CN-370000-GC891-T5.pdf
PDF 240 KB Posted
- Contract number
- GC891
- Issued by
- Florida
About this file
This document is Task Assignment Notification Form No. 5 (GC891-05) under DEP Contract No. GC891, a state and local contract indefinite delivery vehicle between the Florida Department of Environmental Protection (DEP) and Miami-Dade County Environmental Resources Management. The task assignment covers the period of July 1, 2020 to June 30, 2021, with Wilbur Mayorga serving as the Local Program Contract Manager and David G. Warfel as the DEP Contract Manager.
The contract establishes a fixed-cost task assignment of $1,320,480.00 for petroleum cleanup site management services covering 379 non-Low Score Assessment (LSA) source properties at an annual base rate of $1,257,600.00. Compensation is structured by site phase: planning phase sites receive $4,000.00 per year, remediation phase sites receive $8,000.00 per year for the first two years then $4,000.00 thereafter, and monitoring phase sites receive $2,400.00 per year. Non-Program and Voluntary Cleanup sites are compensated at 75% of these rates. Low Score Assessment sites receive a one-time payment of $4,000.00 upon issuance of the first purchase order. Performance incentives of $1,000.00 per site are available when Site Rehabilitation Completion Orders are issued within 60 days of approval, with a maximum annual incentive cap of 5% of total non-LSA compensation. The contract includes a monthly retainage of 5% of 1/12 of total non-LSA compensation, with 80% releasable based on four performance metrics (deliverable turnaround times, requests for change turnaround times, data entry accuracy in the Storage Tank Contamination Monitoring database, and document insertion accuracy in OCULUS). An additional 20% retainage is withheld and released only if 98% of assigned source properties are visited or inspected during the fiscal year. Monthly payments may range from 95% to 104% of the monthly compensation amount.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-GC891-T10.pdf | ||
| CN-370000-GC891-T3CO1.pdf | ||
| CN-370000-GC891-T5CO1.pdf | ||
| CN-370000-GC891-T5CO2.pdf | ||
| CN-370000-GC891-T9.pdf | ||
| CN-370000-GC891-A2E1.pdf | ||
| CN-370000-GC891-CMC2.pdf | ||
| CN-370000-GC891-T1.pdf | ||
| CN-370000-GC891-T3.pdf | ||
| CN-370000-GC891-T4.pdf | ||
| CN-370000-GC891-T4CO1.pdf | ||
| CN-370000-GC891-A1R1.pdf | ||
| CN-370000-GC891.pdf | ||
| CN-370000-GC891-CO1.pdf | ||
| CN-370000-GC891-T2.pdf | ||
| CN-370000-GC891-T7.pdf | ||
| CN-370000-GC891-T8.pdf | ||
| CN-370000-GC891-TA06.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT C
DEP Contract No. GC891, Attachment C, Page 1 of 4
TASK ASSIGNMENT NOTIFICATION FORM
DEP Agreement Number: GC891 Task Assignment #: GC891-05
Local Program Name: Miami-Dade County Environmental Resources Management
LP Contract Manager: Wilbur Mayorga Phone #: (305) 372-6708
DEP Contract Manager: David G. Warfel Phone #: (850) 245-8891
Task Description: (use additional pages if necessary)
See attached .
Deliverables: See Attachment A, Paragraphs A, B, C and E.
Task Assignment Type Amount not to Exceed
Fixed Cost: $ 1,320,480.00 Task Performance Period July 1, 2020 to June 30, 2021
Total Task Assignment Value: $ 1,320,480.00
Organization Code E.O. Object Code Module Category Fiscal Year GAA Line Item # Budget Representative Approval
37450401002 JN 131545 4713 104138 00 GAA TBD
DEP Contract Manager Date
Cost Center Administrator Date
Program Administrator Date
Division Director Date
Deputy Secretary Date
Secretary Date
Contractor Representative Date
6-12-20
David G. Warfel Digitally signed by David G. Warfel Date: 2020.06.18 14:58:06 -04'00'
Susan Fields Digitally signed by Susan Fields Date: 2020.06.18 15:39:59 -04'00'
Natasha Lampkin Digitally signed by Natasha Lampkin Date: 2020.06.18 16:30:27 -04'00'
Tim J. Bahr Digitally signed by Tim J. Bahr Date: 2020.06.29 16:32:18 -04'00'
John Truitt Digitally signed by John Truitt Date: 2020.06.29 17:07:52 -04'00'
Justin Wolfe Digitally signed by Justin Wolfe Date: 2020.07.02 11:18:38 -04'00'
Didier Camacho, P.G. Digitally signed by Didier Camacho, P.G.
Date: 2020.06.12 11:27:34 -04'00'
Monica J. Brady Digitally signed by Monica J. Brady Date: 2020.06.29 15:18:40 -04'00'
Brady_MJ Line
Brady_MJ Typewritten Text
DEP Contract No. GC891, Attachment C, Page 2 of 4
Task Assignment No. 5 (07/01/2020 – 06/30/2021) A. Tasks
Local Program performs all work as specified in Attachment A of the Contract GC891.
B. Performance Measures
Department Contract Manager shall review deliverable documentation to ensure that work has been performed as specified in the Scope. The Department Contract Manager will notify the Local Program of acceptance or any deficiencies in the work and/or deliverables. The Local Program will be given an opportunity to remedy deficiencies at no additional cost to the Department. In addition, the Department Contract Manager will perform a detailed performance analysis to determine retainage release on a monthly basis, per Paragraph D below.
C. Compensation
Fixed costs include all expenses associated with vehicle operation and maintenance, lease, or rental (including vehicle maintenance cost for field visits and operation and maintenance (O&M) inspections; all travel costs associated with Department training and/or meetings with Department representative(s) within Florida) all costs for staffing, including salaries, fringe benefits, rent, utilities, any overhead and indirect expenses; general administrative expenses and all other costs related to the performance of the work specified in the Attachment A of the Contract and this Task Assignment.
1. Level of Effort.
If the Local Program has been assigned more than one site (discharge) at a source property, the Local Program will only be compensated for the site with the highest level of effort.
Retainage will be withheld as specified in Paragraph D for the following activities:
a. The Local Program will be compensated at a rate of $4,000.00 per source property per year in planning phase
(site assessment (SA), including interim source removal, and remedial action plan (RAP)).
b. Remediation phase (remedial action construction (RAC), operation and maintenance (O&M) and source removal (SR)); because more effort is expected and required in managing sites in these phases, source properties with sites in remediation phase will be compensated at a rate of $8,000.00 per year for the first two
(2) years after a RAP Approval Order, UIC Approval Order, or County-issued approval letter, if no Order is required, is issued for a Level 1 or Level 2 RAP or a Level 4 Limited Scope RAP or RAP Modification Plan (as defined in Attachment B of the Contract), and $4,000.00 after the first two (2) years. For a Level 1, 2 or 3 Limited Scope RAP or RAP Modification Plan (as defined in Attachment B of the Contract) the source property will be compensated at a rate of $8,000.00 for one (1) year after a RAP Approval Order, UIC Approval Order or County-issued approval letter if no Order is required, is issued, and $4,000.00 for subsequent years. This includes SRs (not interim source removals under SA) which will be paid at $8,000.00 for one (1) year and $4,000.00 for subsequent years.
c. Sites in monitoring phase (natural attenuation monitoring (NAM), post active remediation monitoring (PARM), long term natural attenuation monitoring (LTNAM), and well abandonment for site closure (WASC)); because minimal effort is expected and required for sites in this phase, the Local Program will be compensated at a rate of $2,400.00 per year.
d. Non-Program and Voluntary Cleanup sites: The Local Program will be compensated at 75% of the level of effort cost as described above.
Retainage will not be withheld for the following activities:
a. Sites that are low score assessments (LSAs): for LSA sites, the Local Program will receive a one-time payment of $4,000.00 per source property once the first LSA purchase order is issued.
DEP Contract No. GC891, Attachment C, Page 3 of 4
b. Once an LSA is complete, and if the Local Program determines that the site may qualify for conditional closure without remediation, either because a Conditional Closure Application or a No Further Action Proposal with Conditions has been submitted, the site may be paid at a rate of $4,000.00 on an annual basis until the Conditional Site Rehabilitation Completion Order or LSSI No Further Action Order is issued, or it is determined that conditional closure is not achievable without remediation.
2. Performance Incentives
a. In order to encourage more efficient site cleanup, and in addition to the fixed cost payments, the Local
Program shall be paid an additional target payment of $1,000.00, when the following is completed at a site:
i. A Site Rehabilitation Completion Order (SRCO) per Chapter 62-780.680, F.A.C., or Low Score Site
Initiative No Further Action Approval Order per Section 376.3071(12), F.S., is issued, but only if the order is submitted to the Department within 60 days of the approval of the no further action proposal or well abandonment report, whichever is later. The number of discharges listed in a SRCO should correspond with the number of discharges listed in the no further action proposal. For example, if multiple discharges were proposed for no further action in a report, only one SRCO shall be submitted.
b. 5% PERFORMANCE INCENTIVE PAYMENT MAXIMUM -The maximum amount that can be paid annually is 5% of the total non-LSA source property compensation amount, even if more performance incentives are met. Performance incentives must be billed for on the invoice for the month they are achieved.
3. Cost reimbursement: No cost reimbursement will be made under this Task Assignment.
D. Financial Consequences
No payment will be made for unsatisfactory work. In addition, retainage will be withheld in the amount of 5% of 1/12 of the total non-LSA source property compensation.
Retainage
1. 5% of 1/12 of total non-LSA source property compensation will be withheld as retainage each month.
2. Based on the level to which performance measures are met, up to eighty percent (80%) of the retainage will be released the month after the invoice is submitted. Performance for purposes of obtaining the eighty percent (80%) retainage is based on the following four (4) performance measures:
a. Performance Measure 1: Turnaround times for deliverable reviews – Percentage of deliverable reviews that met turnaround times (Attachment T of Contract) will be self-reported in the monthly invoice and a percentage of those will be verified by the Department;
b. Performance Measure 2: Turnaround times for requests for change – Percentage of requests for change that met turnaround times will be self-reported in the monthly invoice and a percentage of those will be verified by the Department;
c. Performance Measure 3: Data entry correctly and timely completed in the Storage Tank Contamination Monitoring (STCM) database – based on a review by the Department of a percentage of documents reported on the invoice and correctly and timely updated in STCM (Paragraphs A.1.a., A.1.e, A.1.i., and A.1.l. of Attachment A). The overall percentage of data correctly and timely updated or entered in STCM will be extrapolated from the Department’s review; and
d. Performance Measure 4: Document correctly and timely inserted into OCULUS – based on a review by the Department of a percentage of documents reported on the invoice and correctly and timely inserted into STCM (Paragraphs A.1.e., A.1.f, A.1.g.iii, A.1.h, A.1.i., and A.1.m. of Attachment A). The overall percentage will be extrapolated from the Department’s review.
DEP Contract No. GC891, Attachment C, Page 4 of 4
3. Performance Measures: Monthly Retainage Release Schedule
a. The percentage calculated for each of the above four performance metrics will be averaged, and that average will be used to determine how much retainage will be released;
b. If the average of the four monthly performance metrics is 90% or above, then 80% of withheld retainage will be released the following month;
c. If the average of the four monthly performance metrics is at least 80%, but less than 90%, then 60% of withheld retainage will be released the following month and 20% of the withheld retainage will be forfeited.
d. If the average of the four monthly performance metrics is at least 70%, but less than 80%, then 40% of withheld retainage will be released the following month and 40% of the withheld retainage will be forfeited.
e. If the average of the four monthly performance metrics is below 70%, then 0% of the withheld retainage will be released the following month and 80% of the withheld retainage will be forfeited.
4. The remaining twenty percent (20%) of retainage will be withheld from each monthly payment and shall be released at the end of the Task Assignment if 98% of all assigned source properties were visited or inspected during the fiscal year pursuant to Paragraph A.1.g of Attachment A of the Contract, based on self-reporting by the Local Program and a percentage of those will be verified by the Department. See attached List of Source Properties Requiring Inspection in FY 20/21 for list of source properties that are assigned to be visited inspected.
Failure to meet the 98% target shall result in forfeiture of this retainage.
E. Budget Summary
The total Task Assignment (TA) amount for TA #5 of DEP Contract No. GC891 is $1,320,480.00. The Local Program will be paid an annual fixed cost base rate of $1,257,600.00 for petroleum cleanup site management, $1,257,600.00 of which will be for petroleum cleanup site management of 379 non-Low Score Assessment (LSA) source properties. Additional funds are considered in this Task Assignment for compensation associated with the completion of Performance Incentives (see Paragraph C.2., above). However, the actual payment amount may be more or less than the Task Assignment amount, based on the Local Program’s performance
1. Payments for each month can range from 95% to 104% of 1/12 of the total non-LSA source property compensation amount, plus LSA costs (per Paragraph C.1.e above). An additional 1% of 1/12 of the total non- LSA source property compensation amount could be paid at the end of the Task Assignment.
2. SRCOs that are issued do not reduce the total non-LSA source property compensation amount for this Task Assignment.
3. If an additional number of source properties (increase of 5% or 15 sites, whichever is greater) are assigned to the
Local Program during a Task Assignment period, a Task Assignment Change Order may be issued to provide compensation for the increased number of source properties if the Local Program makes a written request.
List of Source Properties Requiring Inspection in FY 20/21
*Note - Per TA Attachment A Section A.1.g.i: "If a site will receive a site rehabilitation completion Order (SRCO) or if a low-score assessment (LSA) will be generally characterized for risk within the first two months of the fiscal year, a field visit or O&M inspection will not be required"
138841212 138503831 138504934 138841204 138842290 138504193 138505998 138506470 138622097 138505163 138506468 138506145 138622180 138503828 138503535 138622123 138622188 138735575 138839165 138842244 139100579 138504620 138503625 138841130 138944682 139100154 139102841 138504858 138838960 139202435 139201892 138505662 139201751 138504646 138505974 138506379 138628672 138622167 138629763 139201754 139202306 138505644 138503771 139700100 138505493 139102133 139401413 138736595 139101612 138505567 139200707 138735287 139102433
139602569 139806572 138504006 138504110 138522020 138505635 139201687 138504478 138629094 138841207 139101371 139201095 139063932 138628904 138504152 138505372 138503565 138505458 138505459 138505561 139807366 139600889 138842457 138503847 138504579 138505647 138841381 138622132 139101678 139046914 138504689 138505142 138505992 139502690 139046852 138942809 138505086 138504795 138505445 138504390 138504472 138505875 138505587 138506377 139501539 138503964 138504496 138504922 138505853 138504349 138732717 139815521 138506140
138942556 138944602 138942654 138503848 138505103 138622122 138629859 138942702 138942772 139500024 139101320 138503836 138504718 138505403 138504793 138945065 138504943 138505609 138842260 138504621 138504700 138506144 139201686 138504651 138505252 138735502 138504041 138504194 138505437 138505535 138629046 138841450 139101677 139501515 138503830 138943848 138504400 138504747 138506213 138506232 138840547 138503963 138506372 138622096 139202115 138504693 138505470 138505893 138732747 138944797 138504998 138504190 138504874
138505104 138505106 138505269 138505614 138506134 138842153 138842154 138942621 138505024 138505454 138504657 138504870 138503698 138504815 138504872 139501701 139601653 139807725 139812385 138504221 138506016 139816492 138622168 138943621 139804800 139809173 138504100 139803397 138629115 138505126 138628942 138505548 138503619 138505465 138944497 139103515 139806129 139806179 139401093 138515170 139810595 139812750 138504595 138506217 138520518 138628726 139045776 139045940 139200292 139602331 139804384 139804881 139813745
139813858 138505534 138504744 139810175 139813982 139813718 138841203 138622089 138503568 139400595 139601579 138942727 139803465 139815306 138505621 138944349 138628802 138628763 139045944 139806893 138626177 138504571 138504572 138732521 138505431 139200586 139803788 138839586 138505123 139401079 138504196 139806304 139804985 139816812 138505169 139806839 138505114 138505997 139813592 138504942 138506284 138506352 138944189 139810555 138504281 138504531 138629044 139602249 139801903 139201879 139801253 139700542 139805553
List of Source Properties Requiring Inspection in FY 20/21
*Note - Per TA Attachment A Section A.1.g.i: "If a site will receive a site rehabilitation completion Order (SRCO) or if a low-score assessment (LSA) will be generally characterized for risk within the first two months of the fiscal year, a field visit or O&M inspection will not be required"
139103362 138943600 138504146 138504942 139101470 139063930 138503927 139103356 138506202 138505389 139501060 139807670 138505199 138504103 138732522 138505701 138943349 139102969 139501863 139806894 138504398 138504453 138504605 138505601 138505985 138732260 138943270 139101121 139400010 139401253 139500561 139803377 139804503 139805141 139806124 139806421 139806556 139810194 139811464 138628963 138732338 138503573 138505939 138506422 139102631 138942713 138505108 139202396 139101916 138505203 138732196 138522022 138504195
138506019 138506045 139807695 138622088 138942558 138837735 138503729 138736532 138506344 138839865 138736946 139500068 138506036 138505889 139101618 139402056 138504363 138505315 139046978 138505897 138622130 138506025 138504756 138506033 138521976 138622158 138628652 138841043 139045888 139046216 139815197 138503995 138504616 138504359 138503825 138622187 138504385 139046224 139102396 139401072 139601054 139601057 139601312 139601316 139701165 139804012 139804013 139804014 139804015 138505401 139602241 138942895 139046225
138504606 138945537 138622184 138838493 139063842 138840842 138504287 138506281 139101660 138734427 138506476 138505254 139815206 138842014 138838306 138622149 139102744 138504022 139301081 139814169 139103408
| C - TA Notification Form - Dade 20-21.pdf |
| Dade TA Site List 20-21 |