This is Amendment No. 14 to the Florida Department of Environmental Protection (DEP) Agency Term Contract No. GC810, executed between the DEP and Georgia Oilmen's Services, Inc. The amendment modifies the rate schedule for petroleum contamination site response action services in the North Region. The contract was originally executed on February 27, 2014, and this amendment became effective June 10, 2024, following the Department's data processing of the rate changes.

The amendment adjusts rates for 347 pay items across the rate schedule, implementing both rate increases and decreases effective for new work assignments offered on or after the Rate Change Date (June 10, 2024). Rate increases range primarily between approximately 2.97% and 5.00%, with the majority of increases capped at the 5% maximum allowed under contract provision 11.B.ii. Specific rate reductions were applied to two bioassay testing items (9-62 and 9-63), which decreased by 3.56% and 7.98% respectively. The pay items cover comprehensive environmental services including mobilization, boring and drilling operations, soil and water sampling and analysis, well installation and abandonment, remedial system pilot testing and operations and maintenance, excavation and disposal services, professional engineering and geological oversight, and report preparation and certification. All pre-Rate Change Date work assignments continue to apply the prior rate schedule, while Attachment D, Rate Schedule (V3.5) governs pricing for all subsequent new work assignments.

View the file

Other files

File Type Posted
CN-370000-GC810-A10.pdf PDF
CN-370000-GC810-A17.pdf PDF
CN-370000-GC810-CMC1.pdf PDF
CN-370000-GC810.pdf PDF
CN-370000-GC810-A13E1.pdf PDF
CN-370000-GC810-A15E2.pdf PDF
CN-370000-GC810-A16E3.pdf PDF
CN-370000-GC810-A11.pdf PDF
CN-370000-GC810-A12.pdf PDF
CN-370000-GC810-A3.pdf PDF
CN-370000-GC810-A4.pdf PDF
CN-370000-GC810-A6.pdf PDF
CN-370000-GC810-A7.pdf PDF
CN-370000-GC810-A8.pdf PDF
CN-370000-GC810-A9.pdf PDF
CN-370000-GC810-AR1.pdf.crdownload CRDOWNLOAD file
CN-370000-GC810-CMC.pdf PDF
CN-370000-GC810-CMC3.pdf PDF
CN-370000-GC784-c01.pdf PDF
CN-370000-GC810-A2.pdf PDF
CN-370000-GC810-A5.pdf PDF
CN-370000-GC810-AR1.pdf PDF
CN-370000-GC810-CMC2.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.

2.

NOW THEREFORE, the parties agree as follows:

WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).

WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate reductions be made to Attachment D (V3.4) entitled "Rate Schedule"; and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.4) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and

WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC810 (hereinafter "Contract") between the FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and GEORGIA

OILMEN'S SERVICES, INC. (hereinafter "Contractor") executed on February 27, 2014, to provide petroleum contamination site response action services in the North Region, is hereby amended.

PETROLEUM RESTORATION PROGRAM

AGENCY TERM CONTRACT NO. GC810

RATE INCREASE AND DECREASE

AMENDMENT NO. 14

Amendment No. 14

DEP Agency Term Contract No. GC810

All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.

Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.

Amendment No. 14

DEP Agency Term Contract No. GC810

3.

4.

5.

6.

This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.

Attachment D, Rate Schedule (V3.5) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this

Amendment, Attachment D, Rate Schedule (V3.5) shall apply.

The Rate Change Date is the date shown at the bottom of this Amendment for the Department’s

Data Processing Information. Prior to the Rate Change Date, the Department shall provide

Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date.

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this

Amendment shall control.

Pre-existing

Rate

Agreed

New Rate (1)

392.15$ $411.75

993.60$ $1,040.00

518.21$ $544.12

594.02$ $623.72

1,131.48$ $1,188.05

280.80$ $294.84

776.25$ $815.06

1,366.20$ $1,434.51

1,223.37$ $1,284.53

777.89$ $816.78

424.28$ $445.49

503.01$ $528.16

776.25$ $815.06

44.71$ $46.94

55.89$ $58.68

155.58$ $163.35

3,601.80$ $3,781.89

2,701.35$ $2,836.41

30.88$ $32.42

Est %

Rate

Change (2)

+5.00%

+4.67%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

2-4.

3-1.

3-3.

3-4.

3-17.

3-19.

3-20.

Sonic Core Sampling - 5 or 10 foot (during boring)

HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth

DPT Membrane Interface Probe (MIP) Equipped with

PID and ECD (add-on cost to DPT base rate)

Direct Push Technology (DPT) Rig and Equipment

Description

Table 1. Listed Schedule of Pay Items with Rate Changes

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way

DPT Rig and Support Vehicles Mobilization - > 100 miles each way

DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way

Work Trailer - ≤ 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way

Contractor Oversight for Non-Price Schedule

Activities

Excavator Mobilization - ≤ 100 miles each way

Notice of Discovery of Contamination Package

(Initial or TPOC)

Split Spoon Sampling – 2 foot (during boring) 50 to

100 feet

Split Spoon Sampling – 2 foot (during boring) < 50 feet

Drum Compactor mobilization - > 100 miles each way

Drum Compactor mobilization - ≤ 100 miles each way

Mini Excavator/Loader (Bobcat

TM

) Mobilization - ≤

100 miles each way

Pay

Item No.

1-3.

3-5.

3-7.a.

3-8.a.

3-9.a.

3-11.

5-1.a.1.

5-1.a.2.

5-1.b.

5-3.a.

5-5.a.

5-6.

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+4.99%

+4.99%

+4.99%

+5.00%

+5.00%

+4.99%

55.15$ $57.90

57.07$ $59.92

64.14$ $67.34

46.66$ $48.99

50.92$ $53.46

60.81$ $63.85

53.74$ $56.42

60.81$ $63.85

74.96$ $78.70

89.10$ $93.54

40.73$ $42.76

44.71$ $46.94

55.33$ $58.09

53.09$ $55.74

71.72$ $75.30

56.41$ $59.23

12.42$ $13.04

732.78$ $769.41

1,403.33$ $1,473.49

366.39$ $384.70

434.70$ $456.43

31.10$ $32.65

39.60$ $41.58

217.35$ $228.21

+4.99%

+4.99%

+4.99%

5-11.

Removal and Reinstallation of 12-inch Manhole and

Well Pad (well pad/manhole has been damaged or destroyed)

Removal of Well Pad and Manhole

Removal and Reinstallation of 8-inch Manhole and

Well Pad (well pad/manhole has been damaged or destroyed)

Installation of Well Vault - 4 x 4 x 2 foot

Installation of Well Vault - 2 x 2 x 2 foot

7-3.

7-4.

6-9.b.

6-11.

6-12.

6-14.

6-15.

7-7.

Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth

Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, 50 to

100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth

Well Installation - 1 inch diameter

Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth

Well Installation - 2 inch diameter (vertical)

Grout and Abandon Well, > 6 inch diameter

Grout and Abandon Well, > 4 to 6 inch diameter

Additional Well Screen > 20 feet - 2 inch diameter

Well Installation - 6 inch diameter

Well Installation - 4 inch diameter (horizontal, by trenching, not directional drilling)

Well Installation - 4 inch diameter (vertical)

Well Installation - 2 inch diameter (horizontal, by trenching, not directional drilling)

6-3.a.

6-3.b.

6-4.

6-2.b.

5-17.

5-18.

5-19.

5-20.

5-21.

6-1.

6-2.a.

5-12.

5-13.

5-15.

5-16.

+4.99%

+5.00%

+4.99%

+5.00%

+5.00%

+4.99%

+4.99%

+5.00%

+4.99%

+5.00%

+4.99%

+4.98%

+4.98%

+4.99%

+4.99%

+4.99%

+5.00%

+5.00%

+4.98%

+5.00%

+5.00%

165.74$ $174.02

225.26$ $236.52

74.39$ $78.10

87.86$ $92.25

74.39$ $78.10

28.12$ $29.52

51.42$ $53.99

54.43$ $55.00

54.43$ $55.00

19.44$ $20.00

432.23$ $453.84

54.57$ $57.29

65.46$ $68.73

80.20$ $84.21

65.46$ $68.73

162.06$ $170.16

57.28$ $60.14

68.60$ $72.00

73.65$ $77.33

+1.05%

+1.05%

8-14.

9-1.

9-2.

9-4.

9-5.

9-6.

8-12.

8-3.

8-4.

8-6.

8-7.

8-9.

9-7.

9-8.

9-9.

9-10.

Other Water Sampling

Domestic Water Well Sampling

Monitoring Well Sampling with Water Level, > 100 foot depth

Monitoring Well Sampling with Water Level, ≤ 100 foot depth 8-1.

8-2.

8-13.

Soil, Total Recoverable Petroleum Hydrocarbons (FL-

PRO)

Soil, Priority Pollutant Extractable Organics-Base

Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])

Survey Latitude/Longitude of New Monitor Wells

Survey Latitude/Longitude of Existing Monitor Wells

Vapor/Ambient Air Sample Collection - Passive

Dosimeter, Sorbent Tube, Tedlar

TM

Bag (or

Equivalent)

Water Level or Free Product Gauging

Soil/Sediment Sample Collection

Soil, BTEX + MTBE (EPA 8021 or EPA 8260)

Soil, Used Oil/Unknown Product Group-Table D of

Ch. 62-780, F.A.C., except for non-Priority Pollutant

Organics (multiple methods)

Encore (25 gram) for SPLP Soil Sample Collection:

[Per Encore]. The cost will include the 25 gram

Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing

(discarded).

Soil, Priority Pollutant Volatile Organics (EPA 8260)

Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)

Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA

8260)

Soil, 8 RCRA Metals (EPA 6010 or EPA 6020

[Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471

[Mercury])

Soil, PCBs [or Aroclors] (EPA 8082)

+2.88%

+5.00%

+4.98%

+5.00%

+5.00%

+5.00%

+5.00%

+4.99%

+4.96%

+5.00%

+5.00%

+5.00%

+4.99%

+5.00%

+4.99%

+4.98%

9.79$ $10.27

9.79$ $10.27

9.79$ $10.27

9.79$ $10.27

26.48$ $27.80

54.57$ $57.29

263.57$ $276.74

432.23$ $453.84

40.91$ $42.95

65.46$ $68.73

65.46$ $68.73

88.37$ $92.78

40.91$ $42.95

71.72$ $75.30

65.46$ $68.73

65.46$ $68.73

162.06$ $170.16

162.06$ $170.16

58.93$ $61.87

+4.98%

+5.00%

+5.00%

+4.99%

+5.00%

+5.00%

+4.99%

+4.99%

+4.99%

+4.90%

+4.90%

+4.90%

+4.90%

+4.98%9-17.

9-11.

9-12.

9-13.

9-14.

Water, Priority Pollutant Volatile Organics [for

NPDES purposes only] (EPA 624)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)

Water, Polycyclic Aromatic Hydrocarbons, including

1-methylnaphthalene + 2-methylnaphthalene (EPA

610 [HPLC], EPA 625, EPA 8270 or EPA 8310)

Water, BTEX + MTBE + VOHs (EPA 601/602, EPA

624, EPA 6021 or EPA 8260)

Water, Volatile Organic Halocarbons, except EDB

(EPA 8021 or EPA 8260)

Water, BTEX + MTBE (EPA 602, EPA 624, EPA

8021 or EPA 8260)

Water, Total Recoverable Petroleum Hydrocarbons

(FL-PRO)

Water, Priority Pollutant Extractable Organics-Base

Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA

8270)

Water, Priority Pollutant Extractable Organics-Base

Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])

Water, Priority Pollutant Volatile Organics (EPA

8260)

Soil, Organic Carbon, Total (EPA 9060 or Walkey-

Black)

Water, Used Oil/Unknown Product Group-Table D of

Ch. 62-780, F.A.C., except for non-Priority Pollutant

Organics (multiple methods)

Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (multiple methods)

Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution

GC/MS)

Soil, Lead (EPA 6010 or EPA 6020)

Soil, Chromium (EPA 6010 or EPA 6020)

Soil, Cadmium (EPA 6010 or EPA 6020)

Soil, Arsenic (EPA 6010 or EPA 6020)

9-32.

9-25.

9-26.

9-27.

9-28.

9-29.

9-30.

9-31.

9-31.a.

9-23.

9-33.

9-34.

9-35.

9-36.

+5.00%

+5.00%

+4.99%

+5.00%

70.15$ $73.65

9.79$ $10.27

9.79$ $10.27

9.79$ $10.27

9.79$ $10.27

21.80$ $22.89

9.79$ $10.27

9.79$ $10.27

34.41$ $36.13

9.79$ $10.27

9.79$ $10.27

9.79$ $10.27

9.79$ $10.27

16.32$ $17.13

17.13$ $17.98

7.76$ $8.14

7.76$ $8.14

8.15$ $8.55

8.15$ $8.55

9-49.

9-50.

9-51.

9-52.

9-53.

9-54.

Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)

Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA

6010 or EPA 6020)

Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA

6010 or EPA 6020)

Water, Potassium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or SM 4500-NO3 F)

Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)

Water, Hardness, Total [as CaCO3] (SM 2340 B or

SM 2340 C)

Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM

4500CI E)

Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3

C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-

NH3 H)

Water, Alkalinity [as CaCO3] (EPA 310.2 or SM

2320 B)

Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA

6020)

Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Magnesium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

Water, Iron, Total (EPA 200.7, EPA 6010 or EPA

6020)

Water, Calcium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Mercury, Total (EPA 245.1, EPA 6020 or

EPA 7470)

Water, Lead, Total (EPA 200.7, EPA 200.8, EPA

6010 or EPA 6020)

Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

9-48.

