This document is a Railroad Change Order No. 1 between the State of Florida Department of Transportation and CSX Transportation Company for a railroad crossing improvement project on State Road 60 in Hillsborough County. The project involves replacing an existing crossing surface and is referenced to an original Railroad Agreement dated 02/13/1980. The change order is federally funded and involves work to be performed by CSX Transportation Company.
The change order authorizes the replacement of the current Concrete Panel crossing with a Concrete Tub crossing, including milling and resurfacing the crossing approaches and installing Dynamic Envelope striping. The total estimated cost of the work is $622,227.00, which will be reimbursed using the Force Account Method under Administrative Rule Chapter 14-57. The project is part of the Railroad Highway Crossings Hazard program, with funding split between Railroad Highway Hazard (48%) and State Transportation Program (2%). The work is to be completed at Crossing #624572B, located at RRMP 828.91, and is set to be performed in accordance with Buy America requirements and federal guidelines.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-C9V06-00110000.pdf | ||
| CN-550000-ASS20-00010000.pdf | ||
| CN-550000-ASS20-W0040000.pdf | ||
| CN-550000-ASS20-W0050000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DocuSign Envelope ID: CBBFB03A-DCF7-4AF2-A86E-CE5C9ECB779C
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
RAILROAD CHANGE ORDER NO. 1
725-090-04A
RAIL
OGC – 1/21
Financial Project Number Road Name or Number County Name Parcel & R/W Number FAP Number
449004-1-57-01 SR 60 HILLSBOROUGH 10110-2102 D722 046 B
A. 1. The CSX Transportation Company is hereby authorized to observe the following changes in the plans and or specifications to the subject Railroad Agreement, and to perform such work accordingly, further described as:
Replacement of the current Concrete Panel crossing with a Concrete Tub crossing. Milling and resurfacing the crossing approaches. Installation of Dynamic Envelope striping. This Change Order includes everything deemed necessary to complete the project
Crossing#: 624572B RRMP: 828.91
2. Exhibit A, Exhibit B, and Exhibit C are attached to the Railroad Change Order and made part of the Original Railroad Agreement.
3. The items of work covered by this Change Order are referenced to an Original Agreement of record dated
02/13/1980 and no supplemental Agreement is required.
Original Type: Crossing Surface Signals Flagging
B. 1. The Railroad Relocation Work is to conform to that shown by the railroad adjustment plans as:
a. ATTACHED
b. X INCLUDED IN THE HIGHWAY CONTRACT PLANS
2. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 as:
a. NONREIMBURSABLE – Section .011(2)
b. X REIMBURSABLE – Section .011(2)
(1) X Force Account Method
(2) Lump Sum Method
(3) Third Party Contract Method
C. ESTIMATED COST OF WORK DUE TO THIS CHANGE ORDER
ITEM
NO.
ITEM UNIT UNIT
PRICE
WORK ELIMINATED (-)
QTY AMOUNT
ADDITIONAL WORK (+)
QTY AMOUNT
1 Construction, CEI & Flagging 1 622,227.00
Sub-Totals ………………………………………………………………… $ $622,227.00 Net Cost of Construction Changes, this order ………………………... $ $622,227.00 Cost of Construction Changes, previously ordered ………………….. $ $ Net Total Cost of Construction Changes, to date…………………………………………….. $622,227.00 Contract Amount ………………………………………………………………………………… $ Estimated Cost of Work Authorized, to date………………………………………………….. $622,227.00
Examined as to provisions and participating items of cost:
Recommended: 6/9/2022 | 2:33 PM ED T Approved: 6/10/2022 | 7:24 AM ED TApproved:
Date Date Date
Kenneth Madden District 7 Rail Administrator
Richard Moss P.E Director of Transporation Development
Division Administrator N/A
Federal Highway Administration
725-090-04A
RAIL
EXHIBIT A
The Company shall:
1. utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the Company during the term of the contract; and
2. include an express requirement in any subcontract that subcontractors performing work or providing services pursuant to the state contract utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term.
RAIL
EXHIBIT B
The Company shall:
1. adhere to all Buy America requirements (23 CFR 635.410) to ensure that all manufacturing processes of steel and iron occur in the United States; and
2. ensure that prefabricated items that contain steel must also comply with Buy America; and
3. provide Buy America certifications that include correct language, project information, and the material’s delivery date.
RAIL
EXHIBIT C
The Company understands:
1. that while FHWA1273 does not apply to force account work performed by rail companies, FHWA-assistance is subject to Title VI (42 U.S.C. § 2000d et seq); and
2. requires appropriate assurances by providing an executed Title VI / Nondiscrimination Assurance, including Appendices A and E.
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
ASS20
5/11/2022
CONTRACT INFORMATION
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR ROBIN M. NAITOVE, CPA, COMPTROLLER ON 5/11/2022
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55072020727
Expansion Option: AA
Object Code: 563000
Amount: $622,227.00
Financial Project: 44900415701
Work Activity (FCT): 127
CFDA:
Fiscal Year: 2022
Budget Entity: 55100100
Category/Category Year: 088808/22
Amendment ID: W001
Sequence: 00
User Assigned ID: CO#1
Enc Line (6s)/Status: 0001/04
Total Amount: $622,227.00
Contract: ASS20
Contract Type: AC - RR CROSSING-PE/INSTAL (RR-XING/PE)
Vendor Name: CSX TRANSPORTATION, INC.
