This is a Task Work Order for Professional Services issued by the State of Florida Department of Transportation (FDOT), specifically Task Work Order No. 3, involving The Balmoral Group as the consultant. The document is associated with DW Contract C-8T39 and involves design services for SR 5, with key FDOT personnel including Project Manager Jazlyn Heywood and Contract Manager Yvonne Broxton.
The task work order authorizes The Balmoral Group to provide design services with a total compensation limit of $176,230.94, broken down into multiple service categories: Design Services ($109,633.86), Survey Services ($32,697.87), Utility Services ($11,918.65), and S.U.E. Services ($15,199.88). The services will be compensated through a combination of lump sum payments based on percentage of completion and units worked at loaded billing rates. The project is to be completed on or before 4/22/2014, and the total authorizations to date, including this task order, amount to $341,902.94. The document includes departmental approval from Suzanne Phillips and consultant acceptance by Valerie Seidel, President of The Balmoral Group.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-C8T39-W0010100.pdf | ||
| CN-550000-C8T39.pdf | ||
| CN-550000-ARS14-W0010000.pdf | ||
| CN-550000-C8T39-00030000.pdf | ||
| CN-550000-C8T39-W0040000.pdf | ||
| CN-550000-C8T39-W0060000.pdf | ||
| CN-550000-C8T39-W0050000.pdf | ||
| CN-550000-C8T39-00010000.pdf | ||
| CN-550000-C8T39-00040000.pdf | ||
| CN-550000-C8T39-W0020100.pdf | ||
| ContractBudgetExport.csv | CSV file |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .