CN-370000-GC812-A8.pdf

PDF 781 KB Posted

Attached to
Master Agreement FL|GC812|e8f6316541da7b448d2bceec5809b441
Contract number
GC812
Issued by
Florida

About this file

Document Summary

This is Amendment No. 8 to DEP Agency Term Contract No. GC812, an indefinite delivery contract between the Florida Department of Environmental Protection (FDEP) and GLE Associates, Inc. The amendment, executed on June 19, 2020, modifies the petroleum contamination site response action services contract originally awarded on March 18, 2014, for work in Florida's North Region. The amendment increases rates across multiple service categories in accordance with provision 11.B of the base contract, which authorizes annual rate increases not to exceed 5 percent.

The rate increase amendment applies exclusively to new work assignments offered on or after the Rate Change Date of June 19, 2020, while all pre-rate-change work assignments continue under the prior rate schedule (V3.1). The revised rates are documented in the new Attachment D (V3.2) Rate Schedule and cover 162 pay items spanning petroleum restoration activities including mobilization, drilling and boring, well installation and abandonment, sample collection and field testing, laboratory analysis, soil source removal, debris and waste disposal, petroleum storage tank removal, resurfacing, trenching, remedial action construction, system operation and maintenance, and professional engineering services. Rate increases range from approximately 2.44 percent to 5.00 percent across various service categories, with the contractor submitting detailed justification for the requested increases, which the Department reviewed and approved as compliant with contract requirements.

View the file

Other files

File Type Posted
CN-370000-GC812-A12.pdf PDF
CN-370000-GC812-A2.pdf PDF
CN-370000-GC812-A4.pdf PDF
CN-370000-GC812-CMC.pdf PDF
CN-370000-GC812-CMC1.pdf PDF
CN-370000-GC812-CMC2.pdf PDF
CN-370000-GC812-A13.pdf PDF
CN-370000-GC812-A14E1.pdf PDF
CN-370000-GC812-A15E2.pdf PDF
CN-370000-GC812-A16E3.pdf PDF
CN-370000-GC812-A6.pdf PDF
CN-370000-GC812-A7.pdf PDF
CN-370000-GC812.pdf PDF
CN-370000-GC812-A11.pdf PDF
CN-370000-GC812-A17.pdf PDF
CN-370000-GC812-A3.pdf PDF
CN-370000-GC812-A5.pdf PDF
CN-370000-GC812-CMC3.pdf PDF
CN-370000-GC812-A10.pdf PDF
CN-370000-GC812-A9.pdf PDF
CN-370000-GC812-AR1.pdf PDF
CN-370000-GC812-CMC4.pdf PDF
PC-370000-GC812.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.

2.

3.

NOW THEREFORE, the parties agree as follows:

WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).

WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.1) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC812 (hereinafter "Contract") between the FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and GLE

ASSOCIATES, INC. (hereinafter "Contractor") executed on March 18, 2014, to provide petroleum contamination site response action services in the North Region, is hereby amended.

PETROLEUM RESTORATION PROGRAM

AGENCY TERM CONTRACT NO. GC812

RATE INCREASE

AMENDMENT NO. 8

Amendment No. 8

DEP Agency Term Contract No. GC812

This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.

All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.

Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.

Amendment No. 8

DEP Agency Term Contract No. GC812

4.

5.

6.

Attachment D, Rate Schedule (V3.2) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this

Amendment, Attachment D, Rate schedule (V3.2) shall apply.

The Rate Change Date is the date shown at the bottom of this Amendment for the Department’s

Data Processing Information. Prior to the Rate Change Date, the Department shall provide

Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date and prior to the Rate Change Date.

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this

Amendment shall control.

Pre-existing

Rate

Agreed

New Rate (1)

495.00$ $ 515.00

495.00$ $ 515.00

825.00$ $ 865.00

7,150.00$ $ 7,500.00

9,350.00$ $ 9,800.00

35.00$ $ 36.00

1,100.00$ $ 1,150.00

27.00$ $ 28.00

35.00$ $ 36.00

183.50$ $ 192.00

1,485.00$ $ 1,550.00

18.00$ $ 18.50

55.00$ $ 57.50

30.00$ $ 31.50

20.00$ $ 21.00

14.31$ $ 15.00

220.00$ $ 230.00

49.50$ $ 51.75

38.50$ $ 40.00

66.00$ $ 69.00

2.60$ $ 2.73

5.25$ $ 5.50

+5.00%

+4.76%

+5.00%

+5.00%

Est %

Rate

Change (2)

+4.04%

+4.04%

+4.85%

10-1.b.

10-1.c.

9-67.

9-78.

9-79.

9-80.

9-18.

9-20.

8-11.

HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth

DPT Membrane Interface Probe (MIP) Equipped with

PID and ECD (add-on cost to DPT base rate)

Installation of Well Vault - 4 x 4 x 2 foot

7-1.

Description

3-13.a.

Table 1. Listed Schedule of Pay Items with Rate Changes

6-10.

6-12.

DPT Rig and Support Vehicles Mobilization - > 100 miles each way

DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way

LDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way

File Review

Split Spoon Sampling – 2 foot (during boring) < 50 feet

LDA Rig and Support Vehicles Mobilization - > 100 miles each way

Well Installation - 2 inch diameter (vertical)

Grout and Abandon Well, 1 to 2 inch diameter

Soil, Texture, (See Gee 7 Bauder [1966])

Electronic Data Deliverables (EDD)

Above Grade Well Completion

Soil, Dry Bulk Density (ASTM D1556-07, ASTM

D2167-08, ASTM D2922-01, -04, -04e, -96e1 or

ASTM D2937-10)

Water, Mercury, Total (EPA 245.1, EPA 6020 or

EPA 7470)

Water, Methane (EPA SOP RSK-175)

Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)

Water, BTEX/MTBE + Naphthalene (EPA 8260)

Water, C10-C40 Alkane Fingerprint, N-Alkanes and

Isoalkanes (ASTM D3328 GC/MS)

Sheet Piling Rental for ≤ 20 feet deep Excavation

Sheet Piling Rental for ≤ 20 feet deep Excavation

Pay

Item No.

1-1.

3-14.a.

3-7.a.

3-8.a.

5-1.a.1.

5-5.a.

5-6.

6-2.a.

9-42.

+4.90%

+4.81%

+2.86%

+4.55%

+3.70%

+4.63%

+4.38%

+2.86%

+2.78%

+4.55%

+4.82%

+4.55%

+3.90%

+4.55%

+4.55%

10.50$ $ 11.00

3.65$ $ 3.80

7.85$ $ 8.20

30.55$ $ 32.00

3,300.00$ $ 3,450.00

1.64$ $ 1.70

1.10$ $ 1.15

6,615.00$ $ 6,945.00

7,715.00$ $ 8,050.00

8,820.00$ $ 9,200.00

1,100.00$ $ 1,150.00

3,670.00$ $ 3,850.00

2,490.00$ $ 2,600.00

5,600.00$ $ 5,850.00

972.00$ $ 1,020.00

1,940.00$ $ 2,025.00

2,050.00$ $ 2,100.00

4,110.00$ $ 4,310.00

1,810.00$ $ 1,900.00

3,600.00$ $ 3,780.00

3,900.00$ $ 4,050.00

1,900.00$ $ 1,990.00

2,150.00$ $ 2,255.00

2,400.00$ $ 2,500.00

2,660.00$ $ 2,780.00

+4.90%

+4.99%

+4.34%

+4.31%

+4.55%

+4.75%

+4.76%

+4.11%

+4.46%

16-24.

16-25.

17-1.

17-2.

17-3.

17-4.

16-18.

16-17.

16-13.

16-19.

16-20.

16-21.

16-22.

16-23.

10-2.c.

10-1.d.

10-2.b.

Clean Backfill Material, Compaction and Testing

(includes transport) > 300 cubic yards

Dewatering System, up to 12 well points (includes installation)

Sheet Piling Rental for ≤ 20 feet deep Excavation

Sheet Piling Rental for > 20 feet deep Excavation

Sheet Piling Rental for > 20 feet deep Excavation

Grass - Sod

Removal and Loading of Asphalt and/or Concrete - up to 4 inch thickness

System Installation/Integration/Startup - 1 Technology

Component - 1-10 Additional Recovery/Treatment

Points greater Than 30 (This item is used in conjunction with 15.4.c when needed)

System Installation/Integration/Startup - 1 Technology

Component - 21-30 Recovery/Treatment Points

System Installation/Integration/Startup - 1 Technology

Component - 11-20 Recovery/Treatment Points

System Installation/Integration/Startup - 1 Technology

Component - 1-10 Recovery/Treatment Points

System O&M Package - Extra Large

System O&M Package - Large

System O&M Package - Medium

System O&M Package - Small

AS/MPE System Package - Medium

MPE System Package - Medium

MPE System Package - Medium

AS/SVE System Package - Medium

AS/SVE System Package - Medium

Air Sparge System Package - Medium

Air Sparge System Package - Medium

Groundwater Treatment System Package - Medium

Groundwater Treatment System Package - Medium

Air Sparging/Multiphase Extraction Pilot Test - 8 hours

10-18.

13-6.

10-15.

12-1.

15-4.a.

15-4.b.

15-4.c.

15-4.d.

+4.55%

+3.66%

+4.55%

+4.94%

+4.38%

+4.42%

+4.46%

+2.44%

+4.87%

+4.97%

+5.00%

+3.85%

+4.74%

+4.88%

+4.17%

+4.51%

390.00$ $ 405.00

305.00$ $ 320.00

183.00$ $ 190.00

910.00$ $ 950.00

458.00$ $ 480.00

1,850.00$ $ 1,940.00

2,100.00$ $ 2,200.00

223.00$ $ 234.00

446.00$ $ 468.00

893.00$ $ 935.00

122.00$ $ 128.00

244.50$ $ 256.00

489.00$ $ 510.00

3,195.00$ $ 3,350.00

2,900.00$ $ 3,040.00

3,510.00$ $ 3,650.00

3,195.00$ $ 3,350.00

5,500.00$ $ 5,750.00

3,850.00$ $ 4,000.00

5,500.00$ $ 5,750.00

5,500.00$ $ 5,750.00

315.00$ $ 330.00

99.00$ $ 103.00

63.00$ $ 66.00

+4.55%

+4.76%

+4.04%

+4.76%

19-20.

20-8.

20-3.

18-57.

18-58.

18-47.

18.48.

18-49.

18-50.

18-51.

18-52.

18-3.

18-4.

18-2.

17-5.

18-1.

18-12.

18-14.

Field Technician (Key)

Medium Holding Tank - 2,000 to 6,000 gal. capacity -

Short Term ≤ 6 mos.

Supplemental System O&M Package - Add Thermox or Catox Treatment

Large Holding Tank > 6,000 to 10,000 gal. capacity -

Long Term > 6 mos.

Large Holding Tank > 6,000 to 10,000 gal. capacity -

Short Term ≤ 6 mos.

Medium Holding Tank - 2,000 to 6,000 gal. capacity -

Long Term > 6 mos.

Carbon Off Gas Treatment - Add On - Large - Long

Term > 6 mos.

Carbon Off Gas Treatment - Add On - Medium -

Long Term > 6 mos.

Carbon Off Gas Treatment - Add On - Small- Long

Term > 6 mos.

Air Sparge System - Small - Long Term > 6 mos.

Air Sparge System - Medium - Long Term > 6 mos.

Soil Vapor Extraction (SVE) System - Large - Short

Term ≤ 6 Months

Soil Vapor Extraction (SVE) System - Medium -

Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System -

Large - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System -

Large - Short Term ≤ 6 Months

Soil Vapor Extraction (SVE) System - Large - Long

Term > 6 Months

Carbon Off Gas Treatment - Add On - Large - Short

Term ≤ 6 mos.

Carbon Off Gas Treatment - Add On - Medium -

Short Term ≤ 6 mos.

Carbon Off Gas Treatment - Add On - Small - Short

Term ≤ 6 mos.

Soil Vapor Extraction (SVE) System - Medium -

Short Term ≤ 6 Months

Soil Vapor Extraction (SVE) System - Small - Long

Term > 6 Months

Soil Vapor Extraction (SVE) System - Small - Short

Term ≤ 6 Months

Engineer (Key)

Letter/NPDES Report

18-38.

18-35.

18-36.

18-37.

18-39.

18-40.

+3.85%

+4.92%

+3.83%

+4.40%

+4.80%

+4.86%

+4.76%

+4.93%

+4.93%

+4.70%

+4.92%

+4.70%

+4.29%

+4.55%

+4.85%

+4.83%

+3.99%

+4.85%

+4.55%

+3.90%

40.00$ $ 42.00

275.00$ $ 285.00

550.00$ $ 575.00

275.00$ $ 285.00 +3.64%

20-11.

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

(1)

The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.

(2)

The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.

Laborers and Security Guards

P.E. Project Oversight for Short Term or Episodic

Remediation System Operation - Weekly Basis

P.E. Project Oversight for Short Term or Episodic

Remediation System Operation - Daily Basis

Notes:

P.E. Review, Evaluation and Certification of a Level 1

Limited Scope Remedial Action Plan or RAP

Modification Plan

21-7.a.

21-7.b.

21-25.

+5.00%

+3.64%

+4.55%

06/19/2020

06/19/2020Blake Miller Digitally signed by Blake Miller Date: 2020.06.19 17:07:11 -04'00'

PAY

ITEM

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

1.

1-1. Per Review $ 450.00 $ 495.00 $ 515.00

1-2. Per Site $ 350.00 $ 350.00 $ 350.00

1-2.a. Per Site Not Applicable $ - $ -

1-3. Per Package $ 300.00 $ 300.00 $ 300.00

1-4. Reimbursable* $ 1.00 $ 1.00 $ 1.00

1-5. Per Agreement $ 353.50 $ 371.17 $ 371.17

1-5.a. Per Agreement Not Applicable $ - $ -

1-6. Reimbursable* $ 1.00 $ 1.00 $ 1.00

1-7. % Surcharge Not Applicable $ 0.06 $ 0.06

2.

