CN-550000-C8T39-W0010100.pdf

PDF 68 KB Posted

Attached to
Master Agreement FL|C8T39|d05873840c2a3105af68e068acc16ba4
Contract number
C8T39
Issued by
Florida

About this file

This document is a Task Work Order Amendment Form for Professional Services issued by the State of Florida Department of Transportation. The amendment involves The Balmoral Group, located at 165 Lincoln Avenue, Winter Park, Florida, under Contract Number C8T39 (DWY Misc Design #111). The amendment is specifically for the SR 5 project completion, with Ashraf Elmaghrahy from FDOT CM identified as the point of contact.

The amendment details changes to the original task work order, primarily affecting survey and utility coordination services. Specifically, the Survey (BSA) compensation is adjusted by -$16.20, reducing the previous amount of $30,198.67 to $30,182.47. The Utility Survey (TBG) compensation is reduced by -$642.53, from $6,737.17 to $6,094.64. Other compensation elements like Design Services and Utility Coordination remain unchanged. The total contract authorization to date, including this amendment, is $368,961.71. The document is signed by a Senior Project Manager from the department and a Vice President from The Balmoral Group, indicating mutual agreement to the amendments.

View the file

Other files

File Type Posted
CN-550000-C8T39.pdf PDF
CN-550000-C8T39-W0050000.pdf PDF
CN-550000-ARS14-W0010000.pdf PDF
CN-550000-C8T39-00030000.pdf PDF
CN-550000-C8T39-W0030000.pdf PDF
CN-550000-C8T39-W0040000.pdf PDF
CN-550000-C8T39-W0060000.pdf PDF
CN-550000-C8T39-00010000.pdf PDF
CN-550000-C8T39-00040000.pdf PDF
CN-550000-C8T39-W0020100.pdf PDF
ContractBudgetExport.csv CSV file
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .