About this file

This document is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (DEP), Division of State Lands (DSL), under DEP Contract No. PL276. The assignment involves Universal Engineering Sciences, Inc. (FEID No. 59-1117804), a contractor providing environmental and engineering services. The task is assigned to conduct environmental assessments for a 4.13-acre parcel located at 100 Central Avenue in Key Largo, Monroe County, Florida, owned by Florida Keys Juvenile Services, Inc. (Parcel ID No. 00087100-000601). The task manager and contract manager is James Parker of the DEP, with Michael Geden serving as the Contractor's Contract Manager.

The services include: (1) a Phase I Environmental Site Assessment in accordance with Division of State Lands standards and ASTM E1527 standards, including an AUL/lien search, and (2) a mold survey in accordance with state of Florida and EPA requirements. The task assignment is structured with a fee schedule amount of $1,600.00 and additional survey costs of $3,765.00, for a total task assignment value of $5,365.00, not to exceed. The draft products are due by September 4, 2020, with liquidated damages assessed at $25.00 per day for delays. Deliverables must be submitted electronically with two compact discs containing the final report upon approval of the draft product. The contract is funded through Organization Code 37102400000 with Fund Object Code 348014, allocated to budget entity 131545 under Project No. 084108 for fiscal year 2020.

View the file

Other files

File Type Posted
CN-370000-PL276-T002.pdf PDF
CN-370000-PL276-T11.pdf PDF
CN-370000-PL276-A3.pdf PDF
CN-370000-PL276-T003.pdf PDF
CN-370000-PL276-T10.pdf.crdownload CRDOWNLOAD file
CN-370000-PL276-T5.pdf PDF
CN-370000-PL276-T7.pdf PDF
CN-370000-HW688-HW001B.pdf PDF
CN-370000-PL276-A1.pdf PDF
CN-370000-PL276-T001.pdf PDF
CN-370000-HW688.pdf PDF
CN-370000-PL276-A2.pdf PDF
CN-370000-PL276-CO01.pdf PDF
CN-370000-PL276-T10.pdf PDF
CN-370000-PL276-T10CO1.pdf PDF
CN-370000-PL276-T12.pdf PDF
CN-370000-PL276-T4.pdf PDF
CN-370000-PL276-T6.pdf PDF
CN-370000-PL276-T8.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TASK ASSIGNMENT NOTIFICATION FORM

DEP CONTRACT NO. PL276

Task Assignment Number: PL276.013 BLA File Number: 328290 Date: August 6, 2019

Project Name: Florida Keys Ecosystem – Key Large County: Monroe Owner’s Name: Florida Keys Juvenile Services, Inc. Acres: 4.13 acres Parcel ID No: 00087100-000601

Contractor: Universal Engineering Sciences, Inc. FEID No: 59-1117804 Contractor Contract Manager: Michael Geden Phone Number: 407-423-0504

DEP Designated Task Manager: James Parker Phone Number: 850-245-3045 DEP Contract Manager: James Parker Phone Number: 850-245-3045 Subcontractors: (List, if any) ___________________________ MBE: ______ Yes No ___________________________________________________ MBE: ______ Yes No

Task Description (Use additional sheets if necessary):

Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) E1527 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. Please be aware that DSL requires the contractor to conduct an AUL/lien search on its behalf, as outlined in the DSL Scope of Services.

2) Provide a mold survey in accordance with all applicable State of Florida and/or EPA requirements, as outlined in the cost estimate submitted to DSL on August 4, 2020 and attached hereto as Exhibit “C”.

Deviations:

The following deviations from DSL standards will be authorized: Submittal of DRAFT and FINAL products may be done electronically; paper copies will not be required. Two (2) compact discs containing the FINAL report will be required upon approval of the DRAFT product. No other deviations from the above-mentioned standards are allowed, unless in writing from the Division of State Lands.

The User Questionnaire is completed and attached. For property access and property-specific questions, contact the seller’s attorney Chelsea Vanadia at 305-296-7227 or chelsea@smithhawks.com or Connie Groves at 386-972-6410. Additionally, please contact the manager of John Pennekamp State Park Paul Rice at 305- 676-3780 or paul.rice@floridadep.gov

Attachments: Exhibit “A”, Exhibit “B”, Exhibit C, & User Questionnaire

DRAFT Products Due Date: September 4, 2020 Liquidated Damages Per Day Charge: $ 25.00

Task Assignment Type: Amount Not to Exceed:

Fee Schedule $1,600.00 Additional Survey’s $3,765.00 Cost Reimbursement $ n/a Total Task Assignment Value $ 5,365.00

UNIVERSAL ENGINEERING SCIENCES, INC. FLORIDA DEPARTMENT OF

ENVIRONMENTAL PROTECTION

Contract Manager Date DEP Contract Manager or designee Date

APPROVED:

Contractual Authority Date

James Parker

Digitally signed by James Parker Date: 2020.08.06 09:22:48 -04'00'

Robbie Parrish

Digitally signed by Robbie Parrish Date: 2020.08.06 09:24:56 -04'00'

8/6/2020

Funding Authority Date

Funding Information:

Org. Code E. O. Fund Object Code Budget Entity Module Special Category Project # Year Amount

37102400000 NE 348014 131545 37100400 NA 084108 50270 20 5,365.00

cc: Contracts Office (MS93) Bureau of Finance & Accounting (MS75) 2 copies

29-Digit FLAIR Code: 37202348014371004000008410820

Performance Measure: DEP Contract Manager will review deliverable to ensure specifications were met.

Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.

Sheryl Boutin Digitally signed by Sheryl Boutin Date: 2020.08.06 09:35:33 -04'00'

EXHIBIT “A”

The land referred to herein below is situated in the County of MONROE, State of Florida, and described as follows:

Commence at the NE corner of the NW 1/4 of Section 27; thence run along the North line of said NW 1/4 S89°51'34"

2083.76 Ft. to a point on the Southeasterly right-of-way of Old State Rd. 4A; thence run along said right of way line S37°22'34" 972.9 feet to a point common to the lands of Stuart D. Marr and Ronald C. Gillman and First Trust and Savings Bank; thence run S52°37'26"E 41.63 feet to a point along the Section 27 and section 28 Section line; thence run S0°5'34"W 1901.53 feet to the Point of Beginning, said point of beginning being 60 feet South Of the Southeast corner of Lot 19 and situated along the section line; thence continue S0°05'34"W along said section line a distance of 556.59 feet including a 15 foot wide unmarked, unimproved, abandoned R/W blocked from all access by anyone other than the owner since 1975 and vacated by the owner by the recording of this deed and Exhibit "A" to the shoreline of the Atlantic Ocean (Straits of Florida); thence run Southwesterly on a meandering line along the shores of the Atlantic Ocean (Straits of Florida) to a point where Lot 20 of the Model Land Company plat meets the North boundary line of Lot 3 Block 1 of The North Carolina Beach Fishing Club subdivision as recorded in Plat Book 1 Page 93; thence run along the North boundary line of The North Carolina Beach Fishing Club subdivision, said boundary line being common with the South boundary line of Lot 20 of the Model Land Company plat recorded in Plat Book 1 Page 68 S88°30'08"W a distance of

553.96 feet to a point, said point being 60' East of the S.W. corner of the said Lot 20 where it meets the S.E. corner of Lot 21; thence run Northeasterly at N44°07'44"E a distance of 859.54 feet to the Point of Beginning; together with all riparian rights due to erosion of or alteration of the shoreline, being a total of 4 +/- acres; and together with a deeded right of ingress and egress along the entire South boundary line of Lot 21 and the West 60' along the South boundary line of Lot 20 as shown in the Model Land Co. Plat recorded in Plat Book 1 Page 68 a width of 10 feet wide to allow for ingress and egress and utilities to and from the legally described land and Central Avenue. All of the land being conveyed is situated in Section 28, Township 61S, Range 39E, Key Largo, Monroe County, Florida and is further described as the Southeasterly Diagonal 4+/- acres of Lot 20 plus the riparian rights and the deeded easement situated in Section 28, Township 61S, Range 39E.

NOTE: The legal description contained in the chain of vesting deeds and that of the Surveyor’s Affidavit recorded in Official Records Book 1887, Page 1482, contains errors in the first two calls whereas the end directional call is missing.

The Company requires that a complete, legal description be provided by a surveyor and that legal description will be used as the insured legal.

BSM APPROVED

By: J.A. Date: _____ 02/27/2020

Florida Keys Ecosystem – Florida Forever BOT Project

Monroe County, Florida

Document Path: F:\SURVEY\Florida Keys Ecosystem\Key Largo Newport Hammocks\FL Keys Juvenile Services\GIS\Appraisal_Key_Largo_Juvenile_Services.mxd

SITE

Date Saved: 2/27/2020 11:30:24 AM

Subject Parcel Florida Forever Project Boundaries State Managed Conservation Lands

0 300 600150

Feet

Subject Parcel

File Location: \\FLDEP1\DSL_Data\

Map Created By: GW Stelter

Data Sources:

1) Cadastral 2019 Data

2) Florida Conservation Lands

3) Florida Forever BOT Projects

4) NAVTEQ Roads

5) Bing Aerials

John Pennekamp Coral Reef State Park

Flo rid a K ey s O ve rse as

Heri tag e S tat e T rai l

Florida Keys Ecosystem Florida Forever BOT Project

- Tropical Flyways

- Newport Hammocks

Owner: Florida Keys Juvenile Services

Hammock: 3.02 Acres Developed: 0.80 Acres

Buttonwood: 0.01 Acres Mangrove: 0.30 Acres

Total: 4.13 Acres

File details come from the government source that posted it. Updated .