2-1. Per Visit $ 700.00 $ 700.00 $ 700.00

2-2. Per Survey $ 850.00 $ 850.00 $ 850.00

2-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00

2-4. Per Day $ 900.00 $ 900.00 $ 900.00

3.

3-1. Per Round Trip $ 550.00 $ 550.00 $ 550.00

3-2. Per Round Trip $ 1,000.00 $ 1,000.00 $ 1,000.00

3-3. Per Round Trip $ 700.00 $ 700.00 $ 700.00

3-4. Per Round Trip $ 1,000.00 $ 1,000.00 $ 1,000.00

3-5. Per Round Trip $ 300.00 $ 300.00 $ 300.00

3-6. Per Round Trip $ 450.00 $ 450.00 $ 450.00

3-7. Per Round Trip $ 550.00 Not Applicable Not Applicable

Region:

Contractor:

Contract #:

North

GLE ASSOCIATES, INC.

GC812

DEP Restated Agency Term Contract No. GC812

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way

Work Trailer - ≤ 100 miles each way

Work Trailer - > 100 miles each way

DPT Rig Mobilization - ≤ 100 miles each way

Contractor Oversight for Non-Price Schedule Activities

MOBILIZATION

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way

Permit Fees - actual fee only, cost to obtain permit is included in applicable pay items

Off-Site Property Access Agreement

Site Property Access Agreement for Source Property at no cost to FDEP

Project Specific Financial Guarantee Bond (if required by DEP)

6% Handling Fee for Cost Reimbursable Items

FIELD ACTIVITIES - GENERAL

DESCRIPTION

OFFICE ACTIVITIES

File Review

Site Health & Safety Plan

Site Health & Safety Plan for Continued Work at no cost to FDEP

Notice of Discovery of Contamination Package (Initial or TPOC)

Site Reconnaissance/Field Measurement Visit

Receptor Survey and Exposure Pathway Identification (Excludes report)

Professional Land Survey (If FDEP authorizes, submit quote(s) with Change Order)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

North

GLE ASSOCIATES, INC.

GC812

DEP Restated Agency Term Contract No. GC812

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

3-7.a. Per Round Trip Not Applicable $ 495.00 $ 515.00

3-8. Per Round Trip $ 900.00 Not Applicable Not Applicable

3-8.a. Per Round Trip Not Applicable $ 825.00 $ 865.00

3-9. Per Round Trip $ 650.00 Not Applicable Not Applicable

3-9.a. Per Round Trip Not Applicable $ 880.00 $ 880.00

3-10. Per Round Trip $ 1,000.00 Not Applicable Not Applicable

3-10.a. Per Round Trip Not Applicable $ 1,320.00 $ 1,320.00

3-11. Per Round Trip $ 700.00 $ 700.00 $ 700.00

3-12. Per Round Trip $ 1,100.00 $ 1,100.00 $ 1,100.00

3-13. Per Round Trip $ 9,074.50 Not Applicable Not Applicable

3-13.a. Per Round Trip Not Applicable $ 7,150.00 $ 7,500.00

3-14. Per Round Trip $ 12,598.50 Not Applicable Not Applicable

3-14.a. Per Round Trip Not Applicable $ 9,350.00 $ 9,800.00

3-15. Per Round Trip $ 600.00 $ 600.00 $ 600.00

3-16. Per Round Trip $ 1,000.00 $ 1,000.00 $ 1,000.00

3-17. Per Round Trip $ 475.00 $ 475.00 $ 475.00

3-18. Per Round Trip $ 700.00 $ 700.00 $ 700.00

3-19. Per Round Trip Not Applicable $ 500.00 $ 500.00

3-20. Per Round Trip Not Applicable $ 850.00 $ 850.00

4.

Drum Compactor mobilization - > 100 miles each way

MEALS AND LODGING

LDA Rig and Support Vehicles Mobilization - > 100 miles each way

Loader/Backhoe Mobilization - ≤ 100 miles each way

Loader/Backhoe Mobilization - > 100 miles each way

Mini Excavator/Loader (Bobcat

TM

) Mobilization - ≤ 100 miles each way

Mini Excavator/Loader (Bobcat

TM

) Mobilization - > 100 miles each way Drum Compactor mobilization - ≤ 100 miles each way

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - >

100 miles each way

Excavator Mobilization - ≤ 100 miles each way

Excavator Mobilization - > 100 miles each way

LDA Rig Mobilization - ≤ 100 miles each way

LDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way

LDA Rig Mobilization - > 100 miles each way

DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way

DPT Rig Mobilization - > 100 miles each way

DPT Rig and Support Vehicles Mobilization - > 100 miles each way

Drill Rig Mobilization - ≤ 100 miles each way

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤

100 miles each way

Drill Rig Mobilization - > 100 miles each way

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

North

GLE ASSOCIATES, INC.

GC812

DEP Restated Agency Term Contract No. GC812

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

4-1.a.

Per Person, Per Day $ - $ 80.00 $ 80.00

4-1.b. Reimbursable* $ 1.00 $ 1.00 $ 1.00

5.

5-1.a. Per Spoon $ 40.00 Not Applicable Not Applicable

5-1.a.1. Per Spoon Not Applicable $ 35.00 $ 36.00

5-1.a.2. Per Spoon Not Applicable $ 39.50 $ 39.50

5-1.a.3. Per Spoon Not Applicable $ 44.00 $ 44.00

5-1.b. Per Core $ 150.00 $ 150.00 $ 150.00

5-1.c. Per Core $ 35.00 Not Applicable Not Applicable

5-2. Per Boring $ 200.00 $ 200.00 $ 200.00

5-3. Per Foot $ 20.00 Not Applicable Not Applicable

5-3.a. Full Day Not Applicable $ 2,725.00 $ 2,725.00

5-4. Per Foot $ 27.75 Not Applicable Not Applicable

5-5. Per Foot $ 36.63 Not Applicable Not Applicable

5-5.a. Full Day Not Applicable $ 1,100.00 $ 1,150.00

5-6. Per Foot $ 25.00 $ 27.00 $ 28.00

5-7. Per Foot $ 30.00 $ 30.00 $ 30.00

5-8. Per Foot $ 35.00 $ 35.00 $ 35.00

HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth

Direct Push Boring

Direct Push Technology (DPT) Rig and Equipment

Direct Push Boring with Cone Penetrometer Test Probe (CPT)

Direct Push Boring with Membrane Interface Probe (MIP)

DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (Add-on Cost to DPT

Base Rate)

HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth

Split Spoon Sampling – 2 foot (during boring) < 50 feet

Split Spoon Sampling – 2 foot (during boring) 50 to 100 feet

Split Spoon Sampling – 2 foot (during boring) > 100 feet

Sonic Core Sampling - 5 or 10 foot (during boring)

DPT Core Sampling - 4 or 5 foot (during boring)

Hand Auger Boring ≤ 10 foot total depth

Per Diem - For Travel > 1 Consecutive day (prorated in quarter day increments)-Current

State Rate 112.061, F.S. Travel Voucher required and quoted rate should be per person per day.

Meals, Lodging and Transportation - For Contractor travel for specific meetings or legal proceedings required by Department, hotel and meals may be paid in accordance with

Section 112.061, F.S.

DRILLING AND BORING

Split Spoon Sampling - 2 foot (during boring)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

North

GLE ASSOCIATES, INC.

GC812

DEP Restated Agency Term Contract No. GC812

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

5-9. Per Foot $ 37.00 $ 37.00 $ 37.00

5-10. Per Foot $ 40.00 $ 40.00 $ 40.00

5-11. Per Foot $ 45.00 $ 45.00 $ 45.00

5-12. Per Foot $ 50.00 $ 50.00 $ 50.00

5-13. Per Foot $ 55.00 $ 55.00 $ 55.00

5-14. Per Foot $ 60.00 $ 60.00 $ 60.00

5-15. Per Foot $ 39.96 $ 39.96 $ 39.96

5-16. Per Foot $ 39.96 $ 39.96 $ 39.96

5-17. Per Foot $ 43.29 $ 43.29 $ 43.29

5-18. Per Foot $ 50.00 $ 50.00 $ 50.00

5-19. Per Foot $ 55.00 $ 55.00 $ 55.00

5-20. Per Foot $ 60.00 $ 60.00 $ 60.00

5-21. Per Foot $ 75.00 $ 75.00 $ 75.00

5-22. Per Foot $ 80.00 $ 80.00 $ 80.00

5-23. Per Foot $ 95.00 $ 95.00 $ 95.00

6.

6-1. Per Foot $ 32.00 $ 32.00 $ 32.00

6-2. Per Foot $ 40.00 Not Applicable Not Applicable

6-2.a. Per Foot Not Applicable $ 35.00 $ 36.00

6-2.b. Per Foot Not Applicable $ 175.00 $ 175.00

6-3. Per Foot $ 45.00 Not Applicable Not Applicable

6-3.a. Per Foot Not Applicable $ 42.00 $ 42.00

6-3.b. Per Foot Not Applicable $ 200.00 $ 200.00

6-4. Per Foot $ 55.00 $ 55.00 $ 55.00

6-5. Per Foot $ 45.00 $ 45.00 $ 45.00

Well Installation - 4 inch diameter (Horizontal, by trenching, not directional drilling)

Well Installation - 6 inch diameter

Surface Casing - 6 inch diameter

Well Installation - 1 inch diameter

Well Installation - 2 inch diameter

Well Installation - 2 inch diameter (Vertical)

Well Installation - 2 inch diameter (Horizontal, by trenching, not directional drilling)

Well Installation - 4 inch diameter

Well Installation - 4 inch diameter (Vertical)

Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth

Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth

Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth

Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth

WELL INSTALLATION

HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth

Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

North

GLE ASSOCIATES, INC.

GC812

DEP Restated Agency Term Contract No. GC812

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

6-6. Per Foot $ 55.00 $ 55.00 $ 55.00

6-7. Per Foot $ 65.00 $ 65.00 $ 65.00

6-8. Per Foot $ 80.00 $ 80.00 $ 80.00

6-9.a. Per Foot $ 6.66 $ 7.30 $ 7.30

6-9.b. Per Foot $ 8.88 $ 9.32 $ 9.32

6-9.c. Per Foot $ 11.10 $ 12.20 $ 12.20

6-9.d. Per Foot $ 13.32 $ 14.65 $ 14.65

6-10. Per Well $ 166.50 $ 183.50 $ 192.00

6-11. Per Vault $ 800.00 $ 882.00 $ 882.00

6-12. Per Vault $ 1,350.00 $ 1,485.00 $ 1,550.00

6-13. Per Well Not Applicable $ 200.00 $ 200.00

6-14. Per Well Not Applicable $ 350.00 $ 350.00

6-15. Per Well Not Applicable $ 400.00 $ 400.00

Installation of Well Vault - 4 x 4 x 2 foot

Well Redevelopment

Removal and Reinstallation of 8-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed

Removal and Reinstallation of 12-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed

Additional Well Screen > 20 feet - 1 inch diameter

Additional Well Screen > 20 feet - 2 inch diameter

Additional Well Screen > 20 feet - 4 inch diameter

Additional Well Screen > 20 feet - 6 inch diameter

Above Grade Well Completion

Installation of Well Vault - 2 x 2 x 2 foot

Surface Casing - 8 inch diameter

Surface Casing - 10 inch diameter

Surface Casing - 12 inch diameter

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

North

GLE ASSOCIATES, INC.

GC812

DEP Restated Agency Term Contract No. GC812

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

7.

7-1. Per Foot $ 18.00 $ 18.00 $ 18.50

7-2. Per Foot $ 20.00 $ 20.00 $ 20.00

7-3. Per Foot $ 22.00 $ 22.00 $ 22.00

7-4. Per Foot $ 30.00 $ 30.00 $ 30.00

7-5. Per Vault $ 525.00 $ 525.00 $ 525.00

7-6. Per Vault $ 950.00 $ 950.00 $ 950.00

7-7. Per Well Not Applicable $ 175.00 $ 175.00

8.

8-1. Per Well $ 200.00 $ 200.00 $ 200.00

8-2. Per Well $ 250.00 $ 250.00 $ 250.00

8-3. Per Well $ 100.00 $ 100.00 $ 100.00

8-4. Per Sample $ 100.00 $ 100.00 $ 100.00

8-5. Per Sample $ 100.00 $ 100.00 $ 100.00

8-6. Per Sample $ 100.00 $ 100.00 $ 100.00

8-7. Per Well $ 25.00 $ 25.00 $ 25.00

8-8. Per Well $ 100.00 $ 100.00 $ 100.00

8-9. Per Sample $ 50.00 $ 50.00 $ 50.00

8-10. Per Sample $ 150.00 $ 150.00 $ 150.00

8-11. Per Sampling Event Not Applicable $ 55.00 $ 57.50

8-12. Per Well Not Applicable $ 80.00 $ 80.00

8-13. Per Well Not Applicable $ 80.00 $ 80.00

Survey Latitude/Longitude of Existing Monitor Wells

Survey Latitude/Longitude of New Monitor Wells

Soil/Sediment Sample Collection

Water Level or Free Product Gauging

Free Product Gauging & Bailing

Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, Tedlar

TM

Bag

(or Equivalent)

Vapor/Ambient Air Sample Collection - SUMMA

TM

Canister (or Equivalent)

Electronic Data Deliverables (EDD)

SAMPLE COLLECTION AND FIELD TESTING

Monitoring Well Sampling with Water Level, ≤ 100 foot depth

Monitoring Well Sampling with Water Level, > 100 foot depth

Domestic Water Well Sampling

Other Water Sampling

Free Product Sample Collection

Grout and Abandon Well, > 2 to 4 inch diameter

Grout and Abandon Well, > 4 to 6 inch diameter

Grout and Abandon Well, > 6 inch diameter

Removal of Well Vault - 2 x 2 x 2 foot

Removal of Well Vault - 4 x 4 x 2 foot

Removal of Well Pad and Manhole

WELL ABANDONMENT

Grout and Abandon Well, 1 to 2 inch diameter

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

North

GLE ASSOCIATES, INC.

GC812

DEP Restated Agency Term Contract No. GC812

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

8-14. Per Sample Not Applicable $ 15.75 $ 15.75

9.

9.A.

9-1. Per Sample $ 525.00 $ 525.00 $ 525.00

9-2. Per Sample $ 50.00 $ 50.00 $ 50.00

9-3. Per Sample $ 60.00 $ 60.00 $ 60.00

9-4. Per Sample $ 100.00 $ 100.00 $ 100.00

9-5. Per Sample $ 100.00 $ 100.00 $ 100.00

9-6. Per Sample $ 110.00 $ 110.00 $ 110.00

9-7. Per Sample $ 275.00 $ 275.00 $ 275.00

9-8. Per Sample $ 75.00 $ 75.00 $ 75.00

9-8.a. Per Sample Not Applicable $ 250.00 $ 250.00

9-9. Per Sample $ 65.00 $ 65.00 $ 65.00

9-10. Per Sample $ 90.00 $ 90.00 $ 90.00

9-11. Per Sample $ 12.75 $ 12.75 $ 12.75

9-12. Per Sample $ 12.75 $ 12.75 $ 12.75

9-13. Per Sample $ 12.75 $ 12.75 $ 12.75 Soil, Chromium (EPA 6010 or EPA 6020)

Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO)

Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method)

Soil, PCBs [or Aroclors] (EPA 8082)

Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury])

Soil, Arsenic (EPA 6010 or EPA 6020)

Soil, Cadmium (EPA 6010 or EPA 6020)

Soil, BTEX + MTBE (EPA 8021 or EPA 8260)

Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260)

Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260)

Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)

Soil, Priority Pollutant Volatile Organics (EPA 8260)

Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA

8270 list [e.g., EPA 8081/8082 + EPA 8270])

Encore (25 gram) for SPLP Soil Sample Collection: [Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing

(discarded).

LABORATORY ANALYSIS

SOIL/SEDIMENT ANALYSIS

Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-

Priority Pollutant Organics (Multiple Methods)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

North

GLE ASSOCIATES, INC.

GC812

DEP Restated Agency Term Contract No. GC812

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

9-14. Per Sample $ 12.75 $ 12.75 $ 12.75

9-15. Per Sample $ 65.00 $ 65.00 $ 65.00

9-16. Per Sample $ 70.00 $ 70.00 $ 70.00

9-17. Per Sample $ 35.00 $ 35.00 $ 35.00

9-18. Per Sample $ 27.27 $ 30.00 $ 31.50

9-19. Per Sample $ 18.18 $ 18.18 $ 18.18

9-20. Per Sample $ 18.18 $ 20.00 $ 21.00

9-21. Per Sample $ 375.00 $ 375.00 $ 375.00

9-22. Per Sample $ 500.00 $ 500.00 $ 500.00

9-23. Per Sample $ 80.00 $ 80.00 $ 80.00

9-24. Per Sample $ 200.00 $ 200.00 $ 200.00

9.B.

9-25. Per Sample $ 325.00 $ 325.00 $ 325.00

9-26. Per Sample $ 525.00 $ 525.00 $ 525.00

9-27. Per Sample $ 50.00 $ 50.00 $ 50.00

9-28. Per Sample $ 65.00 $ 65.00 $ 65.00

WATER ANALYSIS

Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (Multiple

Methods)

Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-

Priority Pollutant Organics (Multiple Methods)

Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)

Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260)

Soil, Moisture Content (ASTM D2216-10)

Soil, Texture, (See Gee 7 Bauder [1966])

Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS)

Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution GC/MS)

Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High

Resolution GC/MS)

Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)

Soil, Lead (EPA 6010 or EPA 6020)

Soil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311)

Soil, Synthetic Precipitation Leaching Procedure-Extraction Only (EPA1312)

Soil, Organic Carbon, Total (EPA 9060 or Walkey-Black)

Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -

96e1 or ASTM D2937-10)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

North

GLE ASSOCIATES, INC.

GC812

DEP Restated Agency Term Contract No. GC812

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

9-29. Per Sample $ 95.00 $ 95.00 $ 95.00

9-30. Per Sample $ 100.00 $ 100.00 $ 100.00

9-31. Per Sample $ 50.00 $ 50.00 $ 50.00

9-31.a. Per Sample Not Applicable $ 55.00 $ 55.00

9-32. Per Sample $ 100.00 $ 100.00 $ 100.00

9-33. Per Sample $ 100.00 $ 100.00 $ 100.00

9-34. Per Sample $ 315.00 $ 315.00 $ 315.00

9-35. Per Sample $ 315.00 $ 315.00 $ 315.00

9-36. Per Sample $ 75.00 $ 75.00 $ 75.00

9-37. Per Sample $ 70.00 $ 70.00 $ 70.00

9-38. Per Sample $ 11.50 $ 11.50 $ 11.50

9-39. Per Sample $ 11.50 $ 11.50 $ 11.50

9-40. Per Sample $ 11.50 $ 11.50 $ 11.50

9-41. Per Sample $ 11.50 $ 11.50 $ 11.50

9-41.a. Per Sample Not Applicable $ 25.00 $ 25.00

9-42. Per Sample $ 13.63 $ 14.31 $ 15.00

9-43. Per Sample $ 11.50 $ 11.50 $ 11.50

9-44. Per Sample $ 11.50 $ 11.50 $ 11.50

Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

Water, Mercury, Total (EPA 245.1, EPA 6020 or EPA 7470)

Water, Calcium, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA

8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270)

Water, Total Recoverable Petroleum Hydrocarbons (FL-PRO)

Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)

Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)

Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624)

Water, Priority Pollutant Volatile Organics (EPA 8260)

Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for

NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])

Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

North

GLE ASSOCIATES, INC.

GC812

DEP Restated Agency Term Contract No. GC812

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

9-44.a. Per Sample Not Applicable $ 26.25 $ 26.25

9-45. Per Sample $ 11.50 $ 11.50 $ 11.50

9-46. Per Sample $ 11.50 $ 11.50 $ 11.50

9-47. Per Sample $ 11.50 $ 11.50 $ 11.50

9-48. Per Sample $ 11.50 $ 11.50 $ 11.50

9-49. Per Sample $ 13.63 $ 13.63 $ 13.63

9-50. Per Sample $ 18.18 $ 18.18 $ 18.18

9-51. Per Sample $ 15.00 $ 15.00 $ 15.00

9-52. Per Sample $ 15.00 $ 15.00 $ 15.00

9-53. Per Sample $ 15.00 $ 15.00 $ 15.00

9-54. Per Sample $ 15.00 $ 15.00 $ 15.00

9-55. Per Sample $ 15.00 $ 15.00 $ 15.00

9-56. Per Sample $ 25.00 $ 25.00 $ 25.00

9-57. Per Sample $ 18.18 $ 18.18 $ 18.18

9-58. Per Sample $ 13.63 $ 13.63 $ 13.63

9-59. Per Sample $ 13.63 $ 13.63 $ 13.63

9-60. Per Sample $ 15.00 $ 15.00 $ 15.00

Water, Orthophosphate [as P] (EPA 300.0, EPA 300.1, EPA 365.1, EPA 365.3, EPA

9056, SM 4500-PE or SM 4500-PF)

Water, Residue-filterable [Total Dissolved Solids] (SM 2540 C)

Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D)

Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA

9038, EPA 9056 or SM 4500-SO4 C)

Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI

C or SM 4500CI E)

Water, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C)

Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)

Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or

SM 4500-NO3 F)

Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)

Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)

Water, Magnesium, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B)

Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-NH3 H)

Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

North

GLE ASSOCIATES, INC.

GC812

DEP Restated Agency Term Contract No. GC812

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

9-61. Per Sample $ 41.36 $ 41.36 $ 41.36

9-62. Per Sample $ 900.00 $ 900.00 $ 900.00

9-63. Per Sample $ 900.00 $ 900.00 $ 900.00

9-64. Per Sample $ 375.00 $ 375.00 $ 375.00

9-65. Per Sample $ 450.00 $ 450.00 $ 450.00

9-66. Per Sample $ 175.00 $ 175.00 $ 175.00

9-67. Per Sample $ 200.00 $ 220.00 $ 230.00

9-78. Per Sample Not Applicable $ 49.50 $ 51.75

9-79. Per Sample Not Applicable $ 38.50 $ 40.00

9-80. Per Sample Not Applicable $ 66.00 $ 69.00

Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)

Water, Methane (EPA SOP RSK-175)

Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate:

Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia]

(EPA 2006.0/2007.0)

Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS)

Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution GC/MS)

Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High

Resolution GC/MS)

Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)

Water, BTEX/MTBE + Naphthalene (EPA 8260)

Water, Heterotrophic Plate Count (SM 9215 B)

Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate:

Pimephales promelas or Cyprinella leedsi/Invertebrate: Ceriodaphnia dubia] (EPA

2000.0/2002.0)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

North

GLE ASSOCIATES, INC.

GC812

DEP Restated Agency Term Contract No. GC812

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

9.C.

9-68. Per Sample $ 95.00 $ 95.00 $ 95.00

9-69. Per Sample $ 200.00 $ 200.00 $ 200.00

9-70. Per Sample $ 225.00 $ 225.00 $ 225.00

9-71. Per Sample $ 250.00 $ 260.00 $ 260.00

9.D.

9-72. Per Sample $ 325.00 $ 325.00 $ 325.00

9-73. Per Sample $ 600.00 $ 600.00 $ 600.00

9.E.

9-74. Reimbursable* $ 1.00 Not Applicable Not Applicable

9-75.

Percent

Surcharge

9-76.

Percent

Surcharge $ 0.50 $ 0.50 $ 0.50

9-77.

Percent

Surcharge $ 1.00 $ 1.00 $ 1.00

10.

10-1. Per Sq. Foot/Day $ 65.00 Not Applicable Not Applicable

10-1.a. Per Sq. Foot Not Applicable $ 30.00 $ 30.00

10-1.b. Per Sq. Foot/Day Not Applicable $ 2.60 $ 2.73

10-1.c. Per Sq. Foot/Week Not Applicable $ 5.25 $ 5.50

Sheet Piling Rental for ≤ 20 feet deep Excavation

Sheet Piling Rental for ≤ 20 feet deep Excavation

Additional Laboratory % Surcharge authorized in the ATC contract for 7 Day Turnaround.

Additional Laboratory % Surcharge authorized in the ATC contract for 3 Day Turnaround.

Additional Laboratory % Surcharge authorized in the ATC contract for 1 Day Turnaround.

SOIL SOURCE REMOVAL RELATED

Sheet Piling for ≤ 20 feet deep excavation (per square foot)

Sheet Piling Installation for ≤ 20 feet deep Excavation

Air, Volatile Organic Compounds (EPA Method TO-17)

PRODUCT ANALYSIS

Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High

Resolution GC/FID)

Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution GC/MS)

OTHER ANALYSIS

Other Analysis, Not Otherwise Specified

AIR ANALYSIS

Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)

Air, Volatile Organic Aromatics (EPA Method TO-15)

Air, Polycyclic Aromatic Hydrocarbons (EPA Method TO-13)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

North

GLE ASSOCIATES, INC.

GC812

DEP Restated Agency Term Contract No. GC812

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

10-1.d. Per Sq. Foot/Month Not Applicable $ 10.50 $ 11.00

10-2. Per Sq. Foot/Week $ 65.00 Not Applicable Not Applicable

10-2.a. Per Sq. Foot Not Applicable $ 55.00 $ 55.00

10-2.b. Per Sq. Foot/Day Not Applicable $ 3.65 $ 3.80

10-2.c. Per Sq. Foot/Week Not Applicable $ 7.85 $ 8.20

10-2.d. Per Sq. Foot/Month Not Applicable $ 16.00 $ 16.00

10-3. Per Sq. Foot/Month $ 70.00 Not Applicable Not Applicable

10-4. Per Sq. Foot/Day $ 90.00 Not Applicable Not Applicable

10-5. Per Sq. Foot/Week $ 95.00 Not Applicable Not Applicable

10-6. Per Sq. Foot/Month $ 100.00 Not Applicable Not Applicable

10-7. Per Cubic Yard $ 35.00 $ 36.75 $ 36.75

10-8. Per Cubic Yard $ 30.00 $ 31.50 $ 31.50

10-9. Per Cubic Yard $ 130.00 $ 130.00 $ 130.00

10-10. Per Cubic Yard $ 120.00 $ 120.00 $ 120.00

10-11.a. Per Cubic Yard $ 150.00 $ 150.00 $ 150.00

10-11.b. Per Cubic Yard $ 300.00 $ 300.00 $ 300.00

10-12.a. Per Cubic Yard $ 135.00 $ 135.00 $ 135.00

10-12.b. Per Cubic Yard $ 225.00 $ 225.00 $ 225.00

10-13. Per Cubic Yard $ 110.00 $ 110.00 $ 110.00

10-14. Per Cubic Yard $ 31.50 $ 34.50 $ 34.50

10-15. Per Cubic Yard $ 27.72 $ 30.55 $ 32.00

10-15.a. Per Cubic Yard Not Applicable $ 25.00 $ 25.00

10-15.b. Per Cubic Yard Not Applicable $ 20.00 $ 20.00

10-16. Per Ton $ 60.00 $ 60.00 $ 60.00

Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards

Pea Gravel

LDA Excavation and Loading With Surface Casing > 300 cubic yards

LDA Excavation and Loading With Driven Casing > 300 cubic yards

Flowable Fill Concrete and Installation

Clean Backfill Material, Compaction and Testing (includes transport) ≤ 300 cubic yards

Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards

Clean Overburden Used As Backfill, Compaction and Testing ≤ 300 cubic yards

Conventional Soil Excavation and Loading ≤ 300 cubic yards

Conventional Soil Excavation and Loading > 300 cubic yards

LDA Excavation and Loading Without Casing ≤ 300 cubic yards

LDA Excavation and Loading Without Casing > 300 cubic yards

LDA Excavation and Loading With Surface Casing ≤ 300 cubic yards

LDA Excavation and Loading With Driven Casing < 300 cubic yards

Sheet Piling Rental for > 20 feet deep Excavation

Sheet Piling Rental for > 20 feet deep Excavation

Sheet Piling for ≤ 20 feet deep excavation (per square foot)

Sheet Piling for > 20 feet deep excavation (per square foot)

Sheet Piling for > 20 feet deep excavation (per sqyuare foot)

Sheet Piling for > 20 feet deep excavation (per square foot)

Sheet Piling Rental for ≤ 20 feet deep Excavation

Sheet Piling for ≤ 20 feet deep excavation (per square foot)

Sheet Piling Installation for > 20 feet deep Excavation

Sheet Piling Rental for > 20 feet deep Excavation

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

North

GLE ASSOCIATES, INC.

GC812

DEP Restated Agency Term Contract No. GC812

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

10-17. Per Ton $ 50.40 $ 50.40 $ 50.40

10-18. Per Day $ 3,300.00 $ 3,300.00 $ 3,450.00

10-19. Per Day $ 625.00 $ 625.00 $ 625.00

10-20. Per Week $ 10,000.00 $ 10,000.00 $ 10,000.00

10-21. Per Week $ 850.00 $ 850.00 $ 850.00

10-22. Per Month $ 18,900.00 $ 18,900.00 $ 18,900.00

10-23. Per Month $ 1,100.00 $ 1,100.00 $ 1,100.00

11.

11-1. Per Tank $ 4,410.00 $ 4,410.00 $ 4,410.00

11-2. Per Tank $ 7,560.00 $ 7,560.00 $ 7,560.00

11-3. Per Tank $ 10,000.00 $ 10,000.00 $ 10,000.00

11-4. Per Tank $ 13,500.00 $ 13,500.00 $ 13,500.00

12.

12-1. Per Square Foot $ 1.50 $ 1.64 $ 1.70

12-2. Per Square Foot $ 3.00 $ 3.00 $ 3.00

12-3. Per Ton $ 60.00 $ 60.00 $ 60.00

12-4. Per Ton $ 45.00 $ 45.00 $ 45.00

12-5. Per Ton $ 55.00 $ 55.00 $ 55.00

12-6. Per Drum $ 200.00 $ 200.00 $ 200.00

12-7. Per Ton $ 30.00 $ 30.00 $ 30.00

12-8. Per Ton $ 40.00 $ 40.00 $ 40.00

12-9. Per Ton $ 35.00 $ 35.00 $ 35.00

12-10. Per Ton $ 35.00 $ 35.00 $ 35.00

12-11. Per Ton $ 40.00 $ 40.00 $ 40.00

12-12. Per Ton $ 40.00 $ 40.00 $ 40.00

Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons

Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) ≤ 450 tons

Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tons

Transport and Disposal of Clean Concrete

Transport and Disposal of Mixed Debris

Transport and Disposal of Petroleum Impacted Soil (includes drum)

Transport Petroleum Impacted Soil (bulk) ≤ 100 miles

Transport Petroleum Impacted Soil (bulk) > 100 miles

Disposal of Petroleum Impacted Soil at a Landfill (bulk) ≤ 450 tons

Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacity

Remove and Dispose Petroleum Storage Tank - > 10,000 gal. capacity

DEBRIS, WASTE AND PRODUCT REMOVAL AND DISPOSAL

Removal and Loading of Asphalt and/or Concrete - up to 4 inch thickness

Additional Removal/Loading Cost for Concrete - > 4 inch thickness

Loading, Transport and Disposal/Recycle Clean Overburden

Additional Dewatering System Well Points (2) (includes installation)

Dewatering System, up to 12 well points (includes installation)

Additional Dewatering System Well Points (2) (includes installation)

PETROLEUM STORAGE TANK REMOVAL AND DISPOSAL

Remove and Dispose Petroleum Storage Tank - ≤ 1,000 gal. capacity

Remove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacity

#57 Stone

Dewatering System, up to 12 well points (includes installation)

Additional Dewatering System Well Points (2) (includes installation)

Dewatering System, up to 12 well points (includes installation)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

North

GLE ASSOCIATES, INC.

GC812

DEP Restated Agency Term Contract No. GC812

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

12-13. Per Drum $ 220.00 $ 220.00 $ 220.00

12-14. Per Gallon $ 1.75 $ 1.75 $ 1.75

12-15. Per Drum $ 220.00 $ 220.00 $ 220.00

12-16. Per Gallon $ 1.50 $ 1.50 $ 1.50

12-17. Per Week Not Applicable $ 750.00 $ 750.00

12-18. Per Week Not Applicable $ 165.00 $ 165.00

13.

13-1. Per Square Foot $ 6.50 $ 6.80 $ 6.80

13-2. Per Square Foot $ 2.50 $ 2.50 $ 2.50

13-3. Per Square Foot $ 8.00 $ 8.00 $ 8.00

13-4. Per Square Foot $ 2.50 $ 2.50 $ 2.50

13-5. Per Square Foot $ 3.00 $ 3.00 $ 3.00

13-6. Per Square Foot $ 1.00 $ 1.10 $ 1.15

13-7. Per Square Foot $ 0.75 $ 0.75 $ 0.75

Concrete Paving - 4 inch thickness (includes sub-base)

Concrete Paving - additional 1 inch thickness

Crushed Lime Rock Cover - 2 inch thickness

Grass - Sod

Grass - Seed and Mulch

Transport and Disposal of Petroleum Product (bulk)

Delivery, Pick Up and Rental of 20 Cubic Yard Roll-Off Container

Additional Rental of 20 Cubic Yard Roll-Off Container

RESURFACING

Asphalt Paving - 2 inch thickness (includes sub-base)

Asphalt Paving - additional 1 inch thickness

Transport and Disposal of Petroleum Contact Water (includes drum)

Transport and Disposal of Petroleum Contact Water (bulk)

Transport and Disposal of Petroleum Product (includes drum)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

North

GLE ASSOCIATES, INC.

GC812

DEP Restated Agency Term Contract No. GC812

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

14.

14-1. Per Foot $ 30.00 Not Applicable Not Applicable

14-1.a. Per Day Not Applicable $ 6,450.00 $ 6,450.00

14-2. Per Injection Point $ 425.00 Not Applicable Not Applicable

14-2.a. Per Day Not Applicable $ 5,000.00 $ 5,000.00

14-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00

14-4. Per Week Not Applicable $ 4,450.00 $ 4,450.00

14-5. Per Month Not Applicable $ 12,655.00 $ 12,655.00

15.

15.A.

15-1. Per Linear Foot $ 75.00 Not Applicable Not Applicable

15-1.a.

Per Linear Foot of

Trench Not Applicable $ 71.50 $ 71.50

15-1.b.

Per Linear Foot of

Trench Not Applicable $ 78.00 $ 78.00

15-1.c.

Per Linear Foot of

Trench Not Applicable $ 85.50 $ 85.50

15-1.d.

Per Linear Foot of

Trench Not Applicable $ 95.00 $ 95.00

15-2. Per Linear Foot $ 7.50 Not Applicable Not Applicable

15-2.a. Per Foot Not Applicable $ 16.50 $ 16.50

Trenching and Installation - Additional 2 plumbing lines

Installation of Plumbing (and Electrical) Lines Above Ground: Per Linear Foot of Piping.

Electrical lines are not counted in determination of costs.

TRENCHING

Trenching and Installation of Plumbing (and Electrical) Lines in Trench - up to 8 plumbing lines

Trenching and Installation of 1-10 Plumbing (and Electrical) Lines in Trench

Trenching and Installation of 11 - 20 Lines

Trenching and Installation of 21 - 30 Lines

Trenching and Installation of Additional 1-10 Lines Greater Than 30 Lines

Direct Push Boring with In-Situ Injection

In-Situ Injection Into Existing Well/Treatment Point

Materials to be Injected

Groundwater Injection System (not by direct push)

Groundwater Injection System (not by direct push)

REMEDIAL ACTION CONSTRUCTION

Direct Push Boring with In-Situ Injection

In-Situ Injection Into Existing Well/Treatment Point

IN-SITU INJECTION

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

North

GLE ASSOCIATES, INC.

GC812

DEP Restated Agency Term Contract No. GC812

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

15-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00

15-3.a. Reimbursable* Not Applicable $ 1.00 $ 1.00

15-3.b. Reimbursable* Not Applicable $ 1.00 $ 1.00

15.B.

15-4.

Per Integration /

Startup $ 7,875.00 Not Applicable Not Applicable

15-4.a. Per Startup Not Applicable $ 6,615.00 $ 6,945.00

15-4.b. Per Startup Not Applicable $ 7,715.00 $ 8,050.00

15-4.c. Per Startup Not Applicable $ 8,820.00 $ 9,200.00

15-4.d. Per Startup Not Applicable $ 1,100.00 $ 1,150.00

15-5.

Per Additional Tech

Component $ 1,375.00 $ 1,500.00 $ 1,500.00

15-6.

Per 2 Recovery /

Treatment Points $ 1,375.00 Not Applicable Not Applicable

15-7. Reimbursable* Not Applicable $ 1.00 $ 1.00

15-8. Reimbursable* Not Applicable $ 1.00 $ 1.00

System Installation/Integration/Startup – Addition of 2 recovery/treatment points

Compound Construction/fencing (materials)

Utility Drop

System Installation/Integration/Startup - 1 technology component - up to 8 recovery/treatment points

System Installation/Integration/Startup - 1 technology component - 1-10 recovery/treatment points

System Installation/Integration/Startup - 1 technology component - 11-20 recovery/treatment points

System Installation/Integration/Startup - 1 technology component - 21-30 recovery/treatment points

System Installation/Integration/Startup - 1 technology component - 1-10 additional recovery/treatment points greater than 30. This item is used in conjunction with 15.4.c when needed.

System Installation/Integration/Startup – Addition of 1 technology component

Plumbing and Electrical Materials/Equipment Installed in Trench (If FDEP authorizes, submit quote(s) with Change Order)

Traffic Bearing Trench Plates (materials)

Infiltration Gallery Installation

REMEDIATION SYSTEM INTEGRATION AND STARTUP

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

North

GLE ASSOCIATES, INC.

GC812

DEP Restated Agency Term Contract No. GC812

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

15-9. Reimbursable* Not Applicable $ 1.00 $ 1.00

15-10. Reimbursable* Not Applicable $ 1.00 $ 1.00

16.

16.A.

16-1. Per Test $ 4,250.00 $ 4,250.00 $ 4,250.00

16-2. Per 2 Hrs $ 650.00 $ 650.00 $ 650.00

16-3. Per Test $ 3,550.00 $ 3,550.00 $ 3,550.00

16-4. Per 2 Hrs $ 650.00 $ 650.00 $ 650.00

16-5. Per Test $ 3,550.00 $ 3,700.00 $ 3,700.00

16-6. Per 2 Hrs $ 650.00 $ 650.00 $ 650.00

16-7. Per Test $ 4,550.00 $ 4,550.00 $ 4,550.00

16-8. Per 2 Hrs $ 650.00 $ 650.00 $ 650.00

16-9. Per Test $ 4,550.00 $ 4,550.00 $ 4,550.00

16-10. Per 2 Hrs $ 650.00 $ 650.00 $ 650.00

16-11. Per Test $ 4,550.00 $ 4,550.00 $ 4,550.00

16-12. Per 2 Hrs $ 650.00 $ 650.00 $ 650.00

16-13. Per Test Not Applicable $ 3,670.00 $ 3,850.00

16-14. Per 2 Hours Not Applicable $ 845.00 $ 845.00

16.B.

16-17. Per Day $ 2,259.90 $ 2,490.00 $ 2,600.00

16-18. Per Week $ 5,120.95 $ 5,600.00 $ 5,850.00

16-19. Per Day $ 882.05 $ 972.00 $ 1,020.00 Air Sparge System Package - Medium

Multi-Phase Extraction Pilot Test - Additional Time

Air Sparging/Multiphase Extraction Pilot Test - 8 hours

Air Sparging/Multiphase Extraction Pilot Test - Additional Time

SHORT TERM/EPISODIC SYSTEM OPERATION PACKAGES (Including Remediation

System Equipment)

Groundwater Treatment System Package - Medium

Groundwater Treatment System Package - Medium

Vapor Extraction Pilot Test - Additional Time

Vapor Extraction/Aquifer Pumping Test - 8 hours

Vapor Extraction/Aquifer Pumping Test - Additional Time

Air Sparging/Vapor Extraction Pilot Test - 8 hours

Air Sparging/Vapor Extraction Pilot Test - Additional Time

Multi-Phase Extraction Pilot Test - 8 hours

PILOT TEST PACKAGES (Including Remediation System Equipment)

Groundwater Recovery System Pilot Test - 8 hours

Groundwater Recovery System Pilot Test - Additional Time

Air Sparging or Biosparging Pilot Test - 8 hours

Air Sparging or Biosparging Pilot Test - Additional Time

Vapor Extraction Pilot Test - 8 hours

Utility Connection

Utility Disconnect

REMEDIAL ACTION - PACKAGED WORK SCOPES (Including Remediation System

Equipment)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.1)

REVISED

CONTRACTED

ITEM PRICE (V3.2)

Region:

Contractor:

Contract #:

North

GLE ASSOCIATES, INC.

GC812

DEP Restated Agency Term Contract No. GC812

Amendment No. 8

Attachment D (V3.2) - Rate Schedule

DESCRIPTION

16-20. Per Week $ 1,764.10 $ 1,940.00 $ 2,025.00

16-21. Per Day $ 1,868.75 $ 2,050.00 $ 2,100.00

16-22. Per Week $ 3,737.50 $ 4,110.00 $ 4,310.00

16-23. Per Day $ 1,645.65 $ 1,810.00 $ 1,900.00

16-24. Per Week $ 3,291.30 $ 3,600.00 $ 3,780.00

16-25. Per Day Not Applicable $ 3,900.00 $ 4,050.00

16-26. Per Week Not Applicable $ 12,500.00 $ 12,500.00

16-27. Per Day Not Applicable $ 3,250.00 $ 3,250.00

16-28. Per Week Not Applicable $ 8,250.00 $ 8,250.00

17.

17-1. Per Month $ 1,725.00 $ 1,900.00 $ 1,990.00

17-2. Per…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .