This is Amendment No. 14 to the Florida Department of Environmental Protection (DEP) Agency Term Contract No. GC810, executed between the DEP and Georgia Oilmen's Services, Inc. The amendment modifies the rate schedule for petroleum contamination site response action services in the North Region. The contract was originally executed on February 27, 2014, and this amendment became effective June 10, 2024, following the Department's data processing of the rate changes.
The amendment adjusts rates for 347 pay items across the rate schedule, implementing both rate increases and decreases effective for new work assignments offered on or after the Rate Change Date (June 10, 2024). Rate increases range primarily between approximately 2.97% and 5.00%, with the majority of increases capped at the 5% maximum allowed under contract provision 11.B.ii. Specific rate reductions were applied to two bioassay testing items (9-62 and 9-63), which decreased by 3.56% and 7.98% respectively. The pay items cover comprehensive environmental services including mobilization, boring and drilling operations, soil and water sampling and analysis, well installation and abandonment, remedial system pilot testing and operations and maintenance, excavation and disposal services, professional engineering and geological oversight, and report preparation and certification. All pre-Rate Change Date work assignments continue to apply the prior rate schedule, while Attachment D, Rate Schedule (V3.5) governs pricing for all subsequent new work assignments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-GC810-A10.pdf | ||
| CN-370000-GC810-A17.pdf | ||
| CN-370000-GC810-CMC1.pdf | ||
| CN-370000-GC810.pdf | ||
| CN-370000-GC810-A13E1.pdf | ||
| CN-370000-GC810-A15E2.pdf | ||
| CN-370000-GC810-A16E3.pdf | ||
| CN-370000-GC810-A11.pdf | ||
| CN-370000-GC810-A12.pdf | ||
| CN-370000-GC810-A3.pdf | ||
| CN-370000-GC810-A4.pdf | ||
| CN-370000-GC810-A6.pdf | ||
| CN-370000-GC810-A7.pdf | ||
| CN-370000-GC810-A8.pdf | ||
| CN-370000-GC810-A9.pdf | ||
| CN-370000-GC810-AR1.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-GC810-CMC.pdf | ||
| CN-370000-GC810-CMC3.pdf | ||
| CN-370000-GC784-c01.pdf | ||
| CN-370000-GC810-A2.pdf | ||
| CN-370000-GC810-A5.pdf | ||
| CN-370000-GC810-AR1.pdf | ||
| CN-370000-GC810-CMC2.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.
2.
NOW THEREFORE, the parties agree as follows:
WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).
WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate reductions be made to Attachment D (V3.4) entitled "Rate Schedule"; and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.4) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and
WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC810 (hereinafter "Contract") between the FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and GEORGIA
OILMEN'S SERVICES, INC. (hereinafter "Contractor") executed on February 27, 2014, to provide petroleum contamination site response action services in the North Region, is hereby amended.
PETROLEUM RESTORATION PROGRAM
AGENCY TERM CONTRACT NO. GC810
RATE INCREASE AND DECREASE
AMENDMENT NO. 14
Amendment No. 14
DEP Agency Term Contract No. GC810
All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.
Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.
Amendment No. 14
DEP Agency Term Contract No. GC810
3.
4.
5.
6.
This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.
Attachment D, Rate Schedule (V3.5) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this
Amendment, Attachment D, Rate Schedule (V3.5) shall apply.
The Rate Change Date is the date shown at the bottom of this Amendment for the Department’s
Data Processing Information. Prior to the Rate Change Date, the Department shall provide
Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this
Amendment shall control.
Pre-existing
Rate
Agreed
New Rate (1)
392.15$ $411.75
993.60$ $1,040.00
518.21$ $544.12
594.02$ $623.72
1,131.48$ $1,188.05
280.80$ $294.84
776.25$ $815.06
1,366.20$ $1,434.51
1,223.37$ $1,284.53
777.89$ $816.78
424.28$ $445.49
503.01$ $528.16
776.25$ $815.06
44.71$ $46.94
55.89$ $58.68
155.58$ $163.35
3,601.80$ $3,781.89
2,701.35$ $2,836.41
30.88$ $32.42
Est %
Rate
Change (2)
+5.00%
+4.67%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
2-4.
3-1.
3-3.
3-4.
3-17.
3-19.
3-20.
Sonic Core Sampling - 5 or 10 foot (during boring)
HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth
DPT Membrane Interface Probe (MIP) Equipped with
PID and ECD (add-on cost to DPT base rate)
Direct Push Technology (DPT) Rig and Equipment
Description
Table 1. Listed Schedule of Pay Items with Rate Changes
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way
DPT Rig and Support Vehicles Mobilization - > 100 miles each way
DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way
Work Trailer - ≤ 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way
Contractor Oversight for Non-Price Schedule
Activities
Excavator Mobilization - ≤ 100 miles each way
Notice of Discovery of Contamination Package
(Initial or TPOC)
Split Spoon Sampling – 2 foot (during boring) 50 to
100 feet
Split Spoon Sampling – 2 foot (during boring) < 50 feet
Drum Compactor mobilization - > 100 miles each way
Drum Compactor mobilization - ≤ 100 miles each way
Mini Excavator/Loader (Bobcat
TM
) Mobilization - ≤
100 miles each way
Pay
Item No.
1-3.
3-5.
3-7.a.
3-8.a.
3-9.a.
3-11.
5-1.a.1.
5-1.a.2.
5-1.b.
5-3.a.
5-5.a.
5-6.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+4.99%
+4.99%
+4.99%
+5.00%
+5.00%
+4.99%
55.15$ $57.90
57.07$ $59.92
64.14$ $67.34
46.66$ $48.99
50.92$ $53.46
60.81$ $63.85
53.74$ $56.42
60.81$ $63.85
74.96$ $78.70
89.10$ $93.54
40.73$ $42.76
44.71$ $46.94
55.33$ $58.09
53.09$ $55.74
71.72$ $75.30
56.41$ $59.23
12.42$ $13.04
732.78$ $769.41
1,403.33$ $1,473.49
366.39$ $384.70
434.70$ $456.43
31.10$ $32.65
39.60$ $41.58
217.35$ $228.21
+4.99%
+4.99%
+4.99%
5-11.
Removal and Reinstallation of 12-inch Manhole and
Well Pad (well pad/manhole has been damaged or destroyed)
Removal of Well Pad and Manhole
Removal and Reinstallation of 8-inch Manhole and
Well Pad (well pad/manhole has been damaged or destroyed)
Installation of Well Vault - 4 x 4 x 2 foot
Installation of Well Vault - 2 x 2 x 2 foot
7-3.
7-4.
6-9.b.
6-11.
6-12.
6-14.
6-15.
7-7.
Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth
Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, 50 to
100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth
Well Installation - 1 inch diameter
Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth
Well Installation - 2 inch diameter (vertical)
Grout and Abandon Well, > 6 inch diameter
Grout and Abandon Well, > 4 to 6 inch diameter
Additional Well Screen > 20 feet - 2 inch diameter
Well Installation - 6 inch diameter
Well Installation - 4 inch diameter (horizontal, by trenching, not directional drilling)
Well Installation - 4 inch diameter (vertical)
Well Installation - 2 inch diameter (horizontal, by trenching, not directional drilling)
6-3.a.
6-3.b.
6-4.
6-2.b.
5-17.
5-18.
5-19.
5-20.
5-21.
6-1.
6-2.a.
5-12.
5-13.
5-15.
5-16.
+4.99%
+5.00%
+4.99%
+5.00%
+5.00%
+4.99%
+4.99%
+5.00%
+4.99%
+5.00%
+4.99%
+4.98%
+4.98%
+4.99%
+4.99%
+4.99%
+5.00%
+5.00%
+4.98%
+5.00%
+5.00%
165.74$ $174.02
225.26$ $236.52
74.39$ $78.10
87.86$ $92.25
74.39$ $78.10
28.12$ $29.52
51.42$ $53.99
54.43$ $55.00
54.43$ $55.00
19.44$ $20.00
432.23$ $453.84
54.57$ $57.29
65.46$ $68.73
80.20$ $84.21
65.46$ $68.73
162.06$ $170.16
57.28$ $60.14
68.60$ $72.00
73.65$ $77.33
+1.05%
+1.05%
8-14.
9-1.
9-2.
9-4.
9-5.
9-6.
8-12.
8-3.
8-4.
8-6.
8-7.
8-9.
9-7.
9-8.
9-9.
9-10.
Other Water Sampling
Domestic Water Well Sampling
Monitoring Well Sampling with Water Level, > 100 foot depth
Monitoring Well Sampling with Water Level, ≤ 100 foot depth 8-1.
8-2.
8-13.
Soil, Total Recoverable Petroleum Hydrocarbons (FL-
PRO)
Soil, Priority Pollutant Extractable Organics-Base
Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])
Survey Latitude/Longitude of New Monitor Wells
Survey Latitude/Longitude of Existing Monitor Wells
Vapor/Ambient Air Sample Collection - Passive
Dosimeter, Sorbent Tube, Tedlar
TM
Bag (or
Equivalent)
Water Level or Free Product Gauging
Soil/Sediment Sample Collection
Soil, BTEX + MTBE (EPA 8021 or EPA 8260)
Soil, Used Oil/Unknown Product Group-Table D of
Ch. 62-780, F.A.C., except for non-Priority Pollutant
Organics (multiple methods)
Encore (25 gram) for SPLP Soil Sample Collection:
[Per Encore]. The cost will include the 25 gram
Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing
(discarded).
Soil, Priority Pollutant Volatile Organics (EPA 8260)
Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)
Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA
8260)
Soil, 8 RCRA Metals (EPA 6010 or EPA 6020
[Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471
[Mercury])
Soil, PCBs [or Aroclors] (EPA 8082)
+2.88%
+5.00%
+4.98%
+5.00%
+5.00%
+5.00%
+5.00%
+4.99%
+4.96%
+5.00%
+5.00%
+5.00%
+4.99%
+5.00%
+4.99%
+4.98%
9.79$ $10.27
9.79$ $10.27
9.79$ $10.27
9.79$ $10.27
26.48$ $27.80
54.57$ $57.29
263.57$ $276.74
432.23$ $453.84
40.91$ $42.95
65.46$ $68.73
65.46$ $68.73
88.37$ $92.78
40.91$ $42.95
71.72$ $75.30
65.46$ $68.73
65.46$ $68.73
162.06$ $170.16
162.06$ $170.16
58.93$ $61.87
+4.98%
+5.00%
+5.00%
+4.99%
+5.00%
+5.00%
+4.99%
+4.99%
+4.99%
+4.90%
+4.90%
+4.90%
+4.90%
+4.98%9-17.
9-11.
9-12.
9-13.
9-14.
Water, Priority Pollutant Volatile Organics [for
NPDES purposes only] (EPA 624)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)
Water, Polycyclic Aromatic Hydrocarbons, including
1-methylnaphthalene + 2-methylnaphthalene (EPA
610 [HPLC], EPA 625, EPA 8270 or EPA 8310)
Water, BTEX + MTBE + VOHs (EPA 601/602, EPA
624, EPA 6021 or EPA 8260)
Water, Volatile Organic Halocarbons, except EDB
(EPA 8021 or EPA 8260)
Water, BTEX + MTBE (EPA 602, EPA 624, EPA
8021 or EPA 8260)
Water, Total Recoverable Petroleum Hydrocarbons
(FL-PRO)
Water, Priority Pollutant Extractable Organics-Base
Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA
8270)
Water, Priority Pollutant Extractable Organics-Base
Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])
Water, Priority Pollutant Volatile Organics (EPA
8260)
Soil, Organic Carbon, Total (EPA 9060 or Walkey-
Black)
Water, Used Oil/Unknown Product Group-Table D of
Ch. 62-780, F.A.C., except for non-Priority Pollutant
Organics (multiple methods)
Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (multiple methods)
Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution
GC/MS)
Soil, Lead (EPA 6010 or EPA 6020)
Soil, Chromium (EPA 6010 or EPA 6020)
Soil, Cadmium (EPA 6010 or EPA 6020)
Soil, Arsenic (EPA 6010 or EPA 6020)
9-32.
9-25.
9-26.
9-27.
9-28.
9-29.
9-30.
9-31.
9-31.a.
9-23.
9-33.
9-34.
9-35.
9-36.
+5.00%
+5.00%
+4.99%
+5.00%
70.15$ $73.65
9.79$ $10.27
9.79$ $10.27
9.79$ $10.27
9.79$ $10.27
21.80$ $22.89
9.79$ $10.27
9.79$ $10.27
34.41$ $36.13
9.79$ $10.27
9.79$ $10.27
9.79$ $10.27
9.79$ $10.27
16.32$ $17.13
17.13$ $17.98
7.76$ $8.14
7.76$ $8.14
8.15$ $8.55
8.15$ $8.55
9-49.
9-50.
9-51.
9-52.
9-53.
9-54.
Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)
Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA
6010 or EPA 6020)
Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA
6010 or EPA 6020)
Water, Potassium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or SM 4500-NO3 F)
Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)
Water, Hardness, Total [as CaCO3] (SM 2340 B or
SM 2340 C)
Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM
4500CI E)
Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3
C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-
NH3 H)
Water, Alkalinity [as CaCO3] (EPA 310.2 or SM
2320 B)
Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA
6020)
Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Magnesium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
Water, Iron, Total (EPA 200.7, EPA 6010 or EPA
6020)
Water, Calcium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Mercury, Total (EPA 245.1, EPA 6020 or
EPA 7470)
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA
6010 or EPA 6020)
Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
9-48.
9-41.
9-42.
9-43.
9-44.
9-44.a.
9-45.
9-46.
9-47.
9-39.
9-40.
9-37.
9-38.
+4.99%
+4.90%
+4.90%
+4.90%
+4.90%
+5.00%
+4.90%
+4.90%
+5.00%
+4.90%
+4.90%
+4.90%
+4.90%
+4.96%
+4.96%
+4.90%
+4.90%
+4.91%
+4.91%
8.15$ $8.55
17.13$ $17.98
13.06$ $13.71
10.88$ $11.42
10.88$ $11.42
8.15$ $8.55
21.80$ $22.89
622.14$ $600.00
1,086.75$ $1,000.00
90.02$ $94.52
47.19$ $49.54
166.89$ $175.23
192.51$ $202.13
146.45$ $153.77
78.00$ $81.90
59.62$ $62.60
245.57$ $257.84
286.51$ $300.83
327.43$ $343.80
+5.00%
+5.00%
+5.00%
+5.00%
+4.98%
10-9.
9-57.
9-58.
9-59.
9-60.
9-61.
9-62.
9-63.
10-2.a.
9-55.
9-56.
9-68.
Water, Residue-nonfilterable [Total Suspended
Solids] (SM 2540 D)
Water, Residue-filterable [Total Dissolved Solids]
(SM 2540 C)
Water, Orthophosphate [as P] (EPA 300.0, EPA
300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-
PE or SM 4500-PF)
Water, Organic Carbon, Total (SM 5310 B, SM 5310
C or EPA 9060)
Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM
4500-NO2 B or SM 4500-NO3 F)
Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA
9056 or SM 4500-SO4 C)
Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)
Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA
2006.0/2007.0)
Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate: Pimephales promelas or Cyprinella leedsi/Invertebrate:
Ceriodaphnia dubia] (EPA 2000.0/2002.0)
Water, Heterotrophic Plate Count (SM 9215 B)
#57 Stone
Pea Gravel
Flowable Fill Concrete and Installation
Additional Dewatering System Well Points (2)
(includes installation)
Additional Dewatering System Well Points (2)
(includes installation)
LDA Excavation and Loading With Surface Casing ≤
300 cubic yards
LDA Excavation and Loading Without Casing ≤ 300 cubic yards
Sheet Piling Installation for > 20 feet deep Excavation
Additional Dewatering System Well Points (2)
(includes installation)
10-11.a.
10-19.
10-21.
10-23.
10-17.
10-13.
10-16.
+5.00%
+4.91%
+4.96%
+4.98%
+4.96%
+4.96%
+4.91%
+5.00%
-3.56%
-7.98%
+5.00%
+5.00%
+5.00%
3.66$ $3.84
2.43$ $2.55
50.52$ $53.04
61.31$ $64.37
222.37$ $233.48
34.86$ $36.60
48.63$ $51.06
43.58$ $45.75
44.16$ $46.36
43.47$ $45.64
43.47$ $45.64
218.87$ $229.81
1.66$ $1.74
229.81$ $241.30
1.67$ $1.75
1,055.70$ $1,108.48
8.92$ $9.36
2.86$ $3.00
8.49$ $8.91
2.73$ $2.86
3.03$ $3.12
0.21$ $0.22
6,359.04$ $6,676.99
98.11$ $103.00
43.11$ $45.26 +4.99%
15-1.a.
12-4.
12-5.
12-6.
12-7.
Direct Push Boring with In-Situ Injection
Grass - Seed and Mulch
Crushed Lime Rock Cover - 2 inch thickness
Disposal of Petroleum Impacted Soil at a Landfill
(bulk) ≤ 450 tons
Transport Petroleum Impacted Soil (bulk) > 100 miles
Asphalt Paving - 2 inch thickness (includes sub-base)
Delivery, Pick Up and Rental of 20 Cubic Yard Roll-
Off Container
Transport and Disposal of Petroleum Product (bulk)
Transport and Disposal of Petroleum Product
(includes drum)
Transport and Disposal of Petroleum Contact Water
(bulk)
Transport and Disposal of Petroleum Contact Water
(includes drum)
Disposal of Petroleum Impacted Soil at a Thermal
Treatment Facility (bulk) > 450 tons
Disposal of Petroleum Impacted Soil at a Thermal
Treatment Facility (bulk) ≤ 450 tons
Disposal of Petroleum Impacted Soil at a Landfill
(bulk) > 450 tons
Transport Petroleum Impacted Soil (bulk) ≤ 100 miles
Transport and Disposal of Petroleum Impacted Soil
(includes drum)
Transport and Disposal of Mixed Debris
Transport and Disposal of Clean Concrete
Additional Removal/Loading Cost for Concrete - > 4 inch thickness
Removal and Loading of Asphalt and/or Concrete - up to 4 inch thickness
Concrete Paving - additional 1 inch thickness
Concrete Paving - 4 inch thickness (includes sub-base)
Asphalt Paving - additional 1 inch thickness
Trenching and Installation of Additional 1-10 Lines
Greater Than 30 Lines
Trenching and Installation of 1-10 Plumbing (and
Electrical) Lines in Trench
14-1.a.
12-17.
13-1.
13-2.
13-3.
13-4.
13-5.
13-7.
12-8.
12-1.
12-2.
15-1.d.
12-9.
12-10.
12-11.
12-12.
12-13.
12-14.
12-15.
12-16.
+4.92%
+4.94%
+4.99%
+4.99%
+5.00%
+4.99%
+5.00%
+4.98%
+4.98%
+4.98%
+4.99%
+4.99%
+5.00%
+4.82%
+5.00%
+4.79%
+5.00%
+4.93%
+4.90%
+4.95%
+4.76%
+2.97%
+4.76%
19,685.70$ $20,669.98
23,586.27$ $24,765.58
3,594.41$ $3,774.13
1,686.38$ $1,770.69
4,802.73$ $5,000.00
458.42$ $480.00
3,867.11$ $4,000.00
458.42$ $481.34
4,957.32$ $5,000.00
458.42$ $481.34
574.23$ $602.94
573.02$ $601.67
5,137.97$ $5,394.86
458.41$ $481.33
5,018.28$ $5,200.00
458.41$ $481.33
671.41$ $704.98
4,502.55$ $4,700.00
9,267.08$ $9,500.00
2,728.81$ $2,864.25
4,666.25$ $4,899.56
6,876.64$ $7,220.47
4,009.69$ $4,200.00
+4.11%
+4.71%
+3.44%
+5.00%
+0.86%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+3.62%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
16-5.
16-18.
16-17.
16-6.
16-7.
16-8.
16-9.
16-10.
16-11.
16-12.
16-14.
16-19.
16-20.
16-22.
16-23.
16-1.
16-2.
16-3.
16-4.
Multi-Phase Pilot Test - Additional Time
Vapor Extraction/Aquifer Pumping Test - Additional
Time
Vapor Extraction/Aquifer Pumping Test - 8 hours
Vapor Extraction Pilot Test - Additional Time
Vapor Extraction Pilot Test - 8 hours
Air Sparging or Biosparging Pilot Test - Additional
Time
Air Sparging or Biosparging Pilot Test - 8 hours
Groundwater Recovery System Pilot Test - Additional
Time
Groundwater Recovery System Pilot Test - 8 hours
System Installation/Integration/Startup – Addition of
1 Technology Component
System Installation/Integration/Startup - 1 Technology
Component - 1-10 Additional Recovery/Treatment
Points greater Than 30 (This item is used in conjunction with 15.4.c when needed)
System Installation/Integration/Startup - 1 Technology
Component - 21-30 Recovery/Treatment Points
System Installation/Integration/Startup - 1 Technology
Component - 11-20 Recovery/Treatment Points
Multi-Phase Pilot Test - 8 hours
Air Sparging/Vapor Extraction Pilot Test - Additional
Time
Air Sparging/Vapor Extraction Pilot Test - 8 hours
MPE System Package - Medium
AS/SVE System Package - Medium
Air Sparge System Package - Medium
Air Sparge System Package - Medium
Groundwater Treatment System Package - Medium
Groundwater Treatment System Package - Medium
Air Sparging/Multiphase Extraction Pilot Test -
Additional Time
15-4.b.
15-4.c.
15-4.d.
15-5.
+4.96%
+5.00%
+4.39%
+2.51%
+5.00%
+4.75%
6,057.97$ $6,350.00
4,568.36$ $4,796.77
4,719.60$ $4,955.58
549.47$ $576.94
6,593.72$ $6,923.40
9,730.20$ $10,216.71
7,391.19$ $7,760.74
14,464.63$ $15,187.86
11,123.21$ $11,679.37
3,326.07$ $3,492.37
2,814.56$ $2,955.28
3,920.59$ $4,116.61
3,309.58$ $3,475.05
4,977.36$ $5,226.22
3,946.05$ $4,143.35
4,322.44$ $4,538.56
3,830.61$ $4,022.14
4,977.36$ $5,226.22
4,322.44$ $4,538.56
6,287.19$ $6,601.54
5,468.54$ $5,741.94
4,960.14$ $5,208.14
4,158.21$ $4,366.12
6,143.73$ $6,450.10
+5.00%
+5.00%
16-24.
18-5.
18-7.
18-8.
18-9.
18-10.
18-21.
18-22.
17-3.
17-4.
17-5.
18-20.
18-11.
18-12.
18-13.
18-14.
18-15.
18-16.
18-17.
18-18.
18-19.
Supplemental System O&M Package - Add Thermox or Catox Treatment
Groundwater Treatment System - Stand Alone Large -
Long Term > 6 mos.
Groundwater Treatment System - Stand Alone Large -
Short Term ≤ 6 mos.
Groundwater Treatment System - Stand Alone
Medium - Long Term > 6 mos.
Groundwater Treatment System - Stand Alone
Medium - Short Term ≤ 6 mos.
Groundwater Treatment System - Stand Alone Small -
Short Term ≤ 6 mos.
System O&M Package - Extra Large
System O&M Package - Large
MPE System Package - Medium
Air Sparge System - Medium - Short Term ≤ 6 mos.
Air Sparge System - Small - Long Term > 6 mos.
Air Sparge System - Small - Short Term ≤ 6 mos.
MPE System - Medium - Short Term ≤ 6 mos.
MPE System - Small - Long Term > 6 mos.
MPE System - Small - Short Term ≤ 6 mos.
AS/SVE System - Large - Long Term > 6 mos.
AS/SVE System - Large - Short Term ≤ 6 mos.
AS/SVE System - Medium - Long Term > 6 mos.
AS/SVE System - Medium - Short Term ≤ 6 mos.
AS/SVE System - Small - Long Term > 6 mos.
AS/SVE System - Small - Short Term ≤ 6 mos.
Air Sparge System - Large - Long Term > 6 mos.
Air Sparge System - Large - Short Term ≤ 6 mos.
Air Sparge System - Medium - Long Term > 6 mos.
18-23.
18-24.
18-25.
+4.82%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+4.99%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
5,257.15$ $5,520.00
8,170.86$ $8,579.40
6,704.04$ $7,039.24
2,193.95$ $2,303.64
3,475.06$ $3,648.81
5,831.88$ $6,123.47
1,211.57$ $1,272.14
2,685.13$ $2,819.38
4,649.90$ $4,882.39
512.46$ $538.08
700.09$ $735.09
1,216.35$ $1,277.14
325.29$ $341.55
466.74$ $490.07
749.60$ $787.08
3,634.89$ $3,816.63
4,144.06$ $4,351.26
3,881.25$ $4,075.31
3,300.01$ $3,465.01
5,644.89$ $5,927.13
5,117.04$ $5,372.89
6,853.04$ $7,195.69
6,298.79$ $6,613.72
18-44.
18-45.
18-47.
18.48.
18-49.
18-50.
18-51.
18-52.
Carbon Off Gas Treatment - Add On - Large - Long
Term > 6 mos.
Carbon Off Gas Treatment - Add On - Medium -
Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Small- Long
Term > 6 mos.
Groundwater Treatment - Add On - Large - Long
Term > 6 mos.
Groundwater Treatment - Add On - Medium - Long
Term > 6 mos.
Groundwater Treatment - Add On - Small - Long
Term > 6 mos.
Groundwater Treatment - Add On - Large - Short
Term ≤ 6 mos.
Groundwater Treatment - Add On - Medium - Short
Term ≤ 6 mos.
Groundwater Treatment - Add On - Small - Short
Term ≤ 6 mos.
MPE System - Large - Long Term > 6 mos.
MPE System - Large - Short Term ≤ 6 mos.
MPE System - Medium - Long Term > 6 mos.
Soil Vapor Extraction (SVE) System - Large - Short
Term ≤ 6 Months
Soil Vapor Extraction (SVE) System - Medium -
Long Term > 6 Months
Soil Vapor Extraction (SVE) System - Large - Long
Term > 6 Months
Carbon Off Gas Treatment - Add On - Large - Short
Term ≤ 6 mos.
Carbon Off Gas Treatment - Add On - Medium -
Short Term ≤ 6 mos.
Carbon Off Gas Treatment - Add On - Small - Short
Term ≤ 6 mos.
Soil Vapor Extraction (SVE) System - Medium -
Short Term ≤ 6 Months
Soil Vapor Extraction (SVE) System - Small - Long
Term > 6 Months
Soil Vapor Extraction (SVE) System - Small - Short
Term ≤ 6 Months
Thermox/Catox Off Gas Treatment - Add On -
Medium - Long Term > 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Small -
Long Term > 6 mos.
18-38.
18-29.
18-30.
18-31.
18-32.
18-33.
18-34.
18-35.
18-36.
18-37.
18-26.
18-27.
18-28.
18-39.
18-40.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
7,785.47$ $8,174.74
6,298.79$ $6,613.72
2,205.10$ $2,315.35
4,654.53$ $4,887.25
610.24$ $640.75
1,851.51$ $1,944.08
1,671.51$ $1,755.08
14,702.89$ $15,438.03
19,087.41$ $20,041.78
1,967.23$ $2,065.59
3,561.60$ $3,739.68
6,647.47$ $6,979.84
10,125.50$ $10,631.77
4,693.08$ $4,927.73
874.32$ $918.03
2,948.52$ $3,095.94
437.16$ $459.01
2,126.34$ $2,232.65
3,770.73$ $3,959.26
1,594.36$ $1,674.07
631.31$ $662.87
366.44$ $384.76
143.76$ $150.94
129.38$ $135.84
123.22$ $129.38
115.02$ $120.77
115.02$ $120.77
104.32$ $109.53
91.28$ $95.84
86.94$ $91.28
75.39$ $79.15
62.10$ $65.20
55.89$ $58.68
163.00$ $171.15
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+4.99%
+4.99%
+5.00%
+5.00%
+5.00%
+4.99%
+5.00%
+4.99%
+4.99%
19-20.
19-21.
19-22.
19-23.
19-25.
20-9.
20-10.
20-11.
21-1.
19-17.
19-8.
19-10.
19-11.
19-12.
19-13.
19-14.
19-15.
19-16.
20-8.
19-26.
20-1.
20-2.
20-3.
20-4.
20-5.
20-6.
20-7.
19-1.
19-3.
19-6.
19-18.
19-19.
18-53.
18-54.
Remedial Action Startup Report
As-Built Drawings (P.E. Sealed red lined modifications)
Professional Engineer (Key)
Laborers and Security Guards
Administrative
Draftsperson
Field Technician (Key)
Construction Drawings and Specs Report
Level 1 Remedial Action Plan
Pilot Test Report
Natural Attenuation or Post RA Monitoring Report, Annual
Level 2 Natural Attenuation Monitoring Plan
General Site Assessment Report
Soil Source Removal Report
Air Sparge/Multiphase Extraction (AS/MPE) System -
Small - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System -
Small - Short Term ≤ 6 Months
Level 4 Limited Scope Remedial Action Plan or RAP
Modification Plan
Level 3 Limited Scope Remedial Action Plan or RAP
Modification Plan
Level 2 Limited Scope Remedial Action Plan or RAP
Modification Plan
Level 1 Limited Scope Remedial Action Plan or RAP
Modification Plan
Level 2 Remedial Action Plan
Assistant Scientist/Technical Specialist
Scientist/Technical Specialist (Key)
Hydrogeologist/Modeler (Key)
Geologist/Geoscientist (Key)
Engineer (Key)
Project Manager (Key)
Program Manager (Key)
Well Abandonment/Site Restoration Report
Free Product Recovery Report
Remedial Action General Report
Operation & Maintenance Annual Report
Operation & Maintenance Report, Quarterly or Non-
Annual
Letter/NPDES Report
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+4.99%
+4.99%
+5.00%
+5.00%
163.00$ $171.15
155.25$ $163.01
155.25$ $163.01
158.13$ $163.01
158.13$ $163.01
158.13$ $163.01
158.13$ $163.01
158.13$ $163.01
143.76$ $150.94
143.76$ $150.94
143.76$ $150.94
143.76$ $150.94
143.76$ $150.94
+4.99%
Professional Geologist (Key)
P.G. Review and Certification of Sufficiency of
Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill with Monitoring and Maintenance Recommendations
Required for a Conditional NFA
P.E. Review and Certification of Sufficiency of
Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with Monitoring and Maintenance Recommendations
Required for a Conditional NFA
P.E. Project Oversight for Remediation System
Operation and Maintenance
P.E. Project Oversight for Short Term or Episodic
Remediation System Operation - Weekly Basis
P.E. Project Oversight for Short Term or Episodic
Remediation System Operation - Daily Basis
P.E. Project Oversight for Remediation System
Integration and Startup - Extra Large System
P.E. Project Oversight for Remediation System
Integration and Startup - Large System
P.E. Project Oversight for Remediation System
Integration and Startup - Medium System
P.E. Project Oversight for Remediation System
Integration and Startup - Small System
P.E. Project Oversight for Remediation Technology
Pilot Testing
P.G. Field Oversight of Well Installation (Use hourly rate on site specific basis)
P.G. Field Oversight of Drilling and Boring and Soil-
Boring Logging (Use hourly rate on site specific basis)
21-6.a.
21-6.b.
21-6.c.
21-6.d.
21-7.a.
21-7.b.
21-8.
21-9.
21-10.
21-2.
21-3.
21-4.
21-5.
+5.00%
+5.00%
+5.00%
+3.09%
+3.09%
+3.09%
+3.09%
+3.09%
+4.99%
+4.99%
+4.99%
143.76$ $150.94
143.76$ $150.94
143.76$ $150.94
143.76$ $150.94
143.76$ $150.94
143.76$ $150.94
143.76$ $150.94
143.76$ $150.94
143.76$ $150.94
143.76$ $150.94
179.71$ $188.69
179.71$ $188.69
179.71$ $188.69
+4.99%
+4.99%
+4.99%
+4.99%
+4.99%
+4.99%
+4.99%
+5.00%
+5.00%
+5.00%
P.E. Review, Evaluation and Certification of a Level
1 Remedial Action Plan
P.E. Review, Evaluation and Certification of a Pilot
Test Report
P.E. Review, Evaluation and Certification of a Pilot
Test Plan
P.G or P.E. Review, Evaluation and Certification of an Annual Natural Attenuation Monitoring Report
P.E. Review, Evaluation and Certification of a Non-
Annual Natural Attenuation or Post RA Monitoring
Report That Includes a Recommendation for NFA or a Recommendation to Modify the Approved
Monitoring Plan
P.E. Review, Evaluation and Certification of a Level
2 Natural Attenuation Monitoring Plan
P.G. or P.E. Review, Evaluation and Certification of a
Receptor and Exposure Pathway Report
P.G. or Qualified P.E. Review, Evaluation and
Certification of a Supplemental Site Assessment
Report
P.G. or Qualified P.E. Review, Evaluation and
Certification of a General Site Assessment Report
P.G. or P.E. Review, Evaluation and Certification of a
Soil Source Removal Report That Includes a
Recommendation for NFA
P.G. Review, Evaluation and Certification of Plans and Project Oversight for Installation of Engineering
Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill Required for a
Conditional NFA
P.E. Design and Certification of Plans and Project
Oversight of Installation for Engineering Controls
(other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA
P.E. Review, Evaluation and Certification of a Level
2 Remedial Action Plan
21-11.
21-12.
21-13.
21-15.
21-16.
21-17.
21-18.
21-19.
21-20.
21-21.
21-22.
21-23.
21-24.
+4.99%
+4.99%
179.71$ $188.69
179.71$ $188.69
179.71$ $188.69
179.71$ $188.69
179.71$ $188.69
179.71$ $188.69
179.71$ $188.69
179.71$ $188.69
179.71$ $188.69
179.71$ $188.69
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%21-31.
21-32.
21-33.
21-34.
P.G or P.E. Review, Evaluation and Certification of an Interim Remedial Action Report That Includes a
Recommendation for System Modification or
Significant Change in the Course of Action
(1)
The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.
(2)
The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.
Notes:
P.G or P.E. Review, Evaluation and Certification of a
Remedial Action General Report
P.E. Review, Evaluation and Certification of an
Annual Operation and Maintenance Report
P.E. Review, Evaluation and Certification of a Non-
Annual Operation and Maintenance Report That
Includes Significant Proposed Changes to the
Approved RAP
P.E. Review, Evaluation and Certification of a
Remedial Action Startup Report That Includes a
Recommendation for System Modification or
Significant Change in the Course of Action
P.E. Review, Evaluation and Certification of As-Built
Drawings (P.E. sealed red lined modifications)
P.E. Review, Evaluation and Certification of a Level
4 Limited Scope Remedial Action Plan or RAP
Modification Plan
P.E. Review, Evaluation and Certification of a Level
3 Limited Scope Remedial Action Plan or RAP
Modification Plan
P.E. Review, Evaluation and Certification of a Level
2 Limited Scope Remedial Action Plan or RAP
Modification Plan
P.E. Review, Evaluation and Certification of a Level
1 Limited Scope Remedial Action Plan or RAP
Modification Plan
21-29.
21-30.
21-25.
21-26.
21-27.
21-28.
+5.00%
+5.00%