Amendment No. 4 to DEP Agency Term Contract No. GC812
This document is Amendment No. 4 to Agency Term Contract No. GC812, a rate increase amendment executed between the Florida Department of Environmental Protection (FDEP) and GLE Associates, Inc. The contract, originally executed on March 18, 2014, provides petroleum contamination site response action services in Florida's North Region. Amendment No. 4 was executed on May 22, 2018, and modifies the rate schedule effective for new work assignments offered on or after the Rate Change Date (May 22, 2018). All pre-Rate Change Date work assignments continue to apply the contractor's prior rate schedule.
The amendment increases rates for 119 pay items across multiple service categories, with rate increases ranging from approximately 4.67% to 5.00%, all within the maximum 5% increase allowable under contract provision 11.B.ii. The services covered include office activities, field activities, mobilization, drilling and boring, well installation, well abandonment, sample collection and field testing, laboratory analysis (soil, water, air, and product), soil source removal, debris and waste removal, petroleum storage tank removal, resurfacing, in-situ injection, trenching and remedial construction, pilot testing, system operations and maintenance packages, reports, personnel services, and professional engineering and professional geology services. Updated Attachment D (Rate Schedule V2.1) containing all revised rates becomes effective upon implementation, with the contractor required to receive formal notice of the effective Rate Change Date within five business days of data entry.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-GC812-A12.pdf | ||
| CN-370000-GC812-A2.pdf | ||
| CN-370000-GC812-CMC.pdf | ||
| CN-370000-GC812-CMC1.pdf | ||
| CN-370000-GC812-CMC2.pdf | ||
| CN-370000-GC812-A11.pdf | ||
| CN-370000-GC812-A17.pdf | ||
| CN-370000-GC812-A3.pdf | ||
| CN-370000-GC812-A5.pdf | ||
| CN-370000-GC812-CMC3.pdf | ||
| CN-370000-GC812-A13.pdf | ||
| CN-370000-GC812-A14E1.pdf | ||
| CN-370000-GC812-A15E2.pdf | ||
| CN-370000-GC812-A16E3.pdf | ||
| CN-370000-GC812-A6.pdf | ||
| CN-370000-GC812-A7.pdf | ||
| CN-370000-GC812-A8.pdf | ||
| CN-370000-GC812.pdf | ||
| CN-370000-GC812-A10.pdf | ||
| CN-370000-GC812-A9.pdf | ||
| CN-370000-GC812-AR1.pdf | ||
| CN-370000-GC812-CMC4.pdf | ||
| PC-370000-GC812.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.
2.
3.
All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor�s applicable prior Rate Schedule.
Contractor�s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.
WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (�New Work� assignments).
WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department�s data processing of the rate changes (hereinafter �Rate Change Date�); and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V2.0) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC812 (hereinafter "Contract") between the FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and GLE ASSOCIATES, INC. (hereinafter "Contractor") executed on March 18, 2014, to provide petroleum contamination site response action services in the North Region, is hereby amended.
PETROLEUM RESTORATION PROGRAM
AGENCY TERM CONTRACT NO. GC812
RATE INCREASE
AMENDMENT NO. 4
Amendment No. 4 DEP Agency Term Contract No. GC812
This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.
NOW THEREFORE, the parties agree as follows:
Amendment No. 4 DEP Agency Term Contract No. GC812
4.
5.
6.
Attachment D, Rate Schedule (V2.1) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate schedule (V2.1) shall apply.
The Rate Change Date is the date shown at the bottom of this Amendment for the Department�s Data Processing Information. Prior to the Rate Change Date, the Department shall provide Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date and prior to the Rate Change Date.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this Amendment shall control.
Pre-existing Rate
Agreed New Rate(1)
$450.00 $472.50 $353.50 $371.17
$450.00 $472.50
$750.00 $787.50
$800.00 $840.00
$1,200.00 $1,260.00
$6,500.00 $6,825.00
$8,500.00 $8,925.00
$1,000.00 $1,050.00
$25.00 $26.25
$6.66 $6.99
$8.88 $9.32
$11.10 $11.65
$13.32 $13.98
$166.50 $174.82 $800.00 $840.00
$1,350.00 $1,417.50 $50.00 $52.50
$27.27 $28.63
$18.18 $19.08
+5.00%
+4.95%
+4.95%
+4.95%
+5.00% +5.00% +5.00%
+5.00%
+5.00%
+4.95%
+5.00%
+5.00%
+5.00%
+5.00%
5-5.a.
5-6.
Pay Item No.
1-1.
1-5.
3-14.a.
3-7.a.
3-8.a.
3-9.a.
3-10.a.
Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -96e1 or
ASTM D2937-10)
Soil, Texture, (See Gee 7 Bauder [1966])
Electronic Data Deliverables (EDD)
Above Grade Well Completion
Additional Well Screen > 20 feet - 6 inch diameter
Additional Well Screen > 20 feet - 4 inch diameter
Additional Well Screen > 20 feet - 2 inch diameter
Additional Well Screen > 20 feet - 1 inch diameter
File Review Off-Site Property Access Agreement
LDA Rig and Support Vehicles Mobilization - > 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - 100 miles each way
DPT Rig and Support Vehicles Mobilization - > 100 miles each way
DPT Rig and Support Vehicles Mobilization - 100 miles each way
LDA Rig and Support Vehicles Mobilization - 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way
Description
3-13.a.
Table 1. Listed Schedule of Pay Items with Rate Changes
6-9.c.
6-9.d.
6-10.
6-11.
6-12.
HSA or MR Boring, 6 inch diameter, < 50 foot total depth
DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (add-on cost to DPT base rate)
Installation of Well Vault - 4 x 4 x 2 foot Installation of Well Vault - 2 x 2 x 2 foot
6-9.a.
6-9.b.
9-18.
9-20.
8-11.
Est % Rate
Change(2)
+5.00% +5.00%
+5.00%
+5.00%
+4.99%
+4.95%
$13.63 $14.31
$200.00 $210.00
$45.00 $47.25
$35.00 $36.75
$60.00 $63.00
$31.50 $33.07
$27.72 $29.10
$1.50 $1.57
$150.00 $157.50
$1.00 $1.05
$65.00 $68.25
$72.50 $76.12
$15.00 $15.75
$6,000.00 $6,300.00
$7,000.00 $7,350.00
$8,000.00 $8,400.00
$1,000.00 $1,050.00
$1,375.00 $1,443.75
+5.00%
+5.00%
+5.00%
+4.67%
+5.00%
+5.00%
+5.00%
+5.00%
+4.99%
10-15.
12-1.
15-2.a.
15-4.a.
15-4.b.
15-4.c.
15-4.d.
15-5.
12-18.
13-6.
10-14.
9-42.
Trenching and Installation of 11 - 20 Lines
System Installation/Integration/Startup � Addition of 1 Technology Component
System Installation/Integration/Startup - 1 Technology Component - 1-10 Additional Recovery/Treatment Points greater Than 30 (This item is used in conjunction with 15.4.c when needed)
System Installation/Integration/Startup - 1 Technology Component - 21-30 Recovery/Treatment Points
System Installation/Integration/Startup - 1 Technology Component - 11-20 Recovery/Treatment Points
System Installation/Integration/Startup - 1 Technology Component - 1-10 Recovery/Treatment Points
Installation of Plumbing (and Electrical) Lines Above Ground: Per Linear Foot of Piping.
Electrical lines are not counted in determination of costs.
Trenching and Installation of 1-10 Plumbing (and Electrical) Lines in Trench
Grass - Sod
Additional Rental of 20 Cubic Yard Roll-Off Container
Removal and Loading of Asphalt and/or Concrete -up to 4 inch thickness
Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards
Clean Backfill Material, Compaction and Testing (includes transport) 300 cubic yards
Water, Methane (EPA SOP RSK-175)
Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)
Water, BTEX/MTBE + Naphthalene (EPA 8260)
Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Water, Mercury, Total (EPA 245.1, EPA 6020 or
EPA 7470)
9-67.
9-78.
9-79.
9-80.
15-1.a.
15-1.b.
+4.98%
+4.98%
+4.99%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
$3,350.00 $3,517.50
$2,259.90 $2,372.89
$5,120.95 $5,376.99
$882.05 $926.15 $1,764.10 $1,852.30 $1,868.75 $1,962.18 $3,737.50 $3,924.37 $1,645.65 $1,727.93 $3,291.30 $3,455.86 $1,725.00 $1,811.25 $1,955.00 $2,052.75 $2,185.00 $2,294.25 $2,415.00 $2,535.75
$277.50 $291.37
$166.50 $174.82
$832.50 $874.12
$416.25 $437.06
$202.58 $212.70
$405.15 $425.40
$810.30 $850.81
$111.00 $116.55
$222.00 $233.10
$444.00 $466.20
$2,900.00 $3,045.00
$2,650.00 $2,782.50
$3,200.00 $3,360.00
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00% +5.00%
+5.00%
+5.00%
+5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00% +5.00%
18-40.
18-38.
18-35.
18-36.
18-37.
18-39.
Carbon Off Gas Treatment - Add On - Large - Short Term 6 mos.
Carbon Off Gas Treatment - Add On - Medium - Short Term 6 mos.
Carbon Off Gas Treatment - Add On - Small - Short Term 6 mos.
Soil Vapor Extraction (SVE) System - Medium - Short Term 6 Months
Soil Vapor Extraction (SVE) System - Small - Long Term > 6 Months
Soil Vapor Extraction (SVE) System - Small - Short Term 6 Months
Carbon Off Gas Treatment - Add On - Large - Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Medium - Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Small- Long Term > 6 mos.
Medium Holding Tank - 2,000 to 6,000 gal. capacity
- Short Term 6 mos.
Large Holding Tank > 6,000 to 10,000 gal. capacity - Long Term > 6 mos.
Large Holding Tank > 6,000 to 10,000 gal. capacity - Short Term 6 mos.
Medium Holding Tank - 2,000 to 6,000 gal. capacity
- Long Term > 6 mos.
System O&M Package - Extra Large System O&M Package - Large System O&M Package - Medium System O&M Package - Small MPE System Package - Medium MPE System Package - Medium AS/SVE System Package - Medium AS/SVE System Package - Medium Air Sparge System Package - Medium Air Sparge System Package - Medium
Groundwater Treatment System Package - Medium
Groundwater Treatment System Package - Medium
Air Sparging/Multiphase Extraction Pilot Test - 8 hours
16-18.
16-17.
16-13.
16-19.
16-20.
16-21.
16-22.
16-23.
16-24.
18-3.
18-4.
18-2.
17-1.
17-2.
17-3.
17-4.
18-1.
18-47.
18.48.
18-49.
$2,900.00 $3,045.00
$5,000.00 $5,250.00
$3,500.00 $3,675.00
$5,000.00 $5,250.00
$5,000.00 $5,250.00
$1,250.00 $1,312.50 $10,000.00 $10,500.00 $13,000.00 $13,650.00
$2,500.00 $2,625.00
$4,500.00 $4,725.00
$1,850.00 $1,942.50
$1,600.00 $1,680.00
$2,750.00 $2,887.50 $1,000.00 $1,050.00
$500.00 $525.00
$250.00 $262.50
$500.00 $525.00
$500.00 $525.00
$2,000.00 $2,100.00
$250.00 $262.50
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00% +5.00%
21-5.
21-24.
21-25.
21-7.a.
21-7.b.
21-8.
P.E. Review, Evaluation and Certification of a Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan
P.E. Review, Evaluation and Certification of a Level 2 Remedial Action Plan
Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 2 Remedial Action Plan
Remedial Action General Report Operation & Maintenance Annual Report
Operation & Maintenance Report, Quarterly or Non- Annual
Level 1 Remedial Action Plan Pilot Test Report
Soil Vapor Extraction (SVE) System - Large - Short Term 6 Months
Soil Vapor Extraction (SVE) System - Medium - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System
- Large - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System
- Large - Short Term 6 Months
Soil Vapor Extraction (SVE) System - Large - Long Term > 6 Months
P.E. Project Oversight for Remediation System Operation and Maintenance
P.E. Project Oversight for Short Term or Episodic Remediation System Operation - Weekly Basis
P.E. Project Oversight for Short Term or Episodic Remediation System Operation - Daily Basis
P.E. Project Oversight for Remediation Technology Pilot Testing
Notes:
Remedial Action Startup Report
18-57.
18-58.
19-19.
18-50.
18-51.
18-52.
19-21.
19-22.
19-23.
19-10.
19-11.
19-12.
19-14.
19-15.
+5.00%
+5.00%
+5.00%
+5.00% +5.00%
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
(1) The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.
(2) The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.
PAY
ITEM UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
1.
1-1. Per Review $ 450.00 $ 450.00 $ 472.50 1-2. Per Site $ 350.00 $ 350.00 $ 350.00
1-2.a. Per Site Not Applicable $ - $ - 1-3. Per Package $ 300.00 $ 300.00 $ 300.00 1-4. Reimbursable* $ 1.00 $ 1.00 $ 1.00 1-5. Per Agreement $ 353.50 $ 353.50 $ 371.17
1-5.a. Per Agreement Not Applicable $ - $ - 1-6. Reimbursable* $ 1.00 $ 1.00 $ 1.00 1-7. % Surcharge Not Applicable $ 0.06 $ 0.06 2.
2-1. Per Visit $ 700.00 $ 700.00 $ 700.00 2-2. Per Survey $ 850.00 $ 850.00 $ 850.00 2-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00 2-4. Per Day $ 900.00 $ 900.00 $ 900.00 3.
3-1. Per Round Trip $ 550.00 $ 550.00 $ 550.00 3-2. Per Round Trip $ 1,000.00 $ 1,000.00 $ 1,000.00 3-3. Per Round Trip $ 700.00 $ 700.00 $ 700.00 3-4. Per Round Trip $ 1,000.00 $ 1,000.00 $ 1,000.00 3-5. Per Round Trip $ 300.00 $ 300.00 $ 300.00 3-6. Per Round Trip $ 450.00 $ 450.00 $ 450.00
Region:
Contractor:
Contract #:
North
GLE ASSOCIATES, INC.
GC812
DEP Restated Agency Term Contract No. GC812 Amendment No. 4
Attachment D (V2.1) ‐ Rate Schedule
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way Work Trailer - ≤ 100 miles each way Work Trailer - > 100 miles each way
Contractor Oversight for Non-Price Schedule Activities
MOBILIZATION
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way
Permit Fees - actual fee only, cost to obtain permit is included in applicable pay items Off-Site Property Access Agreement Site Property Access Agreement for Source Property at no cost to FDEP Project Specific Financial Guarantee Bond (if required by DEP) 6% Handling Fee for Cost Reimbursable Items
FIELD ACTIVITIES - GENERAL
DESCRIPTION
OFFICE ACTIVITIES
File Review Site Health & Safety Plan Site Health & Safety Plan for Continued Work at no cost to FDEP Notice of Discovery of Contamination Package (Initial or TPOC)
Site Reconnaissance/Field Measurement Visit Receptor Survey and Exposure Pathway Identification (Excludes report) Professional Land Survey (If FDEP authorizes, submit quote(s) with Change Order)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
Region:
Contractor:
Contract #:
North
GLE ASSOCIATES, INC.
GC812
DEP Restated Agency Term Contract No. GC812 Amendment No. 4
Attachment D (V2.1) ‐ Rate Schedule
DESCRIPTION
3-7. Per Round Trip $ 550.00 Not Applicable Not Applicable 3-7.a. Per Round Trip Not Applicable $ 450.00 $ 472.50 3-8. Per Round Trip $ 900.00 Not Applicable Not Applicable
3-8.a. Per Round Trip Not Applicable $ 750.00 $ 787.50 3-9. Per Round Trip $ 650.00 Not Applicable Not Applicable
3-9.a. Per Round Trip Not Applicable $ 800.00 $ 840.00
3-10. Per Round Trip $ 1,000.00 Not Applicable Not Applicable
3-10.a. Per Round Trip Not Applicable $ 1,200.00 $ 1,260.00
3-11. Per Round Trip $ 700.00 $ 700.00 $ 700.00 3-12. Per Round Trip $ 1,100.00 $ 1,100.00 $ 1,100.00 3-13. Per Round Trip $ 9,074.50 Not Applicable Not Applicable
3-13.a. Per Round Trip Not Applicable $ 6,500.00 $ 6,825.00 3-14. Per Round Trip $ 12,598.50 Not Applicable Not Applicable
3-14.a. Per Round Trip Not Applicable $ 8,500.00 $ 8,925.00 3-15. Per Round Trip $ 600.00 $ 600.00 $ 600.00 3-16. Per Round Trip $ 1,000.00 $ 1,000.00 $ 1,000.00 3-17. Per Round Trip $ 475.00 $ 475.00 $ 475.00 3-18. Per Round Trip $ 700.00 $ 700.00 $ 700.00 3-19. Per Round Trip Not Applicable $ 500.00 $ 500.00 3-20. Per Round Trip Not Applicable $ 850.00 $ 850.00 Drum Compactor mobilization - > 100 miles each way
LDA Rig and Support Vehicles Mobilization - > 100 miles each way Loader/Backhoe Mobilization - ≤ 100 miles each way Loader/Backhoe Mobilization - > 100 miles each way Mini Excavator/Loader (BobcatTM) Mobilization - ≤ 100 miles each way Mini Excavator/Loader (BobcatTM) Mobilization - > 100 miles each way Drum Compactor mobilization - ≤ 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way Excavator Mobilization - ≤ 100 miles each way Excavator Mobilization - > 100 miles each way LDA Rig Mobilization - ≤ 100 miles each way LDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way LDA Rig Mobilization - > 100 miles each way
DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way DPT Rig Mobilization - > 100 miles each way DPT Rig and Support Vehicles Mobilization - > 100 miles each way Drill Rig Mobilization - ≤ 100 miles each way Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way Drill Rig Mobilization - > 100 miles each way
DPT Rig Mobilization - ≤ 100 miles each way
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
Region:
Contractor:
Contract #:
North
GLE ASSOCIATES, INC.
GC812
DEP Restated Agency Term Contract No. GC812 Amendment No. 4
Attachment D (V2.1) ‐ Rate Schedule
DESCRIPTION
4.
4-1.a. Per Person, Per Day $ - $ 80.00 $ 80.00
4-1.b. Reimbursable* $ 1.00 $ 1.00 $ 1.00
5.
5-1.a. Per Spoon $ 40.00 Not Applicable Not Applicable
5-1.a.1. Per Spoon Not Applicable $ 35.00 $ 35.00 5-1.a.2. Per Spoon Not Applicable $ 39.50 $ 39.50 5-1.a.3. Per Spoon Not Applicable $ 42.00 $ 42.00 5-1.b. Per Core $ 150.00 $ 150.00 $ 150.00 5-1.c. Per Core $ 35.00 Not Applicable Not Applicable 5-2. Per Boring $ 200.00 $ 200.00 $ 200.00 5-3. Per Foot $ 20.00 Not Applicable Not Applicable
5-3.a. Full Day Not Applicable $ 2,725.00 $ 2,725.00 5-4. Per Foot $ 27.75 Not Applicable Not Applicable 5-5. Per Foot $ 36.63 Not Applicable Not Applicable
5-5.a. Full Day Not Applicable $ 1,000.00 $ 1,050.00
5-6. Per Foot $ 25.00 $ 25.00 $ 26.25
Direct Push Boring Direct Push Technology (DPT) Rig and Equipment Direct Push Boring with Cone Penetrometer Test Probe (CPT) Direct Push Boring with Membrane Interface Probe (MIP) DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (Add-on Cost to DPT Base Rate) HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth
Split Spoon Sampling – 2 foot (during boring) < 50 feet Split Spoon Sampling – 2 foot (during boring) 50 to 100 feet Split Spoon Sampling – 2 foot (during boring) > 100 feet Sonic Core Sampling - 5 or 10 foot (during boring) DPT Core Sampling - 4 or 5 foot (during boring) Hand Auger Boring ≤ 10 foot total depth
MEALS AND LODGING
Per Diem - For Travel > 1 Consecutive day (prorated in quarter day increments)-Current State Rate 112.061, F.S. Travel Voucher required and quoted rate should be per person per day.
Meals, Lodging and Transportation - For Contractor travel for specific meetings or legal proceedings required by Department, hotel and meals may be paid in accordance with Section 112.061, F.S.
DRILLING AND BORING
Split Spoon Sampling - 2 foot (during boring)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
Region:
Contractor:
Contract #:
North
GLE ASSOCIATES, INC.
GC812
DEP Restated Agency Term Contract No. GC812 Amendment No. 4
Attachment D (V2.1) ‐ Rate Schedule
DESCRIPTION
5-7. Per Foot $ 30.00 $ 30.00 $ 30.00 5-8. Per Foot $ 35.00 $ 35.00 $ 35.00 5-9. Per Foot $ 37.00 $ 37.00 $ 37.00
5-10. Per Foot $ 40.00 $ 40.00 $ 40.00 5-11. Per Foot $ 45.00 $ 45.00 $ 45.00 5-12. Per Foot $ 50.00 $ 50.00 $ 50.00 5-13. Per Foot $ 55.00 $ 55.00 $ 55.00 5-14. Per Foot $ 60.00 $ 60.00 $ 60.00 5-15. Per Foot $ 39.96 $ 39.96 $ 39.96 5-16. Per Foot $ 39.96 $ 39.96 $ 39.96 5-17. Per Foot $ 43.29 $ 43.29 $ 43.29 5-18. Per Foot $ 50.00 $ 50.00 $ 50.00 5-19. Per Foot $ 55.00 $ 55.00 $ 55.00 5-20. Per Foot $ 60.00 $ 60.00 $ 60.00 5-21. Per Foot $ 75.00 $ 75.00 $ 75.00 5-22. Per Foot $ 80.00 $ 80.00 $ 80.00 5-23. Per Foot $ 95.00 $ 95.00 $ 95.00
6.
6-1. Per Foot $ 32.00 $ 32.00 $ 32.00 6-2. Per Foot $ 40.00 Not Applicable Not Applicable
6-2.a. Per Foot Not Applicable $ 35.00 $ 35.00 6-2.b. Per Foot Not Applicable $ 175.00 $ 175.00
Well Installation - 1 inch diameter Well Installation - 2 inch diameter Well Installation - 2 inch diameter (Vertical) Well Installation - 2 inch diameter (Horizontal, by trenching, not directional drilling)
Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth
WELL INSTALLATION
HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth
HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
Region:
Contractor:
Contract #:
North
GLE ASSOCIATES, INC.
GC812
DEP Restated Agency Term Contract No. GC812 Amendment No. 4
Attachment D (V2.1) ‐ Rate Schedule
DESCRIPTION
6-3. Per Foot $ 45.00 Not Applicable Not Applicable 6-3.a. Per Foot Not Applicable $ 40.00 $ 40.00 6-3.b. Per Foot Not Applicable $ 200.00 $ 200.00 6-4. Per Foot $ 55.00 $ 55.00 $ 55.00 6-5. Per Foot $ 45.00 $ 45.00 $ 45.00 6-6. Per Foot $ 55.00 $ 55.00 $ 55.00 6-7. Per Foot $ 65.00 $ 65.00 $ 65.00 6-8. Per Foot $ 80.00 $ 80.00 $ 80.00
6-9.a. Per Foot $ 6.66 $ 6.66 $ 6.99 6-9.b. Per Foot $ 8.88 $ 8.88 $ 9.32 6-9.c. Per Foot $ 11.10 $ 11.10 $ 11.65 6-9.d. Per Foot $ 13.32 $ 13.32 $ 13.98 6-10. Per Well $ 166.50 $ 166.50 $ 174.82 6-11. Per Vault $ 800.00 $ 800.00 $ 840.00 6-12. Per Vault $ 1,350.00 $ 1,350.00 $ 1,417.50 6-13. Per Well Not Applicable $ 200.00 $ 200.00
6-14. Per Well Not Applicable $ 350.00 $ 350.00
6-15. Per Well Not Applicable $ 400.00 $ 400.00
Installation of Well Vault - 4 x 4 x 2 foot Well Redevelopment Removal and Reinstallation of 8-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed
Removal and Reinstallation of 12-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed
Additional Well Screen > 20 feet - 1 inch diameter Additional Well Screen > 20 feet - 2 inch diameter Additional Well Screen > 20 feet - 4 inch diameter Additional Well Screen > 20 feet - 6 inch diameter Above Grade Well Completion Installation of Well Vault - 2 x 2 x 2 foot
Well Installation - 4 inch diameter (Horizontal, by trenching, not directional drilling) Well Installation - 6 inch diameter Surface Casing - 6 inch diameter Surface Casing - 8 inch diameter Surface Casing - 10 inch diameter Surface Casing - 12 inch diameter
Well Installation - 4 inch diameter Well Installation - 4 inch diameter (Vertical)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
Region:
Contractor:
Contract #:
North
GLE ASSOCIATES, INC.
GC812
DEP Restated Agency Term Contract No. GC812 Amendment No. 4
Attachment D (V2.1) ‐ Rate Schedule
DESCRIPTION
7.
7-1. Per Foot $ 18.00 $ 18.00 $ 18.00 7-2. Per Foot $ 20.00 $ 20.00 $ 20.00 7-3. Per Foot $ 22.00 $ 22.00 $ 22.00 7-4. Per Foot $ 30.00 $ 30.00 $ 30.00 7-5. Per Vault $ 525.00 $ 525.00 $ 525.00 7-6. Per Vault $ 950.00 $ 950.00 $ 950.00 7-7 Per Well Not Applicable $ 175.00 $ 175.00 8.
8-1. Per Well $ 200.00 $ 200.00 $ 200.00 8-2. Per Well $ 250.00 $ 250.00 $ 250.00 8-3. Per Well $ 100.00 $ 100.00 $ 100.00 8-4. Per Sample $ 100.00 $ 100.00 $ 100.00 8-5. Per Sample $ 100.00 $ 100.00 $ 100.00 8-6. Per Sample $ 100.00 $ 100.00 $ 100.00 8-7. Per Well $ 25.00 $ 25.00 $ 25.00 8-8. Per Well $ 100.00 $ 100.00 $ 100.00
8-9. Per Sample $ 50.00 $ 50.00 $ 50.00
8-10. Per Sample $ 150.00 $ 150.00 $ 150.00 8-11. Per Sampling Event Not Applicable $ 50.00 $ 52.50 8-12. Per Well Not Applicable $ 80.00 $ 80.00 Survey Latitude/Longitude of Existing Monitor Wells
Soil/Sediment Sample Collection Water Level or Free Product Gauging Free Product Gauging & Bailing Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, TedlarTM Bag (or Equivalent) Vapor/Ambient Air Sample Collection - SUMMATM Canister (or Equivalent) Electronic Data Deliverables (EDD)
SAMPLE COLLECTION AND FIELD TESTING
Monitoring Well Sampling with Water Level, ≤ 100 foot depth Monitoring Well Sampling with Water Level, > 100 foot depth Domestic Water Well Sampling Other Water Sampling Free Product Sample Collection
Grout and Abandon Well, > 2 to 4 inch diameter Grout and Abandon Well, > 4 to 6 inch diameter Grout and Abandon Well, > 6 inch diameter Removal of Well Vault - 2 x 2 x 2 foot Removal of Well Vault - 4 x 4 x 2 foot Removal of Well Pad and Manhole
WELL ABANDONMENT
Grout and Abandon Well, 1 to 2 inch diameter
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
Region:
Contractor:
Contract #:
North
GLE ASSOCIATES, INC.
