifications listed in the contract are eligible to work on this task work order.
General Support Services
G:\Professional Services\CONTRACT.398\437xxxx\43719943.202 C 9Z54 18740\TWOs\1A5 TWO Fee Sheet
File details come from the government source that posted it. Updated .