CN-550000-C9Y60-00040000.pdf

PDF 96 KB Posted

Attached to
Master Agreement FL|C9Y60|8e050007efb68266dfeeed939b53a3cc
Contract number
C9Y60
Issued by
Florida

About this file

This document is an Amendment (No. 3) to a Standard Professional Services Agreement between the State of Florida Department of Transportation and Phillips Precision Engineering, Inc. The original contract was executed on March 5, 2018, and this amendment was executed on March 25, 2019. The agreement pertains to the design of a sidewalk project on Chester Street from State Road 20 to Tom Love Road in Liberty County.

The amendment establishes funding for Post Design Services, adding $10,294 to the total contract amount, which increases the Total Maximum Limiting Amount to $240,298.48. The financial project number is 42985523201, and the services will be paid based on approved time and expenses at rates established in the original agreement. The post design services are to be invoiced under Financial Project Number 42985526202, and the consultant will only be compensated for services actually performed. The contract remains in effect through completion of all services or for a ten-year term from the original execution date, whichever occurs first.

View the file

Other files

File Type Posted
CN-550000-C9Y60.pdf PDF
CN-550000-C9Y60-00020000.pdf PDF
CN-550000-C9Y60-00050000.pdf PDF
CN-550000-C9Y60-S0010000.pdf PDF
CN-550000-CA362-W0060000.pdf PDF
ContractBudgetExport.csv CSV file
CN-550000-C9Y60-00030000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of Florida Department of Transportation

AMENDMENT

TO

STANDARD PROFESSIONAL SERVICES AGREEMENT

Amendment No.: 3 Execution Date:

Original Contract No.: C-9Y60 Original Execution Date: March 5, 2018 Consultant Name: Phillips Precision Engineering, Inc.

Agreement Description: Design of Sidewalk of Chester Street from State Road 20 to Tom Love Road in Liberty County.

Purpose of Amendment: Establish Funding for Post Design Services

This Supplemental Amendment provides compensation to the Consultant for Post Design Services.

The terms of the original agreement, referenced above, are hereby amended as follows:

Item 2.1, Summary of Compensation of Exhibit “B”, Method of Compensation, of the original Agreement is amended as follows:

For Financial Project No. 42985523201, $10,294 is established for Post Design Services bringing the Total Maximum Limiting Amount established for this project and said Agreement to $240,298.48.

Post Design Services (LA-4)

Subject to the established amount, the Consultant shall perform post design services upon execution of this Amendment. The Consultant shall be paid for only those services actually performed. Payment for such services will be based on approved time and expenses (if applicable) incurred during the billing period at the rates established in Table 6 of the original agreement. For accounting purposes, these services are to be invoiced under Financial Project Number 42985526202).

Compensation is to be paid in accordance with Exhibit “B” of the original agreement, except as specified above.

The provisions of said Agreement, and any amendments thereto, shall remain in full force and effect through completion of all services required of the consultant or a ten (10) year term from the date of the execution of said agreement, whichever occurs first.

The following attachments are hereby incorporated into this agreement:

Contract Compensation Summary, Page 2

STATE OF FLORIDA

PHILLIPS PRECISION ENGINEERING, INC. DEPARTMENT OF TRANSPORTATION

BY: BY:

Jared Perdue, P.E.

(Name) (Name)

Director of Transportation Development (Title) (Title)

Professional Services Review: Legal Review:

DocuSign Envelope ID: 9860F380-5047-4A14-A87D-A1CB71F8586D

Natacha Phillips

President

March 25, 2019

Original Agreement (Executed 3/5/2018); Amendment No. 1 (Executed 3/14/2018);

Amendment No. 2 (Executed 2/25/2019):

Financial Project No. 42985523201 Limit or

F.A.P. No. 8886 898 A Estimate

Basic Services Including Direct Expenses (LS 2) $165,925.00 L

Environmental Services (LA 4) $27,966.06 L

Geotechnical Services (LA 4) $12,045.53 L

Survey Services (LA 4) $24,067.89 L

Total Maximum Limiting Amount $230,004.48

Amendment No. 3:

Financial Project No. 42985523201 Limit or

F.A.P. No. 8886 898 A Estimate

Basic Services Including Direct Expenses (LS 2) $0.00 L

Environmental Services (LA 4) $0.00 L

Geotechnical Services (LA 4) $0.00 L

Survey Services (LA 4) $0.00 L

Post Design Services (LA 4) $10,294.00 L

Total Maximum Limiting Amount $10,294.00

Original Agreement (Executed 3/5/2018); Amendment No. 1 (Executed 3/14/2018);

Amendment No. 2 (Executed 2/25/2019); Amendment No. 3:

Financial Project No. 42985523201 Limit or

F.A.P. No. 8886 898 A Estimate

Basic Services Including Direct Expenses (LS 2) $165,925.00 L

Environmental Services (LA 4) $27,966.06 L

Geotechnical Services (LA 4) $12,045.53 L

Survey Services (LA 4) $24,067.89 L

Post Design Services (LA 4) $10,294.00 L

Total Maximum Limiting Amount $240,298.48

Contract Compensation Summary

Contract Compensation Summary

Contract Compensation Summary

DocuSign Envelope ID: 9860F380-5047-4A14-A87D-A1CB71F8586D

File details come from the government source that posted it. Updated .