This is Amendment No. 14 to Agency Term Contract No. GC822, a rate increase amendment between the Florida Department of Environmental Protection (FDEP) and Professional Service Industries, Inc. (FEID No. 370962090). The contract, originally executed on February 26, 2014, provides petroleum contamination site response action services in the North Region of Florida. This amendment modifies only the rates specified in the contract rate schedule and does not add, delete, or otherwise modify any line items.

The amendment increases rates across the contract's comprehensive scope of services, which includes drilling and boring operations, well installation and abandonment, soil and water sampling and analysis, remedial action oversight, system operations and maintenance, engineering controls, and various specialized environmental remediation technologies. Rate increases range from approximately 6.78% to 8.00% across all pay items, with most increases at 8.00%. The new rates in Attachment D (Rate Schedule V3.5) became effective on June 1, 2023, for all new work assignments issued on or after that date. Pre-Rate Change Date work assignments continue to apply the prior rate schedule. The amendment also clarifies that no new Purchase Orders or Task Assignments shall be issued after the renewal term, though existing assignments may continue up to twelve months post-expiration, and adds a requirement for photo documentation of drums to verify the industry standard of 75% capacity.

View the file

Other files

File Type Posted
CN-370000-GC822-A2.pdf PDF
CN-370000-GC822-CMC5.pdf PDF
CN-370000-GC822-A11.pdf PDF
CN-370000-GC822-A13.pdf PDF
CN-370000-GC822-A15E1.pdf PDF
CN-370000-GC822-A17E3.pdf PDF
CN-370000-GC822-A18.pdf PDF
CN-370000-GC822-A3.pdf PDF
CN-370000-GC822-A6.pdf PDF
CN-370000-GC822-A8.pdf PDF
CN-370000-GC822-A9.pdf PDF
CN-370000-GC822-CMC3.pdf PDF
CN-370000-GC822-A10.pdf PDF
CN-370000-GC822-A16E2.pdf PDF
CN-370000-GC822-A4.pdf PDF
CN-370000-GC822-A5.pdf PDF
CN-370000-GC822-A7.pdf PDF
CN-370000-GC822-AR1.pdf PDF
CN-370000-GC822-CMC.pdf PDF
CN-370000-GC829-CMC5.pdf PDF
CN-370000-GC822-A12.pdf PDF
CN-370000-GC822-A3.pdf.crdownload CRDOWNLOAD file
CN-370000-GC822-CMC1.pdf PDF
CN-370000-GC822-CMC2.pdf PDF
CN-370000-GC822-CMC6.pdf PDF
CN-370000-GC822.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.

2.

3.

4.

NOW THEREFORE, the parties agree as follows:

WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).

WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.4) entitled "Rate Schedule" in accordance with provision 11.C of the Contract; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, The Agency Term Contract No. GC822 (hereinafter "Contract") between the FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and

PROFESSIONAL SERVICE INDUSTRIES, INC. (hereinafter "Contractor") executed on February 26, 2014, to provide petroleum contamination site response action services in the North Region, is hereby amended.

PETROLEUM RESTORATION PROGRAM

AGENCY TERM CONTRACT NO. GC822

LANGUAGE AMENDMENT WITH

RATE INCREASE

AMENDMENT NO. 14

Amendment No. 14

DEP Agency Term Contract No. GC822

This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.

All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.

Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.

Attachment D, Rate Schedule (V3.5) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate Schedule (V3.5) shall apply.

Amendment No. 14

DEP Agency Term Contract No. GC822

5.

6.

C.

7.

8.

The following provision is hereby added to paragraph 4, Term of Contract:

This amendment shall include an update to ATTACHMENT A (V2.0), SCOPE OF SERVICES, V.

Technical Specification, B. Schedule of Pay Items, Section 12. DEBRIS, WASTE AND

PRODUCT REMOVAL AND DISPOSAL, as follows:

No new Purchase Orders or Task Assignments shall be issued or executed after renewal term. However, the Restated Contract shall continue in effect up to twelve months after expiration of the renewal term for completion of any Purchase Order or Task Assignment issued/executed during the renewal term. Purchase Orders or Task Assignments, completion of which that extends beyond the renewal term shall continue to be subject to change, as appropriate.

Photo documentation of the inside of the drums is required to ensure drums meet the industry wide standard of being 75% full.

The Rate Change Date is the date shown at the bottom of this Amendment for the Department’s

Data Processing Information. Prior to the Rate Change Date, the Department shall provide

Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change

Date, within five (5) business days from the data entry date.

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this

Amendment shall control.

Pre-existing

Rate

Agreed

New Rate(1)

705.39$ $ 761.80

359.86$ $ 388.60

372.68$ $ 402.45

396.22$ $ 427.90

761.29$ $ 822.15

825.55$ $ 891.50

1,153.10$ $ 1,245.30

539.89$ $ 583.08

719.85$ $ 777.43

575.85$ $ 621.91

1,007.74$ $ 1,088.35

287.91$ $ 310.94

430.90$ $ 465.37

659.87$ $ 712.65

1,049.19$ $ 1,133.12

1,042.61$ $ 1,126.01

1,931.97$ $ 2,086.52

769.68$ $ 831.25

1,111.76$ $ 1,200.70

6,622.34$ $ 7,152.12

10,719.90$ $ 11,577.49

Est %

Rate

Change(2)

+8.00%

+7.99%

+7.99%

+8.00%

+7.99%

+7.99%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

2-1.

2-2.

2-4.

3-1.

3-2.

3-3.

3-4.

Description

3-12.

3-13.a.

Table 1. Listed Schedule of Pay Items with Rate Changes

Drill Rig and Support Vehicles Mobilization

(hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way

DPT Rig and Support Vehicles Mobilization - >

100 miles each way

DPT Rig and Support Vehicles Mobilization - ≤

100 miles each way

Work Trailer - > 100 miles each way

Work Trailer - ≤ 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way

Contractor Oversight for Non-Price Schedule

Activities

LDA Rig and Support Vehicles Mobilization - ≤

100 miles each way

Excavator Mobilization - > 100 miles each way

Excavator Mobilization - ≤ 100 miles each way

Drill Rig and Support Vehicles Mobilization

(hollow stem auger, mud rotary or sonic) - > 100 miles each way

File Review

Site Health & Safety Plan

Notice of Discovery of Contamination Package

(Initial or TPOC)

Off-Site Property Access Agreement

Receptor Survey and Exposure Pathway

Identification (excludes report)

Site Reconnaissance/Field Measurement Visit

LDA Rig and Support Vehicles Mobilization - >

100 miles each way

Pay Item No.

1-1.

1-2.

1-3.

1-5.

3-14.a.

3-5.

3-6.

3-7.a.

3-8.a.

3-9.a.

3-10.a.

3-11.

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

629.83$ $ 680.21

899.73$ $ 971.70

449.91$ $ 485.90

680.20$ $ 734.61

454.94$ $ 491.30

744.27$ $ 803.81

44.05$ $ 47.57

52.68$ $ 56.89

61.73$ $ 66.65

159.89$ $ 172.68

229.81$ $ 248.19

2,354.12$ $ 2,542.40

2,375.38$ $ 2,565.41

36.55$ $ 39.47

40.46$ $ 43.69

46.34$ $ 50.04

41.50$ $ 44.82

49.34$ $ 53.28

52.88$ $ 57.11

55.72$ $ 60.17

62.03$ $ 66.99

+8.00%

3-15.

3-16.

3-17.

3-18.

3-19.

3-20.

5-9.

5-10.

5-11.

Hand Auger Boring ≤ 10 foot total depth

Sonic Core Sampling - 5 or 10 foot (during boring)

Split Spoon Sampling – 2 foot (during boring) >

100 feet

HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth

DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (add-on cost to DPT base rate)

Direct Push Technology (DPT) Rig and

Equipment

HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, <

50 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, >

100 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, <

50 foot total depth

HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth

Split Spoon Sampling – 2 foot (during boring)

50 to 100 feet

Split Spoon Sampling – 2 foot (during boring) <

50 feet

Drum Compactor mobilization - > 100 miles each way

Drum Compactor mobilization - ≤ 100 miles each way

Mini Excavator/Loader (Bobcat

TM

) Mobilization

- > 100 miles each way

Mini Excavator/Loader (Bobcat

TM

) Mobilization

- ≤ 100 miles each way

Loader/Backhoe Mobilization - > 100 miles each way

Loader/Backhoe Mobilization - ≤ 100 miles each way

5-1.a.1.

5-1.a.2.

5-1.a.3.

5-1.b.

5-2.

5-3.a.

5-5.a.

5-6.

5-7.

5-12.

5-13.

5-8.

+8.00%

+8.00%

+8.00%

+8.00%

+7.99%

+8.00%

+7.99%

+7.99%

+7.97%

+8.00%

+8.00%

+8.00%

+8.00%

+7.99%

+7.98%

+7.98%

+8.00%

+7.99%

+7.99%

65.95$ $ 71.22

44.39$ $ 47.94

48.65$ $ 52.54

55.95$ $ 60.42

57.23$ $ 61.80

61.95$ $ 66.90

71.81$ $ 77.55

82.98$ $ 89.61

94.01$ $ 101.53

116.21$ $ 125.50

39.16$ $ 42.29

43.27$ $ 46.72

123.91$ $ 133.82

53.41$ $ 57.68

141.39$ $ 152.70

66.41$ $ 71.72

52.23$ $ 56.40

65.28$ $ 70.50

77.10$ $ 83.26

92.41$ $ 99.80

9.22$ $ 9.95

12.56$ $ 13.56

19.74$ $ 21.31

24.47$ $ 26.42

491.61$ $ 530.93

986.76$ $ 1,065.70

2,052.75$ $ 2,216.97

6-5.

6-6.

6-7.

6-8.

Installation of Well Vault - 4 x 4 x 2 foot

Installation of Well Vault - 2 x 2 x 2 foot

6-9.a.

6-9.b.

6-9.c.

6-9.d.

6-10.

6-11.

6-12.

Surface Casing - 8 inch diameter

Surface Casing - 6 inch diameter

Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth

Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, >

100 foot total depth

Well Installation - 1 inch diameter

Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth

Sonic Boring, > 10 to 14 inch diameter, 50 to

100 foot total depth

Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth

Well Installation - 2 inch diameter (vertical)

Above Grade Well Completion

Additional Well Screen > 20 feet - 6 inch diameter

Additional Well Screen > 20 feet - 4 inch diameter

Additional Well Screen > 20 feet - 2 inch diameter

Additional Well Screen > 20 feet - 1 inch diameter

Surface Casing - 12 inch diameter

Surface Casing - 10 inch diameter

Well Installation - 6 inch diameter

Well Installation - 4 inch diameter (horizontal, by trenching, not directional drilling)

Well Installation - 4 inch diameter (vertical)

Well Installation - 2 inch diameter (horizontal, by trenching, not directional drilling)

6-3.a.

6-3.b.

6-4.

6-2.b.

5-17.

5-18.

5-19.

5-20.

5-21.

5-22.

5-23.

6-1.

6-2.a.

5-14.

5-15.

5-16.

+8.00%

+8.00%

+7.98%

+8.00%

+7.99%

+8.00%

+7.92%

+7.99%

+7.96%

+7.95%

+7.97%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+7.99%

+7.99%

+7.99%

+7.99%

+7.99%

+8.00%

+7.99%

+7.99%

+7.97%

+8.00%

+7.99%

174.14$ $ 188.07

343.65$ $ 371.14

391.56$ $ 422.88

22.35$ $ 24.13

25.97$ $ 28.04

31.84$ $ 34.38

35.88$ $ 38.75

529.33$ $ 571.67

963.50$ $ 1,040.58

212.79$ $ 229.81

259.15$ $ 279.88

322.49$ $ 348.28

123.28$ $ 133.14

119.15$ $ 128.68

106.68$ $ 115.21

71.96$ $ 77.71

25.89$ $ 27.96

129.13$ $ 139.46

44.01$ $ 47.53

73.35$ $ 79.21

40.34$ $ 43.56

36.66$ $ 39.59

36.66$ $ 39.59

592.25$ $ 639.63

59.69$ $ 64.46

77.95$ $ 84.18

+7.99%

+7.99%

9-1.

9-2.

9-3.

8-12.

8-3.

8-4.

8-5.

8-6.

8-7.

8-8.

8-9.

8-10.

8-11.

Removal and Reinstallation of 12-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)

Free Product Sample Collection

Other Water Sampling

Domestic Water Well Sampling

Monitoring Well Sampling with Water Level, >

100 foot depth

Monitoring Well Sampling with Water Level, ≤

100 foot depth

Removal of Well Pad and Manhole

Removal of Well Vault - 4 x 4 x 2 foot

Removal of Well Vault - 2 x 2 x 2 foot

Removal and Reinstallation of 8-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)

Well Redevelopment

7-2.

7-3.

7-4.

7-5.

7-1.

6-13.

6-14.

6-15.

7-6.

7-7.

8-1.

8-2.

8-13.

Grout and Abandon Well, > 6 inch diameter

Grout and Abandon Well, > 4 to 6 inch diameter

Grout and Abandon Well, > 2 to 4 inch diameter

Grout and Abandon Well, 1 to 2 inch diameter

Survey Latitude/Longitude of New Monitor

Wells

Survey Latitude/Longitude of Existing Monitor

Wells

Electronic Data Deliverables (EDD)

Vapor/Ambient Air Sample Collection -

SUMMATM Canister (or equivalent)

Vapor/Ambient Air Sample Collection - Passive

Dosimeter, Sorbent Tube, Tedlar

TM

Bag (or

Equivalent)

Free Product Gauging & Bailing

Water Level or Free Product Gauging

Soil/Sediment Sample Collection

Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260)

Soil, BTEX + MTBE (EPA 8021 or EPA 8260)

Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority

Pollutant Organics (multiple methods)

+8.00%

+8.00%

+8.00%

+7.96%

+7.97%

+7.98%

+8.00%

+7.99%

+7.99%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+7.99%

+8.00%

+8.00%

+8.00%

+7.99%

+7.98%

105.16$ $ 113.57

114.10$ $ 123.22

113.32$ $ 122.38

346.10$ $ 373.78

87.75$ $ 94.77

316.41$ $ 341.72

78.29$ $ 84.55

103.82$ $ 112.12

14.57$ $ 15.73

14.57$ $ 15.73

14.57$ $ 15.73

14.57$ $ 15.73

58.47$ $ 63.14

58.47$ $ 63.14

56.29$ $ 60.79

84.78$ $ 91.56

16.47$ $ 17.78

90.83$ $ 98.09

453.89$ $ 490.20

599.01$ $ 646.93

+8.00%

+7.95%

+7.99%

+8.00%

+8.00%

+7.96%

+7.96%

+7.96%

+7.96%

+7.99%

+7.99%

+7.99%

9-4.

9-5.

9-6.

9-16.

9-17.

9-18.

9-19.

9-20.

9-15.

9-7.

9-8.

9-8.a.

9-9.

9-10.

9-11.

9-12.

9-13.

9-14.

Soil, TRPH Fractionation (MADEP-EPH/VPH

Method or TPHCWG Direct Method)

Soil, Total Recoverable Petroleum

Hydrocarbons (FL-PRO)

Soil, Priority Pollutant Extractable Organics-

Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])

Soil, Texture, (See Gee 7 Bauder [1966])

Soil, Priority Pollutant Volatile Organics (EPA

8260)

Soil, Polycyclic Aromatic Hydrocarbons (EPA

8270 or EPA 8310)

Soil, BTEX + MTBE + VOHs (EPA 8021 or

EPA 8260)

Soil, Moisture Content (ASTM D2216-10)

Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -

96e1 or ASTM D2937-10)

Soil, Organic Carbon, Total (EPA 9060 or

Walkey-Black)

Soil, Synthetic Precipitation Leaching Procedure-

Extraction Only (EPA1312)

Soil, Toxicity Characteristic Leaching Procedure-

Extraction Only (EPA 1311)

Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA

8260Mod, High Resolution GC/MS)

Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High

Resolution GC/MS)

Soil, Lead (EPA 6010 or EPA 6020)

Soil, Chromium (EPA 6010 or EPA 6020)

Soil, Cadmium (EPA 6010 or EPA 6020)

Soil, Arsenic (EPA 6010 or EPA 6020)

Soil, 8 RCRA Metals (EPA 6010 or EPA 6020

[Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471

[Mercury])

Soil, PCBs [or Aroclors] (EPA 8082)

9-21.

9-22.

+8.00%

+7.99%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

104.91$ $ 113.30

366.05$ $ 395.33

354.45$ $ 382.80

555.00$ $ 599.40

56.75$ $ 61.29

76.07$ $ 82.15

98.88$ $ 106.79

111.60$ $ 120.52

52.34$ $ 56.52

67.86$ $ 73.28

109.00$ $ 117.72

108.61$ $ 117.29

323.48$ $ 349.35

337.98$ $ 365.01

87.05$ $ 94.01

78.29$ $ 84.55

13.93$ $ 15.04

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+7.99%

+8.00%

+7.99%

+7.99%

+7.99%

Water, Priority Pollutant Volatile Organics [for

NPDES purposes only] (EPA 624)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)

Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)

Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)

Water, Volatile Organic Halocarbons, except

EDB (EPA 8021 or EPA 8260)

Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)

Water, PCBs [or Aroclors] (EPA 608 or EPA

8082)

Water, Total Recoverable Petroleum

Hydrocarbons (FL-PRO)

Water, Priority Pollutant Extractable Organics-

Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA

608 + EPA 8270)

Water, Priority Pollutant Extractable Organics-

Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 +

EPA 625])

Water, Priority Pollutant Volatile Organics (EPA

8260)

Water, Used Oil/Unknown Product Group-Table

D of Ch. 62-780, F.A.C., except for non-Priority

Pollutant Organics (multiple methods)

Water, Gasoline/Kerosene Analytical Group-

Table C of Ch. 62-780, F.A.C. (multiple methods)

Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)

Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High

Resolution GC/MS)

Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

9-32.

9-24.

9-25.

9-26.

9-27.

9-28.

9-29.

9-30.

9-31.

9-31.a.

9-23.

9-33.

9-34.

9-35.

9-36.

9-37.

9-38.

+8.00%

+8.00%

+8.00%

+8.00%

+7.97%

+8.00%

13.93$ $ 15.04

13.93$ $ 15.04

13.93$ $ 15.04

39.20$ $ 42.33

23.83$ $ 25.73

13.93$ $ 15.04

13.93$ $ 15.04

39.20$ $ 42.33

13.93$ $ 15.04

13.93$ $ 15.04

13.93$ $ 15.04

13.93$ $ 15.04

16.47$ $ 17.78

22.47$ $ 24.26

17.74$ $ 19.15

17.42$ $ 18.81

17.74$ $ 19.15

18.86$ $ 20.36

17.74$ $ 19.15

9-49.

9-50.

9-51.

9-52.

9-53.

9-54.

9-55.

Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)

Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA

353.2, SM 4500-NO3 E or SM 4500-NO3 F)

Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)

Water, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C)

Water, Chloride (EPA 300.0, EPA 9056, EPA

9251, EPA 9053, SM 4500CI B, SM 4500CI C

or SM 4500CI E)

Water, Ammonia [as N] (EPA 350.1, SM 4500-

NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or

SM 4500-NH3 H)

Water, Alkalinity [as CaCO3] (EPA 310.2 or

SM 2320 B)

Water, Sodium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Manganese, Total (EPA 200.7, EPA

200.8, EPA 6010 or EPA 6020)

Water, Magnesium, Total (EPA 200.7, EPA

6010 or EPA 6020)

Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

Water, Iron, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Calcium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Mercury, Total (EPA 245.1, EPA 6020 or

EPA 7470)

Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Chromium, Total (EPA 200.7, EPA

200.8, EPA 6010 or EPA 6020)

9-48.

9-41.

9-41.a.

9-42.

9-43.

9-44.

9-44.a.

9-45.

9-46.

9-47.

9-39.

9-40.

+7.97%

+7.97%

+7.97%

+7.98%

+7.97%

+7.97%

+7.97%

+7.98%

+7.97%

+7.97%

+7.97%

+7.97%

+7.95%

+7.97%

+7.95%

+7.98%

+7.95%

+7.95%

+7.95%

27.94$ $ 30.17

17.75$ $ 19.17

15.34$ $ 16.56

15.66$ $ 16.91

17.74$ $ 19.15

58.44$ $ 63.11

1,165.68$ $ 1,258.93

1,157.38$ $ 1,249.97

475.44$ $ 513.47

559.13$ $ 603.86

97.65$ $ 105.46

229.57$ $ 247.93

80.70$ $ 87.15

62.38$ $ 67.37

102.92$ $ 111.15

9-66.

9-57.

9-58.

9-59.

9-60.

9-61.

9-62.

9-63.

9-64.

9-65.

9-56.

9-67.

9-78.

9-79.

9-80.

Water, Residue-nonfilterable [Total Suspended

Solids] (SM 2540 D)

Water, Residue-filterable [Total Dissolved

Solids] (SM 2540 C)

Water, Orthophosphate [as P] (EPA 300.0, EPA

300.1, EPA 365.1, EPA 365.3, EPA 9056, SM

4500-PE or SM 4500-PF)

Water, Organic Carbon, Total (SM 5310 B, SM

5310 C or EPA 9060)

Water, Sulfate (ASTM D516-02, ASTM D516-

90, EPA 300.0, EPA 300.1, EPA 375.2, EPA

9038, EPA 9056 or SM 4500-SO4 C)

Water, Methane (EPA SOP RSK-175)

Water, EDC [1,2-dichloroethane] (EPA Method

8021 or 8260)

Water, BTEX/MTBE + Naphthalene (EPA

8260)

Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)

Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High

Resolution GC/MS)

Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA

8260Mod, High Resolution GC/MS)

Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High

Resolution GC/MS)

Water, Acute Bioassay-96 Hour, Estuarine +

Marine, Vertebrate/Invertebrate [Vertebrate:

Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia]

(EPA 2006.0/2007.0)

Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate: Pimephales promelas or Cyprinella leedsi/Invertebrate:

Ceriodaphnia dubia] (EPA 2000.0/2002.0)

Water, Heterotrophic Plate Count (SM 9215 B)

+7.99%

+8.00%

+8.00%

+7.98%

+8.00%

+7.95%

+7.98%

+7.95%

+7.99%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

114.90$ $ 124.09

274.21$ $ 296.14

296.10$ $ 319.78

331.60$ $ 358.12

380.36$ $ 410.78

697.26$ $ 753.04

0.59$ $ 0.63

1.26$ $ 1.36

38.51$ $ 41.59

+8.00%

+6.78%

+7.94%

+8.00%

9-72.

9-73.

9-76.

9-77.

10-1.a.

9-68.

9-69.

9-70.

9-71.

Air, Polycyclic Aromatic Hydrocarbons (EPA

Method TO-13)

Air, Volatile Organic Aromatics (EPA Method

TO-15)

Additional Laboratory % Surcharge authorized in the ATC contract for 1 Day Turnaround. The quoted price should be a total of all standard costs for analysis receiving 1 Day Turnaround in each Task. Enter this price in the Quant. column for the associated task. The rate is the % surcharge authorized in the ATC contract (% surcharge is calculated using the item price, where: $1.00 = 100%, $0.75 = 75%, ect.). This will be payable per sample per % surcharge utilizing the dollars as the number of units.

Additional Laboratory % Surcharge authorized in the ATC contract for 3 Day Turnaround. The quoted price should be a total of all standard costs for analysis receiving 3 Day Turnaround in each Task. Enter this price in the Quant. column for the associated task. The rate is the % surcharge authorized in the ATC contract (% surcharge is calculated using the item price, where: $1.00 = 100%, $0.75 = 75%, ect.). This will be payable per sample per % surcharge utilizing the dollars as the number of units.

Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High

Resolution GC/MS)

Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High Resolution

GC/FID)

Air, Volatile Organic Compounds (EPA Method

TO-17)

Sheet Piling Installation for ≤ 20 feet deep

Excavation

Air, Total Petroleum Hydrocarbons (EPA

Method 18 or TO-3) +8.00%

+8.00%

+8.00%

+8.00%

4.80$ $ 5.18

9.62$ $ 10.38

11.23$ $ 12.12

55.54$ $ 59.98

4.80$ $ 5.18

9.62$ $ 10.38

26.77$ $ 28.91

49.45$ $ 53.40

41.83$ $ 45.17

153.06$ $ 165.30

128.59$ $ 138.87

180.29$ $ 194.71

354.97$ $ 383.36

179.71$ $ 194.08

316.25$ $ 341.55

138.86$ $ 149.96

46.98$ $ 50.73

42.65$ $ 46.06

29.15$ $ 31.48

26.71$ $ 28.84

78.48$ $ 84.75

66.55$ $ 71.87

4,333.23$ $ 4,679.88

+7.99%

+7.99%

+7.98%

+8.00%

+7.99%

+8.00%

+8.00%

+8.00%

+8.00%

+7.99%

+7.98%

+8.00%

+7.99%

+7.97%

+7.99%

+7.92%

+7.90%

+7.93%

+7.99%

+7.92%

+7.90%10-2.c.

10-2.d.

10-7.

10-8.

10-9.

10-10.

10-2.a.

10-1.b.

10-1.c.

10-1.d.

10-2.b.

#57 Stone

Pea Gravel

Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards

Clean Overburden Used As Backfill, Compaction and Testing ≤ 300 cubic yards

Clean Backfill Material, Compaction and

Testing (includes transport) > 300 cubic yards

Clean Backfill Material, Compaction and

Testing (includes transport) ≤ 300 cubic yards

Flowable Fill Concrete and Installation

Dewatering System, up to 12 well points

(includes installation)

Sheet Piling Rental for ≤ 20 feet deep

Excavation

Sheet Piling Rental for ≤ 20 feet deep

Excavation

Sheet Piling Rental for ≤ 20 feet deep

Excavation

LDA Excavation and Loading With Driven

Casing > 300 cubic yards

LDA Excavation and Loading With Surface

Casing > 300 cubic yards

LDA Excavation and Loading With Driven

Casing < 300 cubic yards

LDA Excavation and Loading With Surface

Casing ≤ 300 cubic yards

LDA Excavation and Loading Without Casing >

300 cubic yards

LDA Excavation and Loading Without Casing ≤

300 cubic yards

Conventional Soil Excavation and Loading >

300 cubic yards

Conventional Soil Excavation and Loading ≤

300 cubic yards

Sheet Piling Rental for > 20 feet deep

Excavation

Sheet Piling Rental for > 20 feet deep

Excavation

Sheet Piling Rental for > 20 feet deep

Excavation

Sheet Piling Installation for > 20 feet deep

Excavation

10-11.a.

10-18.

10-17.

10-11.b.

10-12.a.

10-12.b.

10-13.

10-14.

10-15.

10-15.a.

10-15.b.

10-16.

+7.99%

253.23$ $ 273.48

9,231.26$ $ 9,969.76

461.27$ $ 498.17

18,311.57$ $ 19,776.49

487.83$ $ 526.85

1,397.70$ $ 1,509.51

2,096.56$ $ 2,264.28

2,795.42$ $ 3,019.05

4,891.97$ $ 5,283.32

4.87$ $ 5.25

4.17$ $ 4.50

41.74$ $ 45.07

43.24$ $ 46.69

55.44$ $ 59.87

234.83$ $ 253.61

33.92$ $ 36.63

48.89$ $ 52.80

42.59$ $ 45.99

41.83$ $ 45.17

42.59$ $ 45.99

41.25$ $ 44.55

237.61$ $ 256.61

+8.00%

+8.00%

12-3.

12-4.

12-5.

12-6.

12-7.

Dewatering System, up to 12 well points

(includes installation)

Additional Dewatering System Well Points (2)

(includes installation)

Dewatering System, up to 12 well points

(includes installation)

Additional Dewatering System Well Points (2)

(includes installation)

Remove and Dispose Petroleum Storage Tank -

> 1,000 to 5,000 gal. capacity

Remove and Dispose Petroleum Storage Tank -

≤ 1,000 gal. capacity

Additional Dewatering System Well Points (2)

(includes installation)

Disposal of Petroleum Impacted Soil at a

Landfill (bulk) ≤ 450 tons

Transport Petroleum Impacted Soil (bulk) > 100 miles

Transport and Disposal of Petroleum Contact

Water (includes drum)

Disposal of Petroleum Impacted Soil at a

Thermal Treatment Facility (bulk) > 450 tons

Disposal of Petroleum Impacted Soil at a

Thermal Treatment Facility (bulk) ≤ 450 tons

Disposal of Petroleum Impacted Soil at a

Landfill (bulk) > 450 tons

Transport Petroleum Impacted Soil (bulk) ≤ 100 miles

Transport and Disposal of Petroleum Impacted

Soil (includes drum)

Transport and Disposal of Mixed Debris

Transport and Disposal of Clean Concrete

Loading, Transport and Disposal/Recycle Clean

Overburden

Additional Removal/Loading Cost for Concrete -

> 4 inch thickness

Removal and Loading of Asphalt and/or

Concrete - up to 4 inch thickness

Remove and Dispose Petroleum Storage Tank -

> 10,000 gal. capacity

Remove and Dispose Petroleum Storage Tank -

> 5,000 to 10,000 gal. capacity

10-19.

10-20.

10-21.

10-22.

10-23.

12-8.

11-3.

11-4.

12-1.

12-2.

11-1.

11-2.

12-9.

12-10.

12-11.

12-12.

12-13.

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+7.80%

+7.91%

+7.98%

+7.98%

+7.99%

+8.00%

+7.99%

+8.00%

+7.98%

+7.98%

+7.98%

+8.00%

1.44$ $ 1.55

263.58$ $ 284.66

1.64$ $ 1.77

554.56$ $ 598.92

361.66$ $ 390.59

9.97$ $ 10.76

2.78$ $ 3.00

10.76$ $ 11.62

2.78$ $ 3.00

3.62$ $ 3.90

1.48$ $ 1.59

0.66$ $ 0.71

7,727.99$ $ 8,346.22

6,439.99$ $ 6,955.18

7,026.87$ $ 7,589.00

14,050.57$ $ 15,174.61

90.40$ $ 97.63

72.31$ $ 78.09

48.20$ $ 52.05

18.73$ $ 20.22

14,843.96$ $ 16,031.47

10,411.90$ $ 11,244.85

9,556.43$ $ 10,320.94

+8.00%

+7.99%

+7.99%

+7.96%

+8.00%

+8.00%

+8.00%

14-4.

14-5.

15-1.b.

15-1.c.

In-Situ Injection Into Existing Well/Treatment

Point

Direct Push Boring with In-Situ Injection

Grass - Seed and Mulch

Grass - Sod

Crushed Lime Rock Cover - 2 inch thickness

Asphalt Paving - 2 inch thickness (includes sub-base)

Additional Rental of 20 Cubic Yard Roll-Off

Container

Delivery, Pick Up and Rental of 20 Cubic Yard

Roll-Off Container

Transport and Disposal of Petroleum Product

(bulk)

Transport and Disposal of Petroleum Product

(includes drum)

Transport and Disposal of Petroleum Contact

Water (bulk)

Concrete Paving - additional 1 inch thickness

Concrete Paving - 4 inch thickness (includes sub-base)

Asphalt Paving - additional 1 inch thickness

Trenching and Installation of 21 - 30 Lines

Trenching and Installation of 11 - 20 Lines

System Installation/Integration/Startup - 1

Technology Component - 21-30

Recovery/Treatment Points

System Installation/Integration/Startup - 1

Technology Component - 11-20

Recovery/Treatment Points

System Installation/Integration/Startup - 1

Technology Component - 1-10

Recovery/Treatment Points

Installation of Plumbing (and Electrical) Lines

Above Ground: Per Linear Foot of Piping.

Electrical lines are not counted in determination of costs.

Trenching and Installation of Additional 1-10

Lines Greater Than 30 Lines

Groundwater Injection System (not by direct push)

Groundwater Injection System (not by direct push)

14-1.a.

12-17.

12-18.

13-1.

13-2.

13-3.

13-4.

13-5.

13-6.

13-7.

15-2.a.

15-4.a.

15-4.b.

15-4.c.

15-1.d.

12-14.

12-15.

12-16.

14-2.a.

+8.00%

+8.00%

+7.64%

+8.00%

+7.93%

+8.00%

+8.00%

+7.92%

+7.91%

+7.99%

+7.91%

+7.73%

+7.43%

+7.58%

+8.00%

5,706.84$ $ 6,163.38

4,255.00$ $ 4,595.40

5,479.71$ $ 5,918.08

585.91$ $ 632.78

4,160.90$ $ 4,493.77

570.12$ $ 615.70

4,313.51$ $ 4,658.59

575.85$ $ 621.91

5,186.01$ $ 5,600.89

572.95$ $ 618.78

4,921.09$ $ 5,314.77

610.43$ $ 659.26

5,711.06$ $ 6,167.94

640.65$ $ 691.90

6,244.98$ $ 6,744.57

752.18$ $ 812.35

4,506.21$ $ 4,866.70

11,842.79$ $ 12,790.21

3,617.24$ $ 3,906.61

8,365.28$ $ 9,034.50

4,465.45$ $ 4,822.68

10,234.02$ $ 11,052.74

5,631.55$ $ 6,082.07

11,127.17$ $ 12,017.34

6,811.05$ $ 7,355.93

16,110.61$ $ 17,399.45

+8.00%

+8.00%

+8.00%

+7.99%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

16-24.

16-25.

16-26.

16-5.

16-18.

16-17.

16-6.

16-7.

16-8.

16-9.

16-10.

16-11.

16-12.

16-13.

16-14.

16-19.

16-20.

16-21.

16-22.

16-23.

16-1.

16-2.

16-3.

16-4.

Multi-Phase Pilot Test - Additional Time

Vapor Extraction/Aquifer Pumping Test -

Additional Time

Vapor Extraction/Aquifer Pumping Test - 8 hours

Vapor Extraction Pilot Test - Additional Time

Vapor Extraction Pilot Test - 8 hours

Air Sparging or Biosparging Pilot Test -

Additional Time

Air Sparging or Biosparging Pilot Test - 8 hours

Groundwater Recovery System Pilot Test -

Additional Time

Groundwater Recovery System Pilot Test - 8 hours

System Installation/Integration/Startup –

Addition of 1 Technology Component

System Installation/Integration/Startup - 1

Technology Component - 1-10 Additional

Recovery/Treatment Points greater Than 30

(This item is used in conjunction with 15.4.c when needed)

Multi-Phase Pilot Test - 8 hours

Air Sparging/Vapor Extraction Pilot Test -

Additional Time

Air Sparging/Vapor Extraction Pilot Test - 8 hours

AS/MPE System Package - Medium

AS/MPE System Package - Medium

MPE System Package - Medium

MPE System Package - Medium

AS/SVE System Package - Medium

AS/SVE System Package - Medium

Air Sparge System Package - Medium

Air Sparge System Package - Medium

Groundwater Treatment System Package -

Medium

Groundwater Treatment System Package -

Medium

Air Sparging/Multiphase Extraction Pilot Test -

Additional Time

Air Sparging/Multiphase Extraction Pilot Test -

8 hours

15-4.d.

15-5.

3,902.21$ $ 4,214.38

9,698.59$ $ 10,474.47

2,879.27$ $ 3,109.61

3,599.08$ $ 3,887.00

4,606.84$ $ 4,975.38

5,353.76$ $ 5,782.06

617.03$ $ 666.39

509.24$ $ 549.97

403.12$ $ 435.35

1,552.50$ $ 1,676.70

1,380.00$ $ 1,490.40

7,198.19$ $ 7,774.04

5,433.75$ $ 5,868.45

12,075.00$ $ 13,041.00

10,350.00$ $ 11,178.00

16,962.50$ $ 18,319.00

13,225.00$ $ 14,283.00

3,599.08$ $ 3,887.00

2,760.00$ $ 2,980.80

4,083.81$ $ 4,410.51

3,018.75$ $ 3,260.25

6,150.21$ $ 6,642.22

4,600.00$ $ 4,968.00

6,452.46$ $ 6,968.65

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

18-3.

18-4.

18-5.

18-6.

18-7.

18-8.

18-9.

18-10.

18-2.

16-27.

16-28.

17-1.

17-2.

17-3.

17-4.

17-5.

18-1.

18-11.

18-12.

18-13.

18-14.

18-15.

18-16.

18-17.

Medium Holding Tank - 2,000 to 6,000 gal.

capacity - Short Term ≤ 6 mos.

Supplemental System O&M Package - Add

Thermox or Catox Treatment

Groundwater Treatment System - Stand Alone

Large - Long Term > 6 mos.

Groundwater Treatment System - Stand Alone

Large - Short Term ≤ 6 mos.

Groundwater Treatment System - Stand Alone

Medium - Long Term > 6 mos.

Groundwater Treatment System - Stand Alone

Medium - Short Term ≤ 6 mos.

Groundwater Treatment System - Stand Alone

Small - Long Term > 6 mos.

Groundwater Treatment System - Stand Alone

Small - Short Term ≤ 6 mos.

Large Holding Tank > 6,000 to 10,000 gal.

capacity - Long Term > 6 mos.

Large Holding Tank > 6,000 to 10,000 gal.

capacity - Short Term ≤ 6 mos.

Medium Holding Tank - 2,000 to 6,000 gal.

capacity - Long Term > 6 mos.

System O&M Package - Extra Large

System O&M Package - Large

System O&M Package - Medium

System O&M Package - Small

SVE System Package - Medium

SVE System Package - Medium

Air Sparge System - Medium - Short Term ≤ 6 mos.

Air Sparge System - Small - Long Term > 6 mos.

Air Sparge System - Small - Short Term ≤ 6 mos.

AS/SVE System - Small - Short Term ≤ 6 mos.

Air Sparge System - Large - Long Term > 6 mos.

Air Sparge System - Large - Short Term ≤ 6 mos.

Air Sparge System - Medium - Long Term > 6 mos.

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

5,039.17$ $ 5,442.30

7,383.86$ $ 7,974.56

5,764.28$ $ 6,225.42

9,181.37$ $ 9,915.80

7,370.22$ $ 7,959.83

5,462.50$ $ 5,899.50

4,717.30$ $ 5,094.68

7,549.84$ $ 8,153.82

5,462.50$ $ 5,899.50

9,179.08$ $ 9,913.40

6,612.50$ $ 7,141.50

5,970.18$ $ 6,447.79

4,295.85$ $ 4,639.51

7,798.84$ $ 8,422.74

5,301.06$ $ 5,725.14

7,309.17$ $ 7,893.90

9,744.58$ $ 10,524.14

695.38$ $ 751.01

865.27$ $ 934.49

1,254.97$ $ 1,355.36

374.29$ $ 404.23

445.59$ $ 481.23

727.31$ $ 785.49

4,290.42$ $ 4,633.65

+8.00%

+8.00%18-21.

18-22.

18-20.

18-18.

18-19.

Thermox/Catox Off Gas Treatment - Add On -

Small - Short Term ≤ 6 mos.

Carbon Off Gas Treatment - Add On - Large -

Long Term > 6 mos.

Carbon Off Gas Treatment - Add On - Medium -

Long Term > 6 mos.

Carbon Off Gas Treatment - Add On - Small-

Long Term > 6 mos.

Groundwater Treatment - Add On - Large - Long

Term > 6 mos.

Groundwater Treatment - Add On - Medium -

Long Term > 6 mos.

Groundwater Treatment - Add On - Small - Long

Term > 6 mos.

Groundwater Treatment - Add On - Large -

Short Term ≤ 6 mos.

Groundwater Treatment - Add On - Medium -

Short Term ≤ 6 mos.

Groundwater Treatment - Add On - Small -

Short Term ≤ 6 mos.

MPE System - Large - Long Term > 6 mos.

MPE System - Large - Short Term ≤ 6 mos.

MPE System - Medium - Long Term > 6 mos.

MPE System - Medium - Short Term ≤ 6 mos.

MPE System - Small - Long Term > 6 mos.

MPE System - Small - Short Term ≤ 6 mos.

AS/SVE System - Large - Long Term > 6 mos.

AS/SVE System - Large - Short Term ≤ 6 mos.

AS/SVE System - Medium - Long Term > 6 mos.

AS/SVE System - Medium - Short Term ≤ 6 mos.

AS/SVE System - Small - Long Term > 6 mos.

Carbon Off Gas Treatment - Add On - Large -

Short Term ≤ 6 mos.

Carbon Off Gas Treatment - Add On - Medium -

Short Term ≤ 6 mos.

Carbon Off Gas Treatment - Add On - Small -

Short Term ≤ 6 mos.

18-38.

18-29.

18-30.

18-31.

18-32.

18-33.

18-34.

18-35.

18-36.

18-37.

18-23.

18-24.

18-25.

18-26.

18-27.

18-28.

18-39.

18-40.

18-41.

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

5,071.63$ $ 5,477.36

7,814.31$ $ 8,439.45

3,767.21$ $ 4,068.58

4,693.03$ $ 5,068.47

6,509.10$ $ 7,029.82

4,194.12$ $ 4,529.60

3,863.02$ $ 4,172.06

4,925.78$ $ 5,319.84

4,580.84$ $ 4,947.30

8,409.33$ $ 9,082.07

7,508.98$ $ 8,109.69

8,085.45$ $ 8,732.28

7,286.82$ $ 7,869.76

9,603.22$ $ 10,371.47

8,567.73$ $ 9,253.14

11,465.91$ $ 12,383.18

10,446.86$ $ 11,282.60

2,400.30$ $ 2,592.32

3,958.99$ $ 4,275.70

2,641.78$ $ 2,853.12

880.61$ $ 951.05

821.85$ $ 887.59

793.05$ $ 856.49

1,762.97$ $ 1,904.00

+8.00%

+8.00%

19-8.

18-43.

18-44.

18-45.

18-46.

18-57.

18-58.

19-1.

19-3.

19-4.

19-5.

19-6.

19-7.

18-56.

18-47.

18.48.

18-49.

18-50.

18-51.

18-52.

18-53.

18-54.

18-55.

Natural Attenuation or Post RA Monitoring

Report, Annual

Natural Attenuation or Post RA Monitoring

Report, Quarterly or Non-Annual

Level 2 Natural Attenuation Monitoring Plan

Receptor and Exposure Pathway Report

Soil Vapor Extraction (SVE) System - Large -

Short Term ≤ 6 Months

Soil Vapor Extraction (SVE) System - Medium -

Long Term > 6 Months

Supplemental Site Assessment Report

General Site Assessment Report

Soil Source Removal Report

Air Sparge/Multiphase Extraction (AS/MPE)

System - Large - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE)

System - Large - Short Term ≤ 6 Months

Air Sparge/Multiphase Extraction (AS/MPE)

System - Medium - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE)

System - Medium - Short Term ≤ 6 Months

Air Sparge/Multiphase Extraction (AS/MPE)

System - Small - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE)

System - Small - Short Term ≤ 6 Months

Soil Vapor Extraction (SVE) System - Large -

Long Term > 6 Months

Soil Vapor Extraction (SVE) System - Medium -

Short Term ≤ 6 Months

Soil Vapor Extraction (SVE) System - Small -

Long Term > 6 Months

Soil Vapor Extraction (SVE) System - Small -

Short Term ≤ 6 Months

Thermox/Catox Off Gas Treatment - Add On -

Large - Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On -

Medium - Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On -

Small - Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On -

Large - Short Term ≤ 6 mos.

Thermox/Catox Off Gas Treatment - Add On -

Medium - Short Term ≤ 6 mos.

18-42.

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

1,113.59$ $ 1,202.67

1,763.92$ $ 1,905.03

13,100.73$ $ 14,148.78

17,781.09$ $ 19,203.57

1,937.94$ $ 2,092.97

3,613.71$ $ 3,902.80

6,523.21$ $ 7,045.06

10,054.63$ $ 10,859.00

4,352.66$ $ 4,700.87

897.37$ $ 969.15

3,238.73$ $ 3,497.82

410.02$ $ 442.82

2,126.66$ $ 2,296.79

3,839.04$ $ 4,146.16

1,465.43$ $ 1,582.66

806.25$ $ 870.75

431.88$ $ 466.43

372.87$ $ 402.65

733.79$ $ 792.49

190.16$ $ 205.37

155.25$ $ 167.67

132.25$ $ 142.83

126.78$ $ 136.92

126.78$ $ 136.92

108.67$ $ 117.36

96.60$ $ 104.32

90.56$ $ 97.80

78.48$ $ 84.75

63.38$ $ 68.45

57.05$ $ 61.61

177.50$ $ 191.70

163.01$ $ 176.05

163.01$ $ 176.05

163.01$ $ 176.05

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+7.99%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+7.99%

+7.99%

+7.99%20-9.

20-10.

20-11.

21-1.

19-17.

19-9.

19-10.

19-11.

19-12.

19-13.

19-14.

19-15.

19-16.

20-8.

19-26.

19-27.

20-1.

20-2.

20-3.

20-4.

20-5.

20-6.

20-7.

19-20.

19-21.

19-22.

19-23.

19-24.

19-25.

19-18.

19-19. Remedial Action Startup Report

As-Built Drawings (P.E. Sealed red lined modifications)

Professional Geologist (Key)

Professional Engineer (Key)

Laborers and Security Guards

Administrative

Draftsperson

Field Technician (Key)

Construction Drawings and Specs Report

P.G. Field Oversight of Well Installation (Use hourly rate on site specific basis)

P.G. Field Oversight of Drilling and Boring and

Soil-Boring Logging (Use hourly rate on site specific basis)

Level 1 Remedial Action Plan

Pilot Test Report

Pilot Test Plan

Level 4 Limited Scope Remedial Action Plan or

RAP Modification Plan

Level 3 Limited Scope Remedial Action Plan or

RAP Modification Plan

Level 2 Limited Scope Remedial Action Plan or

RAP Modification Plan

Level 1 Limited Scope Remedial Action Plan or

RAP Modification Plan

Level 2 Remedial Action Plan

Assistant Scientist/Technical Specialist

Scientist/Technical Specialist (Key)

Hydrogeologist/Modeler (Key)

Geologist/Geoscientist (Key)

Engineer (Key)

Project Manager (Key)

Program Manager (Key)

Interim Assessment Report

Well Abandonment/Site Restoration Report

Free Product Recovery Report

Remedial Action Interim Report

Remedial Action General Report

Operation & Maintenance Annual Report

Operation & Maintenance Report, Quarterly or

Non-Annual

Letter/NPDES Report

21-2.

21-3.

21-4.

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+7.99%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

1,288.00$ $ 1,391.04

1,491.02$ $ 1,610.30

2,415.00$ $ 2,608.20

2,725.50$ $ 2,943.54

4,830.00$ $ 5,216.40

410.94$ $ 443.81

1,232.88$ $ 1,331.51

1,174.17$ $ 1,268.10

1,064.92$ $ 1,150.11

718.81$ $ 776.21

3,220.00$ $ 3,477.60

2,328.75$ $ 2,515.05

+8.00%

P.G. Review and Certification of Sufficiency of

Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean

Fill with Monitoring and Maintenance

Recommendations Required for a Conditional

NFA

P.E. Review and Certification of Sufficiency of

Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with Monitoring and Maintenance

Recommendations Required for a Conditional

NFA

P.E. Project Oversight for Remediation System

Operation and Maintenance

P.E. Project Oversight for Short Term or

Episodic Remediation System Operation -

Weekly Basis

P.E. Project Oversight for Short Term or

Episodic Remediation System Operation - Daily

Basis

P.E. Project Oversight for Remediation System

Integration and Startup - Extra Large System

P.E. Project Oversight for Remediation System

Integration and Startup - Large System

P.E. Project Oversight for Remediation System

Integration and Startup - Medium System

P.E. Project Oversight for Remediation System

Integration and Startup - Small System

P.E. Project Oversight for Remediation

Technology Pilot Testing

P.G. Review, Evaluation and Certification of

Plans and Project Oversight for Installation of

Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean

Fill Required for a Conditional NFA

P.E. Design and Certification of Plans and

Project Oversight of Installation for Engineering

Controls (other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA

21-11.

21-12.

21-6.a.

21-6.b.

21-6.c.

21-6.d.

21-7.a.

21-7.b.

21-8.

21-9.

21-10.

21-5.

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+7.99%

+8.00%

576.54$ $ 622.66

805.00$ $ 869.40

517.50$ $ 558.90

366.89$ $ 396.24

366.89$ $ 396.24

366.89$ $ 396.24

403.59$ $ 435.87

366.89$ $ 396.24

587.04$ $ 634.00

3,622.50$ $ 3,912.30

4,600.00$ $ 4,968.00

410.94$ $ 443.81

410.94$ $ 443.81

1,320.82$ $ 1,426.48

2,535.75$ $ 2,738.61

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

P.E. Review, Evaluation and Certification of a

Level 1 Remedial Action Plan

P.E. Review, Evaluation and Certification of a

Pilot Test Report

P.E. Review, Evaluation and Certification of a

Pilot Test Plan

P.G or P.E. Review, Evaluation and Certification of an Annual Natural Attenuation Monitoring

Report

P.E. Review, Evaluation and Certification of a

Non-Annual Natural Attenuation or Post RA

Monitoring Report That Includes a

Recommendation for NFA or a

Recommendation to Modify the Approved

Monitoring Plan

P.E. Review, Evaluation and Certification of a

Level 2 Natural Attenuation Monitoring Plan

P.G. or P.E. Review, Evaluation and

Certification of a Receptor and Exposure

Pathway Report

P.G. or Qualified P.E. Review, Evaluation and

Certification of a Supplemental Site Assessment

Report

P.G. or Qualified P.E. Review, Evaluation and

Certification of a General Site Assessment

Report

P.G. or P.E. Review, Evaluation and

Certification of a Soil Source Removal Report

That Includes a Recommendation for NFA

P.E. Review, Evaluation and Certification of a

Level 4 Limited Scope Remedial Action Plan or

RAP Modification Plan

P.E. Review, Evaluation and Certification of a

Level 3 Limited Scope Remedial Action Plan or

RAP Modification Plan

P.E. Review, Evaluation and Certification of a

Level 2 Limited Scope Remedial Action Plan or

RAP Modification Plan

P.E. Review, Evaluation and Certification of a

Level 1 Limited Scope Remedial Action Plan or

RAP Modification Plan

P.E. Review, Evaluation and Certification of a

Level 2 Remedial Action Plan

21-13.

21-15.

21-16.

21-17.

21-18.

21-19.

21-20.

21-21.

21-22.

21-23.

21-24.

21-25.

21-26.

21-27.

21-28.

599.01$ $ 646.93

865.24$ $ 934.45

824.11$ $ 890.03

1,198.03$ $ 1,293.87

201.76$ $ 217.90

629.00$ $ 679.32

587.04$ $ 634.00

366.89$ $ 396.24

+8.00%

+8.00%

+8.00%21-31.

21-32.

21-33.

21-34.

21-35.

21-36.

P.E. Review, Evaluation, and Certification of

Annual PARM Report

P.E. Review, Evaluation, and Certification of

Construction Drawings

P.G or P.E. Review, Evaluation and Certification of an Interim Remedial Action Report That

Includes a Recommendation for System

Modification or Significant Change in the

Course of Action

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

(1)

The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.

(2)

The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.

Notes:

P.G or P.E. Review, Evaluation and Certification of a Remedial Action General Report

P.E. Review, Evaluation and Certification of an

Annual Operation and Maintenance Report

P.E. Review, Evaluation and Certification of a

Non-Annual Operation and Maintenance Report

That Includes Significant Proposed Changes to the Approved RAP

P.E. Review, Evaluation and Certification of a

Remedial Action Startup Report That Includes a

Recommendation for System Modification or

Significant Change in the Course of Action

P.E. Review, Evaluation and Certification of As-

Built Drawings (P.E. sealed red lined modifications)

21-29.

21-30.

+8.00%

+8.00%

+8.00%

+8.00%

Printed Printed Name: Name:

Title: Title:

Date: Date:

Letter/Number D (V3.5)

Type Description Attachment Rate Schedule (27 pages)

Signature of Authorized Representative Signature of Authorized Representative

PROFESSIONAL SERVICE INDUSTRIES,

INC.

FLORIDA DEPARTMENT OF

ENVIRONMENTAL PROTECTION

FEID No.: 370962090

List of attachments/exhibits included as part of this Amendment:

Signature of Processor Printed Name of Processor Data Entry Date

The Table 1 rate changes have been entered in the Department’s processing system with an effective Rate Change Date of:

Corresponding Rate Schedule, Attachment D

Version No. V3.5

Department Data Processing Information:

IN WITNESS WHEREOF, the parties have caused this Amendment to be duly executed, the day and year last written below.

Vicki B. Lewis

Department Manager

11 May 2023

6/1/2023

Justin Wolfe Digitally signed by Justin Wolfe Date: 2023.05.30 15:51:00 -04'00'

Jamie Lopez Digitally signed by Jamie Lopez Date: 2023.06.02 09:54:46 -04'00'

File details come from the government source that posted it. Updated .