9-41.

9-42.

9-43.

9-44.

9-44.a.

9-45.

9-46.

9-47.

9-39.

9-40.

9-37.

9-38.

+4.99%

+4.90%

+4.90%

+4.90%

+4.90%

+5.00%

+4.90%

+4.90%

+5.00%

+4.90%

+4.90%

+4.90%

+4.90%

+4.96%

+4.96%

+4.90%

+4.90%

+4.91%

+4.91%

8.15$ $8.55

17.13$ $17.98

13.06$ $13.71

10.88$ $11.42

10.88$ $11.42

8.15$ $8.55

21.80$ $22.89

622.14$ $600.00

1,086.75$ $1,000.00

90.02$ $94.52

47.19$ $49.54

166.89$ $175.23

192.51$ $202.13

146.45$ $153.77

78.00$ $81.90

59.62$ $62.60

245.57$ $257.84

286.51$ $300.83

327.43$ $343.80

+5.00%

+5.00%

+5.00%

+5.00%

+4.98%

10-9.

9-57.

9-58.

9-59.

9-60.

9-61.

9-62.

9-63.

10-2.a.

9-55.

9-56.

9-68.

Water, Residue-nonfilterable [Total Suspended

Solids] (SM 2540 D)

Water, Residue-filterable [Total Dissolved Solids]

(SM 2540 C)

Water, Orthophosphate [as P] (EPA 300.0, EPA

300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-

PE or SM 4500-PF)

Water, Organic Carbon, Total (SM 5310 B, SM 5310

C or EPA 9060)

Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM

4500-NO2 B or SM 4500-NO3 F)

Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA

9056 or SM 4500-SO4 C)

Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)

Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA

2006.0/2007.0)

Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate: Pimephales promelas or Cyprinella leedsi/Invertebrate:

Ceriodaphnia dubia] (EPA 2000.0/2002.0)

Water, Heterotrophic Plate Count (SM 9215 B)

#57 Stone

Pea Gravel

Flowable Fill Concrete and Installation

Additional Dewatering System Well Points (2)

(includes installation)

Additional Dewatering System Well Points (2)

(includes installation)

LDA Excavation and Loading With Surface Casing ≤

300 cubic yards

LDA Excavation and Loading Without Casing ≤ 300 cubic yards

Sheet Piling Installation for > 20 feet deep Excavation

Additional Dewatering System Well Points (2)

(includes installation)

10-11.a.

10-19.

10-21.

10-23.

10-17.

10-13.

10-16.

+5.00%

+4.91%

+4.96%

+4.98%

+4.96%

+4.96%

+4.91%

+5.00%

-3.56%

-7.98%

+5.00%

+5.00%

+5.00%

3.66$ $3.84

2.43$ $2.55

50.52$ $53.04

61.31$ $64.37

222.37$ $233.48

34.86$ $36.60

48.63$ $51.06

43.58$ $45.75

44.16$ $46.36

43.47$ $45.64

43.47$ $45.64

218.87$ $229.81

1.66$ $1.74

229.81$ $241.30

1.67$ $1.75

1,055.70$ $1,108.48

8.92$ $9.36

2.86$ $3.00

8.49$ $8.91

2.73$ $2.86

3.03$ $3.12

0.21$ $0.22

6,359.04$ $6,676.99

98.11$ $103.00

43.11$ $45.26 +4.99%

15-1.a.

12-4.

12-5.

12-6.

12-7.

Direct Push Boring with In-Situ Injection

Grass - Seed and Mulch

Crushed Lime Rock Cover - 2 inch thickness

Disposal of Petroleum Impacted Soil at a Landfill

(bulk) ≤ 450 tons

Transport Petroleum Impacted Soil (bulk) > 100 miles

Asphalt Paving - 2 inch thickness (includes sub-base)

Delivery, Pick Up and Rental of 20 Cubic Yard Roll-

Off Container

Transport and Disposal of Petroleum Product (bulk)

Transport and Disposal of Petroleum Product

(includes drum)

Transport and Disposal of Petroleum Contact Water

(bulk)

Transport and Disposal of Petroleum Contact Water

(includes drum)

Disposal of Petroleum Impacted Soil at a Thermal

Treatment Facility (bulk) > 450 tons

Disposal of Petroleum Impacted Soil at a Thermal

Treatment Facility (bulk) ≤ 450 tons

Disposal of Petroleum Impacted Soil at a Landfill

(bulk) > 450 tons

Transport Petroleum Impacted Soil (bulk) ≤ 100 miles

Transport and Disposal of Petroleum Impacted Soil

(includes drum)

Transport and Disposal of Mixed Debris

Transport and Disposal of Clean Concrete

Additional Removal/Loading Cost for Concrete - > 4 inch thickness

Removal and Loading of Asphalt and/or Concrete - up to 4 inch thickness

Concrete Paving - additional 1 inch thickness

Concrete Paving - 4 inch thickness (includes sub-base)

Asphalt Paving - additional 1 inch thickness

Trenching and Installation of Additional 1-10 Lines

Greater Than 30 Lines

Trenching and Installation of 1-10 Plumbing (and

Electrical) Lines in Trench

14-1.a.

12-17.

13-1.

13-2.

13-3.

13-4.

13-5.

13-7.

12-8.

12-1.

12-2.

15-1.d.

12-9.

12-10.

12-11.

12-12.

12-13.

12-14.

12-15.

12-16.

+4.92%

+4.94%

+4.99%

+4.99%

+5.00%

+4.99%

+5.00%

+4.98%

+4.98%

+4.98%

+4.99%

+4.99%

+5.00%

+4.82%

+5.00%

+4.79%

+5.00%

+4.93%

+4.90%

+4.95%

+4.76%

+2.97%

+4.76%

19,685.70$ $20,669.98

23,586.27$ $24,765.58

3,594.41$ $3,774.13

1,686.38$ $1,770.69

4,802.73$ $5,000.00

458.42$ $480.00

3,867.11$ $4,000.00

458.42$ $481.34

4,957.32$ $5,000.00

458.42$ $481.34

574.23$ $602.94

573.02$ $601.67

5,137.97$ $5,394.86

458.41$ $481.33

5,018.28$ $5,200.00

458.41$ $481.33

671.41$ $704.98

4,502.55$ $4,700.00

9,267.08$ $9,500.00

2,728.81$ $2,864.25

4,666.25$ $4,899.56

6,876.64$ $7,220.47

4,009.69$ $4,200.00

+4.11%

+4.71%

+3.44%

+5.00%

+0.86%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+3.62%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

16-5.

16-18.

16-17.

16-6.

16-7.

16-8.

16-9.

16-10.

16-11.

16-12.

16-14.

16-19.

16-20.

16-22.

16-23.

16-1.

16-2.

16-3.

16-4.

Multi-Phase Pilot Test - Additional Time

Vapor Extraction/Aquifer Pumping Test - Additional

Time

Vapor Extraction/Aquifer Pumping Test - 8 hours

Vapor Extraction Pilot Test - Additional Time

Vapor Extraction Pilot Test - 8 hours

Air Sparging or Biosparging Pilot Test - Additional

Time

Air Sparging or Biosparging Pilot Test - 8 hours

Groundwater Recovery System Pilot Test - Additional

Time

Groundwater Recovery System Pilot Test - 8 hours

System Installation/Integration/Startup – Addition of

1 Technology Component

System Installation/Integration/Startup - 1 Technology

Component - 1-10 Additional Recovery/Treatment

Points greater Than 30 (This item is used in conjunction with 15.4.c when needed)

System Installation/Integration/Startup - 1 Technology

Component - 21-30 Recovery/Treatment Points

System Installation/Integration/Startup - 1 Technology

Component - 11-20 Recovery/Treatment Points

Multi-Phase Pilot Test - 8 hours

Air Sparging/Vapor Extraction Pilot Test - Additional

Time

Air Sparging/Vapor Extraction Pilot Test - 8 hours

MPE System Package - Medium

AS/SVE System Package - Medium

Air Sparge System Package - Medium

Air Sparge System Package - Medium

Groundwater Treatment System Package - Medium

Groundwater Treatment System Package - Medium

Air Sparging/Multiphase Extraction Pilot Test -

Additional Time

15-4.b.

15-4.c.

15-4.d.

15-5.

+4.96%

+5.00%

+4.39%

+2.51%

+5.00%

+4.75%

6,057.97$ $6,350.00

4,568.36$ $4,796.77

4,719.60$ $4,955.58

549.47$ $576.94

6,593.72$ $6,923.40

9,730.20$ $10,216.71

7,391.19$ $7,760.74

14,464.63$ $15,187.86

11,123.21$ $11,679.37

3,326.07$ $3,492.37

2,814.56$ $2,955.28

3,920.59$ $4,116.61

3,309.58$ $3,475.05

4,977.36$ $5,226.22

3,946.05$ $4,143.35

4,322.44$ $4,538.56

3,830.61$ $4,022.14

4,977.36$ $5,226.22

4,322.44$ $4,538.56

6,287.19$ $6,601.54

5,468.54$ $5,741.94

4,960.14$ $5,208.14

4,158.21$ $4,366.12

6,143.73$ $6,450.10

+5.00%

+5.00%

16-24.

18-5.

18-7.

18-8.

18-9.

18-10.

18-21.

18-22.

17-3.

17-4.

17-5.

18-20.

18-11.

18-12.

18-13.

18-14.

18-15.

18-16.

18-17.

18-18.

18-19.

Supplemental System O&M Package - Add Thermox or Catox Treatment

Groundwater Treatment System - Stand Alone Large -

Long Term > 6 mos.

Groundwater Treatment System - Stand Alone Large -

Short Term ≤ 6 mos.

Groundwater Treatment System - Stand Alone

Medium - Long Term > 6 mos.

Groundwater Treatment System - Stand Alone

Medium - Short Term ≤ 6 mos.

Groundwater Treatment System - Stand Alone Small -

Short Term ≤ 6 mos.

System O&M Package - Extra Large

System O&M Package - Large

MPE System Package - Medium

Air Sparge System - Medium - Short Term ≤ 6 mos.

Air Sparge System - Small - Long Term > 6 mos.

Air Sparge System - Small - Short Term ≤ 6 mos.

MPE System - Medium - Short Term ≤ 6 mos.

MPE System - Small - Long Term > 6 mos.

MPE System - Small - Short Term ≤ 6 mos.

AS/SVE System - Large - Long Term > 6 mos.

AS/SVE System - Large - Short Term ≤ 6 mos.

AS/SVE System - Medium - Long Term > 6 mos.

AS/SVE System - Medium - Short Term ≤ 6 mos.

AS/SVE System - Small - Long Term > 6 mos.

AS/SVE System - Small - Short Term ≤ 6 mos.

Air Sparge System - Large - Long Term > 6 mos.

Air Sparge System - Large - Short Term ≤ 6 mos.

Air Sparge System - Medium - Long Term > 6 mos.

18-23.

18-24.

18-25.

+4.82%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+4.99%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

5,257.15$ $5,520.00

8,170.86$ $8,579.40

6,704.04$ $7,039.24

2,193.95$ $2,303.64

3,475.06$ $3,648.81

5,831.88$ $6,123.47

1,211.57$ $1,272.14

2,685.13$ $2,819.38

4,649.90$ $4,882.39

512.46$ $538.08

700.09$ $735.09

1,216.35$ $1,277.14

325.29$ $341.55

466.74$ $490.07

749.60$ $787.08

3,634.89$ $3,816.63

4,144.06$ $4,351.26

3,881.25$ $4,075.31

3,300.01$ $3,465.01

5,644.89$ $5,927.13

5,117.04$ $5,372.89

6,853.04$ $7,195.69

6,298.79$ $6,613.72

18-44.

18-45.

18-47.

18.48.

18-49.

18-50.

18-51.

18-52.

Carbon Off Gas Treatment - Add On - Large - Long

Term > 6 mos.

Carbon Off Gas Treatment - Add On - Medium -

Long Term > 6 mos.

Carbon Off Gas Treatment - Add On - Small- Long

Term > 6 mos.

Groundwater Treatment - Add On - Large - Long

Term > 6 mos.

Groundwater Treatment - Add On - Medium - Long

Term > 6 mos.

Groundwater Treatment - Add On - Small - Long

Term > 6 mos.

Groundwater Treatment - Add On - Large - Short

Term ≤ 6 mos.

Groundwater Treatment - Add On - Medium - Short

Term ≤ 6 mos.

Groundwater Treatment - Add On - Small - Short

Term ≤ 6 mos.

MPE System - Large - Long Term > 6 mos.

MPE System - Large - Short Term ≤ 6 mos.

MPE System - Medium - Long Term > 6 mos.

Soil Vapor Extraction (SVE) System - Large - Short

Term ≤ 6 Months

Soil Vapor Extraction (SVE) System - Medium -

Long Term > 6 Months

Soil Vapor Extraction (SVE) System - Large - Long

Term > 6 Months

Carbon Off Gas Treatment - Add On - Large - Short

Term ≤ 6 mos.

Carbon Off Gas Treatment - Add On - Medium -

Short Term ≤ 6 mos.

Carbon Off Gas Treatment - Add On - Small - Short

Term ≤ 6 mos.

Soil Vapor Extraction (SVE) System - Medium -

Short Term ≤ 6 Months

Soil Vapor Extraction (SVE) System - Small - Long

Term > 6 Months

Soil Vapor Extraction (SVE) System - Small - Short

Term ≤ 6 Months

Thermox/Catox Off Gas Treatment - Add On -

Medium - Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On - Small -

Long Term > 6 mos.

18-38.

18-29.

18-30.

18-31.

18-32.

18-33.

18-34.

18-35.

18-36.

18-37.

18-26.

18-27.

18-28.

18-39.

18-40.

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

7,785.47$ $8,174.74

6,298.79$ $6,613.72

2,205.10$ $2,315.35

4,654.53$ $4,887.25

610.24$ $640.75

1,851.51$ $1,944.08

1,671.51$ $1,755.08

14,702.89$ $15,438.03

19,087.41$ $20,041.78

1,967.23$ $2,065.59

3,561.60$ $3,739.68

6,647.47$ $6,979.84

10,125.50$ $10,631.77

4,693.08$ $4,927.73

874.32$ $918.03

2,948.52$ $3,095.94

437.16$ $459.01

2,126.34$ $2,232.65

3,770.73$ $3,959.26

1,594.36$ $1,674.07

631.31$ $662.87

366.44$ $384.76

143.76$ $150.94

129.38$ $135.84

123.22$ $129.38

115.02$ $120.77

115.02$ $120.77

104.32$ $109.53

91.28$ $95.84

86.94$ $91.28

75.39$ $79.15

62.10$ $65.20

55.89$ $58.68

163.00$ $171.15

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+4.99%

+4.99%

+5.00%

+5.00%

+5.00%

+4.99%

+5.00%

+4.99%

+4.99%

19-20.

19-21.

19-22.

19-23.

19-25.

20-9.

20-10.

20-11.

21-1.

19-17.

19-8.

19-10.

19-11.

19-12.

19-13.

19-14.

19-15.

19-16.

20-8.

19-26.

20-1.

20-2.

20-3.

20-4.

20-5.

20-6.

20-7.

19-1.

19-3.

19-6.

19-18.

19-19.

18-53.

18-54.

Remedial Action Startup Report

As-Built Drawings (P.E. Sealed red lined modifications)

Professional Engineer (Key)

Laborers and Security Guards

Administrative

Draftsperson

Field Technician (Key)

Construction Drawings and Specs Report

Level 1 Remedial Action Plan

Pilot Test Report

Natural Attenuation or Post RA Monitoring Report, Annual

Level 2 Natural Attenuation Monitoring Plan

General Site Assessment Report

Soil Source Removal Report

Air Sparge/Multiphase Extraction (AS/MPE) System -

Small - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System -

Small - Short Term ≤ 6 Months

Level 4 Limited Scope Remedial Action Plan or RAP

Modification Plan

Level 3 Limited Scope Remedial Action Plan or RAP

Modification Plan

Level 2 Limited Scope Remedial Action Plan or RAP

Modification Plan

Level 1 Limited Scope Remedial Action Plan or RAP

Modification Plan

Level 2 Remedial Action Plan

Assistant Scientist/Technical Specialist

Scientist/Technical Specialist (Key)

Hydrogeologist/Modeler (Key)

Geologist/Geoscientist (Key)

Engineer (Key)

Project Manager (Key)

Program Manager (Key)

Well Abandonment/Site Restoration Report

Free Product Recovery Report

Remedial Action General Report

Operation & Maintenance Annual Report

Operation & Maintenance Report, Quarterly or Non-

Annual

Letter/NPDES Report

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+4.99%

+4.99%

+5.00%

+5.00%

163.00$ $171.15

155.25$ $163.01

155.25$ $163.01

158.13$ $163.01

158.13$ $163.01

158.13$ $163.01

158.13$ $163.01

158.13$ $163.01

143.76$ $150.94

143.76$ $150.94

143.76$ $150.94

143.76$ $150.94

143.76$ $150.94

+4.99%

Professional Geologist (Key)

P.G. Review and Certification of Sufficiency of

Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill with Monitoring and Maintenance Recommendations

Required for a Conditional NFA

P.E. Review and Certification of Sufficiency of

Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with Monitoring and Maintenance Recommendations

Required for a Conditional NFA

P.E. Project Oversight for Remediation System

Operation and Maintenance

P.E. Project Oversight for Short Term or Episodic

Remediation System Operation - Weekly Basis

P.E. Project Oversight for Short Term or Episodic

Remediation System Operation - Daily Basis

P.E. Project Oversight for Remediation System

Integration and Startup - Extra Large System

P.E. Project Oversight for Remediation System

Integration and Startup - Large System

P.E. Project Oversight for Remediation System

Integration and Startup - Medium System

P.E. Project Oversight for Remediation System

Integration and Startup - Small System

P.E. Project Oversight for Remediation Technology

Pilot Testing

P.G. Field Oversight of Well Installation (Use hourly rate on site specific basis)

P.G. Field Oversight of Drilling and Boring and Soil-

Boring Logging (Use hourly rate on site specific basis)

21-6.a.

21-6.b.

21-6.c.

21-6.d.

21-7.a.

21-7.b.

21-8.

21-9.

21-10.

21-2.

21-3.

21-4.

21-5.

+5.00%

+5.00%

+5.00%

+3.09%

+3.09%

+3.09%

+3.09%

+3.09%

+4.99%

+4.99%

+4.99%

143.76$ $150.94

143.76$ $150.94

143.76$ $150.94

143.76$ $150.94

143.76$ $150.94

143.76$ $150.94

143.76$ $150.94

143.76$ $150.94

143.76$ $150.94

143.76$ $150.94

179.71$ $188.69

179.71$ $188.69

179.71$ $188.69

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

+5.00%

+5.00%

+5.00%

P.E. Review, Evaluation and Certification of a Level

1 Remedial Action Plan

P.E. Review, Evaluation and Certification of a Pilot

Test Report

P.E. Review, Evaluation and Certification of a Pilot

Test Plan

P.G or P.E. Review, Evaluation and Certification of an Annual Natural Attenuation Monitoring Report

P.E. Review, Evaluation and Certification of a Non-

Annual Natural Attenuation or Post RA Monitoring

Report That Includes a Recommendation for NFA or a Recommendation to Modify the Approved

Monitoring Plan

P.E. Review, Evaluation and Certification of a Level

2 Natural Attenuation Monitoring Plan

P.G. or P.E. Review, Evaluation and Certification of a

Receptor and Exposure Pathway Report

P.G. or Qualified P.E. Review, Evaluation and

Certification of a Supplemental Site Assessment

Report

P.G. or Qualified P.E. Review, Evaluation and

Certification of a General Site Assessment Report

P.G. or P.E. Review, Evaluation and Certification of a

Soil Source Removal Report That Includes a

Recommendation for NFA

P.G. Review, Evaluation and Certification of Plans and Project Oversight for Installation of Engineering

Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill Required for a

Conditional NFA

P.E. Design and Certification of Plans and Project

Oversight of Installation for Engineering Controls

(other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA

P.E. Review, Evaluation and Certification of a Level

2 Remedial Action Plan

21-11.

21-12.

21-13.

21-15.

21-16.

21-17.

21-18.

21-19.

21-20.

21-21.

21-22.

21-23.

21-24.

+4.99%

+4.99%

179.71$ $188.69

179.71$ $188.69

179.71$ $188.69

179.71$ $188.69

179.71$ $188.69

179.71$ $188.69

179.71$ $188.69

179.71$ $188.69

179.71$ $188.69

179.71$ $188.69

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%21-31.

21-32.

21-33.

21-34.

P.G or P.E. Review, Evaluation and Certification of an Interim Remedial Action Report That Includes a

Recommendation for System Modification or

Significant Change in the Course of Action

(1)

The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.

(2)

The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.

Notes:

P.G or P.E. Review, Evaluation and Certification of a

Remedial Action General Report

P.E. Review, Evaluation and Certification of an

Annual Operation and Maintenance Report

P.E. Review, Evaluation and Certification of a Non-

Annual Operation and Maintenance Report That

Includes Significant Proposed Changes to the

Approved RAP

P.E. Review, Evaluation and Certification of a

Remedial Action Startup Report That Includes a

Recommendation for System Modification or

Significant Change in the Course of Action

P.E. Review, Evaluation and Certification of As-Built

Drawings (P.E. sealed red lined modifications)

P.E. Review, Evaluation and Certification of a Level

4 Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level

3 Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level

2 Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level

1 Limited Scope Remedial Action Plan or RAP

Modification Plan

21-29.

21-30.

21-25.

21-26.

21-27.

21-28.

+5.00%

+5.00%

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK