This document is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP), Division of State Lands under DEP Contract No. PL517. The assignment, numbered PL517.012, engages NorthStar Contracting Group, Inc. (FEID No. 13-3879343) to perform environmental assessment services on property owned by The Florida Future Farmers of America Foundation, Inc., located in Polk County, Florida. The property, comprising 74.43 acres across two parcels, is being evaluated for potential acquisition as part of an addition to the Allen David Broussard Catfish Creek Preserve State Park.
The contract requires NorthStar to provide a Limited Phase II Environmental Site Assessment including soil and groundwater evaluation of a rifle backstop area, monitoring well installation and sampling, and potable well testing. The scope encompasses soil boring advancement to 15 locations, laboratory analysis for RCRA 8 metals and TCLP testing, installation of two temporary monitoring wells, groundwater sampling, and production of a comprehensive assessment report certified by a licensed Florida professional engineer or geologist. The total contract value is $32,231.45, allocated as $22,481.32 for field work and $6,820.00 for reporting, with a 10% contingency of $2,930.13 included. The draft products are due by August 11, 2025, with liquidated damages assessed at $25.00 per day for delays. The contractor must comply with Division of State Lands standards, ASTM E1903 requirements, and related federal protocols, with no deviations permitted without written DSL approval.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-PL517-T13.pdf | ||
| CN-370000-PL517-T6.pdf | ||
| CN-370000-PL517-T3.pdf | ||
| CN-370000-PL517-T4.pdf | ||
| CN-370000-PL517-T7.pdf | ||
| CN-370000-PL517-T8CO1.pdf | ||
| CN-370000-PL517-T9.pdf | ||
| CN-370000-PL517.pdf | ||
| PC-370000-PL517.pdf | ||
| CN-370000-PL517-T1.pdf | ||
| CN-370000-PL517-T11.pdf | ||
| CN-370000-PL517-T2.pdf | ||
| CN-370000-PL517-T5.pdf | ||
| CN-370000-PL517-T5CO1.pdf | ||
| CN-370000-PL517-T8.pdf | ||
| CN-370000-PL517-T10.pdf | ||
| CN-370000-PL517-T14.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TASK ASSIGNMENT NOTIFICATION FORM
DEP CONTRACT NO. PL517
Task Assignment Number: PL517.012 BLA File Number: 328913 Date: June 2, 2025
Project Name: Catfish Creek County: Polk Owner’s Name: The Florida Future Farmers of America Foundation, Inc. Acres: 74.43 Parcel ID No: 282914000000033010 & 282915000000011010
Contractor: NORTHSTAR CONTRACTING GROUP, INC. FEID No: 13-3879343 Contractor Contract Manager: Pamela Jackson Phone Number: 850-531-9860 DEP Designated Task Manager: James Parker Phone Number: 850-245-3045 DEP Contract Manager: James Parker Phone Number: 850-245-3045 Subcontractors: (List, if any) ___________________________ MBE: ______ Yes No ___________________________________________________ MBE: ______ Yes No
Task Description (Use additional sheets if necessary):
Provide a Limited Phase II Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B”, and as outlined in the cost proposal / scope of work dated June 2nd, 2025 attached as Exhibit “C”. In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) E1903 standard. If the DSL standards and ASTM requirements for Phase II ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The Phase II ESA report must be approved and certified by a professional engineer or professional geologist licensed by the State of Florida. No deviations from the above-mentioned standards are allowed, unless in writing from the Division of State Lands.
Deviations:
None
Property Contacts For property specific questions and access contact Mr. Dean Saunders 863-287-8340 or Shea Booster at 541- 771-1177 Attachments: Exhibit “A”, Exhibit “B”, Exhibit C
DRAFT Products Due Date: August 11, 2025 Liquidated Damages Per Day Charge: $ 25.00
Task Assignment Type: Amount Not to Exceed:
Fee Schedule/Not to exceed $ 32,231.45 Additional AUL/Lien Searches $ NA Radon, ACM, LBP, Mold Surveys $ NA Total Task Assignment Value $ 32,231.45
NORTHSTAR CONTRACTING GROUP, INC. FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION
Contract Manager Date DEP Contract Manager or designee Date
APPROVED:
Contractual Authority Date
Funding Authority Date
Pamela JW Jackson
Digitally signed by Pamela JW Jackson Date: 2025.06.02 17:55:15 -04'00'
James Parker
Digitally signed by James Parker Date: 2025.06.02 09:51:48 -04'00'
Digitally signed by Robbie Parrish Date: 2025.06.02 13:46:36 -04'00'
Jill Buckley Digitally signed by Jill Buckley Date: 2025.06.02 12:02:01 -04'00'
Funding Information:
Org. Code E. O. Fund Object Code Budget Entity Module Special Category Project # Year Amount
37102400000 QH 423001 131545 37100400 N/A 084108 50004 23 $32,231.45
cc: Contracts Office (MS93)
Bureau of Finance & Accounting (MS75) 2 copies
29-Digit FLAIR Code: 37202423001371004000008410823
Performance Measure: DEP Contract Manager will review deliverable to ensure specifications were met.
Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
FFLORIDAA DEPARTMENTT OF
EEnvironmentall Protection
Marjory Stoneman Douglas Building 3900 Commonwealth Boulevard
Tallahassee, FL 32399
Ronn DeSantis Governor
Alexiss A.. Lambert Secretary
APPRAISAL MAP REVIEW MEMO
TO: Robbie Parrish, Bureau Chief Bureau of Real Estate Services
FROM: Gary Tew, PLS Manager Signature:
Bureau of Survey & Mapping Date:
PROJECT NAME: Catfish Creek
OWNER’S NAME: The Florida Future Farmers of America Foundation, Inc.
PARCEL IDs: 282914000000033010 & 282915000000011010 (partial)
Sections 10, 14, & 15, Township 29 South, Range 28 East, Polk County, Florida.
COMMENTS: The property contains several buildings. It is bordered by Lake Pierce, Catfish Creek Preserve State Park, Allen David Broussard Catfish Creek Preserve State Park, privately owned non-conservation lands, and Catfish Creek which intersects the subject property.
AREAS: Total = 74.43 +/- (Wetlands = 30.98 +/- acres; Uplands = 43.45 +/- acres)(acreages are subject to change upon completion of a boundary survey locating the outparcel)
Title information dated March 25, 2024 has been reviewed.
Legal and physical access to area of the parcel lying North of Catfish Creek is via Firetower Road. Legal and physical access is not guaranteed to the portion of the property lying South of Catfish Creek.
The legal description was derived from the title information referenced above and is attached as Exhibit “A”.
The boundaries, areas and wetlands were derived from December 2024 Cooperative Land Cover data, April 2025 FNAI data, Polk County GIS data, and a 2024 boundary survey of the property by Pickett and Associates, LLC.
The description, areas, boundaries, and encumbrances are subject to change with an accurate field survey and title insurance commitment.
May 8, 2025
Catfish Creek The Florida Future Farmers of America Foundation, Inc.
Polk County Page 1 of 1
EXHIBIT “A”
That part of Section 14, Township 29 South, Range 28 East, Polk County, Florida, described as follows:
The West 200.00 feet of the North 2160.00 feet, and the East 155.00 feet of the Wests 355.00 feet of the South 706.00 feet of the North 2160.00 feet;
The above described compromising a portion of U.S. Government Lot 1 and a portion of U.S.
Government Lot 3.
AND
U.S. Government Lots 6, 7, 8 and that portion of U.S. Government Lot 5 described as follows:
Begin at the Northeast corner of said U.S. Government Lot 5; run thence Southwest to the water’s edge of Lake Pierce; run thence Southeasterly along the water’s edge of Lake Pierce to the East line of said U.S. Government Lot 5; run thence North to the Point of Beginning.
All in Section 10, Township 29 South, Range 28 East.
LESS AND EXCEPT that portion of Government Lot 6 deeded to the State of Florida in Official Records Book 4775, Page 2289, of the Public Records of Polk County, Florida.
ALSO LESS AND EXCEPT an approximately 33-acre outparcel lying Northwesterly of Firetower Road as depicted in the attached aerial map (final legal description to be determined by surveyor with landowner agreement).
AND
U.S. Government Lots 4 and 5 in Section 15, Township 29 South, Range 28 East, Polk County, Florida.
NOTE: This legal description is for appraisal and contract purposes. There will be revisions based on a boundary survey and title insurance commitment of the property.
May 8, 2025
State of Florida Department of Environmental Protection
Phase II Environmental Site Assessment Services Exhibit K
REQUIREMENTS FOR PERFORMING PHASE II ENVIRONMENTAL SITE ASSESSMENT
(PHASE II ESA)
1. Certify the Phase II Environmental Site Assessment (ESA) to the Board of Trustees and any other parties requested by DSL. If the report is not certified to the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida and other requested parties, the product will not be accepted. The certification shall state the following: (a) the date the Task Assignment (TA) was signed by the Contractor and the due date (also insert a copy of the signed TA in the report following the certification page); (b) the Phase II Environmental Site Assessment (ESA) meets the requirements of the Department of Environmental Protection, Division of State Lands; (c) the accuracy, correctness and completeness of the Phase II ESA is provided with the knowledge of the Comprehensive Environmental Response Compensation And Liability Act as set forth in 42 U.S.C.
Section 9601 et seq., as amended (“CERCLA”); and (d) the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida is entitled to rely on the information set forth in the Phase II ESA.
2. Requests for deviation from the requirements as set forth must be approved in writing by the DSL prior to the issuance of a TA.
3. Contractor agrees to notify DSL immediately a) if any substantial problems unfold or are discovered at any point during the Phase II ESA that impact the Subject Property, or b) if any new Recognized Environmental Conditions (RECs) that were not listed as an REC in the corresponding Phase I ESA are discovered during the course of the Phase II ESA.
4. Contractor agrees to communicate to DSL, by email and/or telephone, all of the data results once received from the laboratory prior to submittal of the written report.
5. Provide color photographs of the Phase II ESA work and any onsite conditions that may have changed since the Phase I ESA that may be of concern. Photographs should provide a good representation of the site’s RECs that are associated with the Phase II ESA.
Orient all photographs on a site map.
6. Provide correlating Geographic Information System (GPS) points for all existing wells, sample points, monitor wells, and newly discovered recognized environmental conditions, items of concern or business environmental risks.
Orient GPS points on a site map.
7. All Phase II ESAs shall be approved and certified by a Professional Engineer or Professional Geologist licensed by the State of Florida.
8. Submit a report which shall include a description of the RECs identified in the Phase I ESA (any other
RECs identified during the course of the Phase II ESA), the correlating work performed;
observations; all back up documentation including, but not limited to, the results of the laboratory analysis, waste manifests, receipts and chain of custody documentation; monitoring well construction data; findings; conclusions, and specific recommendations based on the conditions encountered during the assessment.
9. As requested, provide any required hard copies of the reports on double-sided pages.
10. Clearly label appendices in the report.
11. One (1) certified digital copy of the Phase II ESA shall be delivered to the DSL on compact disc, USB storage device, or other approved electronic method as set out below:
The Department Contract Manager Office of Environmental Services Department of Environmental Protection 3900 Commonwealth Boulevard, Mail Station 140 Tallahassee, Florida 32399
325 John Knox Road, C-100 Tallahassee, Florida 32303
850-531-9860 Phone 850-531-9866 Fax
NorthStar Contracting Group, Inc.
www.northstar.com
June 2, 2025
Mr. James Parker Government Operations Consultant III Office of Environmental Services, Division of State Lands Florida Department of Environmental Protection 3900 Commonwealth Boulevard, MS 140 Tallahassee, FL 32399-3000
SUBJECT: WORK PLAN FOR CATFISH CREEK (REVISED BOUNDARY) LIMITED GROUNDWATER AND
SOIL ASSESSMENT
The Florida Future Farmers of America Foundation, Inc.
4902 Firetower Rd, Haines City, FL 33844
Mr. Parker:
NorthStar Contracting Group, Inc. (NorthStar) is pleased to present this Work Plan (WP) to conducted a limited additional assessment of the Florida Future Farmers of American Foundation, Inc (FFFAF) property
– revised property boundaries, southern portion. FDEP is seeking to acquire this property as part of an addition to the Allen David Broussard Catfish Creek Preserve State Park. As part of the due diligence for the land acquisition, FDEP wants to assess soil conditions at a rifle backstop as well as complete a limited evaluation of groundwater impacts beneath the backstop, to the onsite potable well, and at the property’s northern boundary.
Task 1: Field Work This task item includes mobilization to and from the property, conducting soil sampling, monitoring well installation, groundwater sampling, potable well sampling, and monitoring well abandonment.
Backstop Sampling: The NorthStar field crew will mobilize to the site to conduct soil assessment of the Villa 10 backstop. The purpose of the soil assessment will be to determine the horizontal and vertical impacts of site activities to soil within and beneath the backstop berm. To accomplish this, 15 soil borings will be advanced to the water table or 1-foot below the foot of the backstop berm. The soil locations will be based on a sampling grid show in the attached figure. The soil borings will be advanced with a pre-cleaned stainless steel hand auger. Soil samples will be collected at 1-foot intervals per FDEP Standard Operating Procedures (SOP) for field sampling activities. These discrete soil samples will be analyzed for RCRA 8 Metals. In addition to the discrete soil samples, two composite soil samples for waste characterization will be collected. These samples will be composited from the soil collected during the soil boring installation. The waste characterization samples will represent an “inner” and an “outer” area, such that the inner sample represents the areas most likely to be impacted by rifle shot and therefore most likely to require offsite disposal. The outer sample will be collected from the perimeter borings and represent areas less likely to be impacted. Waste characterization samples will be analyzed for TCLP RCRA 8 metals.
Monitor Well Installation and Abandonment: Two monitor wells will be installed during this investigation. One monitor well will be installed near the northern property boundary. The other will be
NorthStar Contracting Group, Inc.
www.northstar.com
Mr. James Paker, LEP FDEP – Division of State Lands Catfish Creek Soil and Groundwater Limited Assessment installed immediately adjacent to the Villa 10 backstop. A map showing the proposed well locations is attached. Both wells will be constructed of 2-inch PVC with a filter pack and bentonite seal. Because these will be temporary installations, no cement seal or surface completion will be installed. After development, the wells will be secured with a locking cap and safety cones. Once sampled (approximately one week after installation), the wells will be abandoned. This work will be conducted by a licensed Florida well driller and supervised by NorthStar personnel. The wells will be installed during the backstop soil sampling event. Abandonment will be conducted during a separate mobilization.
Groundwater Assessment: Approximately one week after well installation, the two temporary monitor wells and the onsite potable water well will be sampled. The monitor wells will be purged and sampled according to FDEP SOP for field sampling. The potable water well sample will be collected from as close to the well-head as possible and aerators present on the spigot will be removed prior to collecting the sample. All water samples will be analyzed for USEPA Methods 8 70, 8081, 8082, and RCRA 8 metals.
Task 2: Reporting The costs under this task include production of a detailed letter report summarizing the field activities and findings of the assessment sampling. The report will include detailed maps showing areas of investigation along with tables summarizing data from the project area to date. The waste characterization data will be utilized to determine if soil must be removed, how much soil will be removed, and whether the soil can be disposed as hazardous or non-hazardous. The report will be signed and sealed by a Florida registered professional geologist or engineer.
COST
Total estimated cost for the above-mentioned scope of services is $32,231.45. The work will be billed on a time and material basis. A 10% contingency amount is included to cover unexpected impacts to the cost schedule, such as additional analyses or extra mobilizations due to weather conditions. No costs beyond those actually incurred will be billed. The rates presented in this estimate are established rates from a recent contract between NorthStar and the State of Florida (BEF01, FDOT District 5). NorthStar appreciates the opportunity to provide these services. Should you have any questions, please contact me at pjackson@northstar.com or (850) 661-4415.
Sincerely, NorthStar Contracting Group, Inc.
Pamela Jackson, PG Senior Professional Geologist
Cc: project file
Attachments: Cost Estimate
COST ESTIMATE
FDEP - Division of State Lands Catfish Creek Shooting Range Phase II
Cost Estimate Revision 0
Catfish Creek - South Additional Site Assessment: Villa 10 Backstop and Groundwater
TASK 1: Soil and Groundwater Assessment
PERSONNEL/LABOR RATE AMOUNT UNITS EXTENDED RATE
PROJECT MANAGER $120.00 2.5 HOURS $300.00
ADMINISTRATIVE ASSISTANT $40.00 4.0 HOURS $160.00
SR GEOLOGIST/ENGINEER $115.00 10.0 HOURS $1,150.00
PROJECT SCIENTIST $110.00 50.0 HOURS $5,500.00
GIS SPECIALIST $85.00 2.0 HOURS $170.00
SENIOR TECHNICIAN $85.00 32.0 HOURS $2,720.00
$10,000.00
EQUIPMENT RATE AMOUNT UNITS EXTENDED RATE
PICKUP TRUCK $70.00 5 DAYS $350.00
MILEAGE $0.445 504 MILES $224.28
GPS EQUIPMENT $5.00 3 WEEK $15.00
METAL DETECTOR $25.00 3 DAYS $75.00
CONDUCTIVITY/pH METER $75.00 1 DAYS $75.00
DO METER $35.00 1 DAYS $35.00
TURBIDITY METER $29.56 4 DAYS $118.24
WATER LEVEL INDICATOR $15.00 5 DAYS $75.00
PERISTALTIC PUMP $35.00 1 DAYS $35.00
HAND AUGER $1.00 3 DAYS $3.00
$1,005.52
ANALYTICALS RATE AMOUNT UNITS EXTENDED RATE
EPA 6010 RCRA 8 Metals - Soil $76.00 77 EACH $5,852.00 EPA 6010/7470 - TCLP Extraction (composite) $50.00 2 EACH $100.00 EPA 6010/7470 - TCLP Metals Extract (composite) $76.00 2 EACH $152.00 USEPA 8270/8081/8082 Groundwater $125.00 4 EACH $500.00 USEPA RCRA 8 Metals Groundwater $76.00 4 EACH $304.00
$6,908.00
LODGING AND PER DIEM RATE AMOUNT UNITS EXTENDED RATE
LODGING (2 People, 3 days) $181.70 4 EACH $726.80 PER DIEM (2 People, 3 days) $36.00 6 PER DAY $216.00
$942.80
OTHER DIRECT COSTS RATE AMOUNT UNITS EXTENDED RATE
Licened Well Driller (install/abandon) $3,500.00 1 Lump Est. $3,500.00 Miscellaneous Expendables $25.00 5 Lump Est. $125.00
$3,625.00
TASK 1 - Field Work: $22,481.32
LABOR SUBTOTAL
EQUIPMENT SUBTOTAL
LODGING AND PER DIEM SUBTOTAL
ANALYTICALS SUBTOTAL
OTHER DIRECT COSTS SUBTOTAL
https://lviservices1-my.sharepoint.com/personal/pjackson_northstar_com/Documents/Laptop/Desktop/Tranfer/State Lands/PL517 ESA/Estimates/Catfish Creek Revised Boundary Addntl Assess/Catfish Creek South Assessment Page 1 of 2
FDEP - Division of State Lands Catfish Creek Shooting Range Phase II
Cost Estimate Revision 0
Catfish Creek - South Additional Site Assessment: Villa 10 Backstop and Groundwater
TASK 2: Assessment Report
PERSONNEL/LABOR RATE AMOUNT UNITS EXTENDED RATE
PROJECT MANAGER $120.00 1 HOURS $120.00
SR ENGINEER/GEOLOGIST/SCIENTIST $115.00 10 HOURS $1,150.00
PROJECT ENGINEER/GEOLOGIST $110.00 35 HOURS $3,850.00
GIS SPECIALIST $85.00 20 HOURS $1,700.00
$6,820.00
TASK 2 - Reporting: $6,820.00
TASK 1 - Field Work: $22,481.32 TASK 2 - Reporting: $6,820.00
$2,930.13
$32,231.45 ESTIMATE PROJECT TOTALS
Continegency (10%)
LABOR SUBTOTAL
https://lviservices1-my.sharepoint.com/personal/pjackson_northstar_com/Documents/Laptop/Desktop/Tranfer/State Lands/PL517 ESA/Estimates/Catfish Creek Revised Boundary Addntl Assess/Catfish Creek South Assessment Page 2 of 2
MAPS
Red = standard soil borings Purple = TCLP borings
File details come from the government source that posted it. Updated .