CN-370000-GC789-A16.pdf
PDF 598 KB Posted
- Contract number
- GC789
- Issued by
- Florida
About this file
This document is Amendment No. 16 to Agency Term Contract No. GC789 between the Florida Department of Environmental Protection (DEP) and APEX Companies, LLC. The contract, originally executed on February 28, 2014, provides petroleum contamination site response action services in the North Region of Florida. This amendment addresses rate increases to the contractor's existing rate schedule and was executed on May 8, 2024, with an effective Rate Change Date of June 10, 2024.
The amendment implements a 5% rate increase across the contract's pay items, with the exception of select items that received increases ranging from 3% to 4.99%, with the maximum permitted increase of 5% complying with provision 11.B.ii of the contract. The rate increases apply only to new work assignments offered on or after the Rate Change Date, while all pre-existing work assignments continue under the prior rate schedule. The updated rates are reflected in Attachment D, Rate Schedule (Version 3.6), which supersedes the previous Version 3.5. The rate changes encompass over 300 pay items covering mobilization services, drilling and boring operations, well installation and abandonment, soil and water sampling and analysis, remedial action systems, engineering and professional services, and various support activities. The contractor's detailed justification for the requested increases was reviewed and approved by the Department prior to amendment execution.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-GC789-A13.pdf | ||
| CN-370000-GC789-A3.pdf | ||
| CN-370000-GC789-CMC2.pdf | ||
| CN-370000-GC789-CO2.pdf | ||
| CN-370000-GC789-A12.pdf | ||
| CN-370000-GC789-A15E1.pdf | ||
| CN-370000-GC789-A17E2.pdf | ||
| CN-370000-GC789-A18.pdf | ||
| CN-370000-GC789-A2.pdf | ||
| CN-370000-GC789-A3.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-GC789-AR1.pdf | ||
| CN-370000-GC789-CM1.pdf | ||
| CN-370000-GC789-CMC.pdf | ||
| CN-370000-GC789-A19.pdf | ||
| CN-370000-GC789-A7.pdf | ||
| CN-370000-GC789-A8.pdf | ||
| CN-370000-GC789-A9.pdf | ||
| CN-370000-GC789-A10.pdf | ||
| CN-370000-GC789-A11.pdf | ||
| CN-370000-GC789-A14.pdf | ||
| CN-370000-GC789-A4.pdf | ||
| CN-370000-GC789-A5.pdf | ||
| CN-370000-GC789-A6.pdf | ||
| CN-370000-GC789-CO1.pdf | ||
| CN-370000-GC789.pdf |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.
2.
3.
NOW THEREFORE, the parties agree as follows:
WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).
WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.5) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC789 (hereinafter "Contract") between the FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and APEX
COMPANIES, LLC (hereinafter "Contractor") executed on February 28, 2014, to provide petroleum contamination site response action services in the North Region, is hereby amended.
PETROLEUM RESTORATION PROGRAM
AGENCY TERM CONTRACT NO. GC789
RATE INCREASE
AMENDMENT NO. 16
Amendment No. 16
DEP Agency Term Contract No. GC789
This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.
All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.
Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.
Amendment No. 16
DEP Agency Term Contract No. GC789
4.
5.
6.
Attachment D, Rate Schedule (V3.6) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this
Amendment, Attachment D, Rate Schedule (V3.6) shall apply.
The Rate Change Date is the date shown at the bottom of this Amendment for the Department’s
Data Processing Information. Prior to the Rate Change Date, the Department shall provide
Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this
Amendment shall control.
Pre-existing
Rate
Agreed
New Rate (1)
594.39$ $624.09
344.45$ $361.67
317.00$ $332.85
538.92$ $565.86
483.44$ $507.61
924.64$ $970.87
538.92$ $565.86
925.90$ $972.19
578.55$ $607.47
1,119.26$ $1,175.22
190.19$ $199.69
253.61$ $266.29
713.91$ $749.59
1,207.71$ $1,268.09
1,118.80$ $1,174.74
1,828.88$ $1,920.32
594.39$ $624.09
693.45$ $728.12
523.07$ $549.22
871.78$ $915.36
356.63$ $374.46
Est %
Rate
Change (2)
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
2-1.
2-2.
2-4.
3-1.
3-2.
3-3.
3-4.
3-15.
3-16.
3-17.
Description
3-12.
Table 1. Listed Schedule of Pay Items with Rate Changes
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way
DPT Rig and Support Vehicles Mobilization - > 100 miles each way
DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way
Work Trailer - > 100 miles each way
Work Trailer - ≤ 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way
Contractor Oversight for Non-Price Schedule
Activities
Excavator Mobilization - > 100 miles each way
Excavator Mobilization - ≤ 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way
File Review
Notice of Discovery of Contamination Package
(Initial or TPOC)
Off-Site Property Access Agreement
Receptor Survey and Exposure Pathway Identification
(excludes report)
Site Reconnaissance/Field Measurement Visit
Mini Excavator/Loader (Bobcat
TM
) Mobilization - ≤
100 miles each way
Loader/Backhoe Mobilization - > 100 miles each way
Loader/Backhoe Mobilization - ≤ 100 miles each way
Pay
Item No.
1-1.
1-3.
1-5.
3-5.
3-6.
3-7.a.
3-8.a.
3-9.a.
3-10.a.
3-11.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
610.25$ $640.76
475.52$ $499.29
41.72$ $43.79
48.03$ $50.43
55.43$ $58.19
146.45$ $153.77
193.65$ $203.33
2,694.70$ $2,829.43
33.57$ $35.24
37.94$ $39.83
43.28$ $45.44
40.98$ $43.02
45.17$ $47.42
49.10$ $51.55
50.05$ $52.55
55.23$ $57.99
60.84$ $63.88
41.63$ $43.71
46.85$ $49.19
51.80$ $54.39
50.14$ $52.64
57.02$ $59.87
+4.99%
+5.00%
+5.00%
+5.00%
3-18.
3-19.
5-9.
5-10.
5-11.
Hand Auger Boring ≤ 10 foot total depth
Sonic Core Sampling - 5 or 10 foot (during boring)
Split Spoon Sampling – 2 foot (during boring) > 100 feet
HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth
Direct Push Technology (DPT) Rig and Equipment
Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth
Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, 50 to
100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, 50 to
100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth
HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth
Split Spoon Sampling – 2 foot (during boring) 50 to
100 feet
Split Spoon Sampling – 2 foot (during boring) < 50 feet
Drum Compactor mobilization - ≤ 100 miles each way
Mini Excavator/Loader (Bobcat
TM
) Mobilization - >
100 miles each way
5-1.a.1.
5-1.a.2.
5-1.a.3.
5-1.b.
5-2.
5-3.a.
5-6.
5-7.
5-17.
5-18.
5-19.
5-12.
5-13.
5-14.
5-15.
5-16.
5-8.
+5.00%
+5.00%
+4.96%
+5.00%
+4.98%
+5.00%
+5.00%
+5.00%
+4.97%
+4.98%
+4.99%
+4.98%
+4.98%
+5.00%
+4.99%
+5.00%
+4.99%
61.73$ $63.58
43.32$ $45.48
52.08$ $54.68
56.23$ $57.92
44.81$ $47.05
52.61$ $54.19
5.11$ $5.36
6.56$ $6.88
8.03$ $8.43
9.67$ $10.15
261.52$ $274.59
744.98$ $782.22
200.77$ $210.79
351.46$ $369.03
20.23$ $21.24
23.70$ $24.88
32.56$ $33.54
435.87$ $457.66
784.62$ $823.85
189.50$ $198.97
196.92$ $206.76
240.51$ $252.53
88.22$ $92.63
28.57$ $29.99
119.07$ $122.64
56.25$ $59.06
44.36$ $46.57
48.32$ $50.73
47.25$ $49.61
+4.99%
+4.99%
8-12.
8-6.
8-7.
8-8.
8-9.
8-11.
6-5.
Monitoring Well Sampling with Water Level, > 100 foot depth
Monitoring Well Sampling with Water Level, ≤ 100 foot depth
Removal of Well Pad and Manhole
Removal of Well Vault - 4 x 4 x 2 foot
Removal of Well Vault - 2 x 2 x 2 foot
Removal and Reinstallation of 8-inch Manhole and
Well Pad (well pad/manhole has been damaged or destroyed)
6-6.
Well Redevelopment
Installation of Well Vault - 2 x 2 x 2 foot
6-9.a.
7-2.
7-4.
7-5.
7-1.
6-9.b.
6-9.c.
6-9.d.
6-10.
6-11.
6-13.
6-14.
7-6.
7-7.
8-1.
8-2.
8-13.
Surface Casing - 8 inch diameter
Surface Casing - 6 inch diameter
Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth
Well Installation - 2 inch diameter (vertical)
Grout and Abandon Well, > 6 inch diameter
Grout and Abandon Well, > 2 to 4 inch diameter
Grout and Abandon Well, 1 to 2 inch diameter
Survey Latitude/Longitude of New Monitor Wells
Survey Latitude/Longitude of Existing Monitor Wells
Electronic Data Deliverables (EDD)
Vapor/Ambient Air Sample Collection - Passive
Dosimeter, Sorbent Tube, Tedlar
TM
Bag (or
Equivalent)
Free Product Gauging & Bailing
Water Level or Free Product Gauging
Soil/Sediment Sample Collection
Above Grade Well Completion
Additional Well Screen > 20 feet - 6 inch diameter
Additional Well Screen > 20 feet - 4 inch diameter
Additional Well Screen > 20 feet - 2 inch diameter
Additional Well Screen > 20 feet - 1 inch diameter
Well Installation - 6 inch diameter
Well Installation - 4 inch diameter (vertical)6-3.a.
6-4.
5-20.
6-2.a.
+3.01%
+5.00%
+3.00%
+4.89%
+4.88%
+4.98%
+4.96%
+5.00%
+5.00%
+4.99%
+3.00%
+4.99%
+4.99%
+5.00%
+4.99%
+4.98%
+3.01%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+4.97%
+3.00%
+5.00%
+4.98%
57.33$ $60.19
99.21$ $104.17
110.92$ $116.46
77.64$ $81.52
310.67$ $326.19
69.94$ $73.43
44.36$ $46.57
44.36$ $46.57
8.78$ $9.21
72.47$ $76.09
80.70$ $84.73
80.70$ $84.73
277.88$ $291.77
50.70$ $53.23
92.99$ $97.63
112.50$ $118.12
63.38$ $66.54
103.02$ $108.17
79.21$ $83.17
68.88$ $72.32
+4.90%
+5.00%
+4.99%
+4.99%
+5.00%
+4.99%
+4.99%
+5.00%
+4.99%
+4.98%
+4.98%
9-2.
9-4.
9-5.
9-16.
9-19.
9-20.
9-15.
9-8.
9-8.a.
9-9.
Soil, TRPH Fractionation (MADEP-EPH/VPH
Method or TPHCWG Direct Method)
Soil, Total Recoverable Petroleum Hydrocarbons (FL-
PRO)
Soil, Texture, (See Gee 7 Bauder [1966])
Soil, BTEX + MTBE (EPA 8021 or EPA 8260)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)
Water, Polycyclic Aromatic Hydrocarbons, including
1-methylnaphthalene + 2-methylnaphthalene (EPA
610 [HPLC], EPA 625, EPA 8270 or EPA 8310)
Water, BTEX + MTBE + VOHs (EPA 601/602, EPA
624, EPA 6021 or EPA 8260)
Water, BTEX + MTBE (EPA 602, EPA 624, EPA
8021 or EPA 8260)
Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)
Water, Total Recoverable Petroleum Hydrocarbons
(FL-PRO)
Water, Priority Pollutant Volatile Organics (EPA
8260)
Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)
Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA
8260)
Soil, Moisture Content (ASTM D2216-10)
Soil, Synthetic Precipitation Leaching Procedure-
Extraction Only (EPA1312)
Soil, Toxicity Characteristic Leaching Procedure-
Extraction Only (EPA 1311)
Soil, C10-C40 Alkane Fingerprint, N-Alkanes and
Isoalkanes (ASTM D3328 GC/MS)
Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution
GC/MS)
Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and
Terpane Biomarkers (ASTM D5739 High Resolution
GC/MS)
Soil, PCBs [or Aroclors] (EPA 8082)
9-24.
9-27.
9-29.
9-30.
9-31.a.
9-21.
9-23.
9-33.
9-36.
9-37.
+4.99%
+5.00%
+4.99%
+5.00%
+5.00%
+4.99%
+5.00%
+4.99%
12.71$ $13.34
12.71$ $13.34
12.71$ $13.34
13.72$ $14.39
12.13$ $12.73
12.13$ $12.73
15.74$ $16.52
16.54$ $17.36
25.54$ $26.81
18.23$ $19.14
14.70$ $15.43
47.49$ $49.86
610.25$ $640.76
76.31$ $80.12
88.74$ $93.17
117.99$ $123.88
303.45$ $318.62
13.29$ $13.95 +4.97%
9-57.
9-58.
9-61.
9-63.
9-72.
10-1.a.
9-52.
9-54.
9-56.
9-78.
9-80.
9-68.
Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA
6010 or EPA 6020)
Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA
6010 or EPA 6020)
Water, Residue-filterable [Total Dissolved Solids]
(SM 2540 C)
Water, Orthophosphate [as P] (EPA 300.0, EPA
300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-
PE or SM 4500-PF)
Water, Organic Carbon, Total (SM 5310 B, SM 5310
C or EPA 9060)
Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or SM 4500-NO3 F)
Water, Hardness, Total [as CaCO3] (SM 2340 B or
SM 2340 C)
Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA
6020)
Water, Calcium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA
6010 or EPA 6020)
Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Product, C3-C44 Hydrocarbon Fingerprint, Gasoline
PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328
High Resolution GC/FID)
Sheet Piling Installation for ≤ 20 feet deep
Excavation
Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)
Water, Methane (EPA SOP RSK-175)
Water, BTEX/MTBE + Naphthalene (EPA 8260)
Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA
2006.0/2007.0)
Water, Heterotrophic Plate Count (SM 9215 B)
9-48.
9-41.
9-43.
9-39.
9-40.
9-38. +4.96%
+4.96%
+4.96%
+4.88%
+4.95%
+4.95%
+4.99%
+4.99%
+4.99%
+5.00%
+4.96%
+4.96%
+4.97%
+4.99%
+4.97%
+4.99%
8.76$ $9.19
15.82$ $16.61
41.18$ $43.23
32.94$ $34.58
141.37$ $148.43
125.45$ $131.72
168.03$ $176.43
245.66$ $257.94
164.03$ $172.23
202.40$ $212.52
149.39$ $156.85
87.89$ $92.28
71.19$ $74.74
7,846.41$ $8,238.73
9,035.28$ $9,487.04
523.07$ $549.22
3.45$ $3.62
3.79$ $3.97
63.38$ $66.54
234.34$ $246.05
34.34$ $36.05
44.36$ $45.69
45.65$ $47.93
+4.98%
+4.98%
+4.99%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+4.99%
+4.99%
+4.91%
+4.99%
12-5.
12-6.
12-7.
10-7.
10-8.
10-9.
10-10.
10-2.a.
10-1.c.
#57 Stone
Pea Gravel
Flowable Fill Concrete and Installation
Dewatering System, up to 12 well points (includes installation)
Dewatering System, up to 12 well points (includes installation)
Sheet Piling Rental for ≤ 20 feet deep Excavation
LDA Excavation and Loading With Driven Casing >
300 cubic yards
LDA Excavation and Loading With Surface Casing >
300 cubic yards
LDA Excavation and Loading With Driven Casing <
300 cubic yards
LDA Excavation and Loading With Surface Casing ≤
300 cubic yards
LDA Excavation and Loading Without Casing > 300 cubic yards
LDA Excavation and Loading Without Casing ≤ 300 cubic yards
Conventional Soil Excavation and Loading > 300 cubic yards
Conventional Soil Excavation and Loading ≤ 300 cubic yards
Sheet Piling Installation for > 20 feet deep Excavation
Additional Dewatering System Well Points (2)
(includes installation)
Disposal of Petroleum Impacted Soil at a Landfill
(bulk) ≤ 450 tons
Transport Petroleum Impacted Soil (bulk) > 100 miles
Transport Petroleum Impacted Soil (bulk) ≤ 100 miles
Transport and Disposal of Petroleum Impacted Soil
(includes drum)
Transport and Disposal of Mixed Debris
Additional Removal/Loading Cost for Concrete - > 4 inch thickness
Removal and Loading of Asphalt and/or Concrete - up to 4 inch thickness
10-11.a.
10-20.
10-22.
10-23.
10-17.
10-11.b.
10-12.a.
10-12.b.
10-13.
10-16.
12-8.
12-1.
12-2.
12-9.
+5.00%
+5.00%
+5.00%
+4.99%
+4.93%
+4.75%
+4.99%
+5.00%
+4.98%
+3.00%
+4.99%
44.26$ $46.47
221.88$ $232.97
221.88$ $232.97
956.57$ $1,004.39
9.90$ $10.39
3.25$ $3.41
10.61$ $11.14
3.13$ $3.28
1.94$ $2.03
1.86$ $1.95
0.75$ $0.78
5,555.53$ $5,833.29
4,697.89$ $4,932.78
101.47$ $104.51
109.82$ $113.11
11,413.00$ $11,983.65
12,205.56$ $12,815.83
13,949.23$ $14,646.69
3,899.41$ $4,094.38
4,248.11$ $4,375.55
4,715.75$ $4,951.53
650.48$ $682.99
4,945.61$ $5,192.89
6,195.00$ $6,380.85
+5.00%
+3.00%
+5.00%
+5.00%
+5.00%
+3.00%
+3.00%
+5.00%
+5.00%
+5.00%
16-5.
16-9.
16-10.
16-11.
16-13.
15-1.a.
15-1.b.
16-3.
In-Situ Injection Into Existing Well/Treatment Point
Direct Push Boring with In-Situ Injection
Grass - Seed and Mulch
Grass - Sod
Crushed Lime Rock Cover - 2 inch thickness
Asphalt Paving - 2 inch thickness (includes sub-base)
Delivery, Pick Up and Rental of 20 Cubic Yard Roll-
Off Container
Transport and Disposal of Petroleum Product
(includes drum)
Transport and Disposal of Petroleum Contact Water
(includes drum)
Disposal of Petroleum Impacted Soil at a Landfill
(bulk) > 450 tons
Vapor Extraction Pilot Test - 8 hours
Air Sparging or Biosparging Pilot Test - 8 hours
Concrete Paving - additional 1 inch thickness
Concrete Paving - 4 inch thickness (includes sub-base)
Asphalt Paving - additional 1 inch thickness
Trenching and Installation of 11 - 20 Lines
System Installation/Integration/Startup - 1 Technology
Component - 21-30 Recovery/Treatment Points
System Installation/Integration/Startup - 1 Technology
Component - 11-20 Recovery/Treatment Points
System Installation/Integration/Startup - 1 Technology
Component - 1-10 Recovery/Treatment Points
Trenching and Installation of 1-10 Plumbing (and
Electrical) Lines in Trench
Multi-Phase Pilot Test - 8 hours
Air Sparging/Vapor Extraction Pilot Test - Additional
Time
Air Sparging/Vapor Extraction Pilot Test - 8 hours
Air Sparging/Multiphase Extraction Pilot Test - 8 hours
14-1.a.
12-17.
13-1.
13-2.
13-3.
13-4.
13-5.
13-6.
13-7.
15-4.a.
15-4.b.
15-4.c.
12-10.
12-13.
12-15.
14-2.a.
+4.99%
+3.00%
+5.00%
+5.00%
+5.00%
+4.95%
+4.92%
+5.00%
+4.79%
+4.64%
+4.84%
+4.00%
+5.00%
554.77$ $582.49
3,054.58$ $3,207.29
3,576.94$ $3,755.78
4,070.04$ $4,273.54
4,519.06$ $4,745.01
525.00$ $551.25
3,856.32$ $3,972.01
3,117.89$ $3,211.43
4,977.32$ $5,126.64
4,184.75$ $4,393.98
3,661.64$ $3,844.72
4,882.19$ $5,126.29
4,184.75$ $4,393.98
6,277.12$ $6,590.97
5,405.29$ $5,675.55
4,981.07$ $5,230.12
3,729.72$ $3,916.19
6,451.48$ $6,774.05
5,003.30$ $5,253.46
8,072.45$ $8,476.07
6,309.45$ $6,624.92
935.19$ $981.94
1,664.37$ $1,747.58
3,051.36$ $3,203.92
491.34$ $515.89
935.19$ $981.94
+5.00%
+5.00%
+5.00%
18-21.
18-22.
17-1.
17-2.
17-3.
17-4.
17-5.
18-20.
18-13.
18-14.
18-15.
18-17.
18-18.
18-19.
16-14.
Supplemental System O&M Package - Add Thermox or Catox Treatment
System O&M Package - Extra Large
System O&M Package - Large
System O&M Package - Medium
System O&M Package - Small
Air Sparging/Multiphase Extraction Pilot Test -
Additional Time
Groundwater Treatment - Add On - Medium - Long
Term > 6 mos.
Groundwater Treatment - Add On - Small - Long
Term > 6 mos.
Groundwater Treatment - Add On - Large - Short
Term ≤ 6 mos.
Groundwater Treatment - Add On - Medium - Short
Term ≤ 6 mos.
Groundwater Treatment - Add On - Small - Short
Term ≤ 6 mos.
MPE System - Large - Long Term > 6 mos.
MPE System - Large - Short Term ≤ 6 mos.
MPE System - Medium - Long Term > 6 mos.
Air Sparge System - Medium - Short Term ≤ 6 mos.
MPE System - Medium - Short Term ≤ 6 mos.
MPE System - Small - Long Term > 6 mos.
MPE System - Small - Short Term ≤ 6 mos.
AS/SVE System - Large - Long Term > 6 mos.
AS/SVE System - Large - Short Term ≤ 6 mos.
AS/SVE System - Medium - Long Term > 6 mos.
AS/SVE System - Medium - Short Term ≤ 6 mos.
AS/SVE System - Small - Long Term > 6 mos.
AS/SVE System - Small - Short Term ≤ 6 mos.
Air Sparge System - Large - Short Term ≤ 6 mos.
Air Sparge System - Medium - Long Term > 6 mos.
18-29.
18-30.
18-31.
18-32.
18-33.
18-23.
18-24.
18-25.
18-26.
18-27.
18-28.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+3.00%
+3.00%
+3.00%
+5.00%
+5.00%
1,981.37$ $2,080.43
1,239.86$ $1,301.85
346.50$ $356.91
418.39$ $439.29
7,239.45$ $7,456.63
9,593.49$ $9,881.29
10,168.69$ $10,677.12
2,474.66$ $2,598.39
4,715.17$ $4,950.92
2,599.89$ $2,729.88
1,424.07$ $1,495.27
828.42$ $869.84
1,840.34$ $1,932.35
1,151.62$ $1,209.19
1,813.37$ $1,904.03
12,855.46$ $13,498.23
17,991.32$ $18,890.79
2,060.66$ $2,163.69
3,693.34$ $3,877.99
6,550.56$ $6,878.08
9,827.83$ $10,319.22
4,595.49$ $4,825.26
899.74$ $944.72
3,481.94$ $3,656.03
424.47$ $445.69
2,299.87$ $2,414.86
4,077.27$ $4,281.13
1,520.67$ $1,596.69
+5.00%
+5.00%
+5.00%
+5.00%
19-20.
19-21.
19-22.
19-23.
19-17.
19-8.
19-9.
19-10.
19-11.
19-12.
19-13.
19-14.
19-15.
19-16.
18-58.
19-1.
19-3.
19-4.
19-5.
19-7.
19-18.
19-19.
18-54.
18-55.
Remedial Action Startup Report
As-Built Drawings (P.E. Sealed red lined modifications)
Construction Drawings and Specs Report
Carbon Off Gas Treatment - Add On - Medium -
Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Small- Long
Term > 6 mos.
Groundwater Treatment - Add On - Large - Long
Term > 6 mos.
Level 1 Remedial Action Plan
Pilot Test Report
Pilot Test Plan
Natural Attenuation or Post RA Monitoring Report, Annual
Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual
Receptor and Exposure Pathway Report
Supplemental Site Assessment Report
General Site Assessment Report
Soil Source Removal Report
Air Sparge/Multiphase Extraction (AS/MPE) System -
Large - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System -
Medium - Short Term ≤ 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System -
Small - Long Term > 6 Months
Carbon Off Gas Treatment - Add On - Large - Short
Term ≤ 6 mos.
Level 4 Limited Scope Remedial Action Plan or RAP
Modification Plan
Level 3 Limited Scope Remedial Action Plan or RAP
Modification Plan
Level 2 Limited Scope Remedial Action Plan or RAP
Modification Plan
Level 1 Limited Scope Remedial Action Plan or RAP
Modification Plan
Level 2 Remedial Action Plan
Remedial Action General Report
Operation & Maintenance Annual Report
Operation & Maintenance Report, Quarterly or Non-
Annual
Letter/NPDES Report
18-38.
18-34.
18-37.
18-39.
+5.00%
+5.00%
+3.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+3.00%
+3.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
848.96$ $891.39
397.74$ $417.62
165.00$ $173.25
137.81$ $144.69
124.66$ $130.89
117.56$ $123.43
118.72$ $124.65
101.84$ $106.93
84.88$ $89.12
88.99$ $93.43
69.34$ $72.79
58.47$ $61.39
160.00$ $167.99
153.18$ $160.83
156.27$ $164.08
156.27$ $164.08
848.01$ $890.41
1,109.57$ $1,165.04
1,386.95$ $1,456.29
1,386.95$ $1,456.29
1,664.37$ $1,747.58
554.77$ $582.49
+5.00%
+5.00%
+5.00%
+4.99%
+5.00%
+4.99%
+4.99%
+5.00%
+5.00%
+4.99%
+4.98%
+5.00%
19-24.
20-9.
20-10.
21-1.
20-8.
19-26.
20-1.
20-2.
20-3.
20-4.
20-5.
20-6.
20-7.
Professional Geologist (Key)
Professional Engineer (Key)
Administrative
Draftsperson
Field Technician (Key)
P.E. Review and Certification of Sufficiency of
Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with Monitoring and Maintenance Recommendations
Required for a Conditional NFA
P.E. Project Oversight for Remediation System
Integration and Startup - Extra Large System
P.E. Project Oversight for Remediation System
Integration and Startup - Large System
P.E. Project Oversight for Remediation System
Integration and Startup - Medium System
P.E. Project Oversight for Remediation System
Integration and Startup - Small System
P.E. Project Oversight for Remediation Technology
Pilot Testing
P.G. Field Oversight of Well Installation (Use hourly rate on site specific basis)
P.G. Field Oversight of Drilling and Boring and Soil-
Boring Logging (Use hourly rate on site specific basis)
Assistant Scientist/Technical Specialist
Scientist/Technical Specialist (Key)
Hydrogeologist/Modeler (Key)
Geologist/Geoscientist (Key)
Engineer (Key)
Project Manager (Key)
Program Manager (Key)
Well Abandonment/Site Restoration Report
Remedial Action Interim Report
21-6.a.
21-6.b.
21-6.c.
21-6.d.
21-9.
21-2.
21-3.
21-4.
21-5.
+4.99%
+4.99%
+4.99%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
396.25$ $416.06
1,386.95$ $1,456.29
990.68$ $1,040.21
524.83$ $551.07
673.66$ $707.34
416.09$ $436.89
277.35$ $291.21
277.35$ $291.21
277.35$ $291.21
416.08$ $436.88
554.77$ $582.49
1,109.57$ $1,165.04
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
P.E. Review, Evaluation and Certification of a Level
1 Remedial Action Plan
P.E. Review, Evaluation and Certification of a Pilot
Test Report
P.E. Review, Evaluation and Certification of a Pilot
Test Plan
P.G. Review and Certification of Sufficiency of
Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill with Monitoring and Maintenance Recommendations
Required for a Conditional NFA
P.E. Review, Evaluation and Certification of a Non-
Annual Natural Attenuation or Post RA Monitoring
Report That Includes a Recommendation for NFA or a Recommendation to Modify the Approved
Monitoring Plan
P.G. or P.E. Review, Evaluation and Certification of a
Receptor and Exposure Pathway Report
P.G. or Qualified P.E. Review, Evaluation and
Certification of a Supplemental Site Assessment
Report
P.G. or Qualified P.E. Review, Evaluation and
Certification of a General Site Assessment Report
P.G. or P.E. Review, Evaluation and Certification of a
Soil Source Removal Report That Includes a
Recommendation for NFA
P.G. Review, Evaluation and Certification of Plans and Project Oversight for Installation of Engineering
Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill Required for a
Conditional NFA
P.E. Design and Certification of Plans and Project
Oversight of Installation for Engineering Controls
(other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA
P.E. Review, Evaluation and Certification of a Level
2 Remedial Action Plan
21-11.
21-12.
21-13.
21-15.
21-16.
21-17.
21-19.
21-10.
21-21.
21-22.
21-23.
21-24.
+5.00%
+5.00%
+5.00%
416.08$ $436.88
554.77$ $582.49
554.77$ $582.49
554.77$ $582.49
554.77$ $582.49
554.77$ $582.49
554.77$ $582.49
373.80$ $385.01
594.39$ $624.09
453.60$ $467.21
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%21-31.
21-32.
21-33.
21-35.
21-36.
P.E. Review, Evaluation, and Certification of Annual
PARM Report
P.E. Review, Evaluation, and Certification of
Construction Drawings
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
(1)
The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.
(2)
The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.
Notes:
P.G or P.E. Review, Evaluation and Certification of a
Remedial Action General Report
P.E. Review, Evaluation and Certification of an
Annual Operation and Maintenance Report
P.E. Review, Evaluation and Certification of a Non-
Annual Operation and Maintenance Report That
Includes Significant Proposed Changes to the
Approved RAP
P.E. Review, Evaluation and Certification of a
Remedial Action Startup Report That Includes a
Recommendation for System Modification or
Significant Change in the Course of Action
P.E. Review, Evaluation and Certification of a Level
4 Limited Scope Remedial Action Plan or RAP
Modification Plan
P.E. Review, Evaluation and Certification of a Level
3 Limited Scope Remedial Action Plan or RAP
Modification Plan
P.E. Review, Evaluation and Certification of a Level
2 Limited Scope Remedial Action Plan or RAP
Modification Plan
P.E. Review, Evaluation and Certification of a Level
1 Limited Scope Remedial Action Plan or RAP
Modification Plan
21-30.
21-25.
21-26.
21-27.
21-28.
+5.00%
+3.00%
+5.00%
+3.00%
File details come from the government source that posted it. Updated .