CN-550000-C9L80-00050000.pdf
PDF 49 KB Posted
- Contract number
- C9L80
- Issued by
- Florida
About this file
This document is a Task Work Order for Professional Services issued by the State of Florida Department of Transportation (FDOT), specifically for District Seven. The contract is with Cardno, Inc., a consulting firm located in Clearwater, Florida, under Contract No. C-9L80 with the Project Number 254653-1-32-16.
The task work order provides on-call and fast response traffic engineering support services with a total compensation limit of $93,742.00. Services include design of traffic, signing, marking, intelligent transportation (ITS), and lighting plans; traffic engineering studies; shop drawing and signalization reviews; crash data compilation and analysis; engineering estimates; and meetings with district staff. The contract has a maximum duration of 52 weeks and will be performed on a cost-reimbursable basis under an upset limit task assignment. The work is intended to ensure timely resolution of department-defined issues and provide technical support as requested by the FDOT.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-C9L80-W0020000.pdf | ||
| ContractBudgetExport.csv | CSV file | |
| CN-550000-C9E70-00110000.pdf | ||
| CN-550000-C9L80-00010000.pdf | ||
| CN-550000-C9L80-00020000.pdf | ||
| CN-550000-C9L80-00070000.pdf | ||
| CN-550000-C9L80-00040000.pdf | ||
| CN-550000-C9L80-00060000.pdf | ||
| CN-550000-C9L80-W0010000.pdf | ||
| CN-550000-C9L80.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
06/17
Consultant:
Address:
Date:
9/13/2020
*Limiting or Estimating/Budgeted Amount.
Distribution:
Consultant Acceptance:
Signature
William Parman, Dawn Krockta, D7FSContractDocs
$93,742.00
$0.00
(name) (title)
$93,742.00
District Wide Minor Traffic Engineering Design
Total authorizations to date (including this one):
Departmental Approval:
$93,742.00 Y
Task for On Call and Fast Response Traffic Engineering Support Services, as described in Attachment "A," Scope of Services.
Cardno, Inc.
380 Park Place Boulevard, Suite 300 Clearwater, Florida 33759
Attn: Mark Modjeski, P.E.
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Est*Method of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$93,742.00
(LA4) Units worked at loaded billing rates in Table 6
Page 1 Total
Page 2 thru 6 Subtotal
Total
Loaded Billing Rates
$268,917.00
(name) (title) Signature
Rebecca L. Schwarz Procurement Services Manager
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
Task Work Order No.:
Contract No.: Payment FM No.:
C-9L80 254653 1 32 16
DocuSign Envelope ID: EF90E31A-227A-49E1-845E-697A627E5290
Attachment A: Scope of Services
4 TWO Scope
CARDNO
Contract No.: C-9L80
FPN: 254653-1-32-16 TASK WORK ORDER NO. 4
Scope of Work In conjunction with District Seven’s District-wide Minor Traffic Engineering Design Contract, the District wishes to secure “on call” assistance to ensure the timely resolution of Department defined issues in order to expedite the needs of the Department. This task work order may include “in-house” technical support as requested by the Department. Requests for support may be initiated via written or email communication. Services may include, but are not limited to:
Design of Traffic Plans Design of Signing and Marking Plans Design of Intelligent Transportation (ITS) Plans Design of Lighting Plans Traffic Engineering Studies and Conceptual Design Intelligent Transportation (ITS) Design, Administration and Support Shop Drawing Review Signalization, Signing and Marking Plans Review Crash data compilation Crash analysis Engineering Estimates Meetings with District staff
In addition, this task work order includes contract management and administration services associated with the project management, task work order preparation and execution of requests.
Schedule The schedule for the task work order shall not exceed 52 weeks unless extended by the Department’s Project Manager.
Compensation Work will be performed under an upset limit task assignment on a cost reimbursable basis. The limiting amount for the period is established in the Estimate of Work Effort and Cost, Attachments ‘’B.’’
DocuSign Envelope ID: EF90E31A-227A-49E1-845E-697A627E5290
File details come from the government source that posted it. Updated .