CN-370000-SW234.pdf
PDF 13 MB Posted
- Contract number
- SW234
- Issued by
- Florida
About this file
This document is a state contract between the Florida Department of Environmental Protection (FDEP) and Geosyntec Consultants for closure and long-term care services for two Construction and Demolition (C&D) Debris Disposal Facilities located in Walton County, Florida - specifically the Coyote East and Coyote West facilities. The contract (DEP Contract No. SW234) is an indefinite delivery vehicle that outlines the terms, conditions, and financial responsibilities for environmental remediation and site closure activities.
The contract covers comprehensive closure services including site inspections, engineering design, stormwater control system construction, vegetative layer installation, monitoring well maintenance, and long-term site care. The total estimated closing costs for the Coyote East facility are $979,238.05, with an additional long-term care cost of $113,826.04 over five years. For the Coyote West facility, the closing costs are $540,063.77, with long-term care costs of $140,512.97 over five years. The contract includes provisions for task assignments, financial assurance, subcontractor utilization, and adherence to Florida Administrative Code requirements for solid waste facility closure. Geosyntec will be compensated on a combination of fixed-price and cost-reimbursement basis, with a total initial funding increment of $1,077,162.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-SW234-T004.pdf | ||
| CN-370000-SW234-T004CO1.pdf | ||
| CN-370000-SW234-T005.pdf | ||
| CN-370000-HW553-A9.pdf | ||
| CN-370000-SW234-A1.pdf | ||
| CN-370000-SW234-T003CO2.pdf | ||
| CN-370000-SW234-CMC.pdf | ||
| CN-370000-SW234-T001.pdf | ||
| CN-370000-SW234-T003.pdf | ||
| CN-370000-SW234-T003CO1.pdf | ||
| CN-370000-SW234-T004CO2.pdf | ||
| CN-370000-SW234-T004CO3.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP Contract No. SW234, Attachment A, Page 15 of 67
Attachment A
Primary Closure Services to be provided under the Contract are to be identified with a corresponding scope of services on a task assignment basis for closure of the construction and demolition debris (C&D) solid waste facilities known as Coyote East and Coyote West. Such services may include site inspections;
engineering services to prepare closure plans and schedules; site management; closure related construction services such as site preparation, construction management, earthwork and grading;
installation of stormwater management systems; quality control and quality assurance construction inspection services; long-term care; and other site related services related to stabilizing and closing the Coyote East and Coyote West C&D facilities. Primary closure services are further described in the tabulation below.
Closure Related Services General Description
Engineering Design Provide suitable engineering plans and specifications for closure related activities.
Site Access Control Install fencing or other barriers as needed to deter unauthorized access to the construction site.
Sedimentation Control Install silt fence and other required turbidity barriers in accordance with NPDES requirements and the Florida Sedimentation manual.
Waste Relocation, Placement, and Compaction
General earthwork services that are intended to relocate stockpiled solid waste debris and provide sloping and fill prior to subsequent closure activities.
Cover Material Stockpile and Placement
General earthwork services that are intended to cover the stockpiling and placement of cover materials.
Stormwater Control System Construction of site stormwater controls consisting of swales, ponds and control structures.
Final Cover Installation General earthwork related to the placement of topsoil layer and placement of suitable ground cover.
Final Survey Professional services related to the preparation of final as-built certification for Department review.
1 2016-04-20
COMPUTATION COVER SHEET
Client: FDEP Project:
Coyote East C&D Debris Disposal Facility Project No.: FL2712
Phase No.: 02
Title of Computations FINANCIAL ASSURANCE COST ESTIMATE
Computations by: Signature
12-Jan-2016 Printed Name Alex Rivera, P.E. Date Title Engineer
Assumptions and Procedures Checked by:
(peer reviewer)
Signature 19-Jan-2016
Printed Name Craig Browne, P.E. Date Title Senior Engineer
Computations Checked by:
Signature 19-Jan-2016
Printed Name Craig Browne, P.E. Date Title Senior Engineer
Computations Backchecked by:
(originator)
Signature
20-Jan-2016 Printed Name Alex Rivera, P.E. Date Title Engineer
Approved by:
(pm or designate)
Signature 20-Apr-2016
Printed Name Craig Browne, P.E. Date Title Senior Engineer
Approval notes:
Revisions (number and initial all revisions)
No. Sheet Date By Checked by Approval
FL2712/Financial Assurance Narrative.doc DEP Contract
No. SW234, Attachment B, Page 16 of 67
ATTACHMENT B
Financial Assurance Cost Estimate Coyote East C&D Debris Disposal Facility
2 2016-04-20
COYOTE EAST C&D FACILITY
FINANCIAL ASSURANCE COST ESTIMATE
Geosyntec Consultants (Geosyntec) has prepared this financial assurance cost estimate (Estimate) in support of the closure of the Coyote East Construction and Demolition (C&D) Debris Disposal Facility (Site or Facility) in Freeport, Florida. This narrative discusses the methods and assumptions used to estimate the cost for the items listed on DEP Form 62- 701.900(28), hereafter referred to as Florida Department of Environmental Protection (FDEP) form. The items listed below were derived from item/unit pricing from contractors and Geosyntec’s experience with similar projects. For engineering and professional time, current Geosyntec labor rates and/or State and federal guidelines were used. The unit costs/labor rates were then used to prepare the costs presented in the FDEP form. Estimated costs are for construction and laboratory analytical testing to be performed by a third party. The item numbers noted below correspond to the item numbers on the FDEP form.
I. General Information
This Estimate covers the Facility closure costs and long-term care costs associated with the Facility. It is understood that the Facility has been under an FDEP closure order since 2011, although the Site failed to close in accordance with the order. Geosyntec conducted Site visits on 17 November 2015 and 3 December 2015 to evaluate existing Site conditions as they relate to closure and long-term care. Utilizing topographic data provided by Chris Odom Photo (acquired during a flyover performed on 12 January 2016), topographic elevations confirmed through a limited ground survey performed by Pittman, Glaze, and Associates, Inc. (dated 15 January 2016), site reconnaissance data gathered by Geosyntec in December 2015, and input from Mike Stephen of FDEP, the estimated C&D disposal footprint (adjusted utilizing a slope correction factor of 1.001 for the top deck area and 1.055 for the side slopes) is approximately
14.2 ac. and will require closure in accordance with Rule 62-701.730, Florida Administrative Code (F.A.C.). Geosyntec has prepared a conceptual site closure plan for the approximate C&D disposal area, shown on Figure 1, which depicts key features assumed for the Site Closure.
II. Type of Financial Assurance Document
The FDEP has assumed management of the escrow account associated with the Facility to address the financial assurance obligations associated with the closure and long-term care of the Facility.
FL2712/Financial Assurance Narrative.doc DEP Contract No.
SW234, Attachment B, Page 17 of 67
3 2016-04-20
III. Estimate Adjustment
This Estimate represents a recalculated cost estimate as requested by FDEP.
IV. Estimated Closing Cost
1. Monitoring Wells
A Site visit was conducted by Geosyntec on 17 November 2015 to locate existing monitoring wells and evaluate the status and condition of the monitoring wells. The recommendations related to the monitoring well network include: (i) addition of bollards to monitoring well MW- 2; (ii) installation of monitoring well MW-3; and (iii) painting of protective casing for MW-4 and MW-5. The cost estimate was obtained from unit rates provided by Preferred Drilling Solutions, Inc. of Live Oak, Florida (see Attachment 2).
The total cost for materials and labor for the above recommendations is $4,070.00
2. Slope and Fill (bedding layer between waste and barrier layer)
Per paragraph 62-701.730(9), F.A.C., a bedding layer is not a requirement in the closure of a C&D disposal facility. Therefore, slope and fill activities associated with the installation of a bedding layer is not included as part of this Estimate. However, as outlined in the Geosyntec memorandum, Coyote East Construction and Demolition Disposal Facility Site Inspection, Walton County, Florida (13 December 2015), areas of exposed waste were identified in the disposal footprint that require slope and fill activities as part of the closure process.
Specifically, approximately 29,060 cubic yards (CY) of stockpiled C&D debris will require on- Site relocation, placement, and compaction. The unit cost of debris management as provided in Attachment 2 by SWS Environmental Services (SWS) of Panama City Beach, Florida includes:
29,060 CY of on-site C&D debris management (handling, placement, and compaction) @
$3.75/CY = $108,975.00
3. Cover Material (Barrier Layer)
Per paragraph 62-701.730(9), F.A.C., a barrier layer is not a requirement in the closure of a C&D disposal facility. Therefore, the cost for the installation of a barrier layer is not included as part of this Estimate.
FL2712/Financial Assurance Narrative.doc DEP Contract No. SW234, Attachment B, Page 18 of
4 2016-04-20
4. Top Soil Cover (includes vegetative soil layer)
In accordance with paragraph 62-701.730(9)(b), F.A.C., the final cover system for a C&D disposal facility shall consist of a 24-inch (in.) thick soil layer with the upper 6 in. of which will be capable of supporting vegetation, and shall be graded and compacted as necessary to promote drainage and minimize erosion. Furthermore, the side slopes of all above-grade disposal units shall be no greater than three feet horizontal to one foot vertical rise (3H:1V).
The required final cover layer consists of 24-in. thick soil layer (with the upper 6 in. capable of supporting vegetation) over the estimated closure footprint of 14.2 ac. Therefore the installation of the cover system would require the following:
• approximately 14,732 CY of general fill (14.2 ac. × 18 in. required general fill thickness minus 19,632 CY of existing in-place onsite cover soil); and
• approximately 11,455 CY of topsoil material (11.4 ac. × 6 in. required vegetative soil thickness).
The cut soil volume from construction of the conceptual stormwater control structures (e.g.
detention pond and perimeter channel) is estimated to be approximately 8,810 CY (see Section 6). Assuming that cut soils are suitable as general fill, approximately 5,922 CY of imported general fill material (14,732 CY – 8,810 CY) will be required. It is assumed that the required materials will be obtained from off-site borrow source(s). The unit costs for the material, hauling, placement, spreading and compaction of cover system soils is provided by SWS in Attachment 2, and includes:
5,922 CY of off-site general fill material (material, transport, placement, and compaction)
@19.00/CY = $112,518.00
11,455 CY of off-site topsoil material (material, transport, placement, and compaction) @
$22.00/CY = $252,010.00
8,810 CY of on-site general fill material (cut, handling, placement and compaction) @
$6.00/CY = $52,860.00
5. Vegetative Layer
In accordance with paragraph 62-701.730(9)(b), F.A.C., the final cover shall be vegetated (e.g.
seeded or sodded). Based on unit rates provided by RDH Environmental (see Attachment 2), the cost estimate for hydroseeding the 14.2ac final cover system is:
14.2 ac @ $2,832/ac = $40,214.40
FL2712/Financial Assurance Narrative.doc DEP Contract No. SW234, Attachment B, Page 19 of 67
5 2016-04-20
6. Stormwater Control System
The perimeter and site storm water controls will be constructed as part of Site closure activities.
Storm water control components for the closure are assumed to include a top deck berm, “tack-on” drainage swales (terraces), downchute channels, perimeter channels, riprap lining at downchute and perimeter channel discharges, and a detention pond.
The proposed top deck berm will require approximately 530 CY (i.e., 1,174 linear feet × 12 square feet (SF) berm cross-sectional area) of fill. The side-slope drainage swales proposed for stormwater conveyance on the final cover system will require approximately 3,200 CY (i.e., 2,155 ft total swale length × 40 SF swale cross-sectional area) of fill. The downchute channels will require approximately 500 CY (i.e., 896 ft total downchute length x 15 SF cross-sectional area of the channel walls). The perimeter channel proposed for stormwater conveyance will require approximately 3,120 CY (i.e., 3,508 linear ft × 24 SF cross-sectional area) of earthwork (cut). The proposed stormwater detention pond will require approximately 5,690 CY (i.e., 200 linear ft × 768 SF cross-sectional area) of earthwork (cut). The earthwork cost for the total 8,810 CY of excavation cut (e.g. stormwater perimeter swale and detention pond) is included in Section 4. It is assumed that general fill will be imported and placed for stormwater conveyance features at a unit cost of $19.00/CY, and is based on cost information provided by SWS (Attachment 2).
Due to high stormwater flow velocities anticipated within the downchute channels, permanent turf reinforcement mat is recommended as a minimum erosion control measure. The cross-sectional width of the downchute channels is estimated to be 12 ft, resulting in a downchute channel area of approximately 1200 SY (i.e., 12 ft x 896 ft). The supply and installation price for the permanent turf reinforcement mat is approximately $10.00/SY as provided by Contech (Attachment 2).
Riprap lining is proposed at each downchute outlet (12 ft width by 18 ft length) and at each channel outlet (18 ft width by 30 ft length) into the proposed detention pond to provide erosion protection, as indicated on Figure 1. A total area of approximately 240 SY (i.e., 216 sf × 5 downchute outlets and 540 sf × 2 pond outfalls) will require the riprap lining, based on the conceptual design. The unit price for materials and installation is $36.00 per SY as provided by SWS in Attachment 2.
The cost for construction of the storm water control components of the final cover system is:
Earthwork: 4,230 CY @ $19.00/CY = $80,370.00 Top Deck Berm Fill: 530 CY Tack-on Swale Fill: 3,200 CY
Contract No. SW234, Attachment B, Page 20 of 67
6 2016-04-21
Downchute Fill: 500 CY Perimeter Swale Cut: Included in Section 4 Detention Pond Cut: Included in Section 4
Riprap: 240 SY @ $36.00/SY = $8,640.00 Turf Reinf. Mat: 1,200 SY @ 10.00/SY = $12,000.00
Total cost = $101,010.00
7. Gas Controls: Passive
Negligible landfill gas readings were observed by Geosyntec during the 13 December 2015 Site inspection. As such, passive gas control systems are not anticipated as part of the Site closure design. Therefore, the cost for the installation of a passive gas control system is not included as part of this Estimate.
8. Gas Control: Active Extraction
Negligible landfill gas readings were observed by Geosyntec during the 13 December 2015 Site inspection, therefore it is assumed that an active extraction gas control will not be required as part of the Site closure design. The cost for the installation of an active extraction gas control system is not included as part of this Estimate.
9. Security System
Geosyntec observed that the facility had a fence along the north boundary of the Site (parallel to Highway 20) that was in fair condition. At the time of the Site inspection, two (2) access gates from Highway 20 to the facility were in place, which both had a chain and lock to prevent unauthorized vehicles from entering. Fencing was not observed along the west and southwest boundary of the Site, though terrain (large earthen berms) and dense vegetation appear to provide sufficient access control in the absence of a fence. Fencing was not observed along the east and southeast boundary of the Site and unauthorized dumping from adjacent residential areas was observed. Therefore, up to 2,500 LF fencing installation along the east and southeast boundary to the Site is recommended. The unit price for materials and installation is $20.00 per LF as provided verbally by Niceville Fence, of Niceville, Florida.
A small sign located at the main (west) Site entrance was visible from Highway 20 to indicate that the Site is closed. General maintenance of the Site security features (e.g. fencing and gate) are included in the long-term maintenance section of this Estimate.
10. Engineering
FL2712/Financial Assurance Narrative.doc DEP Contract No. SW234, Attachment B, Page 21 of 67
7 2016-04-20
The costs of engineering services related to closure of the site is estimated to be 10 percent of the construction cost (sum of items 1 through 9 above). This estimate is based on Geosyntec experience and equates to 0.10 × $721,657.40 = $72,165.74
11. Professional Services
These costs are based on Geosyntec estimates and labor rates. It is estimated that approximately 3 percent of construction cost (sum of items 1 through 9 above) will be needed for contract/construction management, which equates to 0.03 × $721,657.40 = $21,649.72 (rounded to $21,650 on FDEP form).
It is estimated that approximately 7 percent of construction cost will be needed for construction quality assurance (CQA), which equates to 0.07 × $712,657.40 = $50,516.02 (rounded to $50,516 on FDEP form).
Quality assurance testing is estimated to be $1,500, based on recent CQA Plan requirements, estimated quantities, and Geosyntec’s experience.
12. Contingency
A contingency factor for closure costs of 10 percent is estimated.
13. Site Specific Costs
A cost for mobilization and demobilization was provided by SWS in Attachment 2 and is $25,000.00.
V. Annual Cost for Long-Term Care
1. Ground Water Monitoring
It is assumed that the monitoring and sampling activities for the five (5) Site wells (as listed in the most recent FDEP permit) will be self-performed by the FDEP. The estimated cost per well per event for laboratory analyses is $305.00. The laboratory estimate is based on a quote provided by Test America of Tampa, Florida (Attachment 2). It is assumed that the local Test America office (Pensacola, Florida) will be providing courier services to pick-up sample coolers.
The annual cost for monitoring the 5 wells at the Site on a semi-annual basis is:
Contract No. SW234, Attachment B, Page 22 of 67
FL2712/Financial Assurance Narrative.doc 8 2016-04-20
$305.00/monitoring well × 5 wells × 2 events/year = $3,050.00
2. Surface Water Monitoring
The most recent FDEP permit for the Site reflects two surface water monitoring locations.
Also, it is assumed that an additional surface water monitoring point will be located at the proposed detention pond. It is assumed that the monitoring and sampling activities for the surface water monitoring points will be self-performed by the FDEP. The estimated cost per surface water sampling event for laboratory analyses is $505.00. The laboratory estimate is based on a quote provided by Test America of Tampa, Florida (Attachment 2). It is assumed that the local Test America office (Pensacola, Florida) will be providing courier services to pick-up sample coolers.
The cost for monitoring the surface water at the Site on an annual basis is $505.00 per monitoring point. The total estimated annual cost to monitor surface water is:
$505.00/monitoring point × 3 monitoring points × 2 events/year = $3,030.00
3. Landfill Gas Monitoring
Passive and active gas systems are not included as part of the Site closure design. Therefore, the long-term costs associated with landfill gas monitoring is not included as part of this Estimate.
4. Leachate Monitoring
The Site is unlined and does not have a leachate collection system. As such, the cost for leachate monitoring is not included as part of this Estimate.
5. Leachate Collection/Treatment System Maintenance
The Site does not include a leachate collection and treatment system. Therefore, long-term care cost associated with maintenance of a leachate collection and treatment system is not included as part of this Estimate.
6. Maintenance of Groundwater Monitoring Wells
Maintenance of groundwater monitoring wells is estimated at $70.00/well/year, based on experience with similar sites.
DEP Contract No. SW234, Attachment B, Page 23 of 67
9 2016-04-20
Total yearly cost associated with maintenance of groundwater monitoring wells is estimated to be:
5 wells @ $70.00/well = $350.00
7. Gas System Maintenance
Passive and active gas systems are not included as part of the Site closure design. Therefore, long term costs associated with the maintenance of gas systems are not included as part of this Estimate.
8. Landscape Maintenance
It is estimated that approximately 25.6 ac. of the Site (approximately 14.2 ac. of waste footprint and 11.4 ac. of surrounding Site footprint) will require mowing and only the 14.2-ac. waste footprint will require maintenance at an annual cost of $126.12 per acre for mowing and $184.78 per acre for fertilizing. The estimate is based on quotes provided by RDH Environmental (see Attachment 2).
Mowing: 11.4 × $126.12 = $1,437.78 Fertilizing: 14.2 × $184.78 = $2,623.88
9. Erosion Control and Cover Maintenance
It is estimated that erosion control and cover maintenance will include minor regrading, cover repair, and revegetation (hydroseeding). The costs for these activities are noted on the FDEP form.
10. Storm Water Management System Maintenance
Lump sum costs estimated as shown on FDEP form.
11. Security System Maintenance
It is estimated that the security system (consisting of fencing and one access gate) will require minimal maintenance for the long-term maintenance period. The cost for minor maintenance of fencing is $21.00/linear foot. The cost for maintenance and repair of the main access gate is $200.00 per event, based on experience at similar sites.
DEP Contract No. SW234, Attachment B, Page 24 of 67
10 2016-04-20
12. Utilities
It is assumed that there will not be active facilities at the Site that require the usage of local utilities. Therefore, costs associated with utilities are not included as part of this Estimate.
13. Leachate Collection/Treatment Systems Operation
The current Site closure design does not include a leachate collection and treatment system.
Therefore, long-term care cost associated with operation of a leachate collection and treatment system is not included as part of this Estimate.
14. Administrative
An estimate for the administrative costs is noted on the financial assurance cost estimate form because it is assumed that FDEP will be assuming administrative responsibility for carrying out long-term care.
15. Contingency
A contingency of 10% of the total long-term care costs has been included in the cost estimate.
16. Site Specific Costs
No additional site specific costs are estimated.
DEP Contract No. SW234 Attachment B, Page 25 of 67
FIGURE
DEP Contract No. SW234, Attachment B, Page 26 of 67
PROJECT NO:
I:\ _C
AD
D
(P R
O
JE
C
TS
)\F \F
D
EP
\C O
YO
TE
L
AN
D S
C O
\C O
YO
TE
E
AS
T\
FI
G U
R
ES
\F L2
2.
\F
L2
2.
F0
(E
AS
T)
COYOTE EAST CONSTRUCTION AND
DEMOLITION DISPOSAL (C&D)
DISPOSAL FACILITY
FEBRUARY 2016FL2712.05
N
NOTE:
1. AERIAL IMAGERY OUTSIDE LIMITS OF DISPOSAL
AREA WAS PROVIDED BY BING MAPS (THROUGH
AUTOCAD CIVIL3D) AND IS DATED 2013.
2. AERIAL IMAGERY WITHIN LIMITS OF DISPOSAL AREA
WAS PROVIDED BY CHRIS ODOM PHOTO, ACQUIRED
DURING A FLYOVER PERFORMED ON 12 JANUARY
2016.
3. TOPOGRAPHIC DATA WITHIN LIMITS OF DISPOSAL
AREA WAS PROVIDED BY CHRIS ODOM PHOTO,
ACQUIRED DURING A FLYOVER PERFORMED ON 12
JANUARY 2016. TOPOGRAPHIC ELEVATIONS WERE
CONFIRMED THROUGH A LIMITED GROUND SURVEY
PERFORMED BY PITTMAN, GLAZE AND ASSOCIATES,
INC., DATED 15 JANUARY 2016.
200'0
SCALE IN FEET
Approximate boundary of C&D disposal area (11.4 acres)
Downdrains
Perimeter Swale
Top deck berm
Tack on swales
Sideslope downdrains: Assumed to be open channels lined with turf reinforcement mat and sod. Assumed dimensions are 1.5-ft depth, 4-ft bottom width, and 2H:1V sideslopes.
Top Deck Berm:
Assumed dimensions are 2 ft top width, 2 ft height, and 2:1 side slopes around perimeter of top deck.
Perimeter channel:
assumed 6 ft bottom width, 2 ft depth, and 3:1 side slopes
Proposed Detention Pond:
Assumed 6 ft depth with 3:1 side slopes. Riprap outfall protection assumed at each channel outfall in to pond (approximate dimensions 110 ft wide by 200 ft long.
Property boundary
Tack on swales: Assumed dimensions are 1.5 ft depth, 2 ft top width with 2:1 sideslopes.
DEP Contract No. SW234, Attachment B, Page 27 of 67
ATTACHMENT 1
FDEP CLOSURE COST
ESTIMATING FORM
DEP Contract No. SW234, Attachment B, Page 28 of 67
Florida Department of Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Date of DEP Approval:
I. GENERAL INFORMATION:
Facility Name: WACS ID:
Permit Application or Consent Order No.: Expiration Date:
Facility Address:
Permittee or Owner/Operator:
Mailing Address:
Latitude: ° ' " Longitude: ° ' "
Coordinate Method: Datum:
Collected by: Company/Affiliation:
Solid Waste Disposal Units Included in Estimate:
Total disposal unit acreage included in this estimate: Closure: Long-Term Care:
Facility type: Class I Class III C&D Debris Disposal (Check all that apply) Other:
II. TYPE OF FINANCIAL ASSURANCE DOCUMENT (Check type)
Letter of Credit* Insurance Certificate Escrow Account Performance Bond* Financial Test Form 29 (FA Deferral) Guarantee Bond* Trust Fund Agreement
DEP Form # 62-701.900(28), F.A.C.
Form Title: Closure Cost Estimating Form For Solid Waste Facilities
Effective Date: January 6, 2010
Incorporated in Rule 62-701.630(3), F.A.C.
CLOSURE COST ESTIMATING FORM FOR SOLID WASTE FACILITIES
Acres
If active:
Remaining life of unit
If closed:
Official date of closing
Active Life of Unit From Date of Initial Receipt of Waste
Date Unit Began
Accepting Waste
Fort Myers, FL 33901-3881 239-332-6975
Southeast District 400 N. Congress Ave., Ste. 200
If closed:
Date last waste received
West Palm Beach, FL 33401 561-681-6600
Southwest District 13051 N. Telecom Pky.
Temple Terrace, FL 33637 813-632-7600
Phase / Cell
Northeast District 7825 Baymeadows Way, Ste. B200
Jacksonville, FL 32256-7590 904-807-3300
Orlando, FL 32803-3767
Central District 3319 Maguire Blvd., Ste. 232
407-894-7555
Northwest District 160 Government Center
Pensacola, FL 32502-5794 850-595-8360
* - Indicates mechanisms that require the use of a Standby Trust Fund Agreement
South District 2295 Victoria Ave., Ste. 364
Coyote East C&D Debris Disposal Facility 15144
0002048-007-SO 3/4/2013
2377 Highway 20, 2 miles west of Freeport, Walton County, Florida
Coyote Land Company, Inc.
4 Laguna St, Suite 201, Fort Walton Beach, FL 32548
Site Permit WGS84
C&D Disposal Area 14.2 Unknown Unknown Unknown Unknown
14.2 14.2
30 30 30.74 86 10 24.93
Print Form Reset Form
DEP Contract No. SW234, Attachment B, Page 29 of 67
DEP Contract No. SW234, Attachment B, Page 30 of 67
IV. ESTIMATED CLOSING COST (check what applies) Recalculated Cost Estimate New Facility Cost Estimate
Notes: 1. Cost estimates for the time period when the extent and manner of landfill operation makes closing most exp
2. Cost estimate must be certified by a professional engineer.
3. Cost estimates based on third party suppliers of material, equipment and labor at fair market value.
4. In some cases, a price quote in support of individual item estimates may be required.
Unit Number of Units Cost / Unit Total Cost
EA _____
Subtotal Proposed Monitoring Wells:
2. Slope and Fill (bedding layer between waste and barrier layer):
Excavation CY _____ Placement and Spreading CY _____ Compaction CY _____ Off-Site Material CY _____ Delivery CY _____
Subtotal Slope and Fill:
3. Cover Material (Barrier Layer):
Off-Site Clay CY _____ Synthetics - 40 mil SY _____ Synthetics - GCL SY _____ Synthetics - Geonet SY _____ Synthetics - Other (explain) _____ _____
Subtotal Cover Material:
4. Top Soil Cover:
Off-Site Material CY _____ Delivery CY _____ Spread CY _____
Subtotal Top Soil Cover:
5. Vegetative Layer
Sodding SY _____ Hydroseeding AC _____ Fertilizer AC _____ Mulch AC _____ Other (explain) ____________ _____ _____
Subtotal Vegetative Layer:
6. Stormwater Control System:
Earthwork CY _____ Grading SY _____ Piping LF _____ Ditches LF _____ Berms LF _____ Control Structures EA _____ Other (explain)____________ _____ _____
Subtotal Stormwater Control System:
Description
1. Proposed Monitoring Wells (Do not include wells already in existence.)
DEP FORM 62-701.900(28)
Effective January 6, 2010 3 of 9
Included in earthwork total
Berm CY included in earthwork of waste
General Fill
Topsoil
Onsite Soil (Cut, placement, & compaction)
Riprap SY
SYTurf Reinf. Mat
29,060
5,922
11,455
8,810
14.2
4,230
1,200
$4,070.00 $4,070.00
$4,070.00
$3.75 $108,975.00
$108,975.00
$19.00 $22.00
$6.00
$112,518.00
$252,010.00
$52,860.00
$417,388.00
$2,832.00 $40,214.40
$40,214.40
$19.00
$36.00
$10.00
$80,370.00
$8,640.00
$12,000.00
$101,010.00
DEP Contract No. SW234, Attachment B, Page 31 of 67
Unit Number of Units Cost / Unit Total Cost
7. Passive Gas Control:
Wells EA _____ Pipe and Fittings LF _____ Monitoring Probes EA _____ NSPS/Title V requirements LS _____
Subtotal Passive Gas Control:
8. Active Gas Extraction Control:
Traps EA _____ Sumps EA _____ Flare Assembly EA _____ Flame Arrestor EA _____ Mist Eliminator EA _____ Flow Meter EA _____ Blowers EA _____ Collection System LF _____ Other (explain) ____________ _____ _____
Subtotal Active Gas Extraction Control:
9. Security System:
Fencing LF _____ Gate(s) EA _____ Sign(s) EA _____
Subtotal Security System:
10. Engineering:
Closure Plan Report LS _____
LS _____
NSPS/Title V Air Permit LS _____ Final Survey LS _____ Certification of Closure LS _____ Other (explain) ____________ _____ _____
Subtotal Engineering:
Description Hours Cost / Hour Hours Cost / Hour Total Cost
11. Professional Services
P.E. Supervisor _____ _____ _____ _____ On-Site Engineer _____ _____ _____ _____ Office Engineer _____ _____ _____ _____ On-Site Technician _____ _____ _____ _____ Other (explain) _____ _____ _____ _____
Description Unit Number of Units Cost / Unit Total Cost
Quality Assurance Testing LS _____ Subtotal Professional Services:
Quality Assurance
Description
Certified Engineering Drawings
Contract Management
DEP FORM 62-701.900(28)
Effective January 6, 2010 4 of 9
Engineering EA
Services
2,500
$20.00 $50,000.00
$50,000.00
$72,165.74 $72,165.74
$72,165.74
1 $50,516 $72,166.00
1 $1,500.00 $1,500.00
$73,666.00
1 $21,650
DEP Contract No. SW234, Attachment B, Page 32 of 67
Subtotal of 1-11 Above:
12. Contingency _____ % of Subtotal of 1-11 Above Subtotal Contingency:
Estimated Closing Cost Subtotal:
Total Cost
13. Site Specific Costs
Mobilization Waste Tire Facility Materials Recovery Facility Special Wastes Leachate Management System Modification Other (explain)
Subtotal Site Specific Costs:
TOTAL ESTIMATED CLOSING COSTS ($):
Description
10 $86,748.91
$954,238.05
$25,000.00
$25,000.00
$979,238.05
$867,489.14
$86,748.91
DEP FORM 62-701.900(28)
Effective January 6, 2010 5 of 9
DEP Contract No. SW234, Attachment B, Page 33 of 67
V. ANNUAL COST FOR LONG-TERM CARE
(Check Term Length) 5 Years 20 Years 30 Years Other, ___ Years Notes:
3. In some cases, a price quote in support of individual item estimates may be required.
All items must be addressed. Attach a detailed explanation for all entries left blank.
Description
Sampling Frequency
(Events / Year) Number of
Wells (Cost / Well) /
Event Annual Cost
1. Groundwater Monitoring [62-701.510(6), and (8)(a)] Monthly 12 _____ Quarterly 4 _____ Semi-Annually 2 _____ Annually 1 _____
Subtotal Groundwater Monitoring:
2. Surface Water Monitoring [62-701.510(4), and (8)(b)] Monthly 12 _____ Quarterly 4 _____ Semi-Annually 2 _____ Annually 1 _____
Subtotal Surface Water Monitoring:
Monthly 12 _____ Quarterly 4 _____ Semi-Annually 2 _____ Annually 1 _____
Subtotal Gas Monitoring:
4. Leachate Monitoring [62-701.510(5), (6)(b) and 62-701.510(8)c] Monthly 12 _____ Quarterly 4 _____ Semi-Annually 2 _____ Annually 1 _____ Other (explain) _________ _____ _____
Subtotal Leachate Monitoring:
Description Unit Number of Units / Year Cost / Unit Annual Cost
5. Leachate Collection/Treatment Systems Maintenance Maintenance Collection Pipes LF _____ Sumps, Traps EA _____ Lift Stations EA _____ Cleaning LS _____ Tanks EA _____
1. Cost estimates must be certified by a professional engineer.
See 62-701.600(1)a.1., 62-701.620(1), 62-701.630(3)a. and 62-701.730(11)b. F.A.C. for required term length. For landfills certified closed and Department accepted, enter the remaining long-term care length as "Other" and provide years remaining.
2. Cost estimates based on third party suppliers of material, equipment and labor at fair market value.
3. Gas Monitoring [62-701.400(10)]
DEP FORM 62-701.900(28)
Effective January 6, 2010 6 of 9
5 $305.00 $3,050.00
$3,050.00
3 $505.00 $3,030.00
$3,030.00
DEP Contract No. SW234, Attachment B, Page 34 of 67
Description Unit Number of Units / Year Cost / Unit Annual Cost
5. (continued) Impoundments Liner Repair SY _____ Sludge Removal CY _____ Aeration Systems Floating Aerators EA _____ Spray Aerators EA _____ Disposal
1000 gallon _____
6. Groundwater Monitoring Well Maintenance Monitoring Wells LF _____ Replacement EA _____ Abandonment EA _____
Subtotal Groundwater Monitoring Well Maintenance:
7. Gas System Maintenance
Piping, Vents LF _____ Blowers EA _____ Flaring Units EA _____ Meters, Valves EA _____ Compressors EA _____ Flame Arrestors EA _____ Operation LS _____
Subtotal Gas System Maintenance:
Mowing AC _____ Fertilizer AC _____
Subtotal Landscape Maintenance:
9. Erosion Control and Cover Maintenance Sodding SY _____ Regrading AC _____ Liner Repair SY _____ Clay CY _____
Subtotal Erosion Control and Cover Maintenance:
10. Storm Water Management System Maintenance Conveyance Maintenance LS _____
Subtotal Storm Water Management System Maintenance:
11. Security System Maintenance
Fences LS _____ Gate(s) EA _____ Sign(s) EA _____
Subtotal Security System Maintenance:
Off-site (Includes transportation and disposal)
8. Landscape Maintenance
Subtotal Leachate Collection / Treatment Systems Maintenance:
DEP FORM 62-701.900(28)
Effective January 6, 2010 7 of 9 and mowing (combined) hydroseed
1 $350.00 $350.00
$350.00
11.4
14.2
4,840
$126.12
$184.78
$0.60
$2,500.00
$1,437.77
$2,623.88
$4,061.64
$2,904.00 $2,500.00
$5,404.00
$2,500.00
$2,100.00
$2,500.00
$2,500.00
1 $200.00
$2,100.00
$200.00
$2,300.00
DEP Contract No. SW234, Attachment B, Page 35 of 67
Units / Year Cost / Unit Annual Cost
12. Utilities LS _____ Subtotal Utilities:
13. Leachate Collection/Treatment Systems Operation Operation P.E. Supervisor HR _____ On-Site Engineer HR _____ Office Engineer HR _____ OnSite Technician HR _____ Materials LS _____
Subtotal Leachate Collection/Treatment Systems Operation:
14. Administrative
P.E. Supervisor HR _____ On-Site Engineer HR _____ Office Engineer HR _____ OnSite Technician HR _____ Other ________________ _____ _____
Subtotal Administrative:
Subtotal of 1-14 Above:
15. Contingency _____ % of Subtotal of 1-14 Above Subtotal Contingency:
Description Unit Number of Units / Year Cost / Unit Annual Cost
16. Site Specific Costs
Subtotal Site Specific Costs:
ANNUAL LONG-TERM CARE COST ($ / YEAR):
Number of Years of Long-Term Care: _____
TOTAL LONG-TERM CARE COST ($):
DEP FORM 62-701.900(28)
Effective January 6, 2010 8 of 9
$20,695.64
$2,069.56
$22,765.21
$113,826.04
$2,069.56
DEP Contract No. SW234, Attachment B, Page 36 of 67
DEP Contract No. SW234, Attachment B, Page 37 of 67
1 2016-04-21
COMPUTATION COVER SHEET
Client: FDEP Project:
Coyote West C&D Debris Disposal Facility Project No.: FL2712
Phase No.: 02-05
Title of Computations FINANCIAL ASSURANCE COST ESTIMATE
Computations by: Signature
12-Jan-2016 Printed Name Alex Rivera, P.E. Date Title Engineer
Assumptions and Procedures Checked by:
(peer reviewer)
Signature 19-Jan-2016
Printed Name Craig Browne, P.E. Date Title Senior Engineer
Computations Checked by:
Signature 19-Jan-2016
Printed Name Craig Browne, P.E. Date Title Senior Engineer
Computations Backchecked by:
(originator)
Signature
20-Jan-2016 Printed Name Alex Rivera, P.E. Date Title Engineer
Approved by:
(pm or designate)
Signature 21-Apr-2016
Printed Name Craig Browne, P.E. Date Title Senior Engineer
Approval notes:
Revisions (number and initial all revisions)
No. Sheet Date By Checked by Approval
FL2712/Coyote West Financial Assurance Narrative.doc DEP Contract No. SW234, Attachment C, Page 38 of 67
ATTACHMENT C
Coyote West C&D Debris Disposal Facility
2 2016-04-21
COYOTE WEST C&D FACILITY
FINANCIAL ASSURANCE COST ESTIMATE
Geosyntec Consultants (Geosyntec) has prepared this financial assurance cost estimate (Estimate) in support of the closure of the Coyote West Construction and Demolition (C&D) Debris Disposal Facility (Site or Facility) in Freeport, Florida. This narrative discusses the methods and assumptions used to estimate the cost for the items listed on DEP Form 62- 701.900(28), hereafter referred to as Florida Department of Environmental Protection (FDEP) form. The items listed below were derived from item/unit pricing from contractors and Geosyntec’s experience with similar projects. For engineering and professional time, current Geosyntec labor rates and/or State and federal guidelines were used. The unit costs/labor rates were then used to prepare the costs presented in the FDEP form. Estimated costs are for construction and laboratory analytical testing to be performed by a third party. The item numbers noted below correspond to the item numbers on the FDEP form.
I. General Information
This Estimate covers the Facility closure costs and long-term care costs associated with the Facility. It is understood that the Facility has been under an FDEP closure order since 2011, although the Site failed to close in accordance with the order. Geosyntec conducted Site visits on 17 November 2015 and 3 December 2015 to evaluate existing Site conditions as they relate to closure and long-term care. Utilizing topographic data gathered from the Northwest Florida Water Management District (NWFWMD) LiDAR database (www.nwfwmdlidar.com), site reconnaissance data gathered by Geosyntec in December 2015, and input from Mike Stephen of FDEP, the estimated C&D disposal footprint is approximately 11.4 ac. (adjusted utilizing a slope correction factor of 1.001 for the top deck area and 1.055 for the side slopes) and will require closure in accordance with Rule 62-701.730, Florida Administrative Code (F.A.C.) An approximately 2.6 ac. area to the north of the C&D disposal area was utilized for land clearing debris (per Mike Stephen) and is not included as part of this Estimate. Geosyntec has prepared a conceptual site closure plan for the approximate C&D disposal area, shown on Figure 1, which depicts key features assumed for the Site Closure.
II. Type of Financial Assurance Document
The FDEP has assumed management of the escrow account associated with the Facility to address the financial assurance obligations associated with the closure and long-term care of the Facility.
FL2712/Coyote West Financial Assurance Narrative.doc DEP Contract No. SW234, Attachment C, Page 39 of 67
3 2016-04-21
III. Estimate Adjustment
This Estimate represents a recalculated cost estimate as requested by FDEP.
IV. Estimated Closing Cost
1. Monitoring Wells
A Site visit was completed by Geosyntec on 17 November 2015 to locate existing monitoring wells and evaluate the status and condition of the monitoring wells. The recommendations related to the monitoring well network include: (i) addition of bollards to monitoring wells MW-2, MW-3, MW-4, and MW-5; (ii) abandonment and reinstallation of monitoring well MW-2; (iii) reinstallation the protective casing and concrete well pad for MW-5; and (iv) painting of existing bollards and protective casings. The cost estimate was obtained from Preferred Drilling Solutions, Inc. of Live Oak, Florida (see Attachment 2).
The total cost for materials and labor for the above recommendations is $9,896.00
2. Slope and Fill (bedding layer between waste and barrier layer)
Per paragraph 62-701.730(9), F.A.C., a bedding layer is not a requirement in the closure of a C&D disposal facility. Therefore, slope and fill activities associated with the installation of a bedding layer is not included as part of this Estimate. However, as outlined in the Geosyntec memorandum, Coyote West Construction and Demolition Disposal Facility Site Inspection, Walton County, Florida (13 December 2015), areas were identified in the disposal footprint that may require slope and fill activities as part of the closure process. Specifically, approximately 1,500 cubic yards (CY) of stockpiled C&D debris will require on-Site relocation, placement, and compaction. The unit cost of debris management as provided in Attachment 2 by SWS Environmental Services (SWS) includes:
1,500 CY of on-site C&D debris management (excavation, handling, placement, and compaction) @ $5.00/CY = $7,500.00
3. Cover Material (Barrier Layer)
Per paragraph 62-701.730(9), F.A.C., a barrier layer is not a requirement in the closure of a C&D debris disposal facility. Therefore, the cost for the installation of a barrier layer is not included as part of this Estimate.
DEP Contract No. SW234, Attachment C, Page 40 of 67
4 2016-04-21
4. Top Soil Cover (includes vegetative soil layer)
In accordance with paragraph 62-701.730(9)(b), F.A.C., the final cover system for a C&D disposal facility shall consist of a 24-inch (in.) thick soil layer with the upper 6 in. of which will be capable of supporting vegetation, and shall be graded and compacted as necessary to promote drainage and minimize erosion. Furthermore, the side slopes of all above-grade disposal units shall be no greater than three feet horizontal to one foot vertical rise (3H:1V).
The required final cover layer consists of 24-in. thick soil layer (with the upper 6 in. capable of supporting vegetation) over the estimated closure surface area of 11.4 ac. As noted in the Geosyntec memorandum, Coyote West Construction and Demolition Disposal Facility Site Inspection, Walton County, Florida (13 December 2015), varying thicknesses of cover soil exist on top of the C&D debris at the Facility. It is estimated that approximately 8,740 CY exists at the Facility and can remain in place or be re-used for the final cover system construction. Therefore the installation of the cover system would require the following earthwork:
• approximately 18,860 CY of general fill (11.4 ac. × 18 in. required general fill thickness minus 8,740 CY of existing in-place onsite cover soil); and
• approximately 9,200 CY of topsoil material (11.4 ac. × 6 in. required vegetative soil thickness).
Therefore, the total estimated volume of cover soil (general fill and topsoil) required for the
11.4 ac. C&D disposal area is 28,060 CY. The estimated cut soils from construction of the conceptual stormwater control structures (e.g. detention pond and perimeter channel) is approximately 21,250 CY (see Section 6). Assuming that cut soils are suitable as general fill and/or topsoil, approximately 6,810 CY of imported fill/topsoil material (28,060 CY – 21,250 CY) will be required. It is assumed that the imported materials will be obtained from off-site borrow source(s). The unit costs for the material, hauling, placement, spreading and compaction of cover system soils is provided by SWS in Attachment 2, and includes:
21,250 CY of on-site soil material (cut, handling, placement and compaction) @ $6.00/CY = $127,500.00 6,810 CY of off-site topsoil material (transport, placement, and compaction) @ $22.00/CY = $149,820.00
5. Vegetative Layer
In accordance with paragraph 62-701.730(9)(b), F.A.C., the final cover shall be vegetated (e.g.
seeded or sodded). Assuming that additional top soil cover will be installed over the estimated
11.4 ac. closure footprint, approximately 55,180 SY of seed will be required for the final cover
FL2712/Coyote West Financial Assurance Narrative.doc DEP Contract No. SW234, Attachment C, Page 41 of 67
5 2016-04-21 system. The cost estimate provided by RDH Environmental (see Attachment 2) for the installation of seed is $32,280.30 (or approximately $2832/AC).
The total cost for seeding the final cover system is:
11.4 AC @ $2832/AC = $32,284.80
6. Stormwater Control System
The perimeter and site storm water controls will be constructed as part of Site closure activities.
Storm water control components for the closure will include a top deck berm, “tack-on” drainage swales (terraces), downchute channels, perimeter channels, riprap lining at downchute and perimeter channel discharges, perimeter swales, and a detention pond.
The proposed top deck berm will require approximately 720 CY (i.e., 1,600 linear feet × 12 square feet (SF) berm cross-sectional area) of fill. The side-slope drainage swales proposed for stormwater conveyance on the final cover system will require approximately 1,120 CY (i.e., 750 ft total swale length × 40 SF swale cross-sectional area) of fill. The perimeter channel proposed for stormwater conveyance will require approximately 3,030 CY (i.e., 3,400 linear ft × 24 SF cross-sectional area) of earthwork (cut). The proposed stormwater detention pond will require approximately 18,230 CY (i.e., 615 linear ft × 800 SF cross-sectional area) of earthwork (cut). The earthwork price for excavation cut (e.g. stormwater perimeter swale and detention pond) is included in Section 4. It is assumed that general fill will be imported and installed for stormwater conveyance features at a unit cost of $16.00/CY, and is based on cost information provided by SWS (Attachment 2).
Due to high stormwater flow velocities anticipated within the downchute channels, permanent turf reinforcement mat is recommended as a minimum erosion control measure. The cross-sectional width of the downchute channels is estimated to be 12 ft, resulting in a downchute channel area of approximately 1210 SY (i.e., 12 ft x 902 ft). The supply and installation price for the permanent turf reinforcement mat is approximately $10.00/SY as provided by Contech (Attachment 2).
Riprap lining is proposed at each downchute outlet (12 ft width by 18 ft length) and at each channel outlet (18 ft width by 30 ft length) into the proposed detention pond to provide erosion protection, as indicated on Figure 1. A total area of approximately 240 SY (i.e., 216 sf × 5 downchute outlets and 540 sf × 2 pond outfalls) will require the riprap lining, based on the conceptual design. The unit price for materials and installation is $36.00 per SY as provided by SWS in Attachment 2.
DEP Contract No. SW234, Attachment C, Page 42 of 67
6 2016-04-21
The cost for construction of the storm water control components of the final cover system is:
Earthwork: 2,350 CY @ $16.00/CY = $37,600.00 Top Deck Berm Fill: 720 CY Tack-on Swale Fill: 1,120 CY Downchute Fill: 510 CY Perimeter Swale Cut: Included in Section 4 Detention Pond Cut: Included in Section 4
Riprap: 240 SY @ $36.00/SY = $8,640.00 Turf Reinf. Mat: 1,210 SY @ 10.00/SY = $12,100.00
Total cost = $58,340.00
7. Gas Controls: Passive
Negligible landfill gas readings were observed by Geosyntec during the 13 December 2015 Site inspection. As such, passive gas control systems are not anticipated as part of the Site closure design. Therefore, the cost for the installation of a passive gas control system is not included as part of this Estimate.
8. Gas Control: Active Extraction
Negligible landfill gas readings were observed by Geosyntec during the 13 December 2015 Site inspection, therefore it is assumed that an active extraction gas control will not be required as part of the Site closure design. The cost for the installation of an active extraction gas control system is not included as part of this Estimate.
9. Security System
Current Site security includes a perimeter fence observed along the west (parallel to Hatcher Cemetery Road) and south (adjacent to Hatcher Cemetery) boundaries and a site access gate.
Fencing was not observed along the east boundary of the Site, though terrain and dense vegetation appear to provide sufficient access control in the absence of a fence. No sign was observed at the Site entrance to indicate the Site is closed or to refer individuals to contact FDEP, if necessary. Therefore, fencing and gate installation is not included as part of the closure costs in this Estimate. The cost to install appropriate signage to the front entrance of the Site is estimated to be $200.00.
General maintenance of the Site security features (e.g. fencing and gate) are included in the long-term maintenance section of this Estimate.
Contract No. SW234, Attachment C, Page 43 of 67
7 2016-04-21
10. Engineering
The costs of engineering services related to closure of the site is estimated to be 10 percent of the construction cost (sum of items 1 through 9 above). This estimate is based on Geosyntec experience and equates to 0.10 × $385,536.30 = $38,554.08
11. Professional Services
These costs are based on Geosyntec estimates and labor rates. It is estimated that approximately 3 percent of construction cost (sum of items 1 through 9 above) will be needed for contract/construction management, which equates to 0.03 × $385,536.30 = $11,566.00.
It is estimated that approximately 7 percent of construction cost will be needed for construction quality assurance (CQA), which equates to 0.07 × $385,536.30 = $26,988.00.
Quality assurance testing is estimated to be $1,500, based on recent CQA Plan requirements, estimated quantities, and Geosyntec’s experience.
12. Contingency
A contingency factor for closure costs of 10 percent is estimated.
13. Site Specific Costs
Approximately 42,500 square feet (SF) of surface area will require clearing and grubbing to allow access for cover material installation. The estimated cost for clearing and grubbing, as provided in Attachment 2 by RDH Environmental, is $4,500.
A cost for mobilization/demobilization, site preparation, and installation of site controls was provided by SWS in Attachment 2 and is $25,000.00.
V. Annual Cost for Long-Term Care
1. Ground Water Monitoring
It is assumed that the monitoring and sampling activities for the 10 Site wells will be self-performed by the FDEP. The estimated cost per well per event for laboratory analyses is $305.00. The laboratory estimate is based on a quote provided by Test America of Tampa, Florida (Attachment 2). It is assumed that the local Test America office (Pensacola, Florida) will be providing courier services to pick-up sample coolers.
DEP Contract No. SW234, Attachment C, Page 44 of 67
8 2016-04-21
The total annual cost for monitoring the 10 wells at the Site is estimated to be:
10 wells @ $305.00/well/event × 2 events/yr = $6,100.00
2. Surface Water Monitoring
Historical sampling reports for the Site reflect 4 surface water monitoring locations. Also, it is assumed that an additional surface water monitoring point at the proposed detention pond. It is assumed that the monitoring and sampling activities for the surface water monitoring points will be self-performed by the FDEP. The estimated cost per surface water sampling event for laboratory analyses is $505.00. The laboratory estimate is based on a quote provided by Test America of Tampa, Florida (Attachment 2). It is assumed that the local Test America office (Pensacola, Florida) will be providing courier services to pick-up sample coolers.
The cost for monitoring the surface water at the Site on an annual basis is $505.00 per monitoring point. The total estimated annual cost to monitor surface water is:
$505/monitoring point × 5 monitoring points × 2 events/year = $5,050
3. Landfill Gas Monitoring
Passive and active gas systems are not included as part of the Site closure design. Therefore, long term costs associated with landfill gas monitoring are not included as part of this Estimate.
4. Leachate Monitoring
The Site is…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .