CN-370000-GC883-A10.pdf
PDF 1 MB Posted
- Contract number
- GC883
- Issued by
- Florida
About this file
This document is Amendment No. 10 to DEP Agency Term Contract No. GC883, an indefinite delivery contract between the Florida Department of Environmental Protection (FDEP) and Trident Treatment & Dewatering LLC d/b/a MAS Environmental LLC. The contract, originally executed on February 21, 2014, provides petroleum contamination site response action services in Florida's South Region. The amendment was executed in November 2020 and processed for data entry on November 20, 2020.
Amendment No. 10 implements a rate decrease across 190 pay items in the contract's rate schedule, with reductions ranging from approximately 4.86% to 5.14%. The amendment modifies Attachment D (Rate Schedule) from version 3.2 to version 3.3, effective for all new work assignments offered on or after the Rate Change Date of November 20, 2020. Pre-existing work assignments continue to apply the prior rate schedule. The rate changes affect services including mobilization, drilling and boring, well installation, sample collection and analysis, soil source removal, remediation system operations and maintenance, debris removal and disposal, reports, and professional engineering and geology services. No line items were added, deleted, or otherwise modified by this amendment; only the pricing structure was adjusted. All other terms and conditions of the original contract remain in effect.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.
2.
3.
4.
5.
NOW THEREFORE, the parties agree as follows:
WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).
WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate reductions be made to Attachment D (V3.2) entitled "Rate Schedule"; and, The Agency Term Contract No. GC883 (hereinafter "Contract") between the FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and TRIDENT TREATMENT & DEWATERING LLC D/B/A MAS ENVIRONMENTAL LLC (hereinafter "Contractor") executed on February 21, 2014, to provide petroleum contamination site response action services in the South Region, is hereby amended.
PETROLEUM RESTORATION PROGRAM
AGENCY TERM CONTRACT NO. GC883
RATE DECREASE
AMENDMENT NO. 10
Amendment No. 10 DEP Agency Term Contract No. GC883
This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.
All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.
Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, Attachment D, Rate Schedule (V3.3) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate schedule (V3.3) shall apply.
The Rate Change Date is the date shown at the bottom of this Amendment for the Department’s Data Processing Information. Prior to the Rate Change Date, the Department shall provide Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date and prior to the Rate Change Date.
Amendment No. 10 DEP Agency Term Contract No. GC883
6.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this Amendment shall control.
Pre-existing Rate
Agreed New Rate(1)
606.37$ 576.00$ 243.07$ 231.00$
243.07$ 231.00$
420.00$ 399.00$ 668.51$ 635.00$
997.50$ 948.00$
510.51$ 485.00$
753.53$ 716.00$
121.54$ 115.50$ 182.31$ 173.25$
1,000.18$ 950.00$
1,575.29$ 1,497.00$
1,050.00$ 998.00$
16,074.45$ 15,275.00$
19,278.00$ 18,310.00$
972.00$ 923.00$
590.73$ 561.00$
343.81$ 326.50$
343.81$ 326.50$
1,875.35$ 1,782.00$
36.73$ 34.90$
212.68$ 202.00$
Est % Rate
Change(2)
-5.01% -4.97%
-4.97%
-5.00% -5.01%
-4.96%
-5.00%
-4.98%
-4.97% -4.97%
2-1.
2-4.
3-3.
3-4.
3-16.
3-18.
3-19.
3-20.
6-5.
Monitoring Well Sampling with Water Level, > 100 foot depth
DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (add-on cost to DPT base rate)
Description
3-12.
3-13.a.
Table 1. Listed Schedule of Pay Items with Rate Changes
8-2.
Surface Casing - 6 inch diameter
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - 100 miles each way
Work Trailer - > 100 miles each way Work Trailer - 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - 100 miles each way
Contractor Oversight for Non-Price Schedule Activities
LDA Rig and Support Vehicles Mobilization - 100 miles each way
Excavator Mobilization - > 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way
File Review Site Health & Safety Plan Notice of Discovery of Contamination Package (Initial or TPOC) Off-Site Property Access Agreement Site Reconnaissance/Field Measurement Visit
Drum Compactor mobilization - > 100 miles each way
Drum Compactor mobilization - 100 miles each way
Mini Excavator/Loader (BobcatTM) Mobilization - > 100 miles each way
Loader/Backhoe Mobilization - > 100 miles each way
LDA Rig and Support Vehicles Mobilization - > 100 miles each way
Pay Item No.
1-1.
1-2.
1-3.
1-5.
3-14.a.
3-5.
3-6.
3-9.a.
3-10.a.
5-5.a.
-5.02%
-4.97%
-4.95%
-4.97%
-5.02%
-5.04%
-5.03%
-5.03%
-5.03%
-4.98%
-4.98%
-5.02%
140.00$ 133.00$ 110.25$ 104.75$
99.22$ 94.25$ 71.40$ 67.80$ 24.30$ 23.05$ 98.39$ 93.50$
57.87$ 55.00$
57.87$ 55.00$
34.72$ 33.00$
34.72$ 33.00$
20.03$ 19.00$
425.07$ 404.00$
52.50$ 49.90$
82.69$ 78.55$
85.31$ 81.05$
156.27$ 148.50$
250.02$ 237.50$
52.51$ 49.90$
77.51$ 73.60$
12.49$ 11.85$ 12.49$ 11.85$ 12.49$ 11.85$ 12.49$ 11.85$
-4.95%
-4.95%
-5.12% -5.12% -5.12% -5.12%
8-14.
9-1.
9-3.
9-4.
9-6.
8-12.
8-3.
8-4.
8-5.
8-6.
8-7.
8-8.
8-9.
8-10.
9-7.
9-8.a.
9-9.
9-10.
9-11.
9-12.
9-13.
9-14.
Free Product Sample Collection Other Water Sampling Domestic Water Well Sampling
8-13.
Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method)
Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])
Survey Latitude/Longitude of New Monitor Wells
Survey Latitude/Longitude of Existing Monitor Wells
Vapor/Ambient Air Sample Collection - SUMMATM Canister (or equivalent)
Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, TedlarTM Bag (or Equivalent)
Free Product Gauging & Bailing Water Level or Free Product Gauging Soil/Sediment Sample Collection
Soil, Volatile Organic Halocarbons (EPA 8021 or
EPA 8260)
Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)
Encore (25 gram) for SPLP Soil Sample Collection:
[Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).
Soil, Priority Pollutant Volatile Organics (EPA 8260)
Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260)
Soil, Lead (EPA 6010 or EPA 6020) Soil, Chromium (EPA 6010 or EPA 6020) Soil, Cadmium (EPA 6010 or EPA 6020) Soil, Arsenic (EPA 6010 or EPA 6020)
Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury])
Soil, PCBs [or Aroclors] (EPA 8082)
-5.14%
-4.96%
-4.95%
-5.01%
-4.99%
-4.97%
-5.01%
-4.97%
-5.04%
-5.00% -4.99% -5.01% -5.04% -5.14% -4.97%
-4.96%
-4.96%
31.24$ 29.65$
73.71$ 70.00$
6.24$ 5.93$ 62.50$ 59.40$
312.55$ 297.00$
437.54$ 415.50$
62.50$ 59.40$
262.54$ 249.50$
247.51$ 235.00$
446.33$ 424.00$
52.50$ 49.90$
43.75$ 41.50$
43.75$ 41.50$
75.01$ 71.25$
81.25$ 77.20$
156.27$ 148.50$
156.27$ 148.50$
-5.03%
-4.97% -4.96%
-4.98%
-5.04%
-4.96%
-4.97%
-5.05%
-5.00%
-4.95%
-5.14%
-5.14%
-5.09%
9-18.
9-19.
9-20.
9-15.
Soil, Texture, (See Gee 7 Bauder [1966])
Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)
Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])
Water, Priority Pollutant Volatile Organics (EPA 8260)
Soil, Moisture Content (ASTM D2216-10)
Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -96e1 or
ASTM D2937-10)
Soil, Toxicity Characteristic Leaching Procedure- Extraction Only (EPA 1311)
Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)
Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (multiple methods)
Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution
GC/MS)
Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution GC/MS)
Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution
GC/MS)
9-32.
9-24.
9-25.
9-26.
9-28.
9-31.
9-31.a.
9-21.
9-22.
9-23.
9-33.
9-34.
9-35.
-4.97%
-4.97%
-5.01%
-4.98%
52.51$ 49.90$
9.99$ 9.50$
9.99$ 9.50$
9.99$ 9.50$
9.99$ 9.50$
29.86$ 28.40$
18.75$ 17.80$
9.99$ 9.50$
9.99$ 9.50$
29.86$ 28.40$
9.99$ 9.50$
9.99$ 9.50$
9.99$ 9.50$
9.99$ 9.50$
14.28$ 13.55$
19.44$ 18.45$
14.99$ 14.25$
12.49$ 11.85$
14.99$ 14.25$
14.99$ 14.25$
9-49.
9-50.
9-51.
9-52.
9-53.
9-54.
Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)
Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Potassium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or SM 4500-NO3 F)
Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)
Water, Hardness, Total [as CaCO3] (SM 2340 B or
SM 2340 C)
Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM
4500CI E)
Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-
NH3 H)
Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B)
Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Magnesium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Calcium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Mercury, Total (EPA 245.1, EPA 6020 or
EPA 7470)
Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
9-48.
9-41.
9-41.a.
9-42.
9-43.
9-44.
9-44.a.
9-45.
9-46.
9-47.
9-39.
9-40.
9-37.
9-38.
-4.97%
-4.90%
-4.90%
-4.90%
-4.90%
-4.89%
-5.07%
-4.90%
-4.90%
-4.89%
-4.90%
-4.90%
-4.90%
-4.90%
-5.11%
-5.09%
-4.94%
-5.12%
-4.94%
-4.94%
14.99$ 14.25$
22.50$ 21.40$
14.99$ 14.25$
13.09$ 12.45$
13.74$ 13.05$
14.99$ 14.25$
54.00$ 51.25$
992.25$ 943.00$
992.25$ 943.00$
312.55$ 297.00$
437.54$ 415.50$
56.25$ 53.50$
262.54$ 249.50$
70.20$ 66.75$
43.75$ 41.50$
81.25$ 77.25$
87.50$ 83.25$
9-66.
9-57.
9-58.
9-59.
9-60.
9-61.
9-62.
9-63.
9-64.
9-65.
9-55.
9-56.
9-67.
9-78.
9-79.
9-80.
9-68.
Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D)
Water, Residue-filterable [Total Dissolved Solids]
(SM 2540 C)
Water, Orthophosphate [as P] (EPA 300.0, EPA
300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-
PE or SM 4500-PF)
Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)
Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)
Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA
9056 or SM 4500-SO4 C)
Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)
Water, Methane (EPA SOP RSK-175)
Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)
Water, BTEX/MTBE + Naphthalene (EPA 8260)
Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution
GC/MS)
Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution GC/MS)
Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution
GC/MS)
Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA 2006.0/2007.0)
Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate: Pimephales promelas or Cyprinella leedsi/Invertebrate:
Ceriodaphnia dubia] (EPA 2000.0/2002.0)
Water, Heterotrophic Plate Count (SM 9215 B)
-4.91%
-5.14%
-4.92%
-4.86%
-4.94%
-4.89%
-4.94%
-4.89%
-5.02%
-4.94%
-5.09%
-4.96%
-4.96%
-4.98%
-5.04%
-4.89%
-4.97%
150.02$ 142.50$
175.02$ 166.25$
250.02$ 237.50$
262.54$ 249.50$
312.55$ 297.00$
39.60$ 37.60$
50.40$ 47.90$
104.18$ 99.00$
84.73$ 80.50$
115.76$ 110.00$
231.50$ 220.00$
115.76$ 110.00$
150.47$ 143.00$
97.24$ 92.50$
28.22$ 26.80$
23.96$ 22.75$
49.72$ 47.25$
1,186.56$ 1,127.00$
153.96$ 146.25$
6,361.70$ 6,045.00$
307.92$ 292.50$
-4.97%
-4.99%
-4.98%
-4.97%
-4.98%
-4.96%
-4.87%
-5.03%
-5.05%
-4.97%
-4.98%
-5.05%
-4.96%
10-9.
10-10.
10-2.a.
9-72.
9-73.
10-1.a.
9-69.
9-70.
9-71.
Air, Polycyclic Aromatic Hydrocarbons (EPA Method TO-13)
Air, Volatile Organic Aromatics (EPA Method TO- 15)
Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution
GC/MS)
Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High Resolution GC/FID)
Air, Volatile Organic Compounds (EPA Method TO- 17)
Sheet Piling Installation for 20 feet deep Excavation
Pea Gravel
Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards
Clean Overburden Used As Backfill, Compaction and Testing 300 cubic yards
Flowable Fill Concrete and Installation
Additional Dewatering System Well Points (2) (includes installation)
Dewatering System, up to 12 well points (includes installation)
Additional Dewatering System Well Points (2) (includes installation)
Dewatering System, up to 12 well points (includes installation)
LDA Excavation and Loading With Driven Casing > 300 cubic yards
LDA Excavation and Loading With Surface Casing > 300 cubic yards
LDA Excavation and Loading With Driven Casing < 300 cubic yards
LDA Excavation and Loading With Surface Casing 300 cubic yards
LDA Excavation and Loading Without Casing > 300 cubic yards
LDA Excavation and Loading Without Casing 300 cubic yards
Sheet Piling Installation for > 20 feet deep Excavation
10-11.a.
10-18.
10-19.
10-20.
10-21.
10-11.b.
10-12.a.
10-12.b.
10-13.
10-15.a.
10-15.b.
10-16.
-5.01%
-5.01%
-5.01%
-4.97%
-5.01%
-4.98%
-5.01%
-5.02%
12,724.61$ 12,075.00$
428.28$ 407.00$
4,491.16$ 4,265.00$
7,545.39$ 7,165.00$
9,724.71$ 9,235.00$
12,311.33$ 11,700.00$
29.89$ 28.40$
36.45$ 34.60$
35.13$ 33.40$
2.46$ 2.34$
303.87$ 289.00$
303.87$ 289.00$
303.87$ 289.00$
303.87$ 289.00$
303.87$ 289.00$
303.87$ 289.00$
486.20$ 462.00$
2,431.01$ 2,310.00$
4,618.48$ 4,386.00$
1,093.95$ 1,040.00$ 2,673.85$ 2,540.00$ 1,975.00$ 1,875.00$ 3,950.38$ 3,750.00$ 1,944.81$ 1,850.00$ 5,469.25$ 5,200.00$ 3,646.24$ 3,460.00$ 9,115.42$ 8,650.00$ 3,038.76$ 2,890.00$ 7,900.04$ 7,500.00$
-4.89%
-4.89%
-4.89%
-4.89%
-4.89%
-4.89%
-4.98%
16-24.
16-25.
16-26.
16-27.
16-28.
16-18.
16-17.
16-6.
16-8.
16-10.
16-12.
16-14.
16-19.
16-20.
16-21.
16-22.
16-23.
12-4.
16-2.
16-4.
Dewatering System, up to 12 well points (includes installation)
Crushed Lime Rock Cover - 2 inch thickness
Remove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacity
Remove and Dispose Petroleum Storage Tank - 1,000 gal. capacity
Additional Dewatering System Well Points (2) (includes installation)
Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tons
Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) 450 tons
Transport and Disposal of Clean Concrete
Remove and Dispose Petroleum Storage Tank - > 10,000 gal. capacity
Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacity
Multi-Phase Pilot Test - Additional Time
Vapor Extraction/Aquifer Pumping Test - Additional Time
Vapor Extraction Pilot Test - Additional Time
Air Sparging or Biosparging Pilot Test - Additional Time
Groundwater Recovery System Pilot Test - Additional Time
Air Sparging/Vapor Extraction Pilot Test - Additional Time
SVE System Package - Medium SVE System Package - Medium AS/MPE System Package - Medium AS/MPE System Package - Medium MPE System Package - Medium MPE System Package - Medium AS/SVE System Package - Medium AS/SVE System Package - Medium Air Sparge System Package - Medium Air Sparge System Package - Medium
Groundwater Treatment System Package - Medium
Groundwater Treatment System Package - Medium
Air Sparging/Multiphase Extraction Pilot Test - Additional Time
10-22.
10-23.
13-5.
11-3.
11-4.
11-1.
11-2.
12-11.
12-12.
-5.11%
-4.97%
-5.04%
-5.04%
-5.04%
-4.97%
-4.98%
-5.08%
-4.92%
-4.88%
-4.93% -5.01%
-4.98%
-5.03%
-5.06% -5.07% -4.88% -4.92% -5.11% -5.11% -4.90% -5.06%
289.40$ 275.00$
173.62$ 165.00$
868.21$ 825.00$
434.10$ 412.50$
4,781.79$ 4,540.00$ 3,042.11$ 2,890.00$ 6,341.47$ 6,025.00$ 4,448.32$ 4,225.00$ 7,880.25$ 7,485.00$ 5,528.29$ 5,250.00$
5,556.60$ 5,280.00$
4,398.56$ 4,175.00$
5,903.33$ 5,600.00$
5,556.60$ 5,280.00$
12,000.00$ 11,400.00$
7,524.56$ 7,150.00$
-4.98%
-5.00%18-57.
18-58.
18-56.
18-53.
18-54.
18-55.
18-3.
18-4.
18-2.
18-1.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
(1) The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.
(2) The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.
Notes:
Medium Holding Tank - 2,000 to 6,000 gal. capacity - Short Term 6 mos.
Large Holding Tank > 6,000 to 10,000 gal. capacity - Long Term > 6 mos.
Large Holding Tank > 6,000 to 10,000 gal. capacity - Short Term 6 mos.
Medium Holding Tank - 2,000 to 6,000 gal. capacity - Long Term > 6 mos.
MPE System - Large - Long Term > 6 mos.
MPE System - Large - Short Term 6 mos.
MPE System - Medium - Long Term > 6 mos.
MPE System - Medium - Short Term 6 mos.
MPE System - Small - Long Term > 6 mos.
MPE System - Small - Short Term 6 mos.
Air Sparge/Multiphase Extraction (AS/MPE) System - Large - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System - Large - Short Term 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System - Medium - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System - Medium - Short Term 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System - Small - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System - Small - Short Term 6 Months
18-23.
18-24.
18-25.
18-26.
18-27.
18-28.
-4.98%
-4.96%
-4.98%
-4.98%
-5.06% -5.00% -4.99% -5.02% -5.02% -5.03%
-4.98%
-4.98%
-5.08%
-5.14%
John Truitt Digitally signed by John Truitt Date: 2020.11.17 14:41:21 -05'00'
John Truitt Deputy Secretary (see signature block)
Jamie Luten Lopez
Digitally signed by Jamie Luten Lopez Date: 2020.11.20 13:45:50 -05'00' Jamie Lopez 11/20/2020
11/20/2020
PAY
ITEM UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.2)
REVISED
CONTRACTED
ITEM PRICE (V3.3)
1.
1-1. Per Review $ 550.00 $ 606.37 $ 576.00 1-2. Per Site $ 200.00 $ 243.07 $ 231.00
1-2.a. Per Site Not Applicable $ - $ - 1-3. Per Package $ 200.00 $ 243.07 $ 231.00 1-4. Reimbursable* $ 1.00 $ 1.00 $ 1.00 1-5. Per Agreement $ 400.00 $ 420.00 $ 399.00
1-5.a. Per Agreement Not Applicable $ - $ - 1-6. Reimbursable* $ 1.00 $ 1.00 $ 1.00 1-7. % Surcharge Not Applicable $ 0.06 $ 0.06 2.
2-1. Per Visit $ 550.00 $ 668.51 $ 635.00 2-2. Per Survey $ 550.00 $ 668.51 $ 668.51 2-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00 2-4. Per Day $ 950.00 $ 997.50 $ 948.00 3.
3-1. Per Round Trip $ 350.00 $ 425.38 $ 425.38 3-2. Per Round Trip $ 550.00 $ 668.51 $ 668.51 3-3. Per Round Trip $ 420.00 $ 510.51 $ 485.00 3-4. Per Round Trip $ 620.00 $ 753.53 $ 716.00 3-5. Per Round Trip $ 100.00 $ 121.54 $ 115.50 3-6. Per Round Trip $ 150.00 $ 182.31 $ 173.25 3-7. Per Round Trip $ 324.00 Not Applicable Not Applicable
Region:
Contractor:
Contract #:
South
TRIDENT TREATMENT & DEWATERING LLC D/B/A MAS ENVIRONMENTAL LLC
GC883
DEP Restated Agency Term Contract No. GC883 Amendment No. 10
Attachment D (V3.3) Rate Schedule
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way Heavy Duty/Stakebed Truck (3/4 ton +) - 100 miles each way Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way Work Trailer - 100 miles each way Work Trailer - > 100 miles each way DPT Rig Mobilization - 100 miles each way
Contractor Oversight for Non-Price Schedule Activities
MOBILIZATION
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - 100 miles each way
Permit Fees - actual fee only, cost to obtain permit is included in applicable pay items Off-Site Property Access Agreement Site Property Access Agreement for Source Property at no cost to FDEP Project Specific Financial Guarantee Bond (if required by DEP) 6% Handling Fee for Cost Reimbursable Items
FIELD ACTIVITIES - GENERAL
DESCRIPTION
OFFICE ACTIVITIES
File Review Site Health & Safety Plan Site Health & Safety Plan for Continued Work at no cost to FDEP Notice of Discovery of Contamination Package (Initial or TPOC)
Site Reconnaissance/Field Measurement Visit Receptor Survey and Exposure Pathway Identification (Excludes report) Professional Land Survey (If FDEP authorizes, submit quote(s) with Change Order)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.2)
REVISED
CONTRACTED
ITEM PRICE (V3.3)
Region:
Contractor:
Contract #:
South
TRIDENT TREATMENT & DEWATERING LLC D/B/A MAS ENVIRONMENTAL LLC
GC883
DEP Restated Agency Term Contract No. GC883 Amendment No. 10
Attachment D (V3.3) Rate Schedule
DESCRIPTION
3-7.a. Per Round Trip Not Applicable $ 590.73 $ 590.73 3-8. Per Round Trip $ 540.00 Not Applicable Not Applicable
3-8.a. Per Round Trip Not Applicable $ 656.30 $ 656.30 3-9. Per Round Trip $ 378.00 Not Applicable Not Applicable
3-9.a. Per Round Trip Not Applicable $ 1,000.18 $ 950.00
3-10. Per Round Trip $ 594.00 Not Applicable Not Applicable
3-10.a. Per Round Trip Not Applicable $ 1,575.29 $ 1,497.00
3-11. Per Round Trip $ 540.00 $ 656.30 $ 656.30 3-12. Per Round Trip $ 1,000.00 $ 1,050.00 $ 998.00 3-13. Per Round Trip $ 3,500.00 Not Applicable Not Applicable
3-13.a. Per Round Trip Not Applicable $ 16,074.45 $ 15,275.00 3-14. Per Round Trip $ 5,000.00 Not Applicable Not Applicable
3-14.a. Per Round Trip Not Applicable $ 19,278.00 $ 18,310.00 3-15. Per Round Trip $ 540.00 $ 567.00 $ 567.00 3-16. Per Round Trip $ 972.00 $ 972.00 $ 923.00 3-17. Per Round Trip $ 486.00 $ 486.00 $ 486.00 3-18. Per Round Trip $ 486.00 $ 590.73 $ 561.00 3-19. Per Round Trip Not Applicable $ 343.81 $ 326.50 3-20. Per Round Trip Not Applicable $ 343.81 $ 326.50
4.
Drum Compactor mobilization - > 100 miles each way
MEALS AND LODGING
LDA Rig and Support Vehicles Mobilization - > 100 miles each way Loader/Backhoe Mobilization - 100 miles each way Loader/Backhoe Mobilization - > 100 miles each way Mini Excavator/Loader (BobcatTM) Mobilization - 100 miles each way Mini Excavator/Loader (BobcatTM) Mobilization - > 100 miles each way Drum Compactor mobilization - 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way Excavator Mobilization - 100 miles each way Excavator Mobilization - > 100 miles each way LDA Rig Mobilization - 100 miles each way LDA Rig and Support Vehicles Mobilization - 100 miles each way LDA Rig Mobilization - > 100 miles each way
DPT Rig and Support Vehicles Mobilization - 100 miles each way DPT Rig Mobilization - > 100 miles each way DPT Rig and Support Vehicles Mobilization - > 100 miles each way Drill Rig Mobilization - 100 miles each way Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - 100 miles each way Drill Rig Mobilization - > 100 miles each way
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.2)
REVISED
CONTRACTED
ITEM PRICE (V3.3)
Region:
Contractor:
Contract #:
South
TRIDENT TREATMENT & DEWATERING LLC D/B/A MAS ENVIRONMENTAL LLC
GC883
DEP Restated Agency Term Contract No. GC883 Amendment No. 10
Attachment D (V3.3) Rate Schedule
DESCRIPTION
4-1.a. Per Person, Per Day $ 80.00 $ 80.00 $ 80.00
4-1.b. Reimbursable* $ 1.00 $ 1.00 $ 1.00
5.
5-1.a. Per Spoon $ 23.76 Not Applicable Not Applicable
5-1.a.1. Per Spoon Not Applicable $ 38.58 $ 38.58 5-1.a.2. Per Spoon Not Applicable $ 47.98 $ 47.98 5-1.a.3. Per Spoon Not Applicable $ 52.92 $ 52.92 5-1.b. Per Core $ 108.00 $ 131.27 $ 131.27 5-1.c. Per Core $ 10.80 Not Applicable Not Applicable 5-2. Per Boring $ 80.00 $ 97.24 $ 97.24 5-3. Per Foot $ 10.80 Not Applicable Not Applicable
5-3.a. Full Day Not Applicable $ 3,059.13 $ 3,059.13 5-4. Per Foot $ 14.04 Not Applicable Not Applicable 5-5. Per Foot $ 25.00 Not Applicable Not Applicable
5-5.a. Full Day Not Applicable $ 1,875.35 $ 1,782.00
5-6. Per Foot $ 18.00 $ 21.87 $ 21.87 5-7. Per Foot $ 20.00 $ 24.30 $ 24.30 5-8. Per Foot $ 25.00 $ 30.37 $ 30.37
HSA or MR Boring, 6 inch diameter, 50 to 100 foot total depth HSA or MR Boring, 6 inch diameter, > 100 foot total depth
Direct Push Boring Direct Push Technology (DPT) Rig and Equipment Direct Push Boring with Cone Penetrometer Test Probe (CPT) Direct Push Boring with Membrane Interface Probe (MIP) DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (Add-on Cost to DPT Base Rate) HSA or MR Boring, 6 inch diameter, < 50 foot total depth
Split Spoon Sampling – 2 foot (during boring) < 50 feet Split Spoon Sampling – 2 foot (during boring) 50 to 100 feet Split Spoon Sampling – 2 foot (during boring) > 100 feet Sonic Core Sampling - 5 or 10 foot (during boring) DPT Core Sampling - 4 or 5 foot (during boring) Hand Auger Boring 10 foot total depth
Per Diem - For Travel > 1 Consecutive day (prorated in quarter day increments)-Current State Rate 112.061, F.S. Travel Voucher required and quoted rate should be per person per day.
Meals, Lodging and Transportation - For Contractor travel for specific meetings or legal proceedings required by Department, hotel and meals may be paid in accordance with Section 112.061, F.S.
DRILLING AND BORING
Split Spoon Sampling - 2 foot (during boring)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.2)
REVISED
CONTRACTED
ITEM PRICE (V3.3)
Region:
Contractor:
Contract #:
South
TRIDENT TREATMENT & DEWATERING LLC D/B/A MAS ENVIRONMENTAL LLC
GC883
DEP Restated Agency Term Contract No. GC883 Amendment No. 10
Attachment D (V3.3) Rate Schedule
DESCRIPTION
5-9. Per Foot $ 25.00 $ 30.37 $ 30.37 5-10. Per Foot $ 23.76 $ 28.85 $ 28.85 5-11. Per Foot $ 25.92 $ 31.48 $ 31.48 5-12. Per Foot $ 29.70 $ 36.07 $ 36.07 5-13. Per Foot $ 31.32 $ 36.24 $ 36.24 5-14. Per Foot $ 34.56 $ 39.99 $ 39.99 5-15. Per Foot $ 25.38 $ 30.83 $ 30.83 5-16. Per Foot $ 27.00 $ 32.80 $ 32.80 5-17. Per Foot $ 30.24 $ 36.73 $ 36.73 5-18. Per Foot $ 37.80 $ 45.93 $ 45.93 5-19. Per Foot $ 48.60 $ 53.58 $ 53.58 5-20. Per Foot $ 50.76 $ 61.68 $ 61.68 5-21. Per Foot $ 56.16 $ 68.25 $ 68.25 5-22. Per Foot $ 54.16 $ 65.82 $ 65.82 5-23. Per Foot $ 60.00 $ 69.45 $ 69.45
6.
6-1. Per Foot $ 14.04 $ 17.05 $ 17.05 6-2. Per Foot $ 18.36 Not Applicable Not Applicable
6-2.a. Per Foot Not Applicable $ 41.67 $ 41.67 6-2.b. Per Foot Not Applicable $ 48.61 $ 48.61 6-3. Per Foot $ 27.00 Not Applicable Not Applicable
6-3.a. Per Foot Not Applicable $ 46.42 $ 46.42 6-3.b. Per Foot Not Applicable $ 54.69 $ 54.69 6-4. Per Foot $ 37.80 $ 45.93 $ 45.93 6-5. Per Foot $ 30.24 $ 36.73 $ 34.90
Well Installation - 4 inch diameter (Horizontal, by trenching, not directional drilling) Well Installation - 6 inch diameter Surface Casing - 6 inch diameter
Well Installation - 1 inch diameter Well Installation - 2 inch diameter Well Installation - 2 inch diameter (Vertical) Well Installation - 2 inch diameter (Horizontal, by trenching, not directional drilling) Well Installation - 4 inch diameter Well Installation - 4 inch diameter (Vertical)
Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth
WELL INSTALLATION
HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth Sonic Boring, 6 inch diameter, < 50 foot total depth Sonic Boring, 6 inch diameter, 50 to 100 foot total depth Sonic Boring, 6 inch diameter, > 100 foot total depth Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.2)
REVISED
CONTRACTED
ITEM PRICE (V3.3)
Region:
Contractor:
Contract #:
South
TRIDENT TREATMENT & DEWATERING LLC D/B/A MAS ENVIRONMENTAL LLC
GC883
DEP Restated Agency Term Contract No. GC883 Amendment No. 10
Attachment D (V3.3) Rate Schedule
DESCRIPTION
6-6. Per Foot $ 32.40 $ 37.50 $ 37.50 6-7. Per Foot $ 48.60 $ 56.25 $ 56.25 6-8. Per Foot $ 43.50 $ 50.34 $ 50.34
6-9.a. Per Foot $ 6.48 $ 7.49 $ 7.49 6-9.b. Per Foot $ 6.48 $ 7.49 $ 7.49 6-9.c. Per Foot $ 12.96 $ 14.99 $ 14.99 6-9.d. Per Foot $ 19.44 $ 21.43 $ 21.43 6-10. Per Well $ 135.00 $ 156.27 $ 156.27 6-11. Per Vault $ 453.60 $ 551.29 $ 551.29 6-12. Per Vault $ 972.00 $ 1,125.21 $ 1,125.21 6-13. Per Well Not Applicable $ 196.89 $ 196.89
6-14. Per Well Not Applicable $ 346.50 $ 346.50
6-15. Per Well Not Applicable $ 413.23 $ 413.23
Installation of Well Vault - 4 x 4 x 2 foot Well Redevelopment Removal and Reinstallation of 8-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed
Removal and Reinstallation of 12-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed
Additional Well Screen > 20 feet - 1 inch diameter Additional Well Screen > 20 feet - 2 inch diameter Additional Well Screen > 20 feet - 4 inch diameter Additional Well Screen > 20 feet - 6 inch diameter Above Grade Well Completion Installation of Well Vault - 2 x 2 x 2 foot
Surface Casing - 8 inch diameter Surface Casing - 10 inch diameter Surface Casing - 12 inch diameter
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.2)
REVISED
CONTRACTED
ITEM PRICE (V3.3)
Region:
Contractor:
Contract #:
South
TRIDENT TREATMENT & DEWATERING LLC D/B/A MAS ENVIRONMENTAL LLC
GC883
DEP Restated Agency Term Contract No. GC883 Amendment No. 10
Attachment D (V3.3) Rate Schedule
DESCRIPTION
7.
7-1. Per Foot $ 8.21 $ 9.97 $ 9.97 7-2. Per Foot $ 10.64 $ 12.91 $ 12.91 7-3. Per Foot $ 13.88 $ 16.85 $ 16.85 7-4. Per Foot $ 26.30 $ 30.43 $ 30.43 7-5. Per Vault $ 266.00 $ 323.29 $ 323.29 7-6. Per Vault $ 536.00 $ 651.50 $ 651.50 7-7. Per Well Not Applicable $ 185.22 $ 185.22 8.
8-1. Per Well $ 140.00 $ 170.15 $ 170.15 8-2. Per Well $ 175.00 $ 212.68 $ 202.00 8-3. Per Well $ 140.00 $ 140.00 $ 133.00 8-4. Per Sample $ 100.00 $ 110.25 $ 104.75 8-5. Per Sample $ 90.00 $ 99.22 $ 94.25 8-6. Per Sample $ 58.75 $ 71.40 $ 67.80 8-7. Per Well $ 20.00 $ 24.30 $ 23.05 8-8. Per Well $ 85.00 $ 98.39 $ 93.50
8-9. Per Sample $ 50.00 $ 57.87 $ 55.00
8-10. Per Sample $ 50.00 $ 57.87 $ 55.00 8-11. Per Sampling Event Not Applicable $ 144.70 $ 144.70 8-12. Per Well Not Applicable $ 34.72 $ 33.00 8-13. Per Well Not Applicable $ 34.72 $ 33.00
Survey Latitude/Longitude of Existing Monitor Wells Survey Latitude/Longitude of New Monitor Wells
Soil/Sediment Sample Collection Water Level or Free Product Gauging Free Product Gauging & Bailing Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, TedlarTM Bag (or Equivalent) Vapor/Ambient Air Sample Collection - SUMMATM Canister (or Equivalent) Electronic Data Deliverables (EDD)
SAMPLE COLLECTION AND FIELD TESTING
Monitoring Well Sampling with Water Level, 100 foot depth Monitoring Well Sampling with Water Level, > 100 foot depth Domestic Water Well Sampling Other Water Sampling Free Product Sample Collection
Grout and Abandon Well, > 2 to 4 inch diameter Grout and Abandon Well, > 4 to 6 inch diameter Grout and Abandon Well, > 6 inch diameter Removal of Well Vault - 2 x 2 x 2 foot Removal of Well Vault - 4 x 4 x 2 foot Removal of Well Pad and Manhole
WELL ABANDONMENT
Grout and Abandon Well, 1 to 2 inch diameter
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.2)
REVISED
CONTRACTED
ITEM PRICE (V3.3)
Region:
Contractor:
Contract #:
South
TRIDENT TREATMENT & DEWATERING LLC D/B/A MAS ENVIRONMENTAL LLC
GC883
DEP Restated Agency Term Contract No. GC883 Amendment No. 10
Attachment D (V3.3) Rate Schedule
DESCRIPTION
8-14. Per Sample Not Applicable $ 20.03 $ 19.00
9.
9.A.
9-1. Per Sample $ 367.20 $ 425.07 $ 404.00
9-2. Per Sample $ 32.40 $ 39.37 $ 39.37 9-3. Per Sample $ 43.20 $ 52.50 $ 49.90 9-4. Per Sample $ 68.04 $ 82.69 $ 78.55 9-5. Per Sample $ 75.60 $ 91.87 $ 91.87 9-6. Per Sample $ 70.20 $ 85.31 $ 81.05
9-7. Per Sample $ 135.00 $ 156.27 $ 148.50
9-8. Per Sample $ 45.36 $ 55.13 $ 55.13 9-8.a. Per Sample Not Applicable $ 250.02 $ 237.50 9-9. Per Sample $ 45.36 $ 52.51 $ 49.90
9-10. Per Sample $ 66.96 $ 77.51 $ 73.60
9-11. Per Sample $ 10.80 $ 12.49 $ 11.85 9-12. Per Sample $ 10.80 $ 12.49 $ 11.85 9-13. Per Sample $ 10.80 $ 12.49 $ 11.85 Soil, Chromium (EPA 6010 or EPA 6020)
Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO) Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method) Soil, PCBs [or Aroclors] (EPA 8082) Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury]) Soil, Arsenic (EPA 6010 or EPA 6020) Soil, Cadmium (EPA 6010 or EPA 6020)
Soil, BTEX + MTBE (EPA 8021 or EPA 8260) Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260) Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260) Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310) Soil, Priority Pollutant Volatile Organics (EPA 8260) Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])
Encore (25 gram) for SPLP Soil Sample Collection: [Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).
LABORATORY ANALYSIS
SOIL/SEDIMENT ANALYSIS
Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non- Priority Pollutant Organics (Multiple Methods)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.2)
REVISED
CONTRACTED
ITEM PRICE (V3.3)
Region:
Contractor:
Contract #:
South
TRIDENT TREATMENT & DEWATERING LLC D/B/A MAS ENVIRONMENTAL LLC
GC883
DEP Restated Agency Term Contract No. GC883 Amendment No. 10
Attachment D (V3.3) Rate Schedule
DESCRIPTION
9-14. Per Sample $ 10.80 $ 12.49 $ 11.85 9-15. Per Sample $ 27.00 $ 31.24 $ 29.65 9-16. Per Sample $ 27.00 $ 31.24 $ 31.24 9-17. Per Sample $ 32.40 $ 37.50 $ 37.50
9-18. Per Sample $ 70.20 $ 73.71 $ 70.00
9-19. Per Sample $ 5.40 $ 6.24 $ 5.93 9-20. Per Sample $ 54.00 $ 62.50 $ 59.40
9-21. Per Sample $ 270.00 $ 312.55 $ 297.00
9-22. Per Sample $ 378.00 $ 437.54 $ 415.50
9-23. Per Sample $ 54.00 $ 62.50 $ 59.40
9-24. Per Sample $ 226.80 $ 262.54 $ 249.50 9.B.
9-25. Per Sample $ 213.84 $ 247.51 $ 235.00
9-26. Per Sample $ 385.56 $ 446.33 $ 424.00
9-27. Per Sample $ 32.40 $ 39.37 $ 39.37 9-28. Per Sample $ 43.20 $ 52.50 $ 49.90
WATER ANALYSIS
Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (Multiple Methods)
Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non- Priority Pollutant Organics (Multiple Methods) Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260) Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260)
Soil, Moisture Content (ASTM D2216-10) Soil, Texture, (See Gee 7 Bauder [1966]) Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS)
Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution GC/MS) Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS) Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Soil, Lead (EPA 6010 or EPA 6020) Soil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311) Soil, Synthetic Precipitation Leaching Procedure-Extraction Only (EPA1312) Soil, Organic Carbon, Total (EPA 9060 or Walkey-Black) Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, - 96e1 or ASTM D2937-10)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.2)
REVISED
CONTRACTED
ITEM PRICE (V3.3)
Region:
Contractor:
Contract #:
South
TRIDENT TREATMENT & DEWATERING LLC D/B/A MAS ENVIRONMENTAL LLC
GC883
DEP Restated Agency Term Contract No. GC883 Amendment No. 10
Attachment D (V3.3) Rate Schedule
DESCRIPTION
9-29. Per Sample $ 59.40 $ 72.18 $ 72.18
9-30. Per Sample $ 75.60 $ 91.87 $ 91.87
9-31. Per Sample $ 37.80 $ 43.75 $ 41.50 9-31.a. Per Sample Not Applicable $ 43.75 $ 41.50 9-32. Per Sample $ 64.80 $ 75.01 $ 71.25 9-33. Per Sample $ 70.20 $ 81.25 $ 77.20
9-34. Per Sample $ 135.00 $ 156.27 $ 148.50
9-35. Per Sample $ 135.00 $ 156.27 $ 148.50
9-36. Per Sample $ 45.36 $ 52.51 $ 52.51 9-37. Per Sample $ 45.36 $ 52.51 $ 49.90 9-38. Per Sample $ 8.64 $ 9.99 $ 9.50 9-39. Per Sample $ 8.64 $ 9.99 $ 9.50 9-40. Per Sample $ 8.64 $ 9.99 $ 9.50 9-41. Per Sample $ 8.64 $ 9.99 $ 9.50
9-41.a. Per Sample Not Applicable $ 29.86 $ 28.40
9-42. Per Sample $ 16.20 $ 18.75 $ 17.80 9-43. Per Sample $ 8.64 $ 9.99 $ 9.50 9-44. Per Sample $ 8.64 $ 9.99 $ 9.50
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380) Water, Mercury, Total (EPA 245.1, EPA 6020 or EPA 7470) Water, Calcium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270) Water, Total Recoverable Petroleum Hydrocarbons (FL-PRO) Water, PCBs [or Aroclors] (EPA 608 or EPA 8082) Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310) Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011) Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM) Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624) Water, Priority Pollutant Volatile Organics (EPA 8260) Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])
Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.2)
REVISED
CONTRACTED
ITEM PRICE (V3.3)
Region:
Contractor:
Contract #:
South
TRIDENT TREATMENT & DEWATERING LLC D/B/A MAS ENVIRONMENTAL LLC
GC883
DEP Restated Agency Term Contract No. GC883 Amendment No. 10
Attachment D (V3.3) Rate Schedule
DESCRIPTION
9-44.a. Per Sample Not Applicable $ 29.86 $ 28.40
9-45. Per Sample $ 8.64 $ 9.99 $ 9.50 9-46. Per Sample $ 8.64 $ 9.99 $ 9.50 9-47. Per Sample $ 8.64 $ 9.99 $ 9.50 9-48. Per Sample $ 8.64 $ 9.99 $ 9.50 9-49. Per Sample $ 12.96 $ 14.28 $ 13.55
9-50. Per Sample $ 19.44 $ 19.44 $ 18.45
9-51. Per Sample $ 12.96 $ 14.99 $ 14.25
9-52. Per Sample $ 10.80 $ 12.49 $ 11.85 9-53. Per Sample $ 12.96 $ 14.99 $ 14.25
9-54. Per Sample $ 12.96 $ 14.99 $ 14.25
9-55. Per Sample $ 12.96 $ 14.99 $ 14.25 9-56. Per Sample $ 19.44 $ 22.50 $ 21.40
9-57. Per Sample $ 12.96 $ 14.99 $ 14.25
9-58. Per Sample $ 11.88 $ 13.09 $ 12.45 9-59. Per Sample $ 11.88 $ 13.74 $ 13.05
9-60. Per Sample $ 12.96 $ 14.99 $ 14.25
Water, Orthophosphate [as P] (EPA 300.0, EPA 300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-PE or SM 4500-PF) Water, Residue-filterable [Total Dissolved Solids] (SM 2540 C) Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D) Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA 9056 or SM 4500-SO4 C)
Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM 4500CI E) Water, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C) Water, Nitrate [as N] (EPA 300.0 or EPA 353.2) Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or
SM 4500-NO3 F)
Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F) Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)
Water, Magnesium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B) Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-NH3 H)
Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.2)
REVISED
CONTRACTED
ITEM PRICE (V3.3)
Region:
Contractor:
Contract #:
South
TRIDENT TREATMENT & DEWATERING LLC D/B/A MAS ENVIRONMENTAL LLC
GC883
DEP Restated Agency Term Contract No. GC883 Amendment No. 10
Attachment D (V3.3) Rate Schedule
DESCRIPTION
9-61. Per Sample $ 54.00 $ 54.00 $ 51.25
9-62. Per Sample $ 945.00 $ 992.25 $ 943.00
9-63. Per Sample $ 945.00 $ 992.25 $ 943.00
9-64. Per Sample $ 270.00 $ 312.55 $ 297.00
9-65. Per Sample $ 378.00 $ 437.54 $ 415.50
9-66. Per Sample $ 48.60 $ 56.25 $ 53.50
9-67. Per Sample $ 226.80 $ 262.54 $ 249.50 9-78. Per Sample Not Applicable $ 70.20 $ 66.75 9-79. Per Sample Not Applicable $ 43.75 $ 41.50 9-80. Per Sample Not Applicable $ 81.25 $ 77.25
Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260) Water, Methane (EPA SOP RSK-175)
Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate:
Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia]
(EPA 2006.0/2007.0)
Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS)
Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution GC/MS) Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS) Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS) Water, BTEX/MTBE + Naphthalene (EPA 8260)
Water, Heterotrophic Plate Count (SM 9215 B) Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate:
Pimephales promelas or Cyprinella leedsi/Invertebrate: Ceriodaphnia dubia] (EPA 2000.0/2002.0)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.2)
REVISED
CONTRACTED
ITEM PRICE (V3.3)
Region:
Contractor:
Contract #:
South
TRIDENT TREATMENT & DEWATERING LLC D/B/A MAS ENVIRONMENTAL LLC
GC883
DEP Restated Agency Term Contract No. GC883 Amendment No. 10
Attachment D (V3.3) Rate Schedule
DESCRIPTION
9.C.
9-68. Per Sample $ 75.60 $ 87.50 $ 83.25 9-69. Per Sample $ 129.60 $ 150.02 $ 142.50 9-70. Per Sample $ 151.20 $ 175.02 $ 166.25 9-71. Per Sample $ 216.00 $ 250.02 $ 237.50 9.D.
9-72. Per Sample $ 226.80 $ 262.54 $ 249.50
9-73. Per Sample $ 270.00 $ 312.55 $ 297.00
9.E.
9-74. Reimbursable* $ 1.00 Not Applicable Not Applicable
9-75. Percent Surcharge $ - $ - $ -
9-76. Percent Surcharge $ 0.45 $ 0.51 $ 0.51
9-77. Percent Surcharge $ 1.00 $ 1.05 $ 1.05
10.
10-1. Per Sq. Foot/Day $ 2.91 Not Applicable Not Applicable
10-1.a. Per Sq. Foot Not Applicable $ 39.60 $ 37.60 10-1.b. Per Sq. Foot/Day Not Applicable $ 2.39 $ 2.39 10-1.c. Per Sq. Foot/Week Not Applicable $ 4.71 $ 4.71
Sheet Piling Rental for 20 feet deep Excavation Sheet Piling Rental for 20 feet deep Excavation
Additional Laboratory % Surcharge authorized in the ATC contract for 7 Day Turnaround.
Additional Laboratory % Surcharge authorized in the ATC contract for 3 Day Turnaround.
Additional Laboratory % Surcharge authorized in the ATC contract for 1 Day Turnaround.
SOIL SOURCE REMOVAL RELATED
Sheet Piling for 20 feet deep excavation (per square foot) Sheet Piling Installation for 20 feet deep Excavation
Air, Volatile Organic Compounds (EPA Method TO-17)
PRODUCT ANALYSIS
Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High Resolution GC/FID)
Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution GC/MS)
OTHER ANALYSIS
Other Analysis, Not Otherwise Specified
AIR ANALYSIS
Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3) Air, Volatile Organic Aromatics (EPA Method TO-15) Air, Polycyclic Aromatic Hydrocarbons (EPA Method TO-13)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.2)
REVISED
CONTRACTED
ITEM PRICE (V3.3)
Region:
Contractor:
Contract #:
South
TRIDENT TREATMENT & DEWATERING LLC D/B/A MAS ENVIRONMENTAL LLC
GC883
DEP Restated Agency Term Contract No. GC883 Amendment No. 10
Attachment D (V3.3) Rate Schedule
DESCRIPTION
10-1.d. Per Sq. Foot/Month Not Applicable $ 9.34 $ 9.34 10-2. Per Sq. Foot/Week $ 10.00 Not Applicable Not Applicable
10-2.a. Per Sq. Foot Not Applicable $ 50.40 $ 47.90 10-2.b. Per Sq. Foot/Day Not Applicable $ 3.55 $ 3.55 10-2.c. Per Sq. Foot/Week Not Applicable $ 4.71 $ 4.71 10-2.d. Per Sq. Foot/Month Not Applicable $ 9.34 $ 9.34 10-3. Per Sq. Foot/Month $ 20.19 Not Applicable Not Applicable 10-4. Per Sq. Foot/Day $ 3.99 Not Applicable Not Applicable 10-5. Per Sq. Foot/Week $ 15.00 Not Applicable Not Applicable 10-6. Per Sq. Foot/Month $ 25.59 Not Applicable Not Applicable 10-7. Per Cubic Yard $ 24.60 $ 28.47 $ 28.47 10-8. Per Cubic Yard $ 15.00 $ 17.35 $ 17.35 10-9. Per Cubic Yard $ 90.00 $ 104.18 $ 99.00
10-10. Per Cubic Yard $ 73.20 $ 84.73 $ 80.50 10-11.a. Per Cubic Yard $ 100.00 $ 115.76 $ 110.00 10-11.b. Per Cubic Yard $ 200.00 $ 231.50 $ 220.00 10-12.a. Per Cubic Yard $ 100.00 $ 115.76 $ 110.00 10-12.b. Per Cubic Yard $ 130.00 $ 150.47 $ 143.00 10-13. Per Cubic Yard $ 84.00 $ 97.24 $ 92.50 10-14. Per Cubic Yard $ 30.00 $ 34.72 $ 34.72 10-15. Per Cubic Yard $ 23.52 $ 27.21 $ 27.21
10-15.a. Per Cubic Yard Not Applicable $ 28.22 $ 26.80 10-15.b. Per Cubic Yard Not Applicable $ 23.96 $ 22.75 10-16. Per Ton $ 42.96 $ 49.72 $ 47.25
Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards Pea Gravel
LDA Excavation and Loading With Surface Casing > 300 cubic yards LDA Excavation and Loading With Driven Casing > 300 cubic yards Flowable Fill Concrete and Installation Clean Backfill Material, Compaction and Testing (includes transport) 300 cubic yards Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards Clean Overburden Used As Backfill, Compaction and Testing 300 cubic yards
Conventional Soil Excavation and Loading 300 cubic yards Conventional Soil Excavation and Loading > 300 cubic yards LDA Excavation and Loading Without Casing 300 cubic yards LDA Excavation and Loading Without Casing > 300 cubic yards LDA Excavation and Loading With Surface Casing 300 cubic yards LDA Excavation and Loading With Driven Casing < 300 cubic yards
Sheet Piling Rental for > 20 feet deep Excavation Sheet Piling Rental for > 20 feet deep Excavation Sheet Piling for 20 feet deep excavation (per square foot) Sheet Piling for > 20 feet deep excavation (per square foot) Sheet Piling for > 20 feet deep excavation (per sqyuare foot) Sheet Piling for > 20 feet deep excavation (per square foot)
Sheet Piling Rental for 20 feet deep Excavation Sheet Piling for 20 feet deep excavation (per square foot) Sheet Piling Installation for > 20 feet deep Excavation Sheet Piling Rental for > 20 feet deep Excavation
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.2)
REVISED
CONTRACTED
ITEM PRICE (V3.3)
Region:
Contractor:
Contract #:
South
TRIDENT TREATMENT & DEWATERING LLC D/B/A MAS ENVIRONMENTAL LLC
GC883
DEP Restated Agency Term Contract No. GC883 Amendment No. 10
Attachment D (V3.3) Rate Schedule
DESCRIPTION
10-17. Per Ton $ 39.72 $ 45.96 $ 45.96 10-18. Per Day $ 1,025.00 $ 1,186.56 $ 1,127.00 10-19. Per Day $ 133.00 $ 153.96 $ 146.25 10-20. Per Week $ 5,496.00 $ 6,361.70 $ 6,045.00 10-21. Per Week $ 266.00 $ 307.92 $ 292.50 10-22. Per Month $ 10,992.00 $ 12,724.61 $ 12,075.00 10-23. Per Month $ 370.00 $ 428.28 $ 407.00
11.
11-1. Per Tank $ 3,880.00 $ 4,491.16 $ 4,265.00 11-2. Per Tank $ 6,518.00 $ 7,545.39 $ 7,165.00 11-3. Per Tank $ 8,820.60 $ 9,724.71 $ 9,235.00 11-4. Per Tank $ 10,635.00 $ 12,311.33 $ 11,700.00 12.
12-1. Per Square Foot $ 1.33 $ 1.59 $ 1.59 12-2. Per Square Foot $ 2.41 $ 2.91 $ 2.91 12-3. Per Ton $ 24.60 $ 29.89 $ 29.89 12-4. Per Ton $ 24.60 $ 29.89 $ 28.40 12-5. Per Ton $ 35.40 $ 43.01 $ 43.01 12-6. Per Drum $ 167.40 $ 203.44 $ 203.44 12-7. Per Ton $ 23.52 $ 28.57 $ 28.57 12-8. Per Ton $ 34.32 $ 41.70 $ 41.70 12-9. Per Ton $ 27.84 $ 33.83 $ 33.83
12-10. Per Ton $ 27.84 $ 33.83 $ 33.83 12-11. Per Ton $ 30.00 $ 36.45 $ 34.60 12-12. Per Ton $ 28.92 $ 35.13 $ 33.40
Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) 450 tons Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tons
Transport and Disposal of Clean Concrete Transport and Disposal of Mixed Debris Transport and Disposal of Petroleum Impacted Soil (includes drum) Transport Petroleum Impacted Soil (bulk) 100 miles Transport Petroleum Impacted Soil (bulk) > 100 miles Disposal of Petroleum Impacted Soil at a Landfill (bulk) 450 tons
Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal.
This is the start of the file's text. The full file is on GovTribe.