GC812
DEP Restated Agency Term Contract No. GC812 Amendment No. 4
Attachment D (V2.1) ‐ Rate Schedule
DESCRIPTION
8-13. Per Well Not Applicable $ 80.00 $ 80.00
8-14 Per Sample Not Applicable $ 15.00 $ 15.00
9.
9.A.
9-1. Per Sample $ 525.00 $ 525.00 $ 525.00
9-2. Per Sample $ 50.00 $ 50.00 $ 50.00 9-3. Per Sample $ 60.00 $ 60.00 $ 60.00 9-4. Per Sample $ 100.00 $ 100.00 $ 100.00 9-5. Per Sample $ 100.00 $ 100.00 $ 100.00 9-6. Per Sample $ 110.00 $ 110.00 $ 110.00
9-7. Per Sample $ 275.00 $ 275.00 $ 275.00
9-8. Per Sample $ 75.00 $ 75.00 $ 75.00 9-8.a. Per Sample Not Applicable $ 250.00 $ 250.00 9-9. Per Sample $ 65.00 $ 65.00 $ 65.00
9-10. Per Sample $ 90.00 $ 90.00 $ 90.00
9-11. Per Sample $ 12.75 $ 12.75 $ 12.75
Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO) Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method) Soil, PCBs [or Aroclors] (EPA 8082) Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury]) Soil, Arsenic (EPA 6010 or EPA 6020)
Soil, BTEX + MTBE (EPA 8021 or EPA 8260) Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260) Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260) Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310) Soil, Priority Pollutant Volatile Organics (EPA 8260) Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])
Survey Latitude/Longitude of New Monitor Wells Encore (25 gram) for SPLP Soil Sample Collection: [Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).
LABORATORY ANALYSIS
SOIL/SEDIMENT ANALYSIS
Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non- Priority Pollutant Organics (Multiple Methods)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
Region:
Contractor:
Contract #:
North
GLE ASSOCIATES, INC.
GC812
DEP Restated Agency Term Contract No. GC812 Amendment No. 4
Attachment D (V2.1) ‐ Rate Schedule
DESCRIPTION
9-12. Per Sample $ 12.75 $ 12.75 $ 12.75 9-13. Per Sample $ 12.75 $ 12.75 $ 12.75 9-14. Per Sample $ 12.75 $ 12.75 $ 12.75 9-15. Per Sample $ 65.00 $ 65.00 $ 65.00 9-16. Per Sample $ 70.00 $ 70.00 $ 70.00 9-17. Per Sample $ 35.00 $ 35.00 $ 35.00
9-18. Per Sample $ 27.27 $ 27.27 $ 28.63
9-19. Per Sample $ 18.18 $ 18.18 $ 18.18 9-20. Per Sample $ 18.18 $ 18.18 $ 19.08
9-21. Per Sample $ 375.00 $ 375.00 $ 375.00
9-22. Per Sample $ 500.00 $ 500.00 $ 500.00
9-23. Per Sample $ 80.00 $ 80.00 $ 80.00
9-24. Per Sample $ 200.00 $ 200.00 $ 200.00 9.B.
9-25. Per Sample $ 325.00 $ 325.00 $ 325.00
9-26. Per Sample $ 525.00 $ 525.00 $ 525.00
WATER ANALYSIS
Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (Multiple Methods)
Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non- Priority Pollutant Organics (Multiple Methods)
Soil, Moisture Content (ASTM D2216-10) Soil, Texture, (See Gee 7 Bauder [1966]) Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS) Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution GC/MS) Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS) Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Soil, Chromium (EPA 6010 or EPA 6020) Soil, Lead (EPA 6010 or EPA 6020) Soil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311) Soil, Synthetic Precipitation Leaching Procedure-Extraction Only (EPA1312) Soil, Organic Carbon, Total (EPA 9060 or Walkey-Black) Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -96e1 or ASTM D2937-10)
Soil, Cadmium (EPA 6010 or EPA 6020)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
Region:
Contractor:
Contract #:
North
GLE ASSOCIATES, INC.
GC812
DEP Restated Agency Term Contract No. GC812 Amendment No. 4
Attachment D (V2.1) ‐ Rate Schedule
DESCRIPTION
9-27. Per Sample $ 50.00 $ 50.00 $ 50.00 9-28. Per Sample $ 65.00 $ 65.00 $ 65.00 9-29. Per Sample $ 95.00 $ 95.00 $ 95.00
9-30. Per Sample $ 100.00 $ 100.00 $ 100.00
9-31. Per Sample $ 50.00 $ 50.00 $ 50.00 9-31.a. Per Sample Not Applicable $ 55.00 $ 55.00 9-32. Per Sample $ 100.00 $ 100.00 $ 100.00 9-33. Per Sample $ 100.00 $ 100.00 $ 100.00
9-34. Per Sample $ 315.00 $ 315.00 $ 315.00
9-35. Per Sample $ 315.00 $ 315.00 $ 315.00
9-36. Per Sample $ 75.00 $ 75.00 $ 75.00 9-37. Per Sample $ 70.00 $ 70.00 $ 70.00 9-38. Per Sample $ 11.50 $ 11.50 $ 11.50 9-39. Per Sample $ 11.50 $ 11.50 $ 11.50 9-40. Per Sample $ 11.50 $ 11.50 $ 11.50 9-41. Per Sample $ 11.50 $ 11.50 $ 11.50
9-41.a. Per Sample Not Applicable $ 25.00 $ 25.00
9-42. Per Sample $ 13.63 $ 13.63 $ 14.31
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380) Water, Mercury, Total (EPA 245.1, EPA 6020 or EPA 7470)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270) Water, Total Recoverable Petroleum Hydrocarbons (FL-PRO) Water, PCBs [or Aroclors] (EPA 608 or EPA 8082) Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310) Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011) Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM) Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624) Water, Priority Pollutant Volatile Organics (EPA 8260) Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])
Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260) Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260) Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
Region:
Contractor:
Contract #:
North
GLE ASSOCIATES, INC.
GC812
DEP Restated Agency Term Contract No. GC812 Amendment No. 4
Attachment D (V2.1) ‐ Rate Schedule
DESCRIPTION
9-43. Per Sample $ 11.50 $ 11.50 $ 11.50 9-44. Per Sample $ 11.50 $ 11.50 $ 11.50
9-44.a. Per Sample Not Applicable $ 25.00 $ 25.00
9-45. Per Sample $ 11.50 $ 11.50 $ 11.50 9-46. Per Sample $ 11.50 $ 11.50 $ 11.50 9-47. Per Sample $ 11.50 $ 11.50 $ 11.50 9-48. Per Sample $ 11.50 $ 11.50 $ 11.50 9-49. Per Sample $ 13.63 $ 13.63 $ 13.63
9-50. Per Sample $ 18.18 $ 18.18 $ 18.18
9-51. Per Sample $ 15.00 $ 15.00 $ 15.00
9-52. Per Sample $ 15.00 $ 15.00 $ 15.00 9-53. Per Sample $ 15.00 $ 15.00 $ 15.00
9-54. Per Sample $ 15.00 $ 15.00 $ 15.00
9-55. Per Sample $ 15.00 $ 15.00 $ 15.00 9-56. Per Sample $ 25.00 $ 25.00 $ 25.00
9-57. Per Sample $ 18.18 $ 18.18 $ 18.18
9-58. Per Sample $ 13.63 $ 13.63 $ 13.63
Water, Orthophosphate [as P] (EPA 300.0, EPA 300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-PE or SM 4500-PF) Water, Residue-filterable [Total Dissolved Solids] (SM 2540 C)
Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM 4500CI E) Water, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C) Water, Nitrate [as N] (EPA 300.0 or EPA 353.2) Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or
SM 4500-NO3 F)
Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F) Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)
Water, Magnesium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B) Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-NH3 H)
Water, Calcium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
Region:
Contractor:
Contract #:
North
GLE ASSOCIATES, INC.
GC812
DEP Restated Agency Term Contract No. GC812 Amendment No. 4
Attachment D (V2.1) ‐ Rate Schedule
DESCRIPTION
9-59. Per Sample $ 13.63 $ 13.63 $ 13.63
9-60. Per Sample $ 15.00 $ 15.00 $ 15.00
9-61. Per Sample $ 41.36 $ 41.36 $ 41.36
9-62. Per Sample $ 900.00 $ 900.00 $ 900.00
9-63. Per Sample $ 900.00 $ 900.00 $ 900.00
9-64. Per Sample $ 375.00 $ 375.00 $ 375.00
9-65. Per Sample $ 450.00 $ 450.00 $ 450.00
9-66. Per Sample $ 175.00 $ 175.00 $ 175.00
9-67. Per Sample $ 200.00 $ 200.00 $ 210.00 9-78. Per Sample Not Applicable $ 45.00 $ 47.25 9-79. Per Sample Not Applicable $ 35.00 $ 36.75 9-80. Per Sample Not Applicable $ 60.00 $ 63.00
Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260) Water, Methane (EPA SOP RSK-175)
Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate:
Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia]
(EPA 2006.0/2007.0)
Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS) Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution GC/MS) Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS) Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS) Water, BTEX/MTBE + Naphthalene (EPA 8260)
Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D) Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA 9056 or SM 4500-SO4 C) Water, Heterotrophic Plate Count (SM 9215 B) Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate:
Pimephales promelas or Cyprinella leedsi/Invertebrate: Ceriodaphnia dubia] (EPA 2000.0/2002.0)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
Region:
Contractor:
Contract #:
North
GLE ASSOCIATES, INC.
GC812
DEP Restated Agency Term Contract No. GC812 Amendment No. 4
Attachment D (V2.1) ‐ Rate Schedule
DESCRIPTION
9.C.
9-68. Per Sample $ 95.00 $ 95.00 $ 95.00 9-69. Per Sample $ 200.00 $ 200.00 $ 200.00 9-70. Per Sample $ 225.00 $ 225.00 $ 225.00 9-71. Per Sample $ 250.00 $ 250.00 $ 250.00 9.D.
9-72. Per Sample $ 325.00 $ 325.00 $ 325.00
9-73. Per Sample $ 600.00 $ 600.00 $ 600.00
9.E.
9-74. Reimbursable* $ 1.00 Not Applicable Not Applicable
9-75. Percent Surcharge $ - $ - $ -
9-76. Percent Surcharge $ 0.50 $ 0.50 $ 0.50
9-77. Percent Surcharge $ 1.00 $ 1.00 $ 1.00
10.
10-1. Per Sq. Foot/Day $ 65.00 Not Applicable Not Applicable
10-1.a Per Sq. Foot Not Applicable $ 30.00 $ 30.00
Additional Laboratory % Surcharge authorized in the ATC contract for 7 Day Turnaround.
Additional Laboratory % Surcharge authorized in the ATC contract for 3 Day Turnaround.
Additional Laboratory % Surcharge authorized in the ATC contract for 1 Day Turnaround.
SOIL SOURCE REMOVAL RELATED
Sheet Piling for ≤ 20 feet deep excavation (per square foot) Sheet Piling Installation for ≤ 20 feet deep Excavation
Air, Volatile Organic Compounds (EPA Method TO-17)
PRODUCT ANALYSIS
Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High Resolution GC/FID) Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution GC/MS)
OTHER ANALYSIS
Other Analysis, Not Otherwise Specified
AIR ANALYSIS
Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3) Air, Volatile Organic Aromatics (EPA Method TO-15) Air, Polycyclic Aromatic Hydrocarbons (EPA Method TO-13)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
Region:
Contractor:
Contract #:
North
GLE ASSOCIATES, INC.
GC812
DEP Restated Agency Term Contract No. GC812 Amendment No. 4
Attachment D (V2.1) ‐ Rate Schedule
DESCRIPTION
10.1.b Per Sq. Foot/Day Not Applicable $ 2.50 $ 2.50 10.1.c Per Sq. Foot/Week Not Applicable $ 5.00 $ 5.00 10.1.d Per Sq. Foot/Month Not Applicable $ 10.00 $ 10.00 10-2. Per Sq. Foot/Week $ 65.00 Not Applicable Not Applicable
10-2.a Per Sq. Foot Not Applicable $ 55.00 $ 55.00 10.2.b Per Sq. Foot/Day Not Applicable $ 3.50 $ 3.50 10.2.c Per Sq. Foot/Week Not Applicable $ 7.50 $ 7.50 10.2.d Per Sq. Foot/Month Not Applicable $ 16.00 $ 16.00 10-3. Per Sq. Foot/Month $ 70.00 Not Applicable Not Applicable 10-4. Per Sq. Foot/Day $ 90.00 Not Applicable Not Applicable 10-5. Per Sq. Foot/Week $ 95.00 Not Applicable Not Applicable 10-6. Per Sq. Foot/Month $ 100.00 Not Applicable Not Applicable 10-7. Per Cubic Yard $ 35.00 $ 35.00 $ 35.00 10-8. Per Cubic Yard $ 30.00 $ 30.00 $ 30.00 10-9. Per Cubic Yard $ 130.00 $ 130.00 $ 130.00
10-10. Per Cubic Yard $ 120.00 $ 120.00 $ 120.00 10-11.a. Per Cubic Yard $ 150.00 $ 150.00 $ 150.00 10-11.b. Per Cubic Yard $ 300.00 $ 300.00 $ 300.00 10-12.a. Per Cubic Yard $ 135.00 $ 135.00 $ 135.00 10-12.b. Per Cubic Yard $ 225.00 $ 225.00 $ 225.00 10-13. Per Cubic Yard $ 110.00 $ 110.00 $ 110.00 10-14. Per Cubic Yard $ 31.50 $ 31.50 $ 33.07
LDA Excavation and Loading With Surface Casing > 300 cubic yards LDA Excavation and Loading With Driven Casing > 300 cubic yards Flowable Fill Concrete and Installation Clean Backfill Material, Compaction and Testing (includes transport) ≤ 300 cubic yards
Conventional Soil Excavation and Loading ≤ 300 cubic yards Conventional Soil Excavation and Loading > 300 cubic yards LDA Excavation and Loading Without Casing ≤ 300 cubic yards LDA Excavation and Loading Without Casing > 300 cubic yards LDA Excavation and Loading With Surface Casing ≤ 300 cubic yards LDA Excavation and Loading With Driven Casing < 300 cubic yards
Sheet Piling Rental for > 20 feet deep Excavation Sheet Piling Rental for > 20 feet deep Excavation Sheet Piling for ≤ 20 feet deep excavation (per square foot) Sheet Piling for > 20 feet deep excavation (per square foot) Sheet Piling for > 20 feet deep excavation (per sqyuare foot) Sheet Piling for > 20 feet deep excavation (per square foot)
Sheet Piling Rental for ≤ 20 feet deep Excavation Sheet Piling Rental for ≤ 20 feet deep Excavation Sheet Piling Rental for ≤ 20 feet deep Excavation Sheet Piling for ≤ 20 feet deep excavation (per square foot) Sheet Piling Installation for > 20 feet deep Excavation Sheet Piling Rental for > 20 feet deep Excavation
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
Region:
Contractor:
Contract #:
North
GLE ASSOCIATES, INC.
GC812
DEP Restated Agency Term Contract No. GC812 Amendment No. 4
Attachment D (V2.1) ‐ Rate Schedule
DESCRIPTION
10-15. Per Cubic Yard $ 27.72 $ 27.72 $ 29.10 10-15.a. Per Cubic Yard Not Applicable $ 25.00 $ 25.00 10-15.b. Per Cubic Yard Not Applicable $ 20.00 $ 20.00 10-16. Per Ton $ 60.00 $ 60.00 $ 60.00 10-17. Per Ton $ 50.40 $ 50.40 $ 50.40 10-18. Per Day $ 3,300.00 $ 3,300.00 $ 3,300.00 10-19. Per Day $ 625.00 $ 625.00 $ 625.00 10-20. Per Week $ 10,000.00 $ 10,000.00 $ 10,000.00 10-21. Per Week $ 850.00 $ 850.00 $ 850.00 10-22. Per Month $ 18,900.00 $ 18,900.00 $ 18,900.00 10-23. Per Month $ 1,100.00 $ 1,100.00 $ 1,100.00
11.
11-1. Per Tank $ 4,410.00 $ 4,410.00 $ 4,410.00 11-2. Per Tank $ 7,560.00 $ 7,560.00 $ 7,560.00 11-3. Per Tank $ 10,000.00 $ 10,000.00 $ 10,000.00 11-4. Per Tank $ 13,500.00 $ 13,500.00 $ 13,500.00 12.
12-1. Per Square Foot $ 1.50 $ 1.50 $ 1.57 12-2. Per Square Foot $ 3.00 $ 3.00 $ 3.00 12-3. Per Ton $ 60.00 $ 60.00 $ 60.00 12-4. Per Ton $ 45.00 $ 45.00 $ 45.00 12-5. Per Ton $ 55.00 $ 55.00 $ 55.00
Transport and Disposal of Clean Concrete Transport and Disposal of Mixed Debris
Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacity Remove and Dispose Petroleum Storage Tank - > 10,000 gal. capacity
DEBRIS, WASTE AND PRODUCT REMOVAL AND DISPOSAL
Removal and Loading of Asphalt and/or Concrete - up to 4 inch thickness Additional Removal/Loading Cost for Concrete - > 4 inch thickness Loading, Transport and Disposal/Recycle Clean Overburden
Additional Dewatering System Well Points (2) (includes installation) Dewatering System, up to 12 well points (includes installation) Additional Dewatering System Well Points (2) (includes installation)
PETROLEUM STORAGE TANK REMOVAL AND DISPOSAL
Remove and Dispose Petroleum Storage Tank - ≤ 1,000 gal. capacity Remove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacity
Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards Pea Gravel #57 Stone Dewatering System, up to 12 well points (includes installation) Additional Dewatering System Well Points (2) (includes installation) Dewatering System, up to 12 well points (includes installation)
Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards Clean Overburden Used As Backfill, Compaction and Testing ≤ 300 cubic yards
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
Region:
Contractor:
Contract #:
North
GLE ASSOCIATES, INC.
GC812
DEP Restated Agency Term Contract No. GC812 Amendment No. 4
Attachment D (V2.1) ‐ Rate Schedule
DESCRIPTION
12-6. Per Drum $ 200.00 $ 200.00 $ 200.00 12-7. Per Ton $ 30.00 $ 30.00 $ 30.00 12-8. Per Ton $ 40.00 $ 40.00 $ 40.00 12-9. Per Ton $ 35.00 $ 35.00 $ 35.00
12-10. Per Ton $ 35.00 $ 35.00 $ 35.00 12-11. Per Ton $ 40.00 $ 40.00 $ 40.00 12-12. Per Ton $ 40.00 $ 40.00 $ 40.00 12-13. Per Drum $ 220.00 $ 220.00 $ 220.00 12-14. Per Gallon $ 1.75 $ 1.75 $ 1.75 12-15. Per Drum $ 220.00 $ 220.00 $ 220.00 12-16. Per Gallon $ 1.50 $ 1.50 $ 1.50 12-17. Per Week Not Applicable $ 750.00 $ 750.00 12-18. Per Week Not Applicable $ 150.00 $ 157.50
13.
13-1. Per Square Foot $ 6.50 $ 6.50 $ 6.50 13-2. Per Square Foot $ 2.50 $ 2.50 $ 2.50 13-3. Per Square Foot $ 8.00 $ 8.00 $ 8.00 13-4. Per Square Foot $ 2.50 $ 2.50 $ 2.50 13-5. Per Square Foot $ 3.00 $ 3.00 $ 3.00 13-6. Per Square Foot $ 1.00 $ 1.00 $ 1.05 13-7. Per Square Foot $ 0.75 $ 0.75 $ 0.75
Concrete Paving - 4 inch thickness (includes sub-base) Concrete Paving - additional 1 inch thickness Crushed Lime Rock Cover - 2 inch thickness Grass - Sod Grass - Seed and Mulch
Transport and Disposal of Petroleum Product (bulk) Delivery, Pick Up and Rental of 20 Cubic Yard Roll-Off Container Additional Rental of 20 Cubic Yard Roll-Off Container
RESURFACING
Asphalt Paving - 2 inch thickness (includes sub-base) Asphalt Paving - additional 1 inch thickness
Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) ≤ 450 tons Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tons Transport and Disposal of Petroleum Contact Water (includes drum) Transport and Disposal of Petroleum Contact Water (bulk) Transport and Disposal of Petroleum Product (includes drum)
Transport and Disposal of Petroleum Impacted Soil (includes drum) Transport Petroleum Impacted Soil (bulk) ≤ 100 miles Transport Petroleum Impacted Soil (bulk) > 100 miles Disposal of Petroleum Impacted Soil at a Landfill (bulk) ≤ 450 tons
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
Region:
Contractor:
Contract #:
North
GLE ASSOCIATES, INC.
GC812
DEP Restated Agency Term Contract No. GC812 Amendment No. 4
Attachment D (V2.1) ‐ Rate Schedule
DESCRIPTION
14.
14-1. Per Foot $ 30.00 $ 30.00 $ 30.00 14-2. Per Injection Point $ 425.00 $ 425.00 $ 425.00 14-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00 14-4. Per Week Not Applicable $ 4,450.00 $ 4,450.00 14-5. Per Month Not Applicable $ 12,655.00 $ 12,655.00 15.
15.A.
15-1. Per Linear Foot $ 75.00 Not Applicable Not Applicable
15-1.a. Per Linear Foot of Trench Not Applicable $ 65.00 $ 68.25
15-1.b. Per Linear Foot of Trench Not Applicable $ 72.50 $ 76.12
15-1.c. Per Linear Foot of Trench Not Applicable $ 81.50 $ 81.50
15-1.d. Per Linear Foot of Trench Not Applicable $ 95.00 $ 95.00
15-2. Per Linear Foot $ 7.50 Not Applicable Not Applicable
15-2.a. Per Foot Not Applicable $ 15.00 $ 15.75
Trenching and Installation - Additional 2 plumbing lines Installation of Plumbing (and Electrical) Lines Above Ground: Per Linear Foot of Piping.
Electrical lines are not counted in determination of costs.
TRENCHING
Trenching and Installation of Plumbing (and Electrical) Lines in Trench - up to 8 plumbing lines
Trenching and Installation of 1-10 Plumbing (and Electrical) Lines in Trench
Trenching and Installation of 11 - 20 Lines
Trenching and Installation of 21 - 30 Lines
Trenching and Installation of Additional 1-10 Lines Greater Than 30 Lines
Direct Push Boring with In-Situ Injection In-Situ Injection Into Existing Well/Treatment Point Materials to be Injected Groundwater Injection System (not by direct push) Groundwater Injection System (not by direct push)
REMEDIAL ACTION CONSTRUCTION
IN-SITU INJECTION
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
Region:
Contractor:
Contract #:
North
GLE ASSOCIATES, INC.
GC812
DEP Restated Agency Term Contract No. GC812 Amendment No. 4
Attachment D (V2.1) ‐ Rate Schedule
DESCRIPTION
15-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00
15-3.a. Reimbursable* Not Applicable $ 1.00 $ 1.00 15-3.b. Reimbursable* Not Applicable $ 1.00 $ 1.00 15.B.
15-4. Per Integration / Startup $ 7,875.00 Not Applicable Not Applicable
15-4.a Per Startup Not Applicable $ 6,000.00 $ 6,300.00
15-4.b Per Startup Not Applicable $ 7,000.00 $ 7,350.00
15-4.c Per Startup Not Applicable $ 8,000.00 $ 8,400.00
15-4.d Per Startup Not Applicable $ 1,000.00 $ 1,050.00
15-5. Per Additional Tech Component $ 1,375.00 $ 1,375.00 $ 1,443.75
15-6. Per 2 Recovery / Treatment Points $ 1,375.00 Not Applicable Not Applicable
15-7. Reimbursable* Not Applicable $ 1.00 $ 1.00 15-8. Reimbursable* Not Applicable $ 1.00 $ 1.00
System Installation/Integration/Startup – Addition of 2 recovery/treatment points
Compound Construction/fencing (materials) Utility Drop
System Installation/Integration/Startup - 1 technology component - up to 8 recovery/treatment points System Installation/Integration/Startup - 1 technology component - 1-10 recovery/treatment points System Installation/Integration/Startup - 1 technology component - 11-20 recovery/treatment points
System Installation/Integration/Startup - 1 technology component - 21-30 recovery/treatment points
System Installation/Integration/Startup - 1 technology component - 1-10 additional recovery/treatment points greater than 30. This item is used in conjunction with 15.4.c when needed.
System Installation/Integration/Startup – Addition of 1 technology component
Plumbing and Electrical Materials/Equipment Installed in Trench (If FDEP authorizes, submit quote(s) with Change Order) Traffic Bearing Trench Plates (materials) Infiltration Gallery Installation
REMEDIATION SYSTEM INTEGRATION AND STARTUP
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.0)
REVISED
CONTRACTED
ITEM PRICE (V2.1)
Region:
Contractor:
Contract #:
North
GLE ASSOCIATES, INC.
GC812
DEP Restated Agency Term Contract No. GC812 Amendment No. 4
Attachment D (V2.1) ‐ Rate Schedule
DESCRIPTION
15-9. Reimbursable* Not Applicable $ 1.00 $ 1.00 15-10. Reimbursable* Not Applicable $ 1.00 $ 1.00
16.
16.A.
16-1. Per Test $ 4,250.00 $ 4,250.00 $ 4,250.00 16-2. Per 2 Hrs $ 650.00 $ 650.00 $ 650.00 16-3. Per Test $ 3,550.00 $ 3,550.00 $ 3,550.00 16-4. Per 2 Hrs $ 650.00 $ 650.00 $ 650.00 16-5. Per Test $ 3,550.00 $ 3,550.00 $ 3,550.00 16-6. Per 2 Hrs $ 650.00 $ 650.00 $ 650.00 16-7. Per Test $ 4,550.00 $ 4,550.00 $ 4,550.00 16-8. Per 2 Hrs $ 650.00 $ 650.00 $ 650.00 16-9. Per Test $ 4,550.00 $ 4,550.00 $ 4,550.00
16-10. Per 2 Hrs $ 650.00 $ 650.00 $ 650.00 16-11. Per Test $ 4,550.00 $ 4,550.00 $ 4,550.00 16-12. Per 2 Hrs $ 650.00 $ 650.00 $ 650.00 16-13. Per Test Not Applicable $ 3,350.00 $ 3,517.50 16-14. Per 2 Hours Not Applicable $ 845.00 $ 845.00
16.B.
16-17. Per Day $ 2,259.90 $ 2,259.90 $ 2,372.89
Multi-Phase Extraction Pilot Test - Additional Time Air Sparging/Multiphase Extraction Pilot Test - 8 hours Air Sparging/Multiphase Extraction Pilot Test - Additional Time SHORT TERM/EPISODIC SYSTEM OPERATION PACKAGES (Including Remediation System Equipment) Groundwater Treatment System Package - Medium
Vapor Extraction Pilot Test - Additional Time Vapor Extraction/Aquifer Pumping Test - 8 hours Vapor Extraction/Aquifer Pumping Test - Additional Time Air Sparging/Vapor Extraction Pilot Test - 8 hours Air Sparging/Vapor Extraction Pilot Test - Additional Time Multi-Phase Extraction Pilot Test - 8 hours
PILOT TEST PACKAGES (Including Remediation System Equipment) Groundwater Recovery System Pilot Test - 8 hours Groundwater Recovery System Pilot Test - Additional Time Air Sparging or Biosparging Pilot Test - 8 hours Air Sparging or Biosparging Pilot Test - Additional Time Vapor Extraction Pilot Test - 8 hours
Utility Connection Utility Disconnect REMEDIAL ACTION - PACKAGED WORK SCOPES (Including Remediation System Equipment)