- Contract number
- GC799
- Issued by
- Florida
About this file
Amendment No. 16 to Agency Term Contract No. GC799 is a rate increase amendment executed between the Florida Department of Environmental Protection (Department) and Earth Systems, LLC (Contractor) on May 15, 2024. The original contract was executed on February 20, 2014, to provide petroleum contamination site response action services in the North Region. This amendment modifies the Rate Schedule (Attachment D) from Version 3.4 to Version 3.5 and implements rate increases for specified pay items effective June 10, 2024, for new work assignments only.
The amendment adjusts rates for 41 pay items across multiple service categories including mobilization, boring, sampling, well abandonment, soil and water testing, and reporting services. Rate increases range from approximately 2.97% to 4.89%, with most increases at approximately 3.00%, all within the maximum 5% threshold permitted under provision 11.B of the original contract. Representative examples include Drill Rig and Support Vehicles Mobilization increasing from $1,265.22 to $1,303.18; Hand Auger Boring increasing from $150.95 to $155.48; and Soil, TRPH Fractionation increasing from $352.10 to $362.66. All pre-Rate Change Date work assignments and previously offered work assignments continue to apply the prior rate schedule. The new rates in Attachment D (V3.5) became effective June 10, 2024, following data processing completion on June 6, 2024.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.
2.
3.
NOW THEREFORE, the parties agree as follows:
WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).
WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.4) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC799 (hereinafter "Contract") between the FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and EARTH
SYSTEMS, LLC (hereinafter "Contractor") executed on February 20, 2014, to provide petroleum contamination site response action services in the North Region, is hereby amended.
PETROLEUM RESTORATION PROGRAM
AGENCY TERM CONTRACT NO. GC799
RATE INCREASE
AMENDMENT NO. 16
Amendment No. 16
DEP Agency Term Contract No. GC799
This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.
All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.
Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.
Amendment No. 16
DEP Agency Term Contract No. GC799
4.
5.
6.
Attachment D, Rate Schedule (V3.5) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this
Amendment, Attachment D, Rate Schedule (V3.5) shall apply.
The Rate Change Date is the date shown at the bottom of this Amendment for the Department’s
Data Processing Information. Prior to the Rate Change Date, the Department shall provide
Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this
Amendment shall control.
Pre-existing
Rate
Agreed
New Rate (1)
528.34$ $544.19
754.82$ $777.46
826.68$ $851.48
1,265.22$ $1,303.18
45.95$ $47.33
135.84$ $139.92
150.95$ $155.48
27.90$ $28.73
35.92$ $37.00
32.42$ $33.39
45.26$ $46.62
42.24$ $43.51
42.25$ $43.52
4.50$ $4.72
18.10$ $18.64
359.43$ $370.21
718.87$ $740.44
81.49$ $83.93
352.10$ $362.66
15.78$ $16.25
15.78$ $16.25
15.78$ $16.25
15.78$ $16.25
+2.98%
+2.98%
+2.98%
+2.98%
Est %
Rate
Change (2)
+3.00%
+3.00%
+3.00%
8-11.
9-8.a.
9-11.
9-12.
9-13.
9-14.
3-1.
3-2.
5-9.
5-10.
6-5.
Hand Auger Boring ≤ 10 foot total depth
Sonic Core Sampling - 5 or 10 foot (during boring)
Removal of Well Vault - 4 x 4 x 2 foot
Removal of Well Vault - 2 x 2 x 2 foot
HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth
7-5.
7-1.
Description
Table 1. Listed Schedule of Pay Items with Rate Changes
7-6.
Surface Casing - 6 inch diameter
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way
DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way
Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, 50 to
100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth
Split Spoon Sampling – 2 foot (during boring) < 50 feet
Grout and Abandon Well, 1 to 2 inch diameter
Soil, TRPH Fractionation (MADEP-EPH/VPH
Method or TPHCWG Direct Method)
Electronic Data Deliverables (EDD)
Soil, Lead (EPA 6010 or EPA 6020)
Soil, Chromium (EPA 6010 or EPA 6020)
Soil, Cadmium (EPA 6010 or EPA 6020)
Soil, Arsenic (EPA 6010 or EPA 6020)
Pay
Item No.
3-7.a.
3-9.a.
5-1.a.1.
5-1.b.
5-2.
5-6.
5-7.
5-15.
5-16.
+3.00%
+3.00%
+3.00%
+3.00%
+2.97%
+3.01%
+2.99%
+3.00%
+4.89%
+3.01%
+3.01%
+2.98%
+3.00%
+3.00%
+3.00%
+2.99%
45.25$ $46.61
45.25$ $46.61
57.33$ $59.05
106.36$ $109.55
67.91$ $69.95
36.95$ $38.06
110.68$ $114.00
60.36$ $62.17
75.44$ $77.70
1,811.56$ $1,865.81
1,095.11$ $1,127.96
1,095.11$ $1,127.96
784.99$ $808.53 +3.00%
+3.00%
+3.00%
+3.00%
+3.01%
+3.01%
19-27.
19-4.
19-5.
19-6.
15-1.a.
15-1.b.
9-68.
9-16.
9-15.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
(1)
The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.
(2)
The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.
Notes:
Water, Polycyclic Aromatic Hydrocarbons, including
1-methylnaphthalene + 2-methylnaphthalene (EPA
610 [HPLC], EPA 625, EPA 8270 or EPA 8310)
Water, BTEX + MTBE (EPA 602, EPA 624, EPA
8021 or EPA 8260)
Water, Total Recoverable Petroleum Hydrocarbons
(FL-PRO)
Soil, Synthetic Precipitation Leaching Procedure-
Extraction Only (EPA1312)
Soil, Toxicity Characteristic Leaching Procedure-
Extraction Only (EPA 1311)
Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)
Trenching and Installation of 11 - 20 Lines
Trenching and Installation of 1-10 Plumbing (and
Electrical) Lines in Trench
Level 2 Natural Attenuation Monitoring Plan
Receptor and Exposure Pathway Report
Supplemental Site Assessment Report
Interim Assessment Report
9-27.
9-30.
9-41.a.
9-36. +3.00%
+3.00%
+3.00%
+3.00%
+2.99%
+3.00%
+3.00%
File details come from the government source that posted it. Updated .