CN-550000-C8T39-W0060000.pdf

PDF 88 KB Posted

Attached to
Master Agreement FL|C8T39|d05873840c2a3105af68e068acc16ba4
Contract number
C8T39
Issued by
Florida

About this file

This document is a Task Work Order Amendment from the State of Florida Department of Transportation, involving The Balmoral Group as the consultant. The contract, numbered C8T39 (DW 111), is specifically for Amendment No. 3 to Task Work Order No. 3, with the task located at 165 Lincoln Avenue, Winter Park, Florida 32789.

The amendment authorizes additional survey and roadway planning services for the FDOT PM: Catalina Chacon project on SR 5, with a task expiration date of 4-22-2014. The total contract value is increased by $9,779.79, bringing the total to $203,948.44. The amendment includes adjustments to several compensation elements such as Design Services (TBG), Survey (BSA), Utility Coordination (TBE), Utility Survey (TBE), Geotechnical (Nadic), and Environmental (BSA) services. The compensation methods vary between lump sum payments based on percentage of completion and units worked at loaded billing rates in Table 6. The total contract authorizations to date, including this amendment, are $369,620.44.

View the file

Other files

File Type Posted
CN-550000-ARS14-W0010000.pdf PDF
CN-550000-C8T39-00030000.pdf PDF
CN-550000-C8T39-W0030000.pdf PDF
CN-550000-C8T39-W0040000.pdf PDF
CN-550000-C8T39-W0050000.pdf PDF
CN-550000-C8T39-W0010100.pdf PDF
CN-550000-C8T39.pdf PDF
CN-550000-C8T39-00010000.pdf PDF
CN-550000-C8T39-00040000.pdf PDF
CN-550000-C8T39-W0020100.pdf PDF
ContractBudgetExport.csv CSV file
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .