CN-550000-C9Y60-00030000.pdf

PDF 95 KB Posted

Attached to
Master Agreement FL|C9Y60|8e050007efb68266dfeeed939b53a3cc
Contract number
C9Y60
Issued by
Florida

About this file

This document is an Amendment (Amendment No. 2) to a Standard Professional Services Agreement between the State of Florida Department of Transportation and Phillips Precision Engineering, Inc., originally executed on March 5, 2018. The amendment pertains to a project involving the design of a sidewalk on Chester Street from State Road 20 to Tom Love Road in Liberty County, Florida.

The amendment adjusts the contract compensation by reducing funding for specific services related to Financial Project No. 42985523201. Specifically, Environmental Services (LA 4) is decreased by $46.94, Geotechnical Services (LA 4) is reduced by $24.47, and Survey Services (LA 4) is decreased by $0.11, resulting in a total reduction of $71.52. This adjustment brings the Total Maximum Limiting Amount for the project from $230,076.00 to $230,004.48. The purpose of the amendment is to remove Phase 32 residual funding, and all other terms of the original agreement remain unchanged.

View the file

Other files

File Type Posted
CN-550000-C9Y60.pdf PDF
CN-550000-C9Y60-00020000.pdf PDF
CN-550000-C9Y60-00040000.pdf PDF
CN-550000-C9Y60-00050000.pdf PDF
CN-550000-C9Y60-S0010000.pdf PDF
CN-550000-CA362-W0060000.pdf PDF
ContractBudgetExport.csv CSV file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of Florida Department of Transportation

AMENDMENT

TO

STANDARD PROFESSIONAL SERVICES AGREEMENT

Amendment No.: 2 Execution Date:

Original Contract No.: C-9Y60 Original Execution Date: March 5, 2018 Consultant Name: Phillips Precision Engineering, Inc.

Agreement Description: Design of Sidewalk of Chester Street from State Road 20 to Tom Love Road in Liberty County.

Purpose of Amendment: Remove Phase 32 Residual Funding

This Amendment shall serve to remove Phase 32 residual funds on this project.

The terms of the original agreement, referenced above, are hereby amended as follows:

Contract Compensation Summary of Exhibit “B”, Method of Compensation, of the original Agreement is amended as follows:

For Financial Project No. 42985523201, Environmental Services (LA 4) is decreased by $46.94, Geotechnical Services (LA 4) is decreased by $24.47 and Survey Services (LA 4) is decreased by $0.11. This total decrease of $71.52 brings the Total Maximum Limiting Amount for this project and said Agreement to $230,004.48.

Compensation is to be paid in accordance with Exhibit B of the original Agreement, except as specified above, and in the Contract Compensation Summary, attached hereto and made a part hereof.

Except as hereby modified, amended, or changed, all of the terms and conditions of said original agreement and any amendments thereto will remain in full force and effect.

The following attachments are hereby incorporated into this agreement:

Contract Compensation Summary, Page 2

STATE OF FLORIDA

PHILLIPS PRECISION ENGINEERING, INC. DEPARTMENT OF TRANSPORTATION

BY: BY:

Jared Perdue, P.E.

(Name) (Name)

Director of Transportation Development (Title) (Title)

Professional Services Review: Legal Review:

DocuSign Envelope ID: CE641CEB-F5CA-4238-A88B-7D2D01EAA1CE

President

Natacha Phillips

February 25, 2019

Original Agreement (Executed 3/5/2018); Amendment No. 1 (Executed 3/14/2018):

Financial Project No. 42985523201 Limit or

F.A.P. No. 8886 898 A Estimate

Basic Services Including Direct Expenses (LS 2) $165,925.00 L

Environmental Services (LA 4) $28,013.00 L

Geotechnical Services (LA 4) $12,070.00 L

Survey Services (LA 4) $24,068.00 L

Total Maximum Limiting Amount $230,076.00

Amendment No. 2:

Financial Project No. 42985523201 Limit or

F.A.P. No. 8886 898 A Estimate

Basic Services Including Direct Expenses (LS 2) $0.00 L

Environmental Services (LA 4) -$46.94 L

Geotechnical Services (LA 4) -$24.47 L

Survey Services (LA 4) -$0.11 L

Total Maximum Limiting Amount -$71.52

Original Agreement (Executed 3/5/2018); Amendment No. 1 (Executed 3/14/2018);

Amendment No. 2:

Financial Project No. 42985523201 Limit or

F.A.P. No. 8886 898 A Estimate

Basic Services Including Direct Expenses (LS 2) $165,925.00 L

Environmental Services (LA 4) $27,966.06 L

Geotechnical Services (LA 4) $12,045.53 L

Survey Services (LA 4) $24,067.89 L

Total Maximum Limiting Amount $230,004.48

Contract Compensation Summary

Contract Compensation Summary

Contract Compensation Summary

DocuSign Envelope ID: CE641CEB-F5CA-4238-A88B-7D2D01EAA1CE

File details come from the government source that posted it. Updated .