Vendor ID: F546000720022
Beginning Date of This Agreement: 04/28/2022
Ending Date of This Agreement: 12/31/2050
Contract Total/Budgetary Ceiling:
Method of Procurement: R - RAILROAD/UTILITIES AGREEMENT
Description: Concrete Tub Replacement of Crossing # 624574B on SR 60
Page1 of 1
To: David.Grillo@dot.state.fl.us
ACCT. CODE : 709 - FL2832 Form Revision 10/04/21
BUY AMERICA
ESTIMATE SUBJECT TO REVISION AFTER: 1/12/2023 DOT NO.: 624572B
CITY: COUNTY: Hillsborough STATE: FL
ZONE: Florida SUB-DIV: Plant City MILE POST: SV 828.91
AGENCY PROJECT NUMBER: FDOT 449004-1-57-01 (ASP50)
PRELIMINARY ENGINEERING:
212 Contracted & Administrative Engineering Services 23,000$
Subtotal 23,000$
CONSTRUCTION ENGINEERING/INSPECTION:
212 Contracted & Administrative Engineering Services 25,500$
Subtotal 25,500$
FLAGGING SERVICE: (Contract Labor) 70 Labor (Conductor-Flagman) 0 Days @ 350.00$ -$ 50 Labor (Foreman/Inspector) 10 Days @ 504.00$ 5,040$ 70 Additive 137.00% (Transportation Department) -$ 50 Additive 160.00% (Engineering Department) 8,064$
Subtotal 13,104$
SIGNAL & COMMUNICATIONS WORK: 5,856$
TRACK WORK: 506,216$
PROJECT SUBTOTAL: 573,676$
900 CONTINGENCIES: 10.00% 57,368$
PROJECT TOTAL: ***************************************************** 631,044$
CURRENT AUTHORIZED BUDGET: ***************************************************** 25,000$ TOTAL SUPPLEMENT REQUESTED: ***************************************************** 606,044$
DIVISION OF COST:
Agency 100.00% 606,044$ Railroad 0.00% -$
NOTE: Estimate is based on FULL CROSSING CLOSURE during work by Railroad Forces.
Office of Chief Engineer Public Projects--Jacksonville, Florida
Benesch-ASA Approved by: KSW CSXT Public Project Group
DATE: 01/12/22 REVISED: 01/00/00 DATE: 01/12/22
Estimated prepared by:
This estimate has been prepared based on site conditions, anticipated work duration periods, material prices, labor rates, manpower and resource availability, and other factors known as of the date prepared. The actual cost for CSXT work may differ based upon the agency's requirements, their contractor's work procedures, and/or other conditions that become apparent once construction commences or during the progress of the work
Plant City DESCRIPTION: SR-60 construction estimate for the installation of 115'-6" concrete TUB platform, asphalt, thermo pavement markings, MOT and law enforcement. Additional ballast to be placed along the TUB in the median section. A frequency change will need to be made for the crossing start. TUB surface includes proposed sidewalk on the north side of the crossing.
KNPBAGD
Text Box 449004-1 - Project Location Map
If ther please describe here:
Not Applicable _____ Florida Single Audit _____ CSX is not subject to the Single Audit.
Federal Audit _____ (Florida Statute 215.97)
Single Audit Status ¹ ² :
CSFA # ³
5) Agency
*Phone:
Date:
Recipient. The Federal Sub-Recipient and Vendor Determination Checklist is enclosed for reference.
² CFDA Number: If CSX is subject to the Federal Single Audit, please provide the Catalog of Federal Domestic Assistance (CFDA) number.
³ CSFA Number: If CSX is subject to the Florida Single Audit, please provide the Catalog of State Financial Assistance (CSFA) number.
*Please Note: Per 2 CFR 200.425(a), CSXT can recover Federal Audit costs directly through this project.
For Audit related questions, contact GBCompliance@csx.com.
*4) Single Audit Type: Please advise if the project is subject to single audit requirements by completing the appropriate box below (complete only one box).
CSX TRANSPORTATION – GOVERNMENT BILLING DEPT
NEW PROJECT FORM
To ensure compliance with Federal requirements, please provide the following information so that CSXT may accurately and appropriately setup and handle the necessary accounting associated with the proposed project.
*1) Is the project Federally Funded?
*2) Funding Source: If the project is funded by multiple sources please provide the approximate anticipated percentage of the total project cost to be paid by each source.
*3) Project Requirements
Note: This audit is not related to the project specific audit performed by your agency.
Vendor (CFDA # Not Required)
Recipient (CFDA # )
Sub-Recipient (CFDA # )
Signature of Applicant:
Signature of Applicant Please sign, print , and e-mail this form to the authorized CSX representative
*Legal Address (1):
*Name: Federal Award #:
Date of Award:
Page of
| RAILROAD CHANGE ORDER NO. 1 |
| EXHIBIT A |
| FL2832 Construction FAE KSW 20220112.pdf |
| Project Summary Sheet |
| Plant City SR-60 Tub FAE KSW 20210713B.pdf |
| Project Summary Sheet |
| Force Account Worksheet |
| FL2832 Construction FAE KSW 20220112.pdf |
| Project Summary Sheet |
File details come from the government source that posted it. Updated .