This document is a Railroad Change Order No. 3 issued by the Florida Department of Transportation (FDOT) for a project involving CSX Transportation, Inc. The contract pertains to a railroad highway crossing modification on State Road 60 in Hillsborough County, specifically Crossing #624572B RRMP: SV828.91. The original agreement dates back to 02/13/1980, and this change order is a supplemental amendment to that initial contract.

The change order involves the replacement of the current concrete panel crossing with a concrete tube crossing, including asphalt pavement 165 ft west/east of the track centerline. The total estimated cost of the work is $674,919.00, with the project being federally funded at 95% through the Railroad Highway Crossings Hazard program. The work includes construction, construction engineering, flagging services, and track work. The reimbursement method is set as force account method, and the project is subject to procurement restrictions including Buy America requirements for steel and iron materials. The contract period runs from 04/28/2022 to 12/31/2050, with the current change order focusing on specific crossing improvements.

View the file

Other files

File Type Posted
CN-550000-C9V06-00110000.pdf PDF
CN-550000-ASS20-W0010000.pdf PDF
CN-550000-ASS20-W0040000.pdf PDF
CN-550000-ASS20-00